Jump to content

Keiō New Line: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Line 130: Line 130:
==History==
==History==
The Keio New Line began operation on October 30, 1978. With the completion of the last segment of the [[Toei Shinjuku Line]], through service operations began on March 30, 1980.
The Keio New Line began operation on October 30, 1978. With the completion of the last segment of the [[Toei Shinjuku Line]], through service operations began on March 30, 1980.

==See also==
* [[Keio Line]]


==References==
==References==

Revision as of 14:54, 20 June 2021

Keiō New Line
A Toei 10-300 series train at Hatsudai Station in August 2013
Overview
Native name京王新線
Termini
Stations4[1]
Service
TypeCommuter rail
Operator(s)Keio Corporation
History
Opened1978
Technical
Line length3.6 kilometres (2.2 mi)
Track gauge1,372 mm (4 ft 6 in)
Electrification1,500 V DC overhead

The Keio New Line (京王新線, Keiō Shinsen) is a 3.6 km link which connects Keio Corporation's Keiō Line from Sasazuka Station in Shibuya to Shinjuku Station with through service on to the Shinjuku Line of the Tokyo Metropolitan Bureau of Transportation. The line opened on October 30, 1978.

Route information

  • Length: 3.6 km
  • Gauge: 1,372 mm (4 ft 6 in)
  • Electrification: 1,500 V DC overhead
  • Stations: 4[1]

Operations

The Keio New Line generally parallels the main Keio Line along National Route 20 (Kōshū Kaidō) on a deeper route. Except for a short section just before Sasazuka Station, the entire line is underground.

Because the line was built to normal railway standards and not to subway standards, only specially-designed trains can travel along the Keio New Line. However, since new train cars are being designed to be able to operate on above-ground and below-ground tracks there is no real issue with the differentiation. All trains operating west of Sasazuka Station start and arrive at Shinjuku Station. During events at the Tokyo Racecourse, there are express trains that operate from Fuchūkeibaseimonmae Station to Shinjuku station.

The Keio New Line shares the same platforms with the Toei Shinjuku Line at Shinjuku Station. From here trains travel west-southwest. At Hatsudai Station, the westbound platform is two floors underground while the eastbound one is three floors underground. (Both platforms are on the north side of the station.) At Hatagaya Station both platforms are two floors underground with platforms on either side of the two central tracks. From this station, the Keio New line diverges from the Kōshū Kaidō and heads towards the Keio Line further south. The Keiō Line parallels the outside of the New Line on an elevated viaduct over Prefectural Route 420 (Nakano Dori) until Sasazuka Station.

Stations

Although there are four types of trains that travel along the Keio New Line segment (local, rapid, semi express, and express), all trains within the Keio New Line stop at every station.

No. Station km Connections Ward
Through-running to/from the SToei Shinjuku Line towards Motoyawata
KO01 Shinjuku
(New Line Shinjuku)
0.0 Shinjuku
KO02 Hatsudai 1.7 Shibuya
KO03 Hatagaya 2.7
KO04 Sasazuka 3.6 Keio Line
Through-running to/from the KOKeio Line towards Hashimoto, Takaosanguchi, and Keio-Hachioji

History

The Keio New Line began operation on October 30, 1978. With the completion of the last segment of the Toei Shinjuku Line, through service operations began on March 30, 1980.

See also

References

  1. ^ a b "route map of Keio New Line" (in Japanese). Retrieved June 20, 2021.