Jump to content

Parli Thermal Power Station

Coordinates: 18°52′08″N 76°31′34″E / 18.868768°N 76.526127°E / 18.868768; 76.526127
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by InfoboxBot (talk | contribs) at 04:22, 19 June 2018 (Automated edit: fixing infobox parameter "country" (violation of MOS:OVERLINK)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Parali Thermal Power Station
Map
Location within Maharashtra
CountryIndia
LocationParali, Beed, Maharashtra
Coordinates18°52′08″N 76°31′34″E / 18.868768°N 76.526127°E / 18.868768; 76.526127
StatusOperational
Commission date1971
Operator(s)Maharashtra State Power Generation Company (Mahagenco)
Thermal power station
Primary fuelCoal
Power generation
Units operational6
Nameplate capacity1380.00 MW

Source: mahagenco.in

Parali Thermal Power Plant is located at Parali Vaijnath in Beed district of Maharashtra. The power plant is one of the coal based power plants of Maharashtra State Power Generation Company (Mahagenco).[1]

Installed Capacity

Stage Unit Number Installed Capacity (MW) Date of Commissioning Status
Stage I 1 30 1970 August Abandoned
Stage I 2 30 1971 March Abandoned.
Stage II 3 210 1979 April Abandoned.
Stage II 4 210 1980 July Running.
Stage II 5 210 1981 January Running.
Stage III 6 250 2007 Running.
Stage III 7 250 2010 Running.
Stage III 8 250 2016 Running.[2]

References

  1. ^ "Coal scarcity hits Maharashtra power stations". dna. Retrieved 20 April 2015.
  2. ^ http://money.livemint.com/news/market/equity/movers-today/bhel-spurts-on-commissioning-250-mw-thermal-power-plant-in-maharashtra--455059.aspx