Communications-Based Train Control (CBTC) is a railway signalling system that makes use of the telecommunications between the train and track equipment for the traffic management and infrastructure control. By means of the CBTC systems, the exact position of a train is known more accurately than with the traditional signalling systems. This results in a more efficient and safe way to manage the railway traffic.
A CBTC system is a “continuous, automatic train control system utilizing high-resolution train location determination, independent of track circuits; continuous, high-capacity, bidirectional train-to-wayside data communications; and trainborne and wayside processors capable of implementing Automatic Train Protection (ATP) functions, as well as optional Automatic Train Operation (ATO) and Automatic Train Supervision (ATS) functions.”, as defined in the IEEE 1474 standard.[1]
Background and origin
City and population growth increases the need for mass transit transport and signalling systems need to evolve and adapt to safely meet this increase in demand and traffic capacity.[2] As a result of this operators are now focused on maximising train line capacity. The main objective of CBTC is to increase capacity by safely reducing the time interval (headway) between trains travelling along the line.
Traditional legacy signalling systems are historically based in the detection of the trains in discrete sections of the track called ‘blocks’. Each block is protected by signals that prevent a train entering an occupied block. Since every block is fixed by the infrastructure, these systems are referred to as fixed block systems.[3]
Unlike the traditional fixed block systems, in the modern moving block CBTC systems the protected section for each train is not statically defined by the infrastructure (except for the virtual block technology, with operating appearance of a moving block but still constrained by physical blocks). Besides, the trains themselves are continuously communicating their exact position to the equipment in the track by means of a bi-directional radio link.
The advent of digital radio communication technology during the early 90s,[4] encouraged the signalling industry on both sides of the Atlantic to explore using radio communication as a viable means of track to train communication, mainly due to its increased capacity and reduced costs compared to the existing transmission loop-based systems, and this is how CBTC systems started to evolve.[5]
As a result, Bombardier opened the world’s first radio-based CBTC system at San Francisco airport´s Automated People Mover (APM) in February 2003.[6] A few months later, in June 2003,[7] Alstom introduced the railway application of its radio technology on the Singapore North East Line. Previously, CBTC has its former origins in the loop based systems developed by Alcatel SEL (now Thales) for the Bombardier Automated Rapid Transit (ART) systems in Canada during the mid 1980s.[8] These systems, which were also referred to as Transmission-Based Train Control (TBTC), made use of inductive loop transmission techniques for track to train communication, introducing an alternative to track circuit based communication. This technology, operating in the 30-60 KHz frequency range to communicate trains and wayside equipment, was widely adopted by the metro operators in spite of some electromagnetic compatibility (EMC) issues, as well as other installation and maintenance concerns.[9]
As every new application of any technology, some problems arose at the beginning mainly due to compatibility and interoperability aspects.[10][11] However, there have been relevant improvements since then, and currently the reliability of the radio-based communication systems has grown significantly.
Moreover, it is important to highlight that not all the systems using radio communication technology are considered to be CBTC systems. So, for clarity and to keep in line with the state-of-the-art solutions for operator´s requirements,[11] this article only covers the latest moving block principle based (either true moving block or virtual block, so not dependent on track-based detection of the trains)[1] CBTC solutions that make use of the radio communications.
Main features
CBTC and moving block
CBTC systems are modern railway signalling systems that can mainly be used in urban railway lines (either light or heavy) and APMs, although it could also be deployed on commuter lines. For main lines, a similar system might be the European Railway Traffic Management System ERTMS Level 3 (not yet fully defined). In the modern CBTC systems the trains continuously calculate and communicate their status via radio to the wayside equipment distributed along the line. This status includes, among others parameters, the exact position, speed, travel direction and braking distance. This information allows calculation of the area potentially occupied by the train on the track. It also enables the wayside equipment to define the points on the line that must never be passed by the other trains on the same track. These points are communicated to make the trains automatically and continuously adjust their speed while maintaining the safety and comfort (jerk) requirements. So, the trains continuously receive information regarding the distance to the preceding train and are then able to adjust their safety distance accordingly.
From the signalling system perspective, the first figure shows the total occupancy of the leading train by including the whole blocks which the train is located on. This is due to the fact that it is impossible for the system to know exactly where the train actually is within these blocks. Therefore, the fixed block system will only allow the following train to move up to the last unoccupied blocks border.
On the other hand, in a moving block system as shown in the second figure, the train position and its braking curve is continuously calculated by the trains, and then communicated via radio to the wayside equipment. Thus, the wayside equipment is able to establish protected areas called, each one called Limit of Movement Authority (LMA), up to the nearest obstacle (in the figure the tail of the train in front).
It is important to mention that the occupancy calculated in these systems must include a safety margin for location uncertainty (in yellow in the figure) added to the length of the train. Both of them form what is usually called ‘Footprint’. This safety margin depends on the accuracy of the odometry system in the train.
Therefore, the CBTC systems based on moving block allows to reduce the safety distance between two consecutive trains. This distance is varying according to the continuous updates of the train location and speed, maintaining the safety requirements. This results in a reduced headway between consecutive trains and an increased transport capacity.
Levels of automation
Modern CBTC systems allow different levels of automation or Grades of Automation, GoA, as defined and classified in the IEC 62290-1.[12] In fact, CBTC is not a synonym for “driverless” or “automated trains” although it is considered as a basic technology for this purpose.
The grades of automation available range from a manual protected operation, GoA 1 (usually applied as a fallback operation mode) to the fully automated operation, GoA 4 (Unattended Train Operation, UTO). Intermediate operation modes comprise semi-automated GoA 2 (Semi-automated Operation Mode, STO) or driverless GoA 3 (Driverless Train Operation, DTO).[13] The latter operates without a driver in the cabin, but requires an attendant to face degraded modes of operation as well as guide the passengers in the case of emergencies. The higher the GoA, the higher the safety, functionality and performance levels must be.[13]
Main applications
CBTC systems allow optimal use of the railway infrastructure as well as achieving maximum capacity and minimum headway between operating trains, while maintaining the safety requirements. These systems are suitable for the new highly demanding urban lines, but also to be overlaid on existing lines in order to improve their performance.[14]
Of course, in the case of upgrading existing lines the design, installation, test and commissioning stages are much more critical. This is mainly due to the challenge of deploying the overlying system without disrupting the revenue service.[15]
Main benefits
The evolution of the technology and the experience gained in operation over the last 30 years means that modern CBTC systems are more reliable and less prone to failure than older train control systems. CBTC systems normally have less wayside equipment and their diagnostic and monitoring tools have been improved, which makes them easier to implement and, more importantly, easier to maintain.[13]
CBTC technology is evolving, making use of the latest techniques and components to offer more compact systems and simpler architectures. For instance, with the advent of modern electronics it has been possible to build in redundancy so that single failures do not adversely impact operational availability.
Moreover, these systems offer complete flexibility in terms of operational schedules or timetables, enabling urban rail operators to respond to the specific traffic demand more swiftly and efficiently and to solve traffic congestion problems. In fact, automatic operation systems have the potential to significantly reduce the headway and improve the traffic capacity compared to manual driving systems.[16][17]
Finally, it is important to mention that the CBTC systems have proven to be more energy efficient than traditional manually-driven systems.[13] The use of new functionalities, such as automatic driving strategies or a better adaptation of the transport offer to the actual demand, allows significant energy savings reducing the power consumption.
Architecture
The typical architecture of a modern CBTC system comprises the following main subsystems:
- Wayside equipment, which includes the interlocking and the subsystems controlling every zone in the line or network (typically containing the wayside ATP and ATO functionalities). Depending on the suppliers, the architectures may be centralized of distributed. The control of the system is performed from a central command ATS, though local control subsystems may be also included as a fallback.
- CBTC onboard equipment, including ATP and ATO subsystems in the vehicles.
- Train to wayside communication subsystem, currently based on radio links.
Thus, although a CBTC architecture is always depending on the supplier and its technical approach, the following logical components may be found generally in a typical CBTC architecture:
- Onboard ATP system. This subsystem is in charge of the continuous control of the train speed according to the safety profile, and applying the brake if it is necessary. It is also in charge of the communication with the wayside ATP subsystem in order to exchange the information needed for a safe operation (sending speed and braking distance, and receiving the limit of movement authority for a safe operation).
- Onboard ATO system. It is responsible for the automatic control of the traction and braking effort in order to keep the train under the threshold established by the ATP subsystem. Its main task is either to facilitate the driver or attendant functions, or even to operate the train in a fully automatic mode while maintaining the traffic regulation targets and passenger comfort. It also allows the selection of different automatic driving strategies to adapt the runtime or even reduce the power consumption.
- Wayside ATP system. This subsystem undertakes the management of all the communications with the trains in its area. Additionally, it calculates the limits of movement authority that every train must respect while operating in the mentioned area. This task is therefore critical for the operation safety.
- Wayside ATO system. It is in charge of controlling the destination and regulation targets of every train. The wayside ATO functionality provides all the trains in the system with their destination as well as with other data such as the dwell time in the stations. Additionally, it may also perform auxiliary and non-safety related tasks including for instance alarm/event communication and management, or handling skip/hold station commands.
- Communication system.The CBTC systems integrate a digital networked radio system by means of antennas or leaky feeder cable for the bi-directional communication between the track equipment and the trains. The 2,4GHz band is commonly used in these systems (same as WiFi), though other alternative frequencies such as 900MHz (US), 5,8GHz or other licensed bands may be used as well.[18]
- ATS system. The ATS system is commonly integrated within most of the CBTC solutions. Its main task is to act as the interface between the operator and the system, managing the traffic according to the specific regulation criteria. Other tasks may include the event and alarm management as well as acting as the interface with external systems.
- Interlocking system. When needed as an independent subsystem (for instance as a fallback system), it will be in charge of the vital control of the trackside objects such as switches or signals, as well as other related functionality. In the case of simpler networks or lines, the functionality of the interlocking may be integrated into the wayside ATP system.
Main suppliers
Today, the main suppliers of modern CBTC radio-based systems around the world are, in alphabetical order:
Projects
CBTC technology has been (and is being) successfully implemented for a variety of applications as shown in the figure below (mid 2011). They range from some implementations with short track, limited numbers of vehicles and few operating modes (such as the airport APMs in San Francisco or Washington), to complex overlays on existing railway networks carrying more than a million passengers each day and with more than 100 trains (such as lines 1 and 6 in Metro de Madrid, line 3 in Shenzhen Metro, some lines in Paris Metro and Beijing Metro, or the Sub-Surface network SSR in London Underground]).[19]
Despite the difficulty, the table below tries to summarize and reference the main radio-based CBTC systems deployed around the world as well as those ongoing projects being developed. Besides, the table distinguishes between the implementations performed over existing and operative systems (brownfield) and those undertaken on completely new lines (Greenfield).
We must take into account that the transmission technology based on inductive loops (referred to as TBTC in this article) is now being less and less used.[9] That is why, for clarity, all the projects listed here are modern radio-based CBTC systems making use of the moving block concept as described above.
Location | Line/System | Supplier | Solution | Commissioning | Km | No. of trains | Comments |
---|---|---|---|---|---|---|---|
San Francisco Airport | AirTrain APM | CITYFLO 650 | Greenfield, UTO | ||||
Singapore Metro | North-East Line | Urbalis | UTO | ||||
Seattle-Tacoma Airport | Satellite Transit System APM | CITYFLO 650 | Brownfield, UTO | ||||
Las Vegas | Monorail | SelTrac RF | Greenfield, UTO | ||||
Dallas-Fortworth Airport | DFW Skylink APM | CITYFLO 650 | Greenfield, UTO | ||||
Hong Kong Disneyland | Penny´s Bay Line | SelTrac RF | Greenfield, UTO | ||||
Lausanne Metro | M2 | Urbalis | UTO | ||||
Beijing | Airport Express | Urbalis | Greenfield, UTO | ||||
Beijing Metro | 2 | Urbalis | |||||
Metro de Madrid | 1, 6 | CITYFLO 650 | Brownfield, STO | ||||
Las Vegas-McCarran Airport | McCarran Airport APM | CITYFLO 650 | Brownfield, UTO | ||||
London Heathrow Airport | Heathrow APM | CITYFLO 650 | Greenfield, UTO | ||||
Metro de Barcelona | 9 | Trainguard MT CBTC | Greenfield, UTO | ||||
New York City Transit | Canarsie Line | Trainguard MT CBTC | Brownfield, STO | ||||
Washington-Dulles Airport | Dulles APM | SelTrac RF | Greenfield, UTO | ||||
Shanghai Metro | 6, 7, 8, 9 | SelTrac RF | Greenfield and Brownfield | ||||
Taipei Metro | Neihu-Mucha | CITYFLO 650 | Greenfield and Brownfield, UTO | ||||
Philadelphia | SEPTA Light Rail Green Line | CITYFLO 650 | STO | ||||
Beijing Metro | 4 | SelTrac RF | DTO | ||||
Guangzhou Metro | Pearl River Line APM | CITYFLO 650 | Greenfield, DTO | ||||
Guangzhou Metro | 3 | SelTrac RF | DTO | ||||
London Gatwick Airport | Terminal Transfer APM | CITYFLO 650 | Brownfield, UTO | ||||
Paris Metro | 3, 5 | Inside RATP´s Ouragan project |
Brownfield, STO | ||||
Yongin | EverLine ART | CITYFLO 650 | UTO | ||||
Shenzhen Metro | 3 | CITYFLO 650 | STO | ||||
Tianjin Metro | 2, 3 | CITYFLO 650 | STO | ||||
Metro de Madrid | 7 Extension MetroEste | SIRIUS | Brownfield, STO | ||||
Dubai Metro | Red, Green | SelTrac RF | Greenfield, UTO | ||||
Seoul Metro | Bundang Line | SelTrac RF | Greenfield, DTO | ||||
Shenyang Metro | 1 | CBTC | Greenfield, STO | ||||
Sacramento International Airport | Sacramento APM | CITYFLO 650 | Greenfield, UTO | ||||
Singapore Metro | Circle | Urbalis | Greenfield, UTO | ||||
Metro Santiago | 1 | Urbalis | Greenfield and Brownfield, STO | ||||
Sao Paulo Metro | 1, 2, 3 | Urbalis | Brownfield, DTO | ||||
Algiers Metro | 1 | Trainguard MT CBTC | Greenfield, STO | ||||
Paris Metro | 1 | Trainguard MT CBTC | Brownfield, DTO | ||||
Phoenix Sky Harbor Airport | PHX Sky Train | CITYFLO 650 | Greenfield, UTO | ||||
Riyadh | KAFD Monorail | CITYFLO 650 | Greenfield, UTO | ||||
Shanghai Metro | 11 | SelTrac RF | Brownfield and Greenfield | ||||
Sao Paulo Commuter Lines | 8, 9, 11 | SIRIUS | Brownfield, STO | ||||
Sao Paulo Metro | 4 | Trainguard MT CBTC | UTO | ||||
Helsinki Metro | 1 | Trainguard MT CBTC | Greenfield and Brownfield, DTO | ||||
Paris Metro | 13 | SelTrac RF | STO | ||||
Beijing Metro | 8, 10 | Trainguard MT CBTC | STO | ||||
Nanjing Metro | 2, 10 | Trainguard MT CBTC | Greenfield | ||||
Sao Paulo Metro | Tiradentes Monorail Extension Line 2 | CITYFLO 650 | Greenfield, DTO | ||||
Stockholm Metro | Red | CBTC | Brownfield, STO | ||||
Jeddah Airport | King Abdulaziz APM | CITYFLO 650 | Greenfield, UTO | ||||
Incheon Metro | 2 | SelTrac RF | UTO | ||||
Taipei Metro | Circular | CBTC | Greenfield, UTO | ||||
Taichung Metro | Green | Urbalis | Greenfield, UTO | ||||
New York City Transit | Flushing Line | SelTrac RF | Brownfield, STO | ||||
London Underground | SSR Lines: Metropolitan, District, Circle, Hammersmith&City | CITYFLO 650 | Brownfield, STO | ||||
Rennes ART | B | Trainguard MT CBTC | Greenfield, UTO | ||||
Copenhagen Metro | S-Bane | Trainguard MT CBTC | Brownfield, STO | ||||
Budapest Metro | M2, M4 | Trainguard MT CBTC | |||||
Guangzhou Metro | 4, 5 | Trainguard MT CBTC |
Notes and references
Notes
- ^ Only radio-based projects using the moving block principle are shown. Collaboration to update/maintain the map is highly appreciated by the authors, as well as corrections if necessary. Please contact by means of Wikipedia Discussion. The information included here comes from several sources and has been regularly contrasted by means of several media including Wikipedia, insider forums, independent webs and supplier´s corporate sites, so that the authors are not responsible for some errors/mistakes in it and encourage the rest of the editors to collaborate with corrections if these are reliable.
- ^ Only radio-based projects using the moving block principle are shown. Collaboration to update the table is highly appreciated by the authors, as well as corrections if necessary. The information included here comes from several sources and has been regularly contrasted by means of several media including Wikipedia, insider forums, independent webs and supplier´s corporate sites, so that the authors are not responsible for some errors/mistakes in it and encourage the rest of the editors to collaborate with corrections if these are reliable.
- ^ Some of the references come from Mr. Dominique Joubert and other CBTC Meeting Point group members in LinkedIn. Thanks a lot to them, and further collaboration is appreciated.
References
- ^ a b IEEE Standard for CBTC Performance and Functional Requirements (1474.1-1999).[1] IEEE Rail Transit Vehicle Interface Standards Committee of the IEEE Vehicular Technology Society, 1999. Accessed January 2011.
- ^ Public transport impact.[2]. Wikipedia. Retrieved June 2011.
- ^ Railway signalling, history of block signalling. [3] Wikipedia. Retrieved June 2011.
- ^ Radio Communications. 20th century.[4]. Wikipedia. Retrieved August 2011.
- ^ Digital radio shows great potential for Rail[5] Bruno Gillaumin, International Railway Journal, May 2001. Retrieved by findarticles.com in June 2011.
- ^ San Francisco Airpor AirTrain. [6]. Wikipedia. Retrieved June 2011.
- ^ History of the NEL. [7] Wikipedia. Retrieved June 2011.
- ^ Design of the Vancouver SkyTrain [8] Wikipedia. Retrieved June 2011.
- ^ a b Communications in the SelTrac CBTC system[9] Wikipedia. Retrieved June 2011.
- ^ CBTC Projects. [10] www.tsd.org/cbtc/projects, 2005. Accessed June 2011.
- ^ a b CBTC radios: What to do? Which way to go? [11] Tom Sullivan, 2005. www.tsd.org. Accessed May 2011.
- ^ IEC 62290-1, Railway applications - Urban guided transport management and command/control systems - Part 1: System principles and fundamental concepts.[12] IEC, 2006. Accessed June 2011
- ^ a b c d Semi-automatic, driverless, and unattended operation of trains .[13] IRSE-ITC, 2010. Accessed through www.irse-itc.net in June 2011
- ^ CITYFLO 650 Metro de Madrid, Solving the capacity challenge.[14] Bombardier Transportation Rail Control Solutions, 2010. Accessed June 2011
- ^ Madrid´s silent revolution.[15] in International Railway Journal, Keith Barrow, 2010. Accessed through goliath.ecnext.com in June 2011
- ^ CBTC: más trenes en hora punta.[16] Comunidad de Madrid, www.madrig.org, 2010. Accessed June 2011
- ^ How CBTC can Increase capacity - communications-based train control. [17] William J. Moore, Railway Age, 2001. Accessed through findarticles.com in June 2011
- ^ Spread Spectrum.[18] Wikipedia. Accessed June 2011
- ^ Bombardier to Deliver Major London Underground Signalling.[19] Press release, Bombardier Transportation Media Center, 2011. Accessed June 2011
- ^ Aliorations techniques, Ligne 13 du Metro de Paris.[20] Wikipedia. Accessed June 2011
General comments from editors
Trans-Gabon Railway for Hughes satellite based train control system. Singapore's two MRT lines, North East Line and Circle Line are completely CBTC based. The Budapest Underground lines 2 and 4 will be fitted with CBTC system.
External links
- http://www.alstom.com
- http://www.ansaldo-sts.com
- http://www.bombardier.com
- http://www.invensys.com
- http://www.siemens.com
- http://www.thalesgroup.com
- http://www.ieee.org
- http://www.railjournal.com
- http://www.tsd.org
- http://www.iec.ch
- http://www.irse-itc.net
- http://www.madrid.org
- http://www.railwayage.com
- http://www.ieee.org
- http://www.bombardier.com/en/transportation/products-services/rail-control-solutions?docID=0901260d8000a67e
- http://www.linkedin.com/
- http://www.linkedin.com/groups?gid=2692452&trk=hb_side_g