Mojave Solar Project: Difference between revisions

Coordinates: 35°00′40″N 117°19′30″W / 35.0111°N 117.325°W / 35.0111; -117.325
From Wikipedia, the free encyclopedia
Content deleted Content added
→‎Production: already wiki-linked
Rescuing 1 sources. #IABot
Line 44: Line 44:
| extra =
| extra =
}}
}}
The '''Mojave Solar Project''' (MSP) is a [[concentrated solar power]] (CSP) facility in the [[Mojave Desert]] in [[California]], about {{convert|20|mi}} northwest of [[Barstow, California|Barstow]]. Surrounding the hamlet of Lockhart, Mojave Solar is adjacent to [[Harper Lake]] and the [[Solar Energy Generating Systems|SEGS VIII–IX]] solar plant. The site was originally reserved for the planned, never built, SEGS IX and XII. For 15 years following its construction in 1990, this was the largest commercial solar power plant in the world, generating around 160 megawatts at its peak. It is one of three separately owned sites within 40 miles of one another, that make up the nine solar fields in the Solar Electric Generating System (SEGS #1 and 2 are at Daggett, and #3 through 7 are at Kramer Junction). Harper Lake was the last of these built, and is designated as SEGS #8 and 9. It is still online, but has been surpassed by other newer facilities, including the Mojave Solar Project.<ref>http://clui.org/project-page/13338/13344</ref> '''MSP''', with a combined [[nameplate capacity]] of 280&nbsp;[[megawatt|MW]] (net 250&nbsp;MW), is made of two, independently-operable, solar fields. The power plant cost an estimated $1.6&nbsp;billion in total and entered commercial operation in December 2014.<ref>csp-world.com [http://www.csp-world.com/news/20141202/001546/abengoas-mojave-250-mw-csp-plant-enters-commercial-operation Abengoa's Mojave 250 MW CSP plant enters commercial operation], 2 December 2014</ref> The developer, [[Abengoa Solar|Abengoa]], has successfully secured a $1.2&nbsp;billion loan guarantee from the US government for the project.<ref name=aben>{{cite web |url=http://www.energyefficiencynews.com/i/4480/ |title=US government backs Abengoa’s solar project with $1.2 billion loan guarantee |author= |date=19 September 2011 |work=Energy Efficiency News }}</ref><ref>{{cite web
The '''Mojave Solar Project''' (MSP) is a [[concentrated solar power]] (CSP) facility in the [[Mojave Desert]] in [[California]], about {{convert|20|mi}} northwest of [[Barstow, California|Barstow]]. Surrounding the hamlet of Lockhart, Mojave Solar is adjacent to [[Harper Lake]] and the [[Solar Energy Generating Systems|SEGS VIII–IX]] solar plant. The site was originally reserved for the planned, never built, SEGS IX and XII. For 15 years following its construction in 1990, this was the largest commercial solar power plant in the world, generating around 160 megawatts at its peak. It is one of three separately owned sites within 40 miles of one another, that make up the nine solar fields in the Solar Electric Generating System (SEGS #1 and 2 are at Daggett, and #3 through 7 are at Kramer Junction). Harper Lake was the last of these built, and is designated as SEGS #8 and 9. It is still online, but has been surpassed by other newer facilities, including the Mojave Solar Project.<ref>http://clui.org/project-page/13338/13344</ref> '''MSP''', with a combined [[nameplate capacity]] of 280&nbsp;[[megawatt|MW]] (net 250&nbsp;MW), is made of two, independently-operable, solar fields. The power plant cost an estimated $1.6&nbsp;billion in total and entered commercial operation in December 2014.<ref>csp-world.com [http://www.csp-world.com/news/20141202/001546/abengoas-mojave-250-mw-csp-plant-enters-commercial-operation Abengoa's Mojave 250 MW CSP plant enters commercial operation], 2 December 2014</ref> The developer, [[Abengoa Solar|Abengoa]], has successfully secured a $1.2&nbsp;billion loan guarantee from the US government for the project.<ref name=aben>{{cite web |url=http://www.energyefficiencynews.com/i/4480/ |title=US government backs Abengoa’s solar project with $1.2 billion loan guarantee |author= |date=19 September 2011 |work=Energy Efficiency News }}</ref><ref>{{cite web|url=https://lpo.energy.gov/?projects=abengoa-solar-inc-mojave-solar |title=Abengoa Solar, Inc. (Mojave Solar) |date= |year= |month= |work=Loan Guarantee Program |publisher=DOE |accessdate=February 7, 2012 |deadurl=yes |archiveurl=https://web.archive.org/20120127091257/https://lpo.energy.gov/?projects=abengoa-solar-inc-mojave-solar |archivedate=January 27, 2012 }}</ref><ref>Abengoa Solar [http://www.abengoasolar.com/web/en/nuestras_plantas/plantas_en_construccion/estados_unidos/#seccion_1 Abengoa Solar - The Mojave Solar Project]</ref>
|url= https://lpo.energy.gov/?projects=abengoa-solar-inc-mojave-solar
|title= Abengoa Solar, Inc. (Mojave Solar)
|date= |year= |month= |work= Loan Guarantee Program |publisher= DOE
|accessdate= February 7, 2012
}}{{dead link|date=September 2014}}</ref><ref>Abengoa Solar [http://www.abengoasolar.com/web/en/nuestras_plantas/plantas_en_construccion/estados_unidos/#seccion_1 Abengoa Solar - The Mojave Solar Project]</ref>
The plant is expected to generate 617,000&nbsp;[[Megawatt hour|MWh]] of power annually, enough power for more than 88,000 households and to prevent the [[CO2 emission|emission]] of over 430 kilotons of [[Carbon dioxide|CO<sub>2</sub>]] a year.<ref>{{cite web|title=Loans - Award Summay: Mojave Solar LLC|url=http://www.recovery.gov/Transparency/RecoveryData/pages/recipientprojectsummary508.aspx?awardidsur=128169&awardtype=Loans|publisher=U.S. Government|accessdate=26 August 2013}}</ref> Pacific Gas & Electric has agreed to a 25-year [[power purchase agreement]].<ref>{{cite web
The plant is expected to generate 617,000&nbsp;[[Megawatt hour|MWh]] of power annually, enough power for more than 88,000 households and to prevent the [[CO2 emission|emission]] of over 430 kilotons of [[Carbon dioxide|CO<sub>2</sub>]] a year.<ref>{{cite web|title=Loans - Award Summay: Mojave Solar LLC|url=http://www.recovery.gov/Transparency/RecoveryData/pages/recipientprojectsummary508.aspx?awardidsur=128169&awardtype=Loans|publisher=U.S. Government|accessdate=26 August 2013}}</ref> Pacific Gas & Electric has agreed to a 25-year [[power purchase agreement]].<ref>{{cite web
|url= http://www.pge.com/nots/rates/tariffs/tm2/pdf/ELEC_3876-E.pdf
|url= http://www.pge.com/nots/rates/tariffs/tm2/pdf/ELEC_3876-E.pdf

Revision as of 07:07, 26 February 2016

Mojave Solar Project
Map
CountryUnited States
LocationMojave Desert, California
Coordinates35°00′40″N 117°19′30″W / 35.0111°N 117.325°W / 35.0111; -117.325
StatusOperational
Construction beganSeptember 2011
Commission dateDecember 1, 2014
Solar farm
TypeCSP
CSP technologyParabolic trough
Power generation
Nameplate capacity280 MW
Capacity factor28%
Annual net output617 GW·h
External links
CommonsRelated media on Commons

The Mojave Solar Project (MSP) is a concentrated solar power (CSP) facility in the Mojave Desert in California, about 20 miles (32 km) northwest of Barstow. Surrounding the hamlet of Lockhart, Mojave Solar is adjacent to Harper Lake and the SEGS VIII–IX solar plant. The site was originally reserved for the planned, never built, SEGS IX and XII. For 15 years following its construction in 1990, this was the largest commercial solar power plant in the world, generating around 160 megawatts at its peak. It is one of three separately owned sites within 40 miles of one another, that make up the nine solar fields in the Solar Electric Generating System (SEGS #1 and 2 are at Daggett, and #3 through 7 are at Kramer Junction). Harper Lake was the last of these built, and is designated as SEGS #8 and 9. It is still online, but has been surpassed by other newer facilities, including the Mojave Solar Project.[1] MSP, with a combined nameplate capacity of 280 MW (net 250 MW), is made of two, independently-operable, solar fields. The power plant cost an estimated $1.6 billion in total and entered commercial operation in December 2014.[2] The developer, Abengoa, has successfully secured a $1.2 billion loan guarantee from the US government for the project.[3][4][5] The plant is expected to generate 617,000 MWh of power annually, enough power for more than 88,000 households and to prevent the emission of over 430 kilotons of CO2 a year.[6] Pacific Gas & Electric has agreed to a 25-year power purchase agreement.[7]

The plant was commissioned on 1st December, 2014.[8]

Technology

The array of parabolic troughs at the Mojave Solar Project site in their stow position.

Using the desert's solar thermal energy, the facility generates steam in solar steam generators, which expands through a steam turbine generator to produce electrical power from twin, independently operable solar fields, each feeding a 125 MW power island. Generation is provided 100% from sun, no supplement from fossil-based energy sources. There is a gas-fired auxiliary boiler, for each field, only to provide equipment and heat-transfer fluid (HTF) freeze protection, when temperatures fall below 54 °F (12 °C).

The details of the parabolic trough used in the project.

The power cycle is a Rankine-with-reheat thermodynamic cycle from heat supplied via heat-transfer fluid, solar field heated up to 740 °F (393 °C). When operating, the transfer fluid enters the solar field at about 520 °F (271 °C). The steam generator steam exit temperature is about 720 °F (382 °C).

Each field utilizes 1128 solar collector arrays (SCA) sited on about 710 acres (290 ha). Each SCA, model E2 from Abengoa (derived from Luz's LS-3), is 125 metres (410 ft) long and is made of 10 solar collector elements (SCE), 12 metres (39 ft) long each and 5.76 metres (18.9 ft) aperture. The E2 steel frame collector with monolithic glass reflector panels, yields a total aperture area of 691.2 square metres (7,440 sq ft). That makes a total of 779,674 square metres (8,392,340 sq ft) aperture each solar field, 1,559,347 square metres (16,784,670 sq ft) total for the plant, operating about 3,024 hours per year.

Cooling is provided by wet cooling towers; water for the towers and solar collector washing, is supplied from onsite groundwater wells. Water from condensed steam exits the cooling tower pump at about 80 °F (27 °C), before cycling back to the steam generator.

Production

Mojave Solar Project production is as follows (values in GW·h).[9]

Year GW·h
2015 488.3 (first 11 months)

See also

References

  1. ^ http://clui.org/project-page/13338/13344
  2. ^ csp-world.com Abengoa's Mojave 250 MW CSP plant enters commercial operation, 2 December 2014
  3. ^ "US government backs Abengoa's solar project with $1.2 billion loan guarantee". Energy Efficiency News. 19 September 2011.
  4. ^ "Abengoa Solar, Inc. (Mojave Solar)". Loan Guarantee Program. DOE. Archived from the original on January 27, 2012. Retrieved February 7, 2012. {{cite web}}: Cite has empty unknown parameter: |month= (help); Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  5. ^ Abengoa Solar Abengoa Solar - The Mojave Solar Project
  6. ^ "Loans - Award Summay: Mojave Solar LLC". U.S. Government. Retrieved 26 August 2013.
  7. ^ "Advice Letters 3876-E and 3876-E-A" (PDF). California Public Utilities Commission. January 11, 2012. Retrieved February 7, 2012.
  8. ^ "Abengoa puts 250 MW CSP array online in California". Industry Dive. Retrieved June 28, 2015.
  9. ^ Energy Information Administration. "Mojave Solar Project, Annual". Electricity Data Browser. Retrieved February 8, 2016.