Ashton Gate railway station: Difference between revisions
Added gridref Tags: Mobile edit Mobile web edit |
Rescuing 2 sources and tagging 0 as dead. #IABot (v1.4) |
||
Line 43: | Line 43: | ||
'''Ashton Gate railway station''' was a [[railway station]] serving the [[Ashton Gate, Bristol|Ashton Gate]] area of [[Bristol]], [[England]], which included [[Ashton Gate Stadium|Ashton Gate football ground]], the home ground of [[Bristol City F.C.]]. It was located on the [[Portishead Railway]]. |
'''Ashton Gate railway station''' was a [[railway station]] serving the [[Ashton Gate, Bristol|Ashton Gate]] area of [[Bristol]], [[England]], which included [[Ashton Gate Stadium|Ashton Gate football ground]], the home ground of [[Bristol City F.C.]]. It was located on the [[Portishead Railway]]. |
||
Recent proposals have been made for the station to reopen as part of the [[MetroWest (Bristol)|MetroWest]] project to improve rail transport in the Greater Bristol area.<ref>{{cite web|url=http://travelwest.info/wp-content/uploads/2015/03/west-of-england-rail-studies-report-april-2014.pdf |title=West of England Area Rail Studies Final Report|publisher=JTEC - West of England Partnership|accessdate=8 March 2016}}</ref> |
Recent proposals have been made for the station to reopen as part of the [[MetroWest (Bristol)|MetroWest]] project to improve rail transport in the Greater Bristol area.<ref>{{cite web|url=http://travelwest.info/wp-content/uploads/2015/03/west-of-england-rail-studies-report-april-2014.pdf |title=West of England Area Rail Studies Final Report |publisher=JTEC - West of England Partnership |accessdate=8 March 2016 |deadurl=yes |archiveurl=https://web.archive.org/web/20160311170952/http://travelwest.info/wp-content/uploads/2015/03/west-of-england-rail-studies-report-april-2014.pdf |archivedate=11 March 2016 }}</ref> |
||
==History== |
==History== |
||
Line 69: | Line 69: | ||
==Future== |
==Future== |
||
The Portishead Branch Line is to be reopened as part of the [[MetroWest (Bristol)|MetroWest]] scheme, a rail transport plan which aims to enhance transport capacity in the Bristol area.<ref>{{cite web |url= http://www.westofengland.org/media/98508/item%2004%20greater%20bristol%20metro%2013%20march%202009.pdf |title=Item 04: Greater Bristol Metro |first=James |last=White |publisher= West of England Partnership |date=13 March 2009 |accessdate=28 December 2011}}</ref><ref>{{cite news |url= http://www.thisisbristol.co.uk/Campaign-trains-Bristol-Temple-Meads-half-hour/story-14446079-detail/story.html |title=Campaign for trains from Bristol Temple Meads every half hour |work=This is Bristol |publisher=[[Northcliffe Media]] |date=17 January 2012 |accessdate=19 January 2012}}</ref><ref name="metro">{{cite news|author=Ribbeck, Michael|publisher=[[Northcliffe Media]]|work=[[The Post, Bristol]]|date=6 July 2012|accessdate=6 July 2012|title=£100 million Bristol Metro train network by 2016|url=http://www.thisisbristol.co.uk/100-million-Bristol-Metro-train-network-2016/story-16492523-detail/story.html}}</ref> The scheme was given the go-ahead in July 2012 as part of the [[City Deal]], whereby local councils would be given greater control over money by the government.<ref name="metro"/> A consultation on the plans was held between 22 June and 3 August 2015 to gather views from the community and stakeholders before moving on to detailed designs. The detailed proposals will be subject to a second consultation before the plans are finalised. Due to the additional [[capital cost]]s, the line will not be electrified, however the design will include passive provision for future electrification. The line through Ashton Gate would be increased to double track.<ref name="metrowestp1consult">{{cite web|url=http://travelwest.info/wp-content/uploads/2015/06/consultation-leaflet-june-august-2015.pdf|title=Consultation on re-opening the Portishead branch line as part of MetroWest Phase 1|date=June 2015|publisher=[[MetroWest (Bristol)|TravelWest]]|work=[[MetroWest (Bristol)|MetroWest]]}}</ref> [[Network Rail]] stated that it was not feasible to reopen Ashton Gate during the initial stage of the project, but that the scheme will be future-proofed to allow the construction of a station at a later date.<ref>{{cite news|url=http://www.railtechnologymagazine.com/Rail-News/new-ashton-gate-station-delayed-as-part-of-60m-metrowest-project|date=16 December 2014|accessdate=19 December 2014|work=Rail Technology Magazine|publisher=[[Cognitive Publishing]]|title=New Ashton Gate station delayed as part of £60m MetroWest project}}</ref> |
The Portishead Branch Line is to be reopened as part of the [[MetroWest (Bristol)|MetroWest]] scheme, a rail transport plan which aims to enhance transport capacity in the Bristol area.<ref>{{cite web |url= http://www.westofengland.org/media/98508/item%2004%20greater%20bristol%20metro%2013%20march%202009.pdf |title=Item 04: Greater Bristol Metro |first=James |last=White |publisher= West of England Partnership |date=13 March 2009 |accessdate=28 December 2011}}</ref><ref>{{cite news |url= http://www.thisisbristol.co.uk/Campaign-trains-Bristol-Temple-Meads-half-hour/story-14446079-detail/story.html |title=Campaign for trains from Bristol Temple Meads every half hour |work=This is Bristol |publisher=[[Northcliffe Media]] |date=17 January 2012 |accessdate=19 January 2012}}</ref><ref name="metro">{{cite news|author=Ribbeck, Michael|publisher=[[Northcliffe Media]]|work=[[The Post, Bristol]]|date=6 July 2012|accessdate=6 July 2012|title=£100 million Bristol Metro train network by 2016|url=http://www.thisisbristol.co.uk/100-million-Bristol-Metro-train-network-2016/story-16492523-detail/story.html}}</ref> The scheme was given the go-ahead in July 2012 as part of the [[City Deal]], whereby local councils would be given greater control over money by the government.<ref name="metro"/> A consultation on the plans was held between 22 June and 3 August 2015 to gather views from the community and stakeholders before moving on to detailed designs. The detailed proposals will be subject to a second consultation before the plans are finalised. Due to the additional [[capital cost]]s, the line will not be electrified, however the design will include passive provision for future electrification. The line through Ashton Gate would be increased to double track.<ref name="metrowestp1consult">{{cite web|url=http://travelwest.info/wp-content/uploads/2015/06/consultation-leaflet-june-august-2015.pdf |title=Consultation on re-opening the Portishead branch line as part of MetroWest Phase 1 |date=June 2015 |publisher=[[MetroWest (Bristol)|TravelWest]] |work=[[MetroWest (Bristol)|MetroWest]] |deadurl=yes |archiveurl=https://web.archive.org/web/20151119172320/http://travelwest.info/wp-content/uploads/2015/06/consultation-leaflet-june-august-2015.pdf |archivedate=2015-11-19 }}</ref> [[Network Rail]] stated that it was not feasible to reopen Ashton Gate during the initial stage of the project, but that the scheme will be future-proofed to allow the construction of a station at a later date.<ref>{{cite news|url=http://www.railtechnologymagazine.com/Rail-News/new-ashton-gate-station-delayed-as-part-of-60m-metrowest-project|date=16 December 2014|accessdate=19 December 2014|work=Rail Technology Magazine|publisher=[[Cognitive Publishing]]|title=New Ashton Gate station delayed as part of £60m MetroWest project}}</ref> |
||
Trains along the reopened line will operate between Portishead and {{rws|Bristol Temple Meads}}, with two trains per hour in each direction. Services would call at Pill and {{rws|Parson Street}}, with aspirations to also call at {{rws|Bedminster}} and Ashton Gate. Trains could also be extended on to the [[Severn Beach Line]]. The trains used will be [[diesel multiple units]], likely three carriages long. The line will be operated as part of the [[Greater Western franchise|Greater Western passenger franchise]]. [[Great Western Railway (train operating company)|Great Western Railway]], a subsidiary of [[FirstGroup]], currently operate the Greater Western franchise, however their contract expires in early 2019, before services to Portishead are due to start.<ref name="metrowestp1consult"/>{{#tag:ref|{{cite news|url=http://www.bbc.co.uk/news/uk-29565156|title=First Great Western offered new franchise deal|date=10 October 2014|accessdate=10 October 2014|work=[[BBC News]]|publisher=[[British Broadcasting Corporation|BBC]]}}{{#tag:ref|Note that these references refer to First Great Western, which was rebranded as [[Great Western Railway (train operating company)|Great Western Railway]] in 2015.<ref name="fgwgwr">{{cite news|url=http://railnews.co.uk/news/2015/09/21-the-great-western-railway-is.html|title=The Great Western Railway is back in business|date=21 September 2015|accessdate=21 September 2015|work=[[Railnews]]}}</ref>|group="refnote"|name="gwrnote"}}}}{{#tag:ref|{{cite news|url=http://www.railnews.co.uk/news/2014/10/10-updated-franchise-schedule-signals-gw.html|title=Updated franchise schedule signals GW extension|date=10 October 2014|accessdate=10 October 2014|work=[[Railnews]]}}<ref name="gwrnote" group="refnote"/>}} In May 2016, it was reported that [[Bristol City Council]] did not consider there was a business case for the station's reopening due to its low predicted annual patronage of 67,000 excluding Bristol City matches.<ref>{{cite magazine|title=Regional News|first1=Howard|last1=Johnson|magazine=[[RAIL (magazine)|RAIL]]|issue=799|date=27 April – 10 May 2016|page=24}}</ref> |
Trains along the reopened line will operate between Portishead and {{rws|Bristol Temple Meads}}, with two trains per hour in each direction. Services would call at Pill and {{rws|Parson Street}}, with aspirations to also call at {{rws|Bedminster}} and Ashton Gate. Trains could also be extended on to the [[Severn Beach Line]]. The trains used will be [[diesel multiple units]], likely three carriages long. The line will be operated as part of the [[Greater Western franchise|Greater Western passenger franchise]]. [[Great Western Railway (train operating company)|Great Western Railway]], a subsidiary of [[FirstGroup]], currently operate the Greater Western franchise, however their contract expires in early 2019, before services to Portishead are due to start.<ref name="metrowestp1consult"/>{{#tag:ref|{{cite news|url=http://www.bbc.co.uk/news/uk-29565156|title=First Great Western offered new franchise deal|date=10 October 2014|accessdate=10 October 2014|work=[[BBC News]]|publisher=[[British Broadcasting Corporation|BBC]]}}{{#tag:ref|Note that these references refer to First Great Western, which was rebranded as [[Great Western Railway (train operating company)|Great Western Railway]] in 2015.<ref name="fgwgwr">{{cite news|url=http://railnews.co.uk/news/2015/09/21-the-great-western-railway-is.html|title=The Great Western Railway is back in business|date=21 September 2015|accessdate=21 September 2015|work=[[Railnews]]}}</ref>|group="refnote"|name="gwrnote"}}}}{{#tag:ref|{{cite news|url=http://www.railnews.co.uk/news/2014/10/10-updated-franchise-schedule-signals-gw.html|title=Updated franchise schedule signals GW extension|date=10 October 2014|accessdate=10 October 2014|work=[[Railnews]]}}<ref name="gwrnote" group="refnote"/>}} In May 2016, it was reported that [[Bristol City Council]] did not consider there was a business case for the station's reopening due to its low predicted annual patronage of 67,000 excluding Bristol City matches.<ref>{{cite magazine|title=Regional News|first1=Howard|last1=Johnson|magazine=[[RAIL (magazine)|RAIL]]|issue=799|date=27 April – 10 May 2016|page=24}}</ref> |
Revision as of 13:41, 10 July 2017
Ashton Gate | |
---|---|
General information | |
Location | City of Bristol |
Platforms | 2 |
History | |
Original company | Great Western Railway |
Pre-grouping | Great Western Railway |
Post-grouping | Great Western Railway |
Key dates | |
15 September 1906 | Station partly opens as Ashton Gate Platform |
1 October 1910 | Station fully opens |
1917 | Station closed |
23 May 1926 | Station reopens |
August 1928 | Station renamed Ashton Gate |
29 October 1962 | Station renamed Ashton Gate Halt |
7 September 1964 | Station closed |
29 September 1970 | Station reopens |
by 1984 | Station closed |
51°26′30″N 2°37′32″W / 51.441598°N 2.625482°W
Ashton Gate railway station was a railway station serving the Ashton Gate area of Bristol, England, which included Ashton Gate football ground, the home ground of Bristol City F.C.. It was located on the Portishead Railway.
Recent proposals have been made for the station to reopen as part of the MetroWest project to improve rail transport in the Greater Bristol area.[1]
History
The railway through Ashton Gate was opened on 18 April 1867 by the Bristol and Portishead Pier and Railway Company, when services began on their line from the Bristol and Exeter Railway at Portishead Junction[note 1] to a pier on the Severn Estuary at Portishead. The line was built as 7 ft (2,134 mm) broad-gauge, and was largely single track.[2][3] The line was relaid as 4 ft 8+1⁄2 in (1,435 mm) standard gauge between 24 and 27 January 1880, and in 1883 the line was double-tracked.[3]
Ashton Gate station was built after local football team Bristol City were promoted to the Football League First Division, then the top tier of English football. The station was opened to serve their home ground, Ashton Gate Stadium, which was situated nearby. The station opened for supporters on 15 September 1906, and to the general public on 1 October that year.[3] In 1914 it was temporarily renamed "Exhibition Station" for the Bristol International Exhibition.
The station was 8 miles 75 chains (14.4 km) from the line's terminus at Portishead,[note 2] 2 miles 79 chains (4.8 km) from Bristol Temple Meads and 121 miles 30 chains (195.3 km) from the Great Western Railway's terminus at London Paddington.[4][5][note 3]
The station closed due to economies during the First World War. It then passed on to the Western Region of British Railways on nationalisation in 1948. It was then closed by the British Railways Board in 1964, then briefly reopened for traffic to the football ground until 1977, and temporarily re-opened in May 1984 to serve Mission England, a series of evangelical rallies by Billy Graham at the football ground.[6]
Preceding station | Historical railways | Following station | ||
---|---|---|---|---|
Parson Street | Great Western Railway Portishead Railway |
Clifton Bridge Line open, Station closed |
Future
The Portishead Branch Line is to be reopened as part of the MetroWest scheme, a rail transport plan which aims to enhance transport capacity in the Bristol area.[7][8][9] The scheme was given the go-ahead in July 2012 as part of the City Deal, whereby local councils would be given greater control over money by the government.[9] A consultation on the plans was held between 22 June and 3 August 2015 to gather views from the community and stakeholders before moving on to detailed designs. The detailed proposals will be subject to a second consultation before the plans are finalised. Due to the additional capital costs, the line will not be electrified, however the design will include passive provision for future electrification. The line through Ashton Gate would be increased to double track.[10] Network Rail stated that it was not feasible to reopen Ashton Gate during the initial stage of the project, but that the scheme will be future-proofed to allow the construction of a station at a later date.[11]
Trains along the reopened line will operate between Portishead and Bristol Temple Meads, with two trains per hour in each direction. Services would call at Pill and Parson Street, with aspirations to also call at Bedminster and Ashton Gate. Trains could also be extended on to the Severn Beach Line. The trains used will be diesel multiple units, likely three carriages long. The line will be operated as part of the Greater Western passenger franchise. Great Western Railway, a subsidiary of FirstGroup, currently operate the Greater Western franchise, however their contract expires in early 2019, before services to Portishead are due to start.[10][13][14] In May 2016, it was reported that Bristol City Council did not consider there was a business case for the station's reopening due to its low predicted annual patronage of 67,000 excluding Bristol City matches.[15]
Notes
- ^ The junction between the Bristol to Exeter Line and Portishead Railway was known as Portishead Junction until 1932, after which it was known as Parson Street Junction.[2]
- ^ The location of the terminal pier is an estimate.[4]
- ^ Railways in the United Kingdom are, for historical reasons, measured in miles and chains. There are 80 chains to the mile.
References
- ^ "West of England Area Rail Studies Final Report" (PDF). JTEC - West of England Partnership. Archived from the original (PDF) on 11 March 2016. Retrieved 8 March 2016.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ a b Maggs, Colin G (1990). Bristol Railway Panorama. Bath: Millstream Books. pp. 109–119. ISBN 0-948975-22-9.
- ^ a b c Oakley, Mike (2006). Bristol Railway Stations 1840–2005. Bristol: Redcliffe. pp. 35–37. ISBN 1-904537-54-5.
- ^ a b Deaves, Phil. "Engineers' Line References: POD Portishead Branch". Retrieved 13 October 2015.
- ^ Deaves, Phil. "Engineers' Line References: MLN1 Paddington to North Road Junction". Retrieved 13 October 2015.
- ^ "Ashton Gate - Bristol Railway Archive". bristol-rail.co.uk. Retrieved 2009-01-23.
- ^ White, James (13 March 2009). "Item 04: Greater Bristol Metro" (PDF). West of England Partnership. Retrieved 28 December 2011.
- ^ "Campaign for trains from Bristol Temple Meads every half hour". This is Bristol. Northcliffe Media. 17 January 2012. Retrieved 19 January 2012.
- ^ a b Ribbeck, Michael (6 July 2012). "£100 million Bristol Metro train network by 2016". The Post, Bristol. Northcliffe Media. Retrieved 6 July 2012.
- ^ a b "Consultation on re-opening the Portishead branch line as part of MetroWest Phase 1" (PDF). MetroWest. TravelWest. June 2015. Archived from the original (PDF) on 2015-11-19.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ "New Ashton Gate station delayed as part of £60m MetroWest project". Rail Technology Magazine. Cognitive Publishing. 16 December 2014. Retrieved 19 December 2014.
- ^ "The Great Western Railway is back in business". Railnews. 21 September 2015. Retrieved 21 September 2015.
- ^ "First Great Western offered new franchise deal". BBC News. BBC. 10 October 2014. Retrieved 10 October 2014.[refnote 1]
- ^ "Updated franchise schedule signals GW extension". Railnews. 10 October 2014. Retrieved 10 October 2014.[refnote 1]
- ^ Johnson, Howard (27 April – 10 May 2016). "Regional News". RAIL. No. 799. p. 24.
- Butt, R. V. J. (October 1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN 978-1-85260-508-7. OCLC 60251199. OL 11956311M.
- Jowett, Alan (2000). Jowett's Nationalised Railway Atlas (1st ed.). Penryn, Cornwall: Atlantic Transport Publishers. ISBN 978-0-906899-99-1. OCLC 228266687.
Notes to references:
- ^ a b Note that these references refer to First Great Western, which was rebranded as Great Western Railway in 2015.[12]
External links
- Media related to Ashton Gate railway station at Wikimedia Commons
- Pictures of the station