Lockheed Martin F-35 Lightning II
F-35 Lightning II | |
---|---|
An F-35C Lightning II, marked CF-1, conducts a test flight over the Chesapeake Bay in February 2011 | |
Role | Stealth multirole fighter |
National origin | United States |
Manufacturer | Lockheed Martin Aeronautics |
First flight | 15 December 2006 |
Introduction | December 2015 (USMC F-35B)[1][2] December 2016 (USAF F-35A)[2] February 2019 (USN F-35C)[2] |
Status | In initial production and testing, used for training by U.S.[3] |
Primary users | United States Air Force United States Marine Corps United States Navy Royal Air Force |
Produced | 2006–present |
Number built | 63[4] |
Developed from | Lockheed Martin X-35 |
The Lockheed Martin F-35 Lightning II is a family of single-seat, single-engine, fifth generation multirole fighters under development to perform ground attack, reconnaissance, and air defense missions with stealth capability.[5][6] The F-35 has three main models; the F-35A is a conventional takeoff and landing variant, the F-35B is a short take-off and vertical-landing variant, and the F-35C is a carrier-based variant.
The F-35 is descended from the X-35, the product of the Joint Strike Fighter (JSF) program. It is being designed and built by an aerospace industry team led by Lockheed Martin. The F-35 took its first flight on 15 December 2006. The United States plans to buy 2,443 aircraft. The F-35 variants are intended to provide the bulk of its tactical airpower for the U.S. Air Force, Marine Corps and Navy over the coming decades.
JSF development is being principally funded by the United States with additional funding from partners. The partner nations are either NATO members or close U.S. allies. The United Kingdom, Italy, Israel, The Netherlands, Australia, Canada, Norway, Denmark, and Turkey are part of the development program; Japan has ordered the F-35, while Singapore may also equip their air force with the F-35.[7][8][9][10][11][12][13]
Development
JSF Program requirements and selection
The JSF program was designed to replace the United States military F-16, A-10, F/A-18 (excluding newer E/F "Super Hornet" variants) and AV-8B tactical fighter aircraft. To keep development, production, and operating costs down, a common design was planned in three variants that share 80 percent of their parts:
- F-35A, conventional take off and landing (CTOL) variant.
- F-35B, short-take off and vertical-landing (STOVL) variant.
- F-35C, carrier-based CATOBAR (CV) variant.
George Standridge of Lockheed Martin predicted in 2006 that the F-35 will be four times more effective than legacy fighters in air-to-air combat, eight times more effective in air-to-ground combat, and three times more effective in reconnaissance and suppression of air defenses – while having better range and requiring less logistics support and having around the same procurement costs (if development costs are ignored) as legacy fighters.[14] The design goals call for the F-35 to be the premier strike aircraft through 2040 and be second only to the F-22 Raptor in air superiority.[15]
The JSF development contract was signed on 16 November 1996, and the contract for System Development and Demonstration (SDD) was awarded on 26 October 2001 to Lockheed Martin, whose X-35 beat the Boeing X-32. Although both aircraft met or exceeded requirements, the X-35 design was considered to have less risk and more growth potential.[16] The designation of the new fighter as "F-35" is out-of-sequence with standard DoD aircraft numbering,[17] by which it should have been "F-24". It came as a surprise even to Lockheed, which had been referring to the aircraft in-house by this expected designation.[18]
The development of the F-35 is unusual for a fighter aircraft in that no two-seat trainer versions have been built for any of the variants; advanced flight simulators mean that no trainer versions were deemed necessary.[19] Instead F-16s have been used as bridge trainers between the T-38 and the F-35. The T-X was intended to be used to train future F-35 pilots, but this might succumb to budget pressures in the USAF.[20]
Design phase
Based on wind tunnel testing, Lockheed Martin slightly enlarged its X-35 design into the F-35. The forward fuselage is 5 inches (130 mm) longer to make room for avionics. Correspondingly, the horizontal stabilators were moved 2 inches (51 mm) rearward to retain balance and control. The top surface of the fuselage was raised by 1 inch (25 mm) along the center line. Also, it was decided to increase the size of the F-35B STOVL variant's weapons bay to be common with the other two variants.[16] Manufacturing of parts for the first F-35 prototype airframe began in November 2003.[21] Because the X-35 did not have weapons bays, their addition in the F-35 would cause design changes which would lead to later weight problems.[22][23]
The F-35B STOVL variant was in danger of missing performance requirements in 2004 because it weighed too much; reportedly, by 2,200 lb (1,000 kg) or 8 percent. In response, Lockheed Martin added engine thrust and thinned airframe members; reduced the size of the common weapons bay and vertical stabilizers; re-routed some thrust from the roll-post outlets to the main nozzle; and redesigned the wing-mate joint, portions of the electrical system, and the portion of the aircraft immediately behind the cockpit.[24] Many of the changes were applied to all three variants to maintain high levels of commonality. By September 2004, the weight reduction effort had reduced the aircraft's design weight by 2,700 pounds (1,200 kg).[25] but the redesign cost $6.2 billion and delayed the project by 18 months.[26]
On 7 July 2006, the U.S. Air Force officially announced the name of the F-35: Lightning II, in honor of Lockheed's World War II-era twin-prop Lockheed P-38 Lightning and the Cold War-era jet, the English Electric Lightning.[27][N 1][29] English Electric Company's aircraft division was a predecessor of F-35 partner BAE Systems. Lightning II was also an early company name for the fighter that was later named the F-22 Raptor.[citation needed]
Lockheed Martin Aeronautics is the prime contractor and performs aircraft final assembly, overall system integration, mission system, and provides forward fuselage, wings and flight controls system. Northrop Grumman provides Active Electronically Scanned Array (AESA) radar, electro-optical Distributed Aperture System (DAS), Communications, Navigation, Identification (CNI), center fuselage, weapons bay, and arrestor gear. BAE Systems provides aft fuselage and empennages, horizontal and vertical tails, crew life support and escape systems, Electronic warfare systems, fuel system, and Flight Control Software (FCS1). Alenia will perform final assembly for Italy and, according to an Alenia executive, assembly of all European aircraft with the exception of Turkey and the United Kingdom.[30][31] The F-35 program has seen a great deal of investment in automated production facilities. For example, Handling Specialty produced the wing assembly platforms for Lockheed Martin.[32] In November 2009, Jon Schreiber, head of F-35 international affairs program for the Pentagon, said that the U.S. will not share the software code for the F-35 with its allies.[33]
On 19 December 2008, Lockheed Martin rolled out the first weight-optimized F-35A (designated AF-1). It was the first F-35 built at full production speed, and is structurally identical to the production F-35As that were delivered starting in 2010.[34] On 5 January 2009, six F-35s had been built, including AF-1 and AG-1; another 13 pre-production test aircraft and four production aircraft were being manufactured.[35] On 6 April 2009, U.S. Secretary of Defense Robert Gates proposed speeding up production for the U.S. to buy 2,443 F-35s.[36] In August 2010, Lockheed Martin announced delays in resolving a "wing-at-mate overlap" production problem, which would slow initial production.[37]
Program cost increases and further delays through 2012
Since 2006, the program has been subject to re-scoping and a number of reassessments. These are summarized below as the history of the program up to December 2012 and current status after January 2013.
In 2006, the GAO warned that excessive concurrency between the production of additional F-35 aircraft and testing of their design might result in expensive refits for several hundred aircraft planned to be produced before completion of tests.[38] In November 2010, the GAO found that "Managing an extensive, still-maturing global network of suppliers adds another layer of complexity to producing aircraft efficiently and on-time" and that "due to the extensive amount of testing still to be completed, the program could be required to make alterations to its production processes, changes to its supplier base, and costly retrofits to produced and fielded aircraft, if problems are discovered."[39] USAF budget data in 2010, along with other sources, projected the F-35 to have a flyaway cost from US$89 million to US$200 million over the planned production run.[40][41][42] In February 2011, the Pentagon put a price of $207.6 million on each of the 32 aircraft to be acquired in FY2012, rising to $304.15 million ($9,732.8/32) if its share of RDT&E spending is included.[43][44]
On 21 April 2009, media reports, citing Pentagon sources, said that during 2007 and 2008, spies had copied and siphoned off several terabytes of data related to the F-35's design and electronics systems, potentially compromising the aircraft and aiding the development of defense systems against it.[45] Lockheed Martin rejected suggestions that the project was compromised, stating it "does not believe any classified information had been stolen".[46] Other sources suggested that the incident caused both hardware and software redesigns to be more resistant to cyber attack.[47] BAE Systems was reported to be the target of cyber espionage.[48] In February 2013, it was feared that China had intercepted telemetry from F-35 test flights.[49] In 2013, a report from Mandiant tracked the hacking to a unit of the People's Liberation Army.[50]
On 9 November 2009, Ashton Carter, under-secretary of defense for acquisition, technology and logistics, acknowledged that the Pentagon "joint estimate team" (JET) had found possible future cost and schedule overruns in the project and that he would be holding meetings to attempt to avoid these.[51] On 1 February 2010, Gates removed the JSF Program Manager, U.S. Marine Corps Major General David Heinz, and withheld $614 million in payments to Lockheed Martin because of program costs and delays.[52][53]
On 11 March 2010, a report from the Government Accountability Office to United States Senate Committee on Armed Services projected the overall unit cost of an F-35A to be $112M in today's money.[54] In 2010, Pentagon officials disclosed that the F-35 program has exceeded its original cost estimates by more than 50 percent.[55] An internal Pentagon report critical of the JSF project states that "affordability is no longer embraced as a core pillar". In 2010, Lockheed Martin expected to reduce government cost estimates by 20%.[56] On 24 March 2010, Gates termed the cost overruns and delays as "unacceptable" in a testimony before the U.S. Congress; and characterized previous cost and schedule estimates as "overly rosy". Gates insisted the F-35 would become "the backbone of U.S. air combat for the next generation" and informed the Congress that he had expanded the development period by an additional 13 months and budgeted $3 billion more for the testing program while slowing down production.[57]
In November 2010, as part of a cost-cutting measure, the co-chairs of the National Commission on Fiscal Responsibility and Reform suggested cancelling the F-35B and halving orders of F-35As and F-35Cs.[58][59][60] Air Force Magazine reported that "Pentagon officials" were considering canceling the F-35B because its short range meant that the bases or ships it would operate from would be in range of hostile tactical ballistic missiles.[61] Lockheed Martin consultant Loren B. Thompson said that this rumor was a result of the usual tensions between the U.S. Navy and Marine Corps, and there was no alternative to the F-35B as an AV-8B Harrier II replacement.[62] He also confirmed further delays and cost increases because of technical problems with the aircraft and software, blaming most of the delays and extra costs on redundant flight tests.[63]
In November 2010, the Center for Defense Information estimated that the program would be restructured with an additional year of delay and $5 billion in additional costs.[64] On 5 November 2010, the Block 1 software flew for the first time on BF-4.[65] As of the end of 2010, only 15% of the software remained to be written, but this was reported to include the most difficult sections such as data fusion.[66] In 2011, it was revealed that 50% of the eight million lines of code had been written and that it would take another six years to complete the software to the new schedule.[67] By 2012, the total estimated lines of code for the entire program (onboard and offboard) had grown from 15 million lines to 24 million lines.[68]
In 2011, program head Vice Adm. David Venlet confirmed that the concurrency built into the program "was a miscalculation".[69] This was during a contract dispute where the Pentagon insisted that Lockheed Martin help cover the costs of applying fixes found during testing to aircraft already produced.[70] Lockheed Martin objected that the cost sharing posed an uninsurable unbounded risk that the company could not cover, and later responded that the "concurrency costs for F-35 continue to reduce".[71][72] The Senate Armed Services Committee strongly backed the Pentagon position.[73] In December 2011, Lockheed Martin accepted a cost sharing agreement.[74] The Aerospace Industries Association warned that such changes would force them to anticipate cost overruns in future contract bids.[75] As of 2012, problems found in flight testing were expected to continue to lead to higher levels of engineering changes through 2019.[76] The total additional cost for concurrency in the program is around $1.3 billion.[77] By the next year the cost had grown to $1.7 billion.[78]
In January 2011, Defense Secretary Robert Gates expressed the Pentagon's frustration with the rising costs of the F-35 program when he said "The culture of endless money that has taken hold must be replaced by a culture of restraint." Focusing his attention on the troubled F-35B, Gates ordered "a two-year probation", saying it "should be canceled" if corrections are unsuccessful.[79] Gates has stated his support for the program.[80] Some private analysts, such as Richard Aboulafia, of the Teal Group state that the F-35 program is becoming a money pit.[81] Gates' successor, Leon Panetta, ended the F-35B's probation on 20 January 2012, stating "The STOVL variant has made — I believe and all of us believe — sufficient progress."[82]
Former Pentagon manager Paul G. Kaminski has said that the lack of a complete test plan has added five years to the JSF program.[83] Initial operating capability (IOC) will be determined by software development rather than by hardware production or pilot training.[84] As of May 2013[update] the USMC plan an IOC in "mid-2015"[2] for the F-35B with Block 2B software which gives basic air-to-air and air-to-ground capability.[2] It has been reported that the USAF is planning to bring forward IOC for the F-35A to the Block 3I software in mid-2016 rather than waiting for the full-capability Block 3F in mid-2017;[2] the F-35C will not enter service with the USN until mid-2018.[2] The $56.4 billion development project for the aircraft should be completed in 2018 when the block five configuration is expected to be delivered, several years late and considerably over budget.[85]
Delays in the F-35 program may lead to a "fighter gap" where America and other countries will lack sufficient fighters to cover their requirements.[86] Israel may seek to buy second-hand F-15s,[87] while Australia also sought additional Super Hornets in the face of F-35 delays.[88]
In May 2011, the Pentagon's top weapons buyer Ashton Carter said that its new $133 million unit price was not affordable.[89] In 2011, The Economist warned that the F-35 was in danger of slipping into a "death spiral" where increasing per-aircraft costs would lead to cuts in number of aircraft ordered, leading to further cost increases and further order cuts.[90] Later that year, four aircraft were cut from the fifth LRIP order to pay for cost overruns;[91] in 2012, a further two aircraft were cut.[92] Lockheed acknowledged that the slowing of purchases would increase costs.[93] David Van Buren, U.S. Air Force acquisition chief, said that Lockheed needed to cut infrastructure to match the reduced market for their aircraft.[94] The company said that the slowdown in American orders will free up capacity to meet the urgent short term needs of foreign partners for replacement fighters.[95] Air Force Secretary Michael Donley said that no more money was available and that future price increases would be matched with cuts in the number of aircraft ordered.[96] Later that month, the Pentagon reported that costs had risen another 4.3 percent, partially resulting from production delays.[97] In 2012, the purchase of six out of 31 aircraft was tied to performance metrics of the program.[98] In 2013 Bogdan repeated that no more money was available, but that he hoped to avoid the death spiral.[99]
Japan has warned that it may halt their purchase if unit costs increase, and Canada has indicated it is not committed to a purchase yet.[100][101] The United States is projected to spend an estimated US$323 billion for development and procurement on the program, making it the most expensive defense program ever.[102] Testifying before a Canadian parliamentary committee in 2011, Rear Admiral Arne Røksund of Norway estimated that his country's 52 F-35 fighter jets will cost $769 million each over their operational lifetime.[103]
The total life-cycle cost for the entire American fleet is estimated to be US$1.51 trillion over its 50-year life, or $618 million per plane.[104] In order to reduce the estimated $1 trillion cost of the F-35 over its 50-year lifetime, the USAF is considering reducing Lockheed's role in Contractor Logistics Support.[105] Lockheed has responded that the trillion dollar estimate relies on future costs beyond its control such as USAF reorganizations and yet to be specified upgrades.[106] Delays have negatively affected the program's worldwide supply chain and partner organisations.[107]
In 2012, General Norton A. Schwartz decried the "foolishness" of reliance on computer models to settle the final design of the aircraft before flight testing found the issues that needed redesign.[108] In 2013, JSF project team leader USAF Lieutenant General Chris Bogdan said that "A large amount of concurrency, that is, beginning production long before your design is stable and long before you've found problems in test, creates downstream issues where now you have to go back and retrofit airplanes and make sure the production line has those fixes in them. And that drives complexity and cost".[109] Bogdan did however praise the "magical" improvement in the program ever since Lockheed was forced to assume some of the financial risks.[110]
In 2012, in order to avoid further redesign delays, the U.S. DoD accepted a reduced combat radius for the F-35A and a longer takeoff run for the F-35B.[111][112] The F-35B's estimated radius has also decreased by 15 percent.[113] In a meeting in Sydney in March, the United States pledged to eight partner nations that there would be no more program delays.[114]
In May 2012, Lockheed Chief Executive Bob Stevens complained that the Defense Department's requirements for cost data were driving up program cost.[115] Stevens also admitted that a strike might cause a production shortfall of the target of 29 F-35s that year.[116] Striking workers questioned the standards of replacement workers, as even their own work had been cited for "inattention to production quality" with a 16% rework rate.[117] The workers went on strike to protect pensions whose costs have been the subject of negotiations with the Department of Defense over the next batch of aircraft.[118] These same pension costs were cited by Fitch in their downgrade of the outlook for Lockheed Martin's stock price.[119] Stevens said that while he hoped to bring down program costs, the industrial base was not capable of meeting the government's expectations of affordability.[120][121]
According to a June 2012 Government Accountability Office report, the F-35's unit cost has almost doubled, an increase of 93% over the program's 2001 baseline cost estimates.[122] In 2012, Lockheed reportedly feared that the tighter policies for award fees of the Obama administration would reduce their profits by $500 million over the following five years.[123] This was demonstrated in 2012 when the Pentagon withheld the maximum $47 million allowed for Lockheed's failure to certify its program to track project costs and schedules.[124] The GAO has also faulted the USAF and USN for not fully planning the costs of extending legacy F-16 and F-18 fleets to cover for the delayed F-35.[125] Due to cost cutting measures, the US Government and the GAO have stated that the flyaway cost (including engines) has been dropping. The US Government estimates that in 2020 a "F-35 will cost some $85m each or less than half of the 2009 initial examples cost. Adjusted to today’s dollars the 2020 price would be $75m each."[126]
Program cost increases and delays after January 2013
In 2013 Lockheed began to lay off workers at the Fort Worth plant where the F-35s were assembled.[127] They said that the currently estimated concurrency costs of refitting the 187 aircraft built by the time testing concludes in 2016 are now less than previously feared.[128] The GAO's Michael Sullivan said that Lockheed had failed to get an early start on the systems engineering and had not understood the requirements or the technologies involved at the program's start.[129] The Pentagon vowed to continue funding the program during budget sequestration if possible.[130] The United States Congress responded with the Budget Control Act of 2011, which may derail the software needed to complete the F-35 program.[131]
In June 2013, Frank Kendall, Pentagon acquisition, technology and logistics chief, declared “major advances” had been made in the F-35 program over the last three years; and that he intended approve production rate increases in September. Air Force Lt. Gen. Christopher Bogdan, program executive officer, reported far better communications between government and vendor managers, and that negotiations over Lot 6 and 7 talks were moving fast. It was also stated that operating costs had been better understood since training started, and he predicted “we can make a substantial dent in projections” of operating costs.[132]
In July 2013, further doubt was cast on the latest (long delayed) schedule, with further software delays, and sensor, display and wing buffet problems continuing.[133] In August it was revealed that the Pentagon was weighing cancellation of the program as one possible response to the Budget sequestration in 2013,[134][135] and the United States Senate Appropriations Subcommittee on Defense voted to cut advanced procurement for the fighter.[136]
On 21 August 2013 C-Span reported that Congressional Quarterly and the Government Accountability Office were indicating the "Total estimated program cost now $400B--nearly twice initial cost." The Current investment was documented as approximately fifty (50) billion dollars. The Projected $316 billion dollar cost in development and procurement spending was estimated through 2037 at an average of $12.6 billion dollars per year. These were confirmed by Steve O'Bryan, Vice President of Lockheed Martin on the same date.[137]
Concerns over performance and safety
Considerable criticism followed in the wake of US Ambassador Tom Schieffer's confirmation to the Joint Standing Committee on Foreign Affairs (JSCFADT) on 21 June 2004: "With regard to the stealth technology, the airplane that Australia will get will be the stealthiest airplane that anybody outside the United States can acquire. We have given assurances to Australia that we will give you the absolute maximum that we can with regard to that technology. Having said that, the airplane will not be exactly the same airplane as the United States will have. But it will be a stealth fighter; it will have stealth capabilities; and it will be at the highest level that anyone in the world has outside the United States." The F-35's stealth would be similar to contemporary aircraft.[citation needed][138][139][140] A follow on article by Lockheed Martin's Tom Burbage stated that the US would not export key technologies such as stealth.[141] Before, a Jane's article gave a hint that US$1B, spent on several contracts, would serve to protect stealth technology and probably provide for a less stealthy export configuration of the fighter.[142]
In 2006, the F-35 was downgraded from "very low observable" to "low observable", a change former RAAF flight test engineer Peter Goon likened to increasing the radar cross section from a marble to a beach ball.[143] A Parliamentary Inquiry asked what was the re-categorization of the terminology in the United States such that the rating was changed from "very low observable" to "low observable". The Department of Defence said that the change in categorization by the U.S. was due to a revision in procedures for discussing stealth platforms in a public document. Decision to re-categorize in the public domain has now been reversed; subsequent publicly released material has categorized the JSF as very low observable (VLO).[144]
Andrew Krepinevich has questioned the reliance on "short range" aircraft like the F-35 or F-22 to "manage" China in a future conflict and has suggested reducing the number of F-35s ordered in favor of a longer range platform like the Next-Generation Bomber, but Michael Wynne, then United States Secretary of the Air Force rejected this plan of action in 2007.[145][146][147] By 2012, Wynne had conceded that America's short ranged fifth generation fighters would need drop tanks in order to be effective.[148] In 2011, the Center for Strategic and Budgetary Assessments (CSBA) pointed to the restructuring of the F-35 program and the return of the bomber project as a sign of their effectiveness, while Rebecca Grant said that the restructuring was a "vote of confidence" in the F-35 and "there is no other stealthy, survivable new fighter program out there".[149] Lockheed has also said that the F-35 is designed to launch internally carried bombs at supersonic speed and internal missiles at maximum supersonic speed.[150]
In 2008, it was reported that RAND Corporation conducted simulated war games in which Russian Sukhoi Su-35 fighters defeated the F-35.[151][152] During a formal briefing by the Australian Department of Defence to the Australian defence minister Joel Fitzgibbon, it was stated that reports of the simulation were inaccurate and did not compare the F-35's flight performance against other aircraft.[153] The Pentagon and Lockheed Martin also stated that these simulations did not address air-to-air combat.[154][155] A Lockheed Martin press release points to USAF simulations regarding the F-35's air-to-air performance against adversaries described as "4th generation" fighters, in which it claims the F-35 is "400 percent" more effective. Major General Charles R. Davis, USAF, the F-35 program executive officer, has stated that the "F-35 enjoys a significant Combat Loss Exchange Ratio advantage over the current and future air-to-air threats, to include Sukhois".[155]
In March 2012, Tom Burbage, and Gary Liberson, of Lockheed Martin addressed an Australian Parliamentary Committee about earlier assessments, stating "Our current assessment that we speak of is greater than 6 to 1 relative loss exchange ratio against, in 4 versus 8 engagement scenarios—4 blue F-35s versus 8 advanced red threats in the 2015 to 2020 time frame. And it is very important to note that is without the pilot in the loop and are the lowest number that we talk about, the greater than 6 to 1 is when we include the pilot in the loop [simulator] activities". They said: "we actually have a fifth-gen airplane flying today. The F22 has been in many exercises and is much better than the simulations forecast. We have F35 flying today; it has not been put into that scenario yet, but we have very high quality information on the capability of the sensors and the capability of the airplane, and we have represented the airplane fairly and appropriately in these large-scale campaign models that we are using. But it is not just us—it is our air force; it is your air force; it is all the other participating nations that do this; it is our navy and our marine corps that do these exercises. It is not Lockheed in a closet gleaning up some sort of result."[156]
In September 2008, in reference to the original plan to fit the F-35 with only two air-to-air missiles (internally), Major Richard Koch, chief of USAF Air Combat Command’s advanced air dominance branch is reported to have said that "I wake up in a cold sweat at the thought of the F-35 going in with only two air-dominance weapons."[157] The Norwegians have been briefed on a plan to equip the F-35 with six AIM-120D missiles by 2019.[158] Former RAND author John Stillion has written of the F-35A's air-to-air combat performance that it “can’t turn, can’t climb, can’t run”; Lockheed Martin test pilot Jon Beesley has stated that in an air-to-air configuration the F-35 has almost as much thrust as weight and a flight control system that allows it to be fully maneuverable even at a 50-degree angle of attack.[159][160][161] Consultant to Lockheed Martin Loren B. Thompson has said that the "electronic edge F-35 enjoys over every other tactical aircraft in the world may prove to be more important in future missions than maneuverability".[162]
In an April 2009 interview with the state-run[163] Global Times, Chen Hu, editor-in-chief of World Military Affairs magazine has said that the F-35 is too costly because it attempts to provide the capabilities needed for all three American services in a common airframe.[164] U.S. defense specialist Winslow T. Wheeler and aircraft designer Pierre Sprey have commented of the F-35 being "heavy and sluggish" and possessing "pitifully small load for all that money", further criticizing the value for money of the stealth measures as well as lacking fire safety measures; his final conclusion was that any air force would be better off maintaining its fleets of F-16s and F/A-18s compared to buying into the F-35 program.[165] A senior U.S. defense official was quoted as saying that the F-35 will be "the most stealthy, sophisticated and lethal tactical fighter in the sky," and added "Quite simply, the F-15 will be no match for the F-35."[166] After piloting the aircraft, RAF Squadron Leader Steve Long said that, over its existing aircraft, the F-35 will give "the RAF and Navy a quantum leap in airborne capability."[167]
In 2011, Canadian politicians raised the issue of the safety of the F-35's reliance on a single engine (as opposed to a twin-engine configuration, which provides a backup in case of an engine failure). Canada, and other operators, had previous experience with a high-accident rate with the single-engine Lockheed CF-104 Starfighter with many accidents related to engine failures. Defence Minister Peter MacKay, when asked what would happen if the F-35's single engine fails in the Far North, stated "It won’t".[168]
In November 2011, a Pentagon study team identified the following 13 areas of concern that remained to be addressed in the F-35:[169][170]
- The helmet-mounted display system does not work properly.
- The fuel dump subsystem poses a fire hazard.
- The Integrated Power Package is unreliable and difficult to service.
- The F-35C's arresting hook does not work.
- Classified "survivability issues", which have been speculated to be about stealth.[169]
- The wing buffet is worse than previously reported.
- The airframe is unlikely to last through the required lifespan.
- The flight test program has yet to explore the most challenging areas.
- The software development is behind schedule.
- The aircraft is in danger of going overweight or, for the F-35B, not properly balanced for VTOL operations.
- There are multiple thermal management problems. The air conditioner fails to keep the pilot and controls cool enough, the roll posts on the F-35B overheat, and using the afterburner damages the aircraft.
- The automated logistics information system is partially developed.
- The lightning protection on the F-35 is uncertified, with areas of concern.
Michael Auslin of the American Enterprise Institute has questioned the capability of the F-35 to engage modern air defenses.[171] In July 2012, the Pentagon awarded Lockheed $450 million to improve the F-35 electronic warfare systems and incorporate Israeli systems.[172]
In 2010, Lockheed Martin spokesman John Kent said that adding fire-suppression systems would offer "very small" improvement to survivability.[173] However, a report released in 2013 stated that flaws in the fuel tank and fueldraulic (fuel-based hydraulic) systems have left it considerably more vulnerable to lightning strikes and other fire sources including enemy fire than previously revealed, especially at lower altitudes.[174] The same report also noted performance degradation of the three variants, the sustained turn rates had been reduced to 4.6 g for the F-35A, 4.5 g for the F-35B, and 5.0 g for the F-35C. The acceleration performance of all three variants was also downgraded, with the F-35C taking 43 seconds longer than an F-16 to accelerate from Mach 0.8 to Mach 1.2; this was judged by several fighter pilots to be a lower performance level than expected from a fourth generation fighter.[175] The F-35 program office is reconsidering addition of previously removed safety equipment.[176] In 2012, Lockheed program manager Tom Burbage said that while the relatively large cross-sectional area of the fighter that was required by the internal weapons bays gave it a disadvantage against fourth generation fighters that were operating in a clear configuration, once both fighters were armed the F-35 had the advantage.[177]
In December 2011, the Pentagon and Lockheed came to an agreement to assure funding and delivery for a fifth order of early F-35 aircraft of yet undefined type.[178] On 22 February 2013, the fledgling F-35 fleet was grounded after a routine inspection of a F-35A at Edwards Air Force Base found a crack in an engine turbine blade.[179][180]
In June 2012, Australia's Air Vice Marshal Osley responded to Air Power Australia's criticisms by saying "Air Power Australia (Kopp and Goon) claim that the F35 will not be competitive in 2020 and that Air Power Australia's criticisms mainly centre around F35's aerodynamic performance and stealth capabilities." Osley continued with, "these are inconsistent with years of detailed analysis that has been undertaken by Defence, the JSF program office, Lockheed Martin, the U.S. services and the eight other partner nations. While aircraft developments such as the Russian PAK-FA or the Chinese J20, as argued by Airpower Australia, show that threats we could potentially face are becoming increasingly sophisticated, there is nothing new regarding development of these aircraft to change Defence's assessment." He then said that he thinks that the Air Power Australia's "analysis is basically flawed through incorrect assumptions and a lack of knowledge of the classified F-35 performance information."[181]
In March 2013 USAF test pilots noted a lack of visibility from the F-35 cockpit during evaluation flights and said that this will get them consistently shot down in combat. Defense spending analyst Winslow Wheeler concluded from the flight evaluation reports that the F-35A "is flawed beyond redemption";[182] in response, program manager Bogdan suggested that pilots worried about being shot down should fly cargo aircraft instead.[183] The same report found (in addition to the usual problems with the aircraft listed above):
- Current aircraft software is inadequate for even basic pilot training.
- Ejection seat may fail causing pilot fatality.
- Several pilot-vehicle interface issues, including lack of feedback on touch screen controls.
- The radar performs poorly or not at all.
- Engine replacement takes an average of 52 hours, instead of the two hours specified.
- Maintenance tools do not work.[184]
The JPO responded that more experienced pilots would be able to safely operate the aircraft and that procedures would improve over time.[185]
Even in the final "3F" software version, the F-35 will lack ROVER, in spite of having close air support as one of its primary missions.[186]
The F-35B and F-35C models take several complex maneuvers to reach their top speed of Mach 1.6, which consume almost all of the onboard fuel.[187]
Problems with Lockheed Martin
In September 2012, the Pentagon criticized, quite publicly, Lockheed Martin's performance on the F-35 program and stated that it would not bail out the program again if problems with the plane's systems, particularly the helmet-mounted display, were not resolved. The deputy F-35 program manager said that the government's relationship with the company was the "worst I've ever seen" in many years of working on complex acquisition programs. Air Force Secretary Michael Donley told reporters the Pentagon had no more money to pour into the program after three costly restructurings in recent years. He said the department was done with major restructuring and that there was no further flexibility or tolerance for that approach. This criticism followed a "very painful" 7 September review that focused on an array of ongoing program challenges. Lockheed Martin responded with a brief statement saying it would continue to work with the F-35 program office to deliver the new fighter.[188]
On 28 September 2012, the Pentagon announced that the F-35 Joint Strike Fighter support program would become an open competition. They invited companies to participate in a two-day forum on 14–15 November for possible opportunities to compete for work managing the supply chain of the aircraft. Their reason is to reduce F-35 life-cycle costs by creating competition within the program and to refine its acquisition strategy and evaluate alternatives that will deliver the best value, long-term F-35 sustainment solution. This could be hazardous to Lockheed, as they are the current prime contractor for sustainment of all three variants, and selection of another company could reduce their revenues.[189]
In 2013, the officer in charge of the program blamed Lockheed and Pratt & Whitney for gouging the government on costs, instead of focusing on the long term future of the program.[190]
Upgrades
Lockheed's development roadmap extends until 2021, including a block 6 engine improvement in 2019. The aircraft are expected to be upgraded throughout their operational lives.[191]
Design
Overview
The F-35 appears to be a smaller, single-engine sibling of the twin-engine Lockheed Martin F-22 Raptor, and indeed drew elements from it. The exhaust duct design was inspired by the General Dynamics Model 200 design, which was proposed for a 1972 supersonic VTOL fighter requirement for the Sea Control Ship.[192] Lockheed consulted with the Yakovlev Design Bureau in the development of the F-35B STOVL variant, purchasing design data from their development of the Yakovlev Yak-141 "Freestyle".[193][194] Although several experimental designs have been developed since the 1960s, such as the unsuccessful Rockwell XFV-12, the F-35B is to be the first operational supersonic, STOVL stealth fighter.[195]
Acquisition deputy to the assistant secretary of the Air Force, Lt. Gen. Mark D. "Shack" Shackelford has said that the F-35 is designed to be America's "premier surface-to-air missile killer and is uniquely equipped for this mission with cutting edge processing power, synthetic aperture radar integration techniques, and advanced target recognition."[196][197] Lockheed Martin claims the F-35 is intended to have close- and long-range air-to-air capability second only to that of the F-22 Raptor.[5] Lockheed Martin has said that the F-35 has the advantage over the F-22 in basing flexibility and "advanced sensors and information fusion".[198] Lockheed has suggested that the F-35 could replace the USAF's F-15C/D fighters in the air superiority role and the F-15E Strike Eagle in the ground attack role, although the F-35 lacks the range or payload of the F-15.[199] The F-35A carries a similar air-to-air armament as the conceptual Boeing F-15SE Silent Eagle when both aircraft are configured for low observable operations, having roughly 80 percent of the F-15SE's combat radius under those conditions.[200]
Some improvements over current-generation fighter aircraft are:
- Durable, low-maintenance stealth technology, using structural fiber mat instead of the high-maintenance coatings of legacy stealth platforms;[201]
- Integrated avionics and sensor fusion that combine information from off- and on-board sensors to increase the pilot's situational awareness and improve target identification and weapon delivery, and to relay information quickly to other command and control (C2) nodes;
- High speed data networking including IEEE 1394b[202] and Fibre Channel.[203] (Fibre Channel is also used on Boeing's Super Hornet.[204])
- The Autonomic Logistics Global Sustainment (ALGS), Autonomic Logistics Information System (ALIS) and Computerized maintenance management system (CMMS) are to help ensure aircraft uptime with minimal maintenance manpower.[205] The Pentagon has moved to open up the competitive bidding by other companies.[206] This was after Lockheed admitted that instead of costing twenty percent less than the F-16 per flight hour, the F-35 would actually cost twelve percent more.[207] Though the ALGS is intended to reduce maintenance costs, Lockheed Martin disagrees with including the cost of this system in the aircraft ownership calculations.[208] USMC have implemented a workaround for a cyber vulnerability in the system.[209]
- Electrohydrostatic actuators run by a power-by-wire flight-control system.[210]
- A modern and updated flight simulator, which may be used for a greater fraction of pilot training in order to reduce the costly flight hours of the actual aircraft.[211]
- Lightweight, powerful and volatile Lithium-ion batteries similar to those that have grounded the Boeing 787 Dreamliner fleet.[212] These are required to provide power to run the control surfaces in an emergency,[213] and have been strenuously tested.[214]
Structural composites in the F-35 are 35% of the airframe weight (up from 25% in the F-22).[215] The majority of these are bismaleimide (BMI) and composite epoxy material.[216] The F-35 will be the first mass produced aircraft to include structural nanocomposites, namely carbon nanotube reinforced epoxy.[217] Experience of the F-22's problems with corrosion lead to the F-35 using a gap filler that causes less galvanic corrosion to the airframe's skin, designed with fewer gaps requiring filler and implementing better drainage.[218] The relatively short 35-foot wingspan of the A and B variants is set by the F-35B's requirement to fit inside the Navy's current amphibious assault ship elevators; the F-35C's longer wing is considered to be more fuel efficient.[219]
A United States Navy study found that the F-35 will cost 30 to 40 percent more to maintain than current jet fighters;[220] not accounting for inflation over the F-35's operational lifetime. A Pentagon study concluded a $1 trillion maintenance cost for the entire fleet over its lifespan.[221]
Engines
The engine used on the F-35 is the Pratt & Whitney F135. An alternative engine, the General Electric/Rolls-Royce F136, was under development until December 2011 when the manufacturers canceled the project.[222][223] Neither the F135 or F136 engines are designed to supercruise in the F-35,[224] however the F-35 can achieve a limited supercruise of Mach 1.2 for 150 miles.[225] The F135 is the second (radar) stealthy afterburning jet engine and, like the Pratt & Whitney F119 from which it was derived, has suffered from pressure pulsations in the afterburner at low altitude and high speed or "screech" during development.[226] Turbine bearing health will be monitored with thermoelectric-powered sensors.[227]
The F-35 has a maximum speed of over Mach 1.6. With a maximum takeoff weight of 60,000 lb (27,000 kg),[N 2][229] the Lightning II is considerably heavier than the lightweight fighters it replaces. In empty and maximum gross weights, it more closely resembles the single-seat, single-engine Republic F-105 Thunderchief, which was the largest single-engine fighter of the Vietnam war era. The F-35's modern engine delivers over 60 percent more thrust in an aircraft of the same weight so that in thrust to weight and wing loading it is much closer to a comparably equipped F-16.[N 3]
The STOVL F-35B is outfitted with the Rolls-Royce LiftSystem, designed by Lockheed Martin and developed by Rolls-Royce. This system more resembles the Russian Yak-141 and German VJ 101D/E than the preceding STOVL Harrier Jump Jet and the Rolls-Royce Pegasus engine.[231][232][233] The Lift System is composed of a lift fan, drive shaft, two roll posts and a "Three Bearing Swivel Module" (3BSM).[234] The 3BSM is a thrust vectoring nozzle which allows the main engine exhaust to be deflected downward at the tail of the aircraft. The lift fan is near the front of the aircraft and provides a counterbalancing thrust using two counter-rotating blisks.[235] It is powered by the engine's low-pressure (LP) turbine via a drive shaft and gearbox. Roll control during slow flight is achieved by diverting unheated engine bypass air through wing-mounted thrust nozzles called Roll Posts.[236][237]
F136 funding came at the expense of other parts of the program, impacting on unit costs.[238] The F136 team has claimed that their engine has a greater temperature margin which may prove critical for VTOL operations in hot, high altitude conditions.[239] Pratt & Whitney has tested higher thrust versions of the F135, partly in response to GE's claims that the F136 is capable of producing more thrust than the 43,000 lbf (190 kN) of early F135s. The F135 has demonstrated a maximum thrust of over 50,000 lbf (220 kN) during testing;[240] making it the most powerful engine ever installed in a fighter aircraft as of 2010.[241]
Armament
The F-35 features two internal weapons bays, and external hardpoints for mounting up to four underwing pylons and two near wingtip pylons. The two outer hardpoints can carry pylons for the AIM-9X Sidewinder and AIM-132 ASRAAM short-range air-to-air missiles (AAM) only.[242] The other pylons can carry the AIM-120 AMRAAM BVR AAM, Storm Shadow cruise missile, AGM-158 Joint Air to Surface Stand-off Missile (JASSM) cruise missile, and guided bombs. The external pylons can carry missiles, bombs, and fuel tanks at the expense of reduced stealth.[243] An air-to-air load of eight AIM-120s and two AIM-9s is possible using internal and external weapons stations; a configuration of six 2,000 lb (910 kg) bombs, two AIM-120s and two AIM-9s can also be arranged.[244][245]
There are a total of four weapons stations between the two internal bays. Two of these can carry air-to-ground bombs up to 2,000 lb (910 kg) in A and C models, or two bombs up to 1,000 lb (450 kg) in the B model; the other two stations are for smaller weapons such as air-to-air missiles.[244][246] The weapon bays can carry AIM-120 AMRAAM, AIM-132 ASRAAM, the Joint Direct Attack Munition (JDAM), the Joint Stand off Weapon (JSOW), Brimstone anti-armor missiles, and Cluster Munitions (WCMD).[244] The F-35A includes a GAU-22/A, a four-barrel version of the GAU-12 Equalizer 25 mm cannon.[247] The cannon is mounted internally with 182 rounds for the F-35A or in an external pod with 220 rounds for the F-35B and F-35C;[248][249] the gun pod has stealth features. The Terma A/S multi-mission pod (MMP) could be used for different equipment and purposes, such as electronic warfare, reconnaissance, or rear-facing tactical radar.[250][251]
Lockheed Martin states that the weapons load can be configured as all-air-to-ground or all-air-to-air, and has suggested that a Block 5 version will carry three weapons per bay instead of two, replacing the heavy bomb with two smaller weapons such as AIM-120 AMRAAM air-to-air missiles.[151] Upgrades are to allow each weapons bay to carry four GBU-39 Small Diameter Bombs (SDB) for A and C models, or three in F-35B.[252] Another option is four GBU-53/B Small Diameter Bomb IIs in each bay on all F-35 variants.[253] One F-35 has been outfitted with four SDB II bombs and an AMRAAM missile to test adequate bay door clearance.[254] The MBDA Meteor air-to-air missile may be adapted for the F-35, a modified Meteor with smaller tailfins for the F-35 was revealed in September 2010; plans call for the carriage of four Meteors internally.[255] The United Kingdom planned to use up to four AIM-132 ASRAAM missiles internally, later plans call for the carriage of two internal and two external ASRAAMs.[256] The external ASRAAMs are planned to be carried on "stealthy" pylons; the missile allows attacks to slightly beyond visual range without employing radar.[242][257]
Norway and Australia are funding an adaption of the Naval Strike Missile (NSM) for the F-35. Under the designation Joint Strike Missile (JSM), it is to be the only cruise missile to fit the F-35's internal bays; according to studies two JSMs can be carried internally with an additional four externally.[258] The F-35 is expected to take on the Wild Weasel mission, though there are no planned anti-radiation missiles for internal carriage.[259] The B61 nuclear bomb was initially scheduled for deployment in 2017;[260] as of 2012 it is expected to be in the early 2020s.[261]
According to reports in 2002, Solid state lasers were being developed as optional weapons for the F-35.[262][263][264] The F-35 is also one of the target platforms for the High Speed Strike Weapon, assuming that hypersonic missile is successful.[265]
Stealth and signatures
The F-35 has been designed to have a low radar cross section primarily due to the shape of the aircraft and the use of stealthy materials in its construction, including fiber-mat.[201] Unlike the previous generation of fighters, the F-35 was designed for very-low-observable characteristics.[266] Besides radar stealth measures, the F-35 incorporates infrared and visual signature reduction measures.[267][268]
The Fighter Teen Series (F-15, F-16, F/A-18) carried large external fuel tanks, but in order to avoid negating its stealth characteristics the F-35 must fly most missions without them. Unlike the F-16 and F/A-18, the F-35 lacks leading edge extensions and instead uses stealth-friendly chines for vortex lift in the same fashion as the SR-71 Blackbird.[250] The small bumps just forward of the engine air intakes form part of the diverterless supersonic inlet (DSI) which is a simpler, lighter means to ensure high-quality airflow to the engine over a wide range of conditions. These inlets also crucially improve the aircraft's very-low-observable characteristics.[269]
In spite of being smaller than the F-22, the F-35 has a larger radar cross section; said to be roughly equal to a metal golf ball rather than the F-22's metal marble.[270] The F-22 was designed to be difficult to detect by all types of radars and from all directions.[271] The F-35 on the other hand manifests its lowest radar signature from the frontal aspect due to design compromises. Its surfaces are shaped to best defeat radars operating in the X and upper S band, which are typically found on fighters, surface-to-air missiles and their tracking radars; the F-35 would be easier to detect using other radar frequencies.[271] Because the aircraft's shape is important to the radar cross section (RCS), special care must be taken to maintain the "outer mold line" during production.[272] Ground crews require Repair Verification Radar (RVR) test sets to verify the RCS after performing repairs, which is not a concern upon non-stealth aircraft.[273][274]
In late 2008 the air force revealed that the F-35 would be about twice as loud at takeoff as the McDonnell Douglas F-15 Eagle and up to four times as loud during landing.[275] As a result, residents near Luke Air Force Base, Arizona and Eglin Air Force Base, Florida, possible home bases for the jet, requested that the air force conduct environmental impact studies concerning the F-35's noise levels.[275] The city of Valparaiso, Florida, adjacent to Eglin AFB, threatened in February 2009 to sue over the impending arrival of the F-35s, but this lawsuit was settled in March 2010.[276][277][278] It was reported in March 2009 that testing by Lockheed Martin and the Royal Australian Air Force revealed that the F-35 was not as loud as first reported, being "only about as noisy as an F-16 fitted with a Pratt & Whitney F100-PW-200 engine" and "quieter than the Lockheed Martin F-22 Raptor and the Boeing F/A-18E/F Super Hornet."[279] According to an acoustics study done by Lockheed Martin and the U.S. Air Force, the noise levels of the F-35 are found to be comparable to the F-22 Raptor and F/A-18E/F Super Hornet.[280] A USAF environmental impact study found that replacing F-16s with F-35s at Tucson International Airport would subject more than 21 times as many residents to extreme noise levels.[281]
Cockpit
The F-35 features a full-panel-width glass cockpit touch screen[282] "panoramic cockpit display" (PCD), with dimensions of 20 by 8 inches (50 by 20 centimeters).[283] A cockpit speech-recognition system (DVI) provided by Adacel has been adopted on the F-35, added to the pilot's ability to interact with the aircraft and operate its systems. The F-35 will be the first operational U.S. fixed-wing aircraft to employ this DVI system, although similar systems have been used on the AV-8B Harrier II and trialled in previous aircraft, such as the F-16 VISTA.[284]
A helmet-mounted display system (HMDS) will be fitted to all models of the F-35.[285] While some fighters have offered HMDS along with a head up display (HUD), this will be the first time in several decades that a front line fighter has been designed without a HUD.[286] The F-35 is equipped with a right-hand HOTAS side stick controller. The Martin-Baker US16E ejection seat is used in all F-35 variants.[287] The US16E seat design balances major performance requirements, including safe-terrain-clearance limits, pilot-load limits, and pilot size; it uses a twin-catapult system housed in side rails.[288] The F-35 employs an oxygen system derived from the F-22's own system, which has been involved in multiple hypoxia incidents on that aircraft; unlike the F-22, the flight profile of the F-35 is similar to other fighters that routinely use such systems.[289][290]
Sensors and avionics
The F-35's sensor and communications suite is said to possess situational awareness, command-and-control and network-centric warfare capabilities.[5][291] The main sensor on board is the AN/APG-81 AESA-radar, designed by Northrop Grumman Electronic Systems.[292] It is augmented by the nose-mounted Electro-Optical Targeting System (EOTS);[293] designed by Lockheed Martin, it provides the capabilities of the externally mounted Sniper XR pod while making a reduced radar presence.[294][295] The AN/ASQ-239 (Barracuda) system is an improved version of the AN/ALR-94 EW suite on the F-22. The AN/ASQ-239 provides sensor fusion of RF and IR tracking functions, basic radar warning, multispectral countermeasures for self-defense against threat missiles, situational awareness and electronic surveillance; employing 10 radio frequency antennae embedded into the edges of the wing and tail.[296][297]
Six additional passive infrared sensors are distributed over the aircraft as part of Northrop Grumman's AN/AAQ-37 distributed aperture system (DAS),[30] which acts as a missile warning system, reports missile launch locations, detects and tracks approaching aircraft spherically around the F-35, and replaces traditional night vision goggles for night operations and navigation. All DAS functions are performed simultaneously, in every direction, at all times. The F-35's Electronic Warfare systems are designed by BAE Systems and include Northrop Grumman components.[298] Some functions such as the Electro-Optical Targeting System and the Electronic Warfare system are not usually integrated on fighters.[299]
The communications, navigation and identification (CNI) suite is designed by Northrop Grumman and includes the Multifunction Advanced Data Link (MADL), as one of a half dozen different physical links.[300] The F-35 will be the first jet fighter with sensor fusion that combines radio frequency and IR tracking for continuous target detection and identification in all directions which is shared via MADL to other platforms without compromising low observability.[228] The non-stealthy Link 16 is also included for communication with legacy systems.[301] The F-35 has been designed with synergy between sensors as a specific requirement, the aircraft's "senses" being expected to provide a more cohesive picture of the reality around it and be available for use in any possible way and combination with one another; for example, the AN/APG-81 multi-mode radar also acts as a part of the electronic warfare system.[302]
Unlike previous aircraft, such as the F-22, much of the new software for the F-35 is written in C and C++, because of programer availability. Much Ada83 code is reused from the F-22.[303] The Integrity DO-178B real-time operating system (RTOS) from Green Hills Software runs on COTS Freescale PowerPC processors.[304] The final Block 3 software for the F-35 is planned to have 8.6 million lines of software code.[305] The scale of the program has led to a software crisis as officials continue to discover that additional software needs to be written.[306] General Norton Schwartz has said that the software is the biggest factor that might delay the USAF's initial operational capability.[307] Michael Gilmore, Director of Operational Test & Evaluation, has written that, "the F-35 mission systems software development and test is tending towards familiar historical patterns of extended development, discovery in flight test, and deferrals to later increments."[308]
The F-35's electronic warfare systems are intended to detect hostile aircraft, then scan them with the electro-optical system to allow the pilot to engage or evade the opponent before the F-35 is detected.[302] The CATbird avionics testbed for the F-35 program has proved capable of detecting and jamming radars, including those used on the F-22.[309] The F-35 was previously considered a platform for the Next Generation Jammer; however attention has shifted to the use of unmanned aircraft as an alternate platform.[310]
Several "critical electronic subsystems" of the F-35 depend on Xilinx FPGAs.[311] These COTS components allow for refreshes in supplies from the commercial market and to field upgrade the entire fleet via software for the aircraft's Software-defined radio systems.[312]
Helmet-mounted display system
The F-35 does not need to be physically pointing at its target for weapons to be successful.[244][313] Sensors can track and target a nearby aircraft from any orientation, provide the information to the pilot through his helmet (and therefore visible no matter which way the pilot is looking), and provide the seeker-head of a missile with sufficient information. Recent missile types provide a much greater ability to pursue a target regardless of the launch orientation, called "High Off-Boresight" capability. Sensors use combined radio frequency and infra red (SAIRST) to continually track nearby aircraft while the pilot's helmet-mounted display system (HMDS) displays and selects targets; the helmet system replaces the display-suite-mounted head-up display used in earlier fighters.[314]
The F-35's systems provide the edge in the "observe, orient, decide, and act" OODA loop; stealth and advanced sensors aid in observation (while being difficult to observe), automated target tracking helps in orientation, sensor fusion simplifies decision making, and the aircraft's controls allow the pilot to keep their focus on the targets, rather than the controls of their aircraft.[315][N 4]
Problems with the Vision Systems International helmet-mounted display led Lockheed Martin to issue a draft specification for alternative proposals in early 2011, to be based around the Anvis-9 night vision goggles.[316] BAE Systems was selected to provide the alternative system in late 2011.[317] If successful, the BAE Systems alternative helmet is to incorporate all the features of the VSI system.[318] Adopting the alternative helmet would require a cockpit redesign.[319] In 2011, Lockheed granted VSI a contract to fix the vibration, jitter, night-vision and sensor display problems in their helmet-mounted display.[320] A speculated potential improvement is the replacement of Intevac’s ISIE-10 day/night camera with the newer ISIE-11 model.[321] In October 2012, Lockheed stated that progress had been made in resolving the technical issues of the helmet-mounted display, and cited positive reports from night flying tests; it had been questioned whether the helmet system allows pilots enough visibility at night to carry out precision tasks.[322] In 2013, in spite of continuing problems with the helmet display, the F-35B model completed 19 nighttime vertical landings onboard the USS Wasp at sea.[323]
Maintenance
The program's maintenance concept is for any F-35 to be maintained in any F-35 maintenance facility and that all F-35 parts in all bases will be globally tracked and shared as needed.[324] The commonality between the different variants has allowed the USMC to create their first aircraft maintenance Field Training Detachment to directly apply the lessons of the USAF to their F-35 maintenance operations.[325] The aircraft has been designed for ease of maintenance, with 95% of all field replaceable parts "one deep" where nothing else has to be removed to get to the part in question. For instance the ejection seat can be replaced without removing the canopy, the use of low-maintenance electro-hydrostatic actuators instead of hydraulic systems and an all-composite skin without the fragile coatings found on earlier stealth aircraft.[326]
The F-35 has received good reviews from pilots and maintainers, suggesting it is performing better than its predecessors did at a similar stage of development. The stealth type has proved relatively stable from a maintenance standpoint. Part of the improvement is attributed to better maintenance training, as F-35 maintainers have received far more extensive instruction at this early stage of the program than on the F-22 Raptor. The F-35's stealth coatings are much easier to work with than those used on the Raptor. Cure times for coating repairs are lower and many of the fasteners and access panels are not coated, further reducing the workload for maintenance crews. Some of the F-35's radar-absorbent materials are baked into the jet's composite skin, which means its stealthy signature is not easily degraded.[327] It is still harder to maintain (due to its stealth) than fourth-generation aircraft.[328]
Operational history
Testing
The first F-35A (designated AA-1) was rolled out in Fort Worth, Texas, on 19 February 2006. In September 2006, the first engine run of the F135 in an airframe took place.[329] On 15 December 2006, the F-35A completed its maiden flight.[330] A modified Boeing 737–300, the Lockheed CATBird has been used as an avionics test-bed for the F-35 program, including a duplication of the cockpit.[151]
The first F-35B (designated BF-1) made its maiden flight on 11 June 2008, piloted by BAE Systems' test pilot Graham Tomlinson. Flight testing of the variant's STOVL propulsion system began on 7 January 2010.[331] The F-35B's first hover was on 17 March 2010, followed by its first vertical landing the next day.[332] During a test flight on 10 June 2010, the F-35B became the second STOVL aircraft to achieve supersonic speeds[333] after the X-35B.[334] In January 2011, Lockheed Martin reported that a solution had been found for the cracking of an aluminum bulkhead during ground testing of the F-35B.[335] However, in 2013, the F-35B had suffered another incident involving bulkhead cracking.[336]
External videos | |
---|---|
F-35B tests on USS Wasp in 2011 | |
Short TakeOff | |
BF-04 vertical landing |
By June 2009, many of the initial flight test targets had been accomplished but the program was behind schedule.[337] During 2008, a Pentagon Joint Estimate Team (JET) estimated that the program was two years behind the public schedule, a revised estimate in 2009 predicted a 30-month delay.[338] Delays reduced planned production numbers by 122 aircraft through 2015 to provide an addition 2.8 billion for development; internal memos suggested that the official timeline would be extended by 13 months.[338][339] The success of the JET led Ashton Carter calling for more such teams for other poorly performing projects.[340]
Nearly 30 percent of test flights required more than routine maintenance to make the aircraft flightworthy again.[341] As of March 2010, the F-35 program had used a million more man-hours than predicted.[342] The United States Navy projected that lifecycle costs over a 65-year fleet life for all American F-35s to be $442 billion higher than U.S. Air Force projections.[343] F-35 delays have led to shortfall of up to 100 jet fighters in the Navy/Marines team, although measures have been taken using existing assets to manage and reduce this shortfall.[344]
The F-35C's maiden flight took place on 7 June 2010, at NAS Fort Worth JRB. A total of 11 U.S. Air Force F-35s arrived in fiscal year 2011.[345] On 9 March 2011, all F-35s were grounded after a dual generator failure and oil leak in flight;[346] the cause of the incident was discover to have been the result of faulty maintenance.[347] In 2012, Navy Commander Erik Etz of the F-35 JSF Program Office commented that rigorous testing of the F-35's sensors had taken place during exercise Northern Edge 2011, and had served as a significant risk-reduction step.[348][349]
From 3–18 August 2011, the F-35 fleet was grounded while the Joint Program Office investigated an electrical system failure. On 2 August 2011, the Honeywell-built integrated power package (IPP) of an F-35 had failed during a standard engine test at Edwards Air Force Base.[350][351] On 10 August 2011, ground operations for the F-35 Program were re-instituted while the investigation continued. Preliminary inquiries indicated that a control valve did not function properly, leading to the IPP failure.[352][353] On 18 August 2011, the flight ban was lifted for 18 of the 20 fighters; two aircraft remained grounded due to a lack of monitoring systems.[354] The IPP suffered another software-related incident in 2013, this caused no additional disruption as the fleet was already grounded due to separate issues experienced with the engine.[355]
On 25 October 2011, the F-35A reached its designed top speed of Mach 1.6 for the first time.[356] Further testing demonstrated Mach 1.61 and 9.9g.[357] During testing in 2011, all eight landing tests of the F-35C tail hook failed to catch the arresting wire; as a result the design of the hook underwent alteration.[358] In October 2011, two F-35B VTOL aircraft conducted three weeks of initial sea trials aboard USS Wasp.[359] On 15 August 2012, an F-35B completed air start tests, which involved shutting down and restarting the engine while in flight; the F-35A had previously completed these tests.[360]
During the fourth quarter of 2012, weapons separation tests were performed. On 6 October 2012, the F-35A dropped its first bomb,[361] followed three days later by an AIM-120 AMRAAM.[362] On 28 November 2012, an F-35C performed a total of eleven weapon releases, ejecting a GBU-31 JDAM and GBU-12 Paveway from its weapons bay in the first ground weapons ejections for the F-35C.[363]
On 16 November 2012, the U.S. Marines received the first F-35B at MCAS Yuma, and the VMFA(AW)-121 unit is to be redesignated from a Boeing F/A-18 Hornet unit to an F-35B squadron.[364] A February 2013 Time article revealed that Marine pilots are not allowed to perform a vertical landing – the maneuver is deemed too dangerous, and it is reserved only for Lockheed test pilots.[365]
On 18 January 2013, the F-35B variant was grounded after the failure of a fueldraulic line in the aircraft's propulsion system on 16 January prior to a conventional takeoff.[366] The problem was traced an “improperly crimped” fluid line manufactured by Stratoflex.[367][368] The Pentagon cleared all 25 F-35B aircraft to resume flight tests on 12 February 2013.[369] On 22 February 2013, the U.S. Department of Defense grounded the entire fleet of 51 F-35s after the discovery of a cracked turbine blade in a U.S. Air Force F-35A at Edwards Air Force Base.[370][371] On 28 February 2013, the Defense Department lifted the grounding after an investigation concluded that the cracks in that particular engine resulted from stressful testing, including excessive heat for a prolonged period during flight, and did not reflect a fleetwide problem.[372][373]
On 11 February 2013, an F-35A completed its final test mission for clean wing flutter, reporting to be clear of flutter at speeds up to Mach 1.6.[374] On 10 May 2013, the F-35B completed its first vertical takeoff test.[375] On 5 June 2013, an F-35A completed the first in-flight missile launch of an AIM-120 C5 AAVI (AMRAAM Air Vehicle Instrumented) over the Point Mugu Sea Test Range. The missile was launched from the internal weapons bay of the F-35.[376]
On 3 August 2013, the F-35B completed its 500th vertical landing. The aircraft, BF-3, was the same aircraft that made the F-35B's first vertical landing at Naval Air Station Patuxent River in March 2010.[377]
Training
In 2011, the Director of Operational Test and Evaluation warned that the USAF's plan to start unmonitored flight training "risks the occurrence of a serious mishap".[378] The leaders of the United States Senate Committee on Armed Services called on Defense Secretary Leon Panetta to address the issue.[379] Despite the objections, expanded trial flights began in September 2012.[380]
The F-35A and F-35B were cleared for flight training in early 2012.[381] A military flight release for the F-35A was issued on 28 February 2012.[382] The aircraft were restricted to basic maneuvers with no tactical training allowed.[383] On 24 August 2012, an F-35 flew its 200th sortie while at Eglin Air Force Base, flown by a Marine pilot. The pilot said, "The aircraft have matured dramatically since the early days. The aircraft are predictable and seem to be maintainable, which is good for the sortie production rate. Currently, the flight envelope for the F-35 is very, very restricted, but there are signs of improvement there too." The F-35s at the base no longer need to fly with a chase aircraft and are operating in a normal two-ship element.[384]
On 21 August 2012, J. Michael Gilmore wrote that he would not approve the Operational Test and Evaluation master plan until his concerns about electronic warfare testing, budget and concurrency were addressed.[385] On 7 September 2012, the Pentagon failed to approve a comprehensive operational testing plan for the F-35.[386] Instead, on 10 September 2012, the USAF began an operational utility evaluation (OUE) of the F-35A entire system, including logistical support and maintenance, maintenance training, pilot training, and pilot execution.[387] By 1 October, the OUE was reported as "proceeding smoothly", pilots started on simulators prior to flying on 26 October.[388] The OUE was completed on 14 November with the 24th flight, the four pilots involved having completing six flights each.[389]
During the Low Rate Initial Production (LRIP) phase of the aircraft, the U.S. had taken a tri-service approach to developing tactics and procedures for the F-35 using flight simulators prior to the type entering service. Simulated flights had tested the flight control's effectiveness, helping to discover technical problems and refine aircraft design.[390] Maintenance personnel have discovered that it is possible to correct deficiencies in the F-35, which is a software-defined aircraft, simply rebooting the aircraft's software and onboard systems.[391]
Air Force pilot training F-35A started in January 2013 at Eglin Air Force Base; the program has currently has a maximum capacity of 100 military pilots and 2,100 maintainer students.[392]
Basing strategy for U.S. F-35s
On 9 December 2010 Associated Press reported (supplemented with Alert5 on 10 December 2010) that the "USMC will base 216 F-35Bs on the East Coast and 184 of them on the West Coast, documents showed." This report continued to state that, "Cherry Point will get 128 jets to form eight squadrons; Beaufort will have three squadrons and a pilot training center using 88 aircraft; Miramar will form six operational squadrons with 96 jets and 88 F-35s will go to Yuma for five operational squadrons with an additional test and evaluation unit."[393]
In 2011, the USMC and USN signed an agreement that the USMC will purchase 340 F-35B and 80 F-35C fighters. The five squadrons of USMC F-35Cs would be assigned to Navy carriers while F-35Bs would be used ashore.[394][395][396]
Procurement and international participation
While the United States is the primary customer and financial backer, the United Kingdom, Italy, the Netherlands, Canada, Turkey, Australia, Norway and Denmark have agreed to contribute US$4.375 billion towards development costs.[397] Total development costs are estimated at more than US$40 billion (underwritten largely by the United States), the purchase of an estimated 2,400 aircraft is expected to cost an additional US$200 billion.[398] The initial plan was that the nine major partner nations would acquire over 3,100 F-35s through 2035.[399] Sales to partner nations are made through the Pentagon's Foreign Military Sales program.[400]
There are three levels of international participation.[401] The levels generally reflect financial stake in the program, the amount of technology transfer and subcontracts open for bid by national companies, and the order in which countries can obtain production aircraft. The United Kingdom is the sole "Level 1" partner, contributing US$2.5 billion, which was about 10% of the planned development costs[402] under the 1995 Memorandum of Understanding that brought the UK into the project.[403] Level 2 partners are Italy, which is contributing US$1 billion; and the Netherlands, US$800 million. Level 3 partners are Turkey, US$195 million; Canada, US$160 million; Australia, US$144 million; Norway, US$122 million and Denmark, US$110 million. Israel and Singapore have joined as Security Cooperative Participants (SCP).[404][405][406] Japan announced on 20 December 2011 its intent to purchase 42 F-35s with deliveries beginning in 2016 to replace the F-4 Phantom II; Japan seeks for 38 of the F-35s to be assembled domestically.[11]
By 2012, many changes had occurred in the order book. Italy became the first country to announce a reduction of its overall fleet procurement, cutting its buy from 131 to 90 aircraft. Other nations reduced initial purchases or delayed orders while still intending to purchase the same final numbers. The United States canceled the initial purchase of 13 F-35s and postponed orders for another 179. The United Kingdom cut its initial order and delayed a decision on future orders. Australia decided to buy the Boeing F/A-18E/F Super Hornet as an interim measure. Turkey also cut its initial order of four aircraft to two, but confirmed plans to purchase 100 F-35As.[407][408] Turkey will buy four F-35s to be delivered in 2015 and 2016, while the order may be increased from 100 to 120 aircraft.[409] These changes resulted in increased procurement prices, and increased the likelihood of further cuts.[410][411]
On 3 April 2012, the Auditor General of Canada Michael Ferguson published a report on 3 April 2012 outlining problems with Canada's procurement of the jet, including misinformation over the final cost. According to the Auditor General, the government knowingly understated the final price of the 65 jets by $10 billion.[412] Canada's Conservative government had stated it would not reduce its order, claiming an anticipated $75–80 million unit cost; the procurement was termed a "scandal" and "fiasco" by the media and faced a full review to determine any Canadian F-35 purchase.[413][414][415] On 13 December 2012, in a scathing editorial published by CBC News, journalist Brian Stewart termed the F-35 project a "global wrecking ball" due to its run-away costs and lack of affordability for many participating nations.[416]
In May 2013, Lockheed Martin declared that Turkey is projected to earn $12 billion from licensed production of F-35 components.[417][418]
Variants
The F-35 is being built in three different main versions to suit various combat missions.
F-35A
The F-35A is the conventional takeoff and landing (CTOL) variant intended for the U.S. Air Force and other air forces. It is the smallest, lightest F-35 version and is the only variant equipped with an internal cannon, the GAU-22/A. This 25 mm cannon is a development of the GAU-12 carried by the USMC's AV-8B Harrier II. It is designed for increased effectiveness against ground targets compared to the 20 mm M61 Vulcan cannon carried by other USAF fighters.
The F-35A is expected to match the F-16 in maneuverability and instantaneous and sustained high-g performance, and outperform it in stealth, payload, range on internal fuel, avionics, operational effectiveness, supportability, and survivability.[419] It is expected to match an F-16 that is carrying the usual external fuel tank in acceleration performance.[420] It also has an internal laser designator and infrared sensors, equivalent to the Sniper XR pod carried by the F-16, built in to reduce radar cross section.
The A variant is primarily intended to replace the USAF's F-16 Fighting Falcon. At one point it was also intended to replace the A-10 Thunderbolt II starting in 2028.[421][422] The F-35A can be outfitted to receive fuel via either of the two main aerial refueling methods; this was a consideration in the Canadian procurement and a deciding factor for the Japanese purchase.[423][424][425]
F-35B
The F-35B is the short takeoff and vertical landing (STOVL) variant of the aircraft. Similar in size to the A variant, the B sacrifices about a third of the other version's fuel volume to accommodate the vertical flight system. Vertical takeoffs and landings are riskier due to threats such as foreign object damage.[426][427] Whereas the F-35A is stressed to 9 g, the F-35B is stressed to 7 g.[428][429] The first test flight of the F-35B was conducted on 11 June 2008.[430]
Unlike other variants, the F-35B has no landing hook. The "STOVL/HOOK" control instead engages conversion between normal and vertical flight.[431] Jet thrust is sent directly downwards during vertical flight; the nozzle is being redesigned to spread the output across an oval rather than circular shape in order to limit damage to asphalt and ship decks.[432] The variant's three-bearing swivel nozzle that directs the full thrust of the engine is moved by a “fueldraulic” actuator using pressurized fuel.[433]
The United States Marine Corps plans to purchase 340 F-35Bs,[84] to replace current inventories of both the F/A-18 Hornet (A, B, C and D-models), and the AV-8B Harrier II, in the fighter, and attack roles.[434] The Marines plan to use the F-35B from "unimproved surfaces at austere bases", but with "special, high-temperature concrete designed to handle the heat".[435][436] The USMC intends to declare Initial Operational Capability with about 50 F-35s running interim Block 2B software in the 2014 to 2015 timeframe.[437] The USAF had considered replacing the A-10 with the F-35B, but will not do so due to the F-35B inability to generate enough sorties.[438]
The Royal Air Force and Royal Navy plan for the F-35B is to replace the Harrier GR9s, which were retired in 2010. One of the Royal Navy requirements for the F-35B design was a Shipborne Rolling and Vertical Landing (SRVL) mode to increase maximum landing weight to bring back unused ordnance by using wing lift during landing.[439][440] In October 2010, the UK announced plans to order to the CATOBAR F-35C instead,[441] but in May 2012 the UK reverted back to purchasing the F-35B, citing the cost of equipping the UK's new aircraft carriers for the F-35C.[442][443] In July 2013, Chief of the Air Staff, Air Chief Marshal Sir Stephen Dalton announced that 617 Squadron would be the first Royal Air Force squadron to receive the F-35.[444][445]
The Italian Navy is preparing Grottaglie Air Station for future operations with the F-35B. The Italian Navy is to receive 22 aircraft between 2014 and 2021, with its Cavour aircraft carrier set to be modified to operate them by 2016.[446]
Commandant of the U.S. Marine Corps, General James Amos has said that, in spite of increasing costs and schedule delays, there is no plan B to the F-35B.[447] The F-35B is larger than the aircraft it replaces, which required USS America to be designed without well deck capabilities.[448] In 2011, the USMC and USN signed an agreement that the USMC will purchase 340 F-35B and 80 F-35C fighters while the USN will purchase 260 F-35C fighters. The five squadrons of USMC F-35Cs will be assigned to Navy carriers while F-35Bs will be used on amphibious ships and ashore.[394][395][396]
On 6 January 2011, Gates said that the 2012 budget would call for a two-year pause in F-35B production during which the aircraft faced redesign, or cancellation if unsuccessful.[79][449] In 2011, Lockheed Martin executive vice president Tom Burbage and former Pentagon director of operational testing Tom Christie stated that most program delays were due to the F-35B, which forced massive redesigns of other versions.[450] Lockheed Martin Vice President Steve O’Bryan has said that most F-35B landings will be conventional to reduce stress on vertical lift components.[451] USMC Lt. Gen. Robert Schmidle has said that the vertical lift components would only be used "a small percentage of the time" to transfer the aircraft from carriers to land bases.[452] On 3 October 2011, the F-35B began its initial sea-trials by performing a vertical landing on the deck of the amphibious assault ship USS Wasp.[453] Probation status was reportedly ended by Defense Secretary Leon Panetta in January 2012 due to progress made.[82]
F-35C
Compared to the F-35A, the F-35C carrier variant features larger wings with foldable wingtip sections, larger wing and tail control surfaces for improved low-speed control, stronger landing gear for the stresses of carrier arrested landings, a twin-wheel nose gear, and a stronger tailhook for use with carrier arrestor cables. The larger wing area allows for decreased landing speed while increasing both range and payload.
The United States Navy will use the F-35C carrier variant. It intends to buy 480 F-35Cs to replace the F/A-18A, B, C, and D Hornets and complement the existing Super Hornet fleet.[454] On 27 June 2007, the carrier variant completed its Air System Critical Design Review (CDR), allowing the production of the first two functional prototype F-35Cs.[455] The C variant is expected to be available beginning in 2014.[456] The first F-35C was rolled out on 29 July 2009.[457] The United States Marine Corps will also purchase 80 F-35Cs, enough for five marine fighter-attack squadrons, for use with navy carrier air wings in a joint service agreement signed on 14 March 2011.[394][395][396]
On 6 November 2010, the first F-35C arrived at Naval Air Station Patuxent River. At the time, it was determined that the replacement engines for at-sea repair are too large to be transported by current underway replenishment systems.[458] In 2011, the F-35Cs were grounded for six days because of a software error intended to keep the wings from folding in mid-flight.[459] On 27 July 2011, the F-35C test aircraft CF-3 completed its first steam catapult launch during a test flight in Naval Air Engineering Station Lakehurst; the TC-13 Mod 2 test steam catapult, representative of current fleet technology, was used. In addition to catapult launches at varying power levels, a three-week test plan included dual-aircraft jet blast deflector testing and catapult launches using a degraded catapult configuration to measure the effects of steam ingestion on the aircraft.[460]
On 13 August 2011, the F-35 integrated test force successfully completed jet blast deflector (JBD) testing at the Lakehurst facility, with a round of two-aircraft testing. F-35C test aircraft CF-1 along with an F/A-18E tested a combined JBD cooling panel configuration to assess the integration of F-35s in aircraft carrier launch operations. The tests measured temperatures, pressures, sound levels, velocities, and other environmental data; the combined JBD model will enable carrier deck crews to operate all air wing aircraft, including the F-35C, as per operational requirements. Further carrier suitability testing continued, including catapult and arrestment testing in preparation for initial ship trials in 2013.[461] On 18 November 2011, the U.S. Navy used its new Electromagnetic Aircraft Launch System (EMALS) to catapult an F-35C into the air for the first time.[462]
On 22 June 2013, The US Navy's Strike Fighter Squadron VFA-101 received the Navy's first F-35C Lightning II carrier variant aircraft from Lockheed Martin at the squadron's home at Eglin Air Force Base, Florida.[463]
The USN is dealing with the following issues in adapting their carriers to operate the F-35C.[464]
- The F135 engine exceeds the weight capacity of traditional replenishment systems and generates more heat than previous engines.
- The stealthy skin requires new repair techniques; extensive skin damage shall necessitate repairs at Lockheed's land-based facilities.
- The adoption of volatile lithium-ion batteries and higher voltage systems than traditional fighters.
- The use of new weapons not previously employed on carrier aircraft.
- Large quantities of classified data generated during missions shall require additional security.
Other versions
F-35I
The F-35I is an F-35A with Israeli modifications. A senior Israel Air Force official stated "the aircraft will be designated F-35I, as there will be unique Israeli features installed in them". Despite an initial refusal to allow such modifications, the U.S. has agreed to let Israel integrate its own electronic warfare systems into the aircraft’s built-in electronic suite. That would let Israel gradually add indigenously produced EW sensors and countermeasures once it receives its first squadron. In addition, a plug-and-play feature added to the main computer will allow for the use of Israeli electronics in an add-on fashion. Israel will be able to fit its own external jamming pod and plans to install its own air-to-air missiles and guided bombs in the F-35’s internal weapon bays.[465][466] A contract was issued for this in 2012.[172] Israeli pilots are scheduled to start training in F-35s in December 2016 with the first squadron activated about a year later.[467]
Israel Aerospace Industries has considered playing a role in the development of a proposed two-seat F-35. An IAI executive stated, "There is a known demand for two seats not only from Israel but from other air forces. Advanced aircraft are usually two seats rather than single seats."[468] IAI also plans to produce conformal fuel tanks to extend the range.[469]
A senior IAF official has said that elements of the stealth on the F-35 may be overcome in 5 to 10 years, while the aircraft will be in service for 30 to 40 years, which is why Israel has insisted on the ability to install their own electronic warfare systems. “The basic F-35 design is OK. We can make do with adding integrated software.”[470] Israel is interested in purchasing as many as 75 F-35 fighters.[471]
CF-35
The Canadian CF-35 is a proposed variant that would differ from the F-35A through the addition of a drag chute and may include an F-35B/C style refueling probe.[472][473] Norway may also use the drag chute option, as they also have icy runways.[267] However, in 2012 it was revealed that the CF-35 would employ the same boom refueling system as the F-35A.[474]
One alternative proposal would have been the adoption of the F-35C for its probe refueling and lower landing speed; the Parliamentary Budget Officer's report cited the F-35C's limited performance and payload as being too high a price to pay.[475] The heavier F-35C airframe reduces the maximum G-level as compared to the F-35A, the F-35C will have the largest internal fuel capacity and longest range out of the three F-35 variants, it is likely to be more expensive than the F-35A.
Operators
These nations have received aircraft and are currently operating the F-35:
- Royal Air Force: Three aircraft delivered and based in Florida,[476] not expected in UK until 2015 and not expected to be declared operational until 2018.[477][478]
- Royal Netherlands Air Force: One aircraft delivered, a second completed undergoing factory tests until September 2013. Both F-35s based in Florida with one to take part in testing program.[479]
Specifications (F-35A)
External image | |
---|---|
F-35B Lightning II cutaway illustration | |
Hi-res cutaway of F-35B Lightning II STOVL by Flight Global, 2006. |
Data from Lockheed Martin specifications,[229][480][481] F-35 Program brief,[244] F-35 JSF Statistics[248] F-35 Program Status,[482]
General characteristics
- Crew: 1Internal fuel capacity: 18,480 lb (8,382 kg)[N 5]
Performance
- Thrust/weight: **With full fuel: 0.87
- With 50% fuel: 1.07
- Max g-limits: 9 g[N 6]
Armament
- Guns: 1 × General Dynamics GAU-22/A Equalizer 25 mm (0.984 in) 4-barreled gatling cannon, internally mounted with 180 rounds[N 7][248]
- Hardpoints: 6 × external pylons on wings with a capacity of 15,000 lb (6,800 kg)[244][248] and two internal bays with two pylons each[244] for a total weapons payload of 18,000 lb (8,100 kg)[229], with provisions to carry combinations of:
- Missiles:
- Bombs: *** Mark 84, Mark 83 and Mark 82 GP bombs
- Mk.20 Rockeye II cluster bomb
- Wind Corrected Munitions Dispenser capable
- Paveway series laser-guided bombs
- Small Diameter Bomb (SDB)
- JDAM series
- B61 nuclear bomb[486]
- AGM-154 JSOW
- Missiles:
Avionics
- Northrop Grumman Electronic Systems AN/APG-81 AESA radar
- Lockheed Martin AAQ-40 E/O Targeting System (EOTS)
- Northrop Grumman Electronic Systems AN/AAQ-37 Distributed Aperture System (DAS) missile warning system
- BAE Systems AN/ASQ-239 (Barracuda) electronic warfare system
- Harris Corporation Multifunction Advanced Data Link (MADL) communication system
F-35A CTOL |
F-35B STOVL |
F-35C CATOBAR | |
---|---|---|---|
Length | 51.4 ft (15.7 m) | 51.3 ft (15.6 m) | 51.5 ft (15.7 m) |
Wingspan | 35 ft (10.7 m) | 35 ft (10.7 m) | 43 ft (13.1 m) |
Wing Area | 460 ft² (42.7 m²) | 460 ft² (42.7 m²) | 668 ft² (62.1 m²) |
Empty weight | 29,300 lb (13,300 kg) | 32,300 lb (14,700 kg) | 34,800 lb (15,800 kg) |
Internal fuel | 18,250 lb (8,280 kg) | 13,500 lb (6,125 kg) | 19,750 lb (8,860 kg) |
Max takeoff weight | 70,000 lb class (31,800 kg) | 60,000 lb class (27,300 kg) | 70,000 lb class (31,800 kg) |
Range | 1,200 nmi (2,220 km) | 900 nmi (1,670 km) | 1,400 nmi (2,520 km) |
Combat radius on internal fuel[494] |
584 nmi (1,082 km) | 469 nmi (869 km) | 615 nmi (1,141 km) |
Thrust/weight • full fuel: • 50% fuel: |
0.87 1.07 |
0.90 1.04 |
0.75 0.91 |
Notable appearances in media
See also
Aircraft of comparable role, configuration, and era
Related lists
- List of fighter aircraft
- List of active United States military aircraft
- List of megaprojects, Aerospace
References
Notes
- ^ Quote: "The F-35 Lightning II will carry on the legacy of two of the greatest and most capable fighter aircraft of all time. Just as the P-38 and the British Lightning were at the top of their class during their day, the F-35 will redefine multi-role fighter capability in the 21st century." Ralph D. Heath, president of Lockheed Martin Aeronautics Co.[28]
- ^ Quote: "The F-35A, with an air-to-air mission takeoff weight of 49,540 lb."[228]
- ^ "Republic F-105D; one Pratt & Whitney J75-P-19W turbojet of 24,500/10,000 lb thrust; T/Wg 0.50; Wg/S 127.2."[230]
- ^ Quote: "Brigadier Davis was more forthright in his comments to media in Canberra, saying the ‘Raptor’ lacks some of the key sensors and the enhanced man-machine interface of the F-35."[315]
- ^ F-35B: 14,003 lb (6,352 kg); F-35C: 20,085 lb (9,110 kg)
- ^ F-35B: 7.5 g, F-35C: 7.5 g
- ^ F-35B and F-35C have cannon in an external pod with 220 rounds
- ^ C is 51.5 ft (15.7 m)
- ^ B is the same, C: 14.9 ft (4.54 m)
- ^ F-35B: 47,996 lb (21,771 kg); F-35C: 57,094 lb (25,896 kg)
- ^ C is same, B: 60,000 lb (27,000 kg)
- ^ F-35B: vertical thrust 39,700 lbf (176 kN)
Citations
- ^ "Pentagon: First F-35s Operational in 2015." Defense News
- ^ a b c d e f g Shalal-Esa, Andrea (21 May 2013). "U.S. Air Force To Move Forward Target Date For F-35 Use". Aviation Week.
- ^ King, Samuel Jr. "First F-35 arrives at Eglin." U.S. Air Force, 15 July 2011. Retrieved: 20 July 2011.
- ^ Houghton, Kimberley. "BAE Systems gets chunk of jet contract." Union Leader, 5 January 2012. Retrieved: 5 January 2012.
- ^ a b c "Capabilities." (archived version) Lockheed Martin. Retrieved 24 July 2010.
- ^ "Knesset Finance Committee approves F-35 deal." Globes (Israel). Retrieved: 29 November 2010.
- ^ "Lockheed sees increased Singapore interest in F-35 fighter." Reuters, 9 November 2012. Retrieved: 24 February 2013.
- ^ "F-35 Global Partnerships." Lockheed Martin. Retrieved: 31 October 2012.
- ^ Dudley, Richard. "Program Partners Confirm Support for F-35 Joint Strike Fighter." Defence Update, 5 March 2012. Retrieved: 18 March 2012.
- ^ "Israel plans for second F-35 squadron." United Press International, 27 February 2012. Retrieved: 18 March 2012.
- ^ a b "US Lockheed Martin F-35 chosen as Japan fighter jet." BBC News, 20 December 2011. Retrieved: 20 December 2011.
- ^ Fukue, Natsuko. "U.S.-made F-35 is chosen for ASDF."[dead link] Japan Times, 21 December 2011, p. 1.
- ^ Wall, Robert, "Lockheed Dismisses Korea F-35 Schedule Issue."[dead link] Aviation Week. 21 February 2012.
- ^ "Lockheed Martin F22 and F35 5th Gen Revolution In Military Aviation." Space Daily, 22 February 2006.
- ^ "F-35 Joint Strike Fighter (JSF) Lightning II." Global Security. Retrieved: 7 April 2010.
- ^ a b Keijsper 2007, p. 119.
- ^ Polmar 2005, p. 398.
- ^ Parsch, Andreas. "Designation Systems." Designation Systems, 27 April 2006. Retrieved 23 November 2009.
- ^ Thompson, Mark. "The Most Expensive Weapon Ever Built." Time magazine, 25 February 2013, pp. 26–30 (lack of 2-seat trainer variants cited on p. 27).
- ^ Orlando, Dave. "USAF may not be able to afford T-X jet trainer project." Flight global, 22 February 2013. Retrieved: 24 February 2013.
- ^ Keijsper 2007, pp. 122, 124.
- ^ "X to F: F-35 Lightning II And Its X-35 Predecessors"
- ^ "Outgoing LM F-35 program boss admits to flawed weight assumptions."
- ^ Fulghum, David A. and Robert Wall. "USAF Plans for Fighters Change." Aviation Week and Space Technology, 19 September 2004.
- ^ Keijsper 2007, p. 124,
- ^ Pappalardo, Joe. "Weight Watchers - How a team of engineers and a crash diet saved the Joint Strike Fighter." Air & Space magazine, November 2006. Retrieved: 1 April 2013.
- ^ "'Lightning II' moniker given to Joint Strike Fighter." Air Force Link, United States Air Force, 7 June 2006. Retrieved 1 December 2008.
- ^ Kent, John R. and John Smith. "Lockheed Martin Joint Strike Fighter Officially Named 'Lightning II'." Lockheed Martin press release, 7 July 2006. Retrieved: 28 May 2009.
- ^ "F-35 Joint Strike Fighter was officially named Lightning II." Lockheed Martin, 7 July 2006.
- ^ a b "F-35 Distributed Aperture System (EO DAS)." Northrop Grumman. Retrieved 6 April 2010.
- ^ "Italy Wins JSF Final Assembly: U.K. Presses Maintenance, Support." Aviation Week, February 2013.
- ^ "Handling Specialty Turn Key Capabilities." handling.com. Retrieved: 16 November 2010.
- ^ Wolf, Jim. "Exclusive: US to withhold F-35 fighter software codes." Reuters, 24 November 2009. Retrieved: 12 September 2011.
- ^ Kent, John R. and Joseph W. Stout. "Weight-Optimized F-35 Test Fleet Adds Conventional Take off And Landing Variant." Lockheed Martin, 23 December 2008. Retrieved: 23 November 2009.
- ^ Moore, Mona. "F-35 production on target." Northwest Florida Daily News, 5 January 2009, Volume 62, Number 341, p. A1.
- ^ Gearan, Anne. "Defense Secretary Gates proposes weapons cuts." The Seattle Times, 7 April 2009.
- ^ Trimble, Stephen. "Fix for F-35 final assembly problem pushed back." Flight International, 16 August 2010. Retrieved: 24 August 2010.
- ^ GAO-06-356, "DOD Plans to Enter Production before Testing Demonstrates Acceptable Performance." GAO, March 2006.
- ^ "Defense Acquisitions: Assessments of Selected Weapon Programs." Gao.gov, 29 August 2008. Retrieved 4 December 2011.
- ^ "FY 2011 Budget Estimates." U.S. Air Force, February 2010, pp. 1–47.
- ^ "The F-35I Looks Pregnant." strategypage.com. Retrieved 21 October 2010.
- ^ McPhedran, Ian. "Stealth fighters cheap at $140m." Herald Sun, 25 August 2010. Retrieved 21 October 2010.
- ^ "U.S. Program Acquisition Costs by Weapon System." 'defense-aerospace.com'. Retrieved 6 April 2011.
- ^ "United States Department of Defense Fiscal Year 2012 Budget Request: Program Acquisition Costs by Weapon System." Office of the Under Secretary of Defense (Comptroller)/CFO. Retrieved 6 April 2011.
- ^ Gorman, Siobhan. "Computer Spies Breach Fighter-Jet Project." The Wall Street Journal, 21 April 2009. Retrieved 29 March 2010.
- ^ Cullen, Simon. "Jet maker denies F-35 security breach." Australian Broadcasting Corporation, 22 April 2009. Retrieved 29 March 2010.
- ^ "China's Role In JSF's Spiraling Costs." Aviation Week, 8 February 2012.
- ^ "Security experts admit China stole secret fighter jet plans." The Australian. 12 March 2012.
- ^ by John Sheridan (2 February 2013). "ICAO Committee To Tackle Cyber Warfare". Ainonline.com.
- ^ William Gallo, Victor Beattie (20 February 2013). "Chinese Army Rejects US Report on Cyber Hacking". Voice of America.
- ^ Bennett, John T. "Plan Afoot to Halt F-35 Cost Hikes, Delays." defensenews.com, 9 November 2009. Retrieved 23 November 2009.
- ^ Clark, Colin. "Gates Fires JSF Program Manager." dodbuzz.com, 1 February 2010. Retrieved 21 March 2010.
- ^ "Gates Criticizes F-35 Progress, Fires Top Officer." PLANYC 2030, 2011. Retrieved 24 June 2011.
- ^ "JSF faces US Senate grilling." australianaviation.com.au, 12 March 2010.
- ^ Shalal-Esa, Andrea and Tim Dobbyn, ed. "Price of F35 fighter soars." Reuters. Retrieved: 12 September 2011.
- ^ "Lockheed F-35 to beat Pentagon estimate by 20 pct." Reuters, 1 June 2010.
- ^ Thompson, Mark. "The Costly F-35: The Saga of America's Next Fighter Jet." Time, 25 March 2010.
- ^ Clark, Colin. "Prez Panel Wants $100B DoD Cut; Freeze Pay, Kill F-35B, EFV." DoDBuzz, 10 November 2010.
- ^ $200 billion in illustrative savings point 47 National Commission on Fiscal Responsibility and Reform, 10 November 2010.
- ^ "Lockheed F–35 Fighter In Deficit Panel's Sights." The New York Times, 10 November 2010.
- ^ Tirpak, John A. "Shorting the F-35." Air Force Association, 15 November 2010.
- ^ Thompson, Loren B. "Rumor Of Marine F-35 Termination Talks Is Wrong." Lexington Institute, 15 November 2010.
- ^ Thompson, Loren. "Pentagon Factional Disputes Are A Key Driver Of F-35 Cost Increases." Lexington Institute, 1 November 2010.
- ^ Trimble, Stephen. "Lockheed's F-35 faces second restructuring this year." Flight International, 3 November 2010.
- ^ "Lockheed Martin F-35 Begins Flying Block 1 Software." Lockheed Martin, 15 November 2010.
- ^ Hoyle, Craig. "Can Lockheed deliver on the Joint Strike Fighter dream? " Flight International, 14 December 2010.
- ^ Warwick, Graham and Amy Butler. "F-35 Replan Adds Time, Resources For Testing." Aviation Week, 8 February 2011.
- ^ Charette, Robert N. "F-35 Program Continues to Struggle with Software." IEEE Spectrum, 19 September 2012.
- ^ Whittle, Richard. "JSF's Build And Test Was 'Miscalculation,' Adm. Venlet Says; Production Must Slow." Aol Defense, 1 December 2011.
- ^ Cox, Bob. "Pentagon takes a harder line with Lockheed Martin over F-35."[dead link] Star-Telegram, 26 October 2011.
- ^ Thompson, Loren. "Why Pentagon Weapon 'Efficiencies' Are Often An Illusion." Forbes, 1 November 2011.
- ^ Katz, Yaakov. "Will Iran influence pick for next IAF commander?" The Jerusalem Post, 4 December 2011.
- ^ DiMascio, Jen. "McCain Backs Hard-Line Pentagon F-35 Stance."[dead link] Aviation Week, 18 November 2011.
- ^ Clark, Colin. "McCain Slams JSF, Calls Program 'Scandal And A Tragedy;' Contract Talks Advance." Aol Defense, 5 December 2011.
- ^ "US defence firms blast Pentagon on contract changes: companies warn of layoffs, higher costs." Reuters, 12 December 2011.
- ^ "GAO-12-525T: Restructuring Added Resources and Reduced Risk, but Concurrency Is Still a Major Concern." GAO. 20 March 2012.
- ^ Pincus, Walter. "Slack budgeting at Defense." WaPo, 6 June 2012.
- ^ "Exclusive: Retrofits to add $1.7 billion to cost of F-35 - GAO report."
- ^ a b Trimble, Stephen. "US military unveils possible F-35B redesign in sweeping budget reforms." Flight International, 6 January 2011.
- ^ Gates, Robert. "Speech to Air Force Academy." defense.gov, 4 March 2011. Retrieved 8 March 2011.
- ^ Rabechault, Mathieu. "F-35 looking more like white elephant." Yahoo News, 13 January 2011.
- ^ a b Marshall, Tyrone C. Jr. "Panetta Lifts F-35B Probation." Aviation Week, 20 January 2012.
- ^ Fulghum, David A. "Repairing the F-35 Program." Aviation Week, 10 February 2011.
- ^ a b Majumdar, Dave. "F-35 Tests Proceed, Revealing F/A-18-Like Performance." Defense News, 16 May 2011.
- ^ "Program Restructuring Should Improve Outcomes, but Progress Is Still Lagging Overall." star-telegram.com, 15 March 2011.
- ^ Trimble, Stephen. "USAF rules out new F-15s and F-16s to narrow ‘fighter gap’." Flight International, 4 June 2010.
- ^ "Israel eyes used F-15s to fill for F-35s." United Press International, 18 April 2011,
- ^ "Australia may buy more Super Hornets amid F-35 delays: report." Reuters, 13 May 2011.
- ^ "Lockheed Addressing F-35 ‘Development Risks,’ Congress Told." Bloomberg News, 19 May 2011.
- ^ "The last manned fighter." The Economist, 14 July 2011.
- ^ Capaccio, Tony. "Pentagon Cuts Four Lockheed Jets From Next Order, Pentagon Says." Bloomberg, 26 October 2011.
- ^ Lerman, David. "Pentagon Budget for 2013 Calls for Two Fewer of Lockheed’s F-35 Fighters." Bloomberg News. 13 February 2012.
- ^ Gibbs, Walter. "U.S. slowdown on F-35 jet buy to raise cost: Lockheed." Reuters, 14 February 2012.
- ^ "Pentagon, Lockheed see price of F-35 going up." Reuters, 14 February 2012.
- ^ "Japan tells U.S. it may halt F-35 purchase if prices rise." Mainichi Japan. 23 February 2012.
- ^ Shalal-Esa, Andrea. "'No more money' for F-35 cost overruns: Pentagon." Reuters, 20 March 2012.
- ^ Shalal-Esa, Andrea. "Pentagon says F-35 fighter delayed, costs rise 4.3 percent." Reuters, 29 March 2012.
- ^ Cox, Bob. "Pentagon to tie F-35 orders more closely to development and testing progress." Star Telegram, 8 May 2012.
- ^ "F-35 – Avoiding the ‘Death Spiral’."
- ^ Campion-Smith, Bruce. "Canada may not buy F-35 fighter jets, Ottawa admits." The Star, 13 March 2012. Retrieved 23 March 2012.
- ^ "The F-35: Not just costly but obsolete; To aviation nerds, the Joint Strike Fighter is looking more and more like an ugly mutt." Maclean's, 13 April 2012.
- ^ "Pentagon's F-35 Fighter Under Fire in Congress." PBS. Retrieved 22 August 2010.
- ^ "41st Parliament, 1st Session, Standing Committee on National Defence." Parliament of Canada, 24 November 2011.
- ^ Shalal-Esa, Andrea. "Government sees lifetime cost of F-35 fighter at $1.51 trillion." Reuters, 2 April 2012.
- ^ Butler, Amy. "USAF Reducing Possible JSF Basing Locations." Aviation Week. 2 March 2012.
- ^ "Lockheed Martin Statement on 2011 SAR Report." LockMart. 31 March 2012.
- ^ Williams, Peter. "Quickstep finds cash harder to come by." The West Australian, 4 January 2012.
- ^ Weisgerber, Marcus. "DoD Anticipates Better Price on Next F-35 Batch." Defense News. 8 March 2012.
- ^ Four Corners By Andrew Fowler and Clay Hichens. "Pentagon general issues warning on JSF blow-outs". Australian Broadcasting Corporation. Retrieved 24 February 2013.
- ^ "3-star: F-35 comments a ‘shot across the bow’."
- ^ Weisgerber, Marcus. "Schwartz defends reduced F-35 combat radius." AirForce Times. 6 March 2012.
- ^ "Pentagon agrees to F-35A combat radius reduction." Flight International, 8 March 2012.
- ^ "JSFail? Not When the Pentagon Grades the F-35 on a Curve." DefPro.News, 7 March 2012.
- ^ Regan, James. "U.S. seeks to ease concerns over F-35 delays, costs." Reuters, 15 March 2012.
- ^ "U.S. weapons maker pushes back at Pentagon." Reuters, 1 June 2012.
- ^ Shalal-Esa, Andrea. "Lockheed hires temps at strike-hit Fort Worth plant." Reuters, 1 June 2012.
- ^ Shalal-Esa, Andrea. "Lockheed F-35 scrap rate at 16 percent – Pentagon." Reuters, 8 June 2012.
- ^ Shalal-Esa, Andrea. "Lockheed brings in more workers as strike drags on." Reuters, 14 June 2012.
- ^ "Fitch lowers Lockheed Martin outlook to negative." Trefis, 13 June 2012.
- ^ "Lockheed says more orders key to cutting F-35 cost." Reuters, 19 June 2012.
- ^ Freeman, Ben. "The Guerilla Warfare of Pentagon Contractors." POGO, 21 June 2012.
- ^ Wheeler, Winslow. "How the F-35 Nearly Doubled In Price (And Why You Didn’t Know)." Time, 9 July 2012.
- ^ Cox, Bob. "Pentagon tightens grading standards, cuts into Lockheed profits." Star-Telegram, 24 July 2012.
- ^ Capaccio, Tony. "Pentagon Withholds $47 Million From Lockheed on F-35." Business Week, 26 October 2012.
- ^ "Air Force accused of wrong cost estimates to keep F-16s flying". Daytondailynews.com. Retrieved 24 February 2013.
- ^ Paris Air Show 2013 - Day 2 | News | The Royal Aeronautical Society. Media.aerosociety.com (2013-06-20). Retrieved on 2013-08-16.
- ^ "Lockheed lays off 110 workers at Fort Worth assembly plant". The Business Journals. 10 January 2013.
- ^ "F-35 concurrency costs not as great as feared, official says". Janes. 5 February 2013.
- ^ "With 45 states plugged into F-35 program, stealth fighter is too big to kill". Ipolitics.ca. Retrieved 24 February 2013.
- ^ "Pentagon vows to 'protect' funding for F-35 if possible." Reuters.
- ^ Raghavendran, Beena (25 April 2013). "Pentagon's budget cuts could slow F-35 program, Congress told". Stars and Stripes. McClatchy Newspapers.
- ^ F-35 No Longer the Problem Child. Airforcemag.com (2013-06-14). Retrieved on 2013-08-16.
- ^ "More F-35 Delays Predicted."
- ^ "Canceling Lockheed F-35 Said to Be Among Pentagon Options."
- ^ "Pentagon downplays prospects of cancelling F-35, bomber."
- ^ "Is Lockheed's F-35 About to Become a Victim of Sequestration?"
- ^ Washington Journal, 21 August 2013, C-SPAN.ORG.
- ^ "The F-35 (Joint Strike Fighter) Project : progress and issues for Australia" Parliament of Australia, Department of Parliamentary Services, 9 June 2006, p. 2
- ^ [1][dead link] Parliament of Australia, Department of Parliamentary Services,21 June 2004
- ^ "How Stealthy Is Your F-35?" Defensetech.org, 23 June 2011
- ^ Janes Defence Weekly, 26 April 2006
- ^ "JSF security technology costing up to US$1bn" Jane's International Defence Review, 5 April 2004
- ^ "Not so stealthy: the $15b fighters." The Sydney Morning Herald 14 March 2006.
- ^ "Submission No 27: Inquiry into Australian Defence Force Regional Air Superiority." Department of Defence, Canberra, Australia. Retrieved 6 June 2012.
- ^ Kosiak, Steve and Barry Watts. "US Fighter Modernization Plans: Near-term Choices." CSBA. Retrieved 3 July 2010.
- ^ Wolf, Jim. "Air Force chief links F-35 fighter jet to China." Reuters, 19 September 2007. Retrieved 12 September 2011.
- ^ Krepinevich, Andrew. "Testimony by Andrew Krepinevich, Executive Director, before the Senate Armed Services AirLand Subcommittee." CSBA, 10 March 1999.
- ^ Wynne, Mike (29 January 2013). "Mike Wynne, Former Air Force Secretary, Says Deploy Fifth Gen Planes, Fly Em With Korean F-16s". Defense.aol.com. Retrieved 24 February 2013.
- ^ Reed, John. "The Reactions to Gates’ Spending Plans." DoD Buzz, 7 January 2010.
- ^ "F-35B Goes Supersonic." Lockheed Martin Aeronautics Company, 10 June 2010.
- ^ a b c Lake 2010, pp. 37–45.
- ^ "Air Combat Past, Present and Future" Docstoc, 6 October 2010
- ^ "Fighter criticism 'unfair' and 'misrepresented'." ABC News, 25 September 2008. Retrieved 30 October 2008.
- ^ Trimble, Stephen. "US defence policy – and F-35 – under attack." Flight International, Reed Business Information, 15 October 2008.
- ^ a b Kent, John R. "Setting the Record Straight On F-35." Lockheed Martin, 19 September 2008.
- ^ "Department of Defence annual report 2010–11." ParlInfo – Parliamentary Joint Committee on Foreign Affairs, Defence and Trade, 20 March 2012. Retrieved 6 June 2012.
- ^ Sweetman, Bill. "JSF Leaders Back In The Fight." Aviation Week, 22 September 2008. Retrieved 3 July 2010.
- ^ "Lockheed Martin briefing package for Norway." Lockheed Martin, 24 April 2008.
- ^ Pocock, Chris. "LM defends F-35 JSF agility against critics." Aviation International News, 15 June 2009.
- ^ "F-35A achieves max angle of attack". Australianaviation.com.au. 20 November 2012.
- ^ Hoehn, Andrew. "Statement Regarding Media Coverage of F-35 Joint Strike Fighter." RAND, 12 October 2010.
- ^ Thompson, Loren B. "F-35 Fighter Confounding Critics As Flight Tests Ramp Up." Lexington Institute, 1 March 2011.
- ^ Beijing-based newspaper Global Times launches English edition, People's Daily, 20 April 2009
- ^ "F-35 fighter has become a clumsy white elephant." globaltimes.cn, 24 March 2010. Retrieved 3 August 2010.
- ^ "Amerikaanse twijfel over JSF" (in Dutch). Nova, 12 July 2010. Retrieved 22 July 2010.
- ^ Entous, Adam. "U.S.-Saudi Arms Plan Grows to Record Size: Addition of Apaches, Black Hawks Swells Deal to $60 billion." The Wall Street Journal, 14 August 2010. Retrieved 16 August 2010.
- ^ "First RAF pilot flies Joint Strike Fighter." British Ministry of Defence via Defence News, 9 February 2010.
- ^ Stevens, Geoff. "Single-engine F-35’s may endanger Canadian crews." TheRecord, 31 January 2011.
- ^ a b Axe, David. "Trillion-Dollar Jet Has Thirteen Expensive New Flaws." Wired, 13 December 2011.
- ^ "F-35 Joint Strike Fighter Concurrency Quick Look Review." Department of Defense, 29 November 2011. Retrieved 25 January 2012.
- ^ Auslin, Michael. "Flying Not Quite as High." Weekly Standard, 7 May 2012.
- ^ a b "U.S., Lockheed Martin reach deal on Israeli F-35 fighter jets." Reuters, 26 July 2012.
- ^ Shachtman, Noah. "Gajillion-Dollar Stealth Fighter, Now Easier to Shoot Down." Wired, 11 June 2010.
- ^ "Report: Lightning a threat to F-35." Navy Times
- ^ "Reduced F-35 performance specifications may have significant operational impact". Flight International. 30 January 2013. Retrieved 24 February 2013.
- ^ Capaccio, Tony. "Pentagon Mulls Restoring F-35 Safety Gear to Reduce Risk". Bloomberg. Retrieved 24 February 2013.
- ^ "F-35 May Miss Acceleration Goal."
- ^ Shalal-Esa, Andrea. "Pentagon, Lockheed move forward on F-35 contract." Reuters, 5 December 2011.
- ^ http://www.nytimes.com/2013/02/23/business/new-troubles-for-pentagons-f-35-fighter.html?hp
- ^ "F-35 fighter jet fleet grounded by Pentagon". BBC. 22 February 2013.
- ^ "Department of Defence annual report 2010–1." ParlInfo – Parliamentary Joint Committee on Foreign Affairs, Defence and Trade, 16 March 2012. Retrieved 6 June 2012.
- ^ "New Pentagon super fighter will get pilots shot down, warns report."
- ^ "Is there a government conspiracy to save the F-35?"
- ^ "F-35 Report Warns of Visibility Risks, Other Dangers."
- ^ "Top Tester Says F-35A 'Immature' For Training; JPO Says 'Ready For Training'."
- ^ "Stealth Curbed By Uncertainty Over Acquisition And Support Costs."
- ^ "F-35B sea-trials aboard the USS Wasp."
- ^ "Pentagon Tells Lockheed to Shape Up on F-35 Fighter." Reuters.com, 17 September 2012.
- ^ "Pentagon seeks competition for sustainment of Lockheed F-35." Chicago Tribune, 28 September 2012.
- ^ "Pentagon Escalates Rhetoric Against Lockheed Over F-35."
- ^ Byers, Michael and Stewart Webb. "Michael Byers and Stewart Webb on the F-35: The plane that keeps on billing." National Post, 30 November 2012.
- ^ "Vertiflight". Journal of the American Helicopter Society, January 2004.
- ^ Hayles, John. "Yakovlev Yak-41 'Freestyle'." Aeroflight, 28 March 2005. Retrieved 3 July 2008.
- ^ "Joint Strike Fighter (JSF)." Jane's. Retrieved 3 July 2008.
- ^ Kent, John R. and Chris Geisel. "F-35 STOVL supersonic." lockheedmartin.com. Retrieved 16 November 2010.
- ^ Johns, Darnell Sharkleford. "Air Force presentation to House Subcommittee on Air and Land Forces." armedservices.house.gov, 20 May 2009, p. 10.
- ^ Amaani, USAF Tech. Sgt. Lyle. "Air Force takes combat air acquisitions priorities to Hill." U.S. Air Force, 3 April 2009.
- ^ "LockMart F-35 FAQ." Lockheed Martin, 2011.
- ^ Trimble, Stephen. "Lockheed Martin sees F-35A replacing USAF air superiority F-15C/Ds." Flight International, 4 February 2010. Retrieved 2 March 2010.
- ^ "Silent Eagle Media Brief.Doc", p. 10. Boeing, 2009.
- ^ a b Butler, Amy. "New Stealth Concept Could Affect JSF Cost."[dead link] Aviation Week, 17 May 2010. Retrieved 5 June 2010.
- ^ Philips, E. H. "The Electric Jet." Aviation Week & Space Technology, 5 February 2007.
- ^ Parker, Ian. "Reducing Risk on the Joint Strike Fighter." Avionics Magazine, Access Intelligence, LLC, 1 June 2007. Retrieved 8 June 2007.
- ^ "F/A-18E/F Super Hornet." Boeing.
- ^ Giese, Jack. "F-35 Brings Unique 5th Generation Capabilities." lockheedmartin.com, 23 October 2009.
- ^ Shalal-Esa, Andrea. "Pentagon seeks competition for sustainment of Lockheed F-35." Reuters, 28 September 2012.
- ^ Sweetman, Bill. "Wrongheaded? Really?" Aviation Week, 18 October 2012.
- ^ "F-35 Cost Per Flying Hour: A Tale of Two Numbers."
- ^ Majumdar, Dave. "USMC finds workaround for cyber vulnerability on F-35 logistics system." Flight International, 20 November 2012.
- ^ Trimble, Stephen. "Farnborough: Lockheed encouraged by pace of F-35 testing." Flight International, 12 June 2010. Retrieved 22 July 2010.
- ^ "USAF works to bridge gap between its sustainment cost estimates and Lockheed's". Flight International. 12 January 2013. Retrieved 24 February 2013.
- ^ "Factbox: Batteries blamed in Boeing 787 grounding are widely used". Chicago Tribune. 17 January 2013. Retrieved 24 February 2013.
- ^ Hepher, Tim. "Airbus studies dropping Li-Ion battery for A350: sources". Reuters. Retrieved 24 February 2013.
- ^ "Pentagon to Use Lithium-Ion Batteries for F-35 Jets Despite Boeing 787 Woes". Dailytech.com. Retrieved 24 February 2013.
- ^ "Skinning the F-35 fighter."
- ^ "Contract Awarded To Validate Process For JSF." onlineamd.com, 17 May 2010. Retrieved 22 July 2010.
- ^ Trimble, Stephen. "Lockheed Martin reveals F-35 to feature nanocomposite structures." Flight International, 26 May 2011.
- ^ Edwards, Jack E. "Defense Management: DOD Needs to Monitor and Assess Corrective Actions Resulting from Its Corrosion Study of the F-35 Joint Strike Fighter." United States Government Accountability Office, Washington, DC, 16 December 2010.
- ^ "The Ultimate Fighter?". Airspacemag.com. Retrieved 24 February 2013.
- ^ Clark, Colin. "AF Worries JSF Costs May Soar." DoD Buzz 27 January 2011.
- ^ Capaccio, Tony. "Lockheed Martin F-35 Operating Costs May Reach $1 Trillion." Bloomberg News, 21 April 2011.
- ^ Trimble, Stephen. "Rolls-Royce: F136 survival is key for major F-35 engine upgrade." Flight International, 11 June 2009.
- ^ "GE, Rolls Royce Stop Funding F-35 Alt Engine." Defense News, 4 December 2011.
- ^ "Frequently Asked Questions about JSF." JSF. Retrieved 6 April 2010.
- ^ Tirpak, John (November 2012). "The F-35's Race Against Time". Air Force Association. Retrieved 4 November 2012.
while not technically a "supercruising" aircraft, can maintain Mach 1.2 for a dash of 150 miles without using fuel-gulping afterburners
- ^ Warwick, Graham. "Screech, the F135 and the JSF Engine War." Aviation Week, 17 March 2011.
- ^ Swedberg, Claire. "Energy-Harvesting Sensors to Monitor Health of Jet Engines." RFID Journal, 31 May 2011.
- ^ a b c Nativi, Andy. "F-35 Air Combat Skills Analyzed."[dead link] Aviation Week, 5 March 2009.
- ^ a b c Lockheed Martin (undated). "F-35A Conventional Takeoff and Landing Variant". Archived from the original on 17 March 2011. Retrieved 13 July 2012.
{{cite web}}
: Check date values in:|date=
(help) - ^ Loftin, Laurence K. Jr. NASA SP-468 "Quest for Performance: The Evolution of Modern Aircraft." NASA. Retrieved 25 November 2010.
- ^ "Swivel nozzle VJ101D and VJ101E." Vstol.org, 20 June 2009.
- ^ Hirschberg, Mike. ""V/STOL Fighter Programs in Germany: 1956–1975", p. 50. International Powered Lift Conference, 1 November 2000. Retrieved 3 October 2012.
- ^ "How the Harrier hovers." harrier.org. Retrieved 16 November 2010.
- ^ "LiftSystem." Rolls-Royce. Retrieved 23 November 2009.
- ^ Zolfagharifard, Ellie. "Rolls-Royce's LiftSystem for the Joint Strike Fighter" The Engineer, 28 March 2011.
- ^ Kjelgaard, Chris. "From Supersonic to Hover: How the F-35 Flies". Space, 21 December 2007. Retrieved 18 October 2010.
- ^ Hutchinson, John. "Going Vertical: Developing a STOVL system." ingenia.org.uk. Retrieved 23 November 2009.
- ^ Warwick, Graham. "Second Engine Could Cut F-35 Production."[dead link] Aviation Week. Retrieved 6 April 2010.
- ^ "GE Rolls-Royce Fighter Engine Team completes study for Netherlands." rolls-royce.com. Retrieved 23 November 2009.
- ^ "Pratt Raises Stakes In JSF Engine Battle."[dead link] Aviation Week, 27 August 2010. Retrieved 25 November 2010.
- ^ "Lockheed Martin F-35 Joint Strike Fighter Succeeds In First Vertical Landing." lockheedmartin.com, Press Release, 18 March 2010.
- ^ a b Hewson, Robert. "UK changes JSF configuration for ASRAAM." Jane's, 4 March 2008.
- ^ Keijsper 2007, pp. 220, 239.
- ^ a b c d e f g h Davis, Brigadier General Charles R. "F-35 Program Brief." USAF, 26 September 2006.
- ^ a b Digger, Davis. "JSF Range & Airspace Requirements." Headquarters Air Combat Command, Defense Technical Information Center, 30 October 2007.
- ^ "JSF Suite: BRU-67, BRU-68, LAU-147 – Carriage Systems: Pneumatic Actuated, Single Carriage." es.is.itt.com, 2009.
- ^ "F-35 gun system", "GAU-22/A". General Dynamics Armament and Technical Products. Retrieved 7 April 2011.
- ^ a b c d e "F-35 Joint Strike Fighter Media Kit Statistics." JSF.mil August 2004.
- ^ Keijsper 2007, p. 233.
- ^ a b Bolsøy, Bjørnar. "F-35 Lightning II status and future prospects." f-16.net, 17 September 2009. Retrieved 23 November 2009.
- ^ Donald, David. "Terma Highlights F-35 Multi-Mission Pod." AINonline, 11 July 2012.
- ^ "F-35B STOVL Variant." Lockheed Martin. Retrieved 25 November 2010.
- ^ "Small Diameter Bomb II – GBU-53/B." Defense Update. Retrieved 28 August 2010.
- ^ Small Diameter Bomb II Fit Check on F-35 Aircraft - Marketwatch.com, 22 January 2013
- ^ a b Trimble, Stephen. "MBDA reveals clipped-fin Meteor for F-35." Flight International, 7 November 2010.
- ^ "F-35 Lightning II News: ASRAAM Config Change For F-35." f-16.net, 4 March 2008.
- ^ Tran, Pierre. "MBDA Shows Off ASRAAM." Defense News, 22 February 2008.
- ^ "Important cooperative agreement with Lockheed Martin." Kongsberg Defence & Aerospace, 9 June 2009.
- ^ Trimble, Stephen. "Raytheon gets DARPA boost for AMRAAM, HARM replacement." Flight International, 4 November 2010.
- ^ Reed, John. "Minuteman III Follow-On Being Eyed, Nukes for JSF Delayed." DoD Buzz, 6 April 2011.
- ^ Muradian, Vego. "The Future of the U.S. Nuclear Enterprise." Defense News, 14 October 2012.
- ^ Fulghum, David A. "Lasers being developed for F-35 and AC-130." Aviation Week and Space Technology, 8 July 2002.
- ^ Morris, Jefferson. "Keeping cool a big challenge for JSF laser, Lockheed Martin says." Aerospace Daily, 26 September 2002.
- ^ Fulghum, David A. "Lasers, HPM weapons near operational status." Aviation Week and Space Technology, 22 July 2002.
- ^ Norris, Guy (20 May 2013). "High-Speed Strike Weapon To Build On X-51 Flight". www.aviationweek.com. Aviation Week. Retrieved 26 May 2013.
- ^ "F-35 Joint Strike Fighter (JSF) Lightning II." Global Security. Retrieved 16 November 2010.
- ^ a b "USAF FY00 activity on the JSF." U.S. Director, Operational Test & Evaluation. Retrieved: 17 l 2012.
- ^ "F-35 Norwegian Executive Summary." Lockheed Martin, April 2008.
- ^ Hehs, Eric. "JSF Diverterless Supersonic Inlet." Code One Magazine. Retrieved 28 December 2012.
- ^ "F-35 Joint Strike Fighter (JSF) Lightning II." GlobalSecurity.org. Retrieved 7 April 2010.
- ^ a b Kopp, Carlo. "Assessing Joint Strike Fighter Defence Penetration Capabilities." Air Power Australia, October 2009. Retrieved 5 October 2010.
- ^ Capaccio, Tony. "Lockheed Martin’s F-35 Fighter Jet Passes Initial Stealth Hurdle." Bloomberg News, 4 May 2011.
- ^ "Lockheed Martin wins $13 million contract for Strike Fighter aircraft from US Air Force." defenseworld.net, 22 November 2010.
- ^ Brewer, Jeffrey and Shawn Meadows. "Survivability of the Next Strike Fighter", p. 23. Aircraft Survivability: Susceptibility Reduction via Joint Aircraft Survivability Program Office (JASPO), Summer 2006.
- ^ a b Alaimo, Carol Ann. "Noisy F-35 Still Without A Home." Arizona Daily Star, 30 November 2008. Retrieved 23 November 2009.
- ^ Moore, Mona. "Val-P to sue the Air Force." Northwest Florida Daily News, 19 February 2009, Volume 63, Number 20, p. A1.
- ^ Barlow, Kari C. "Val-p wants Okaloosa to reimburse F-35 legal fees."[dead link] thedestinlog.com, 16 April 2010.
- ^ Nicholson, Brendan. "Noise triggers legal bid to down jet fighter." The Australian, 12 April 2011.
- ^ Perrett, Bradley. "F-35 May Need Thermal Management Changes."[dead link] Aviation Week, 12 March 2009. Retrieved 23 November 2009.
- ^ "Joint Communications Release, JSF Program Office & Lockheed Martin. Subject: F-35 Acoustics Based on Edwards AFB Acoustics, Test." JSF Program Office & Lockheed Martin, April 2009. Retrieved 15 January 2011.
- ^ Alaimo, Carol Ann. "Noisy F-35 could affect thousands, study finds." Arizona Daily Star, 13 June 2012.
- ^ "Lockheed Martin’s F-35 Lightning II most advanced cockpit" at wordlesstech.com
- ^ Goebel, Greg. "The Lockheed Martin F-35 Joint Strike Fighter (JSF)."[dead link] vectorsite.net. Retrieved 23 November 2009.
- ^ Schutte, John. "Researchers fine-tune F-35 pilot-aircraft speech system." US Air Force, 10 October 2007.
- ^ "Joint Helmet Mounted Cueing System." Boeing. Retrieved 23 November 2009.
- ^ "VSI's Helmet Mounted Display System flies on Joint Strike Fighter."[dead link] Rockwell Collins, 2007. Retrieved 8 June 2008.
- ^ "Martin-Baker." JSF. Retrieved 23 November 2009.
- ^ "JSF" Martin-Baker. Retrieved 23 November 2009.
- ^ Peladeau, Jean. "Pilots worry about F-35 oxygen system." QMI Agency, 11 May 2012.
- ^ Bennett, John T. "F-22's Oxygen Issues Raise Questions About F-35." US News, 24 May 2012.
- ^ McHale, John. "F-35 avionics: an interview with the Joint Strike Fighter's director of mission systems and software."[dead link] Military Aerospace. Retrieved 5 June 2010.
- ^ "APG-81 (F-35 Lightning II)." Northrop Grumman Electronic Systems. Retrieved 4 August 2007.
- ^ "Lockheed Martin Missiles and Fire Control: Joint Strike Fighter Electro-Optical Targeting System."[dead link] Lockheed Martin. Retrieved 11 April 2008.
- ^ Scott, William B. "Sniper Targeting Pod Attacks From Long Standoff Ranges."[dead link] Aviation Week, 3 October 2004. Retrieved 23 November 2009.
- ^ Pappalardo, Joe. "How an F-35 Targets, Aims and Fires Without Being Seen." Popular Mechanics, December 2009. Retrieved: 6 April 2010.
- ^ "Electronic Warfare: Australia's mixed record | Australian Defence News & Articles". Asia Pacific Defence Reporter. Retrieved 24 February 2013.
- ^ "Electronic Warfare | Australian Defence News & Articles". Asia Pacific Defence Reporter. Retrieved 24 February 2013.
- ^ "JSF EW Suite." istockanalyst.com. Retrieved 23 November 2009.
- ^ Tirpak, John A (October 2012). "Slow Climb for the F-35" (PDF). AIR FORCE Magazine. p. 42. Retrieved 3 October 2012.
- ^ "F-35 jet fighters to take integrated avionics to a whole new level". Military Aerospace. PennWell Corporation. 1 May 2003. Retrieved 27 April 2013.
- ^ "Israel, US Negotiate $450 Million F-35I Avionic Enhancements." Defense Update, 27 July 2012.
- ^ a b Sherman, Ron. "F-35 Electronic Warfare Suite: More Than Self-Protection." aviationtoday.com, 1 July 2006. Retrieved 22 August 2010.
- ^ "Hey C and C++ Can Be Used In Safety Critical Applications Too!". Journal.thecsiac.com. 11 February 2001. Retrieved 24 February 2013.
- ^ McHale, John. "F-35 Joint Strike Fighter leverages COTS for avionics systems."[dead link] Pennnet. Retrieved 12 September 2011.
- ^ Warwick, Graham. "Flight Tests Of Next F-35 Block Underway."[dead link] Aviation Week, 12 June 2010. Retrieved 12 June 2010.
- ^ Cox, Bob. "Pentagon officials to meet to address F-35 program's problems."[dead link] Star-Telegram, 21 November 2010.
- ^ Reed, John. "Schwartz Concerned About F-35A Delays." DoD buzz, 23 November 2010.
- ^ Sweetman, Bill. "More F-35B Delays, Software Schedule At Risk." Aviation Week, 13 January 2011.
- ^ David A. Fulghum, Bill Sweetman, Bradley Perrett and Robert Wall. "Stealthy Chinese J-20 Vulnerable." Aviation Week, 14 January 2011.
- ^ Fulghum, David. "New Plan: NGJ To Go Unmanned." Aviation Week, 25 January 2012.
- ^ "Tens of thousands of Xilinx FPGAs to be supplied by Lockheed Martin for F-35 Joint Strike Fighter avionics."
- ^ "F-35 Joint Strike Fighter leverages COTS for avionics systems."
- ^ "F-35 Distributed Aperture System EO DAS." YouTube. Retrieved 23 November 2009.
- ^ "F-35 Helmet Display System To Scare the Bejeezus Out of Enemies."
- ^ a b "JSF: the first complete ‘OODA Loop’ aircraft." Australian Defence Business Review, December 2006, p. 23.
- ^ Warwick, Graham. "Lockheed Weighs Alternate F-35 Helmet Display." Aviation Week, 21 April 2011.
- ^ "Lockheed Martin Selects BAE Systems to Supply F-35 Joint Strike Fighter (JSF) Helmet Display Solution." BAE Systems, 10 October 2011.
- ^ Szondy, David. "BAE Systems to provide new helmet display for F-35 pilots." Gizmag, 21 October 2011.
- ^ Carey, Bill. "BAE Drives Dual Approach To Fixing F-35 Helmet Display Issues." AINonline . 15 February 2012.
- ^ "Lockheed Martin Awards F-35 Contract." Zacks Investment Research, 17 November 2011.
- ^ Jean, Grace V. "New Sensor Aims to Give F-35 Pilots a ‘Window Into the Night’." National Defense Magazine, August 2011.
- ^ "Lockheed Cites Good Reports on Night Flights of F-35 Helmet." Reuters.com, 30 October 2012.
- ^ "U.S. Marines see progress in F-35 testing despite challenges."
- ^ "F-35, Maintenance and the Challenge of Service Standardization." Second Line of Defense, 9 June 2011.
- ^ Hawkins, Dan. "F-35 maintenance training spawns USMC's first air FTD." USMC, 27 July 2012.
- ^ Clark, Colin. "Why Lockheed Thinks F-35 Beats Boeing's F-18." Aol Defense, 3 November 2011.
- ^ "US Air Force praises early performance of Lockheed Martin F-35." "Flightglobal.com, 6 November 2012.
- ^ Majumdar, Dave. "Stealth isn’t becoming obsolete anytime soon." Flight International, 30 November 2012. Retrieved 1 December 2012.
- ^ "Mighty F-35 Lightning II Engine Roars to Life." Lockheed Martin, 20 September 2006.
- ^ "F-35 First Flight." TeamJSF.com. Retrieved 10 October 2007.
- ^ "News Breaks: F-35B Engages Stovl Mode." Aviation Week, 11 January 2010, p. 15.
- ^ Wolf, Jim. "F-35 fighter makes first vertical landing." Reuters, 18 March 2010.
- ^ Cavas, Christopher P. "F-35B STOVL fighter goes supersonic." Marine Corps Times, 15 June 2010.
- ^ "X-planes". PBS: Nova transcript. Retrieved 9 January 2010.
- ^ Majumdar, Dave. "Lockheed says it’s fixed key F-35B issue." Defense News, 10 January 2011.
- ^ "Lockheed addresses Pentagon F-35 DOT&E report". Flight International. 18 January 2013.
- ^ Sweetman, Bill. "Get out and fly." Defense Technology International, June 2009, pp. 43–44.
- ^ a b Cox, Bob. "Internal Pentagon memo predicts that F-35 testing won't be complete until 2016." Fort Worth Star Telegram, 1 March 2010.
- ^ Capaccio, Tony. "Lockheed F-35 Purchases Delayed in Pentagon’s Fiscal 2011 Plan." Bloomberg BusinessWeek, 6 January 2010.
- ^ Bennett, John T. "Carter: More U.S. Programs To Get JET Treatment." defensenews.com, 29 March 2010.
- ^ Thompson, Loren B. "F-35 Cost Rise Is Speculative, But Progress Is Real." lexingtoninstitute.org, 12 March 2010.
- ^ "Senate Armed Services Committee Holds Hearing on President Obama's Fiscal 2011 Budget Request for the F-35 Joint Strike Fighter Program." Congressional Record via startelegram.typepad.com, 11 March 2010.
- ^ "USAF Disputes Navy F-35 Cost Projections." Aviation Week. Retrieved 3 July 2010.
- ^ Grant, Greg "JSF Production “Turned The Corner." dodbuzz.com. Retrieved 15 April 2010.
- ^ Rolfsen, Bruce. "Jobs to change with focus on irregular warfare." Army Times Publishing Company, 16 May 2010.
- ^ Warwick, Graham. "In-flight Failure Halts F-35 Flight Tests." Av Leak, 11 March 2011.
- ^ Cavas, Christopher P. "All F-35s Cleared To Resume Flight Tests." DefenseNews, 25 March 2011.
- ^ Branch, Ricardo, Army Sgt. "Northern Edge fields new radar system." Northern Edge Joint Information Bureau, 8 March 2012.
- ^ Saiki, Lt. Col. Tracey. "Continued testing of F-35 JSF sensors a success at Northern Edge 2011." Af.mil. Retrieved 18 April 2012.
- ^ Trimble, Stephen. "F-35 fleet grounded after electrical subsystem failure." Flight International, 3 August 2011.
- ^ Majumdar, Dave. "F-35s Grounded After Power Package Fails." Defense News, 3 August 2011.
- ^ "Statement on JPO Reinstituting Ground Operations for the F-35 Program." Joint Strike Fighter Program Office, 10 August 2011.
- ^ "F-35 Fleet Cleared For Ground Operations." Defense News, 10 August 2011.
- ^ Lerman, David. "Air Force Lifts Flight Ban on Lockheed F-35 Fighter Jet." Bloomberg News, 18 August 2011.
- ^ "Honeywell to test some F-35 parts after smoke incident." Reuters.
- ^ "F-35 JSF Flight Test Update." Defense Tech, 4 November 2011.
- ^ a b Norris, Guy. "F-35A pushes to Mach 1.6." Aviation Week & Space Technology, 9 December 2011.
- ^ Majumdar, Dave. "F-35C Tailhook Design Blamed for Landing Issues." Defense News, 17 January 2012.
- ^ "F-35B completes first sea trials on USS Wasp." navair.navy. Retrieved: 17 July 2012.
- ^ "F-35B completes air start testing at Edwards AFB." Flight International, 4 September 2012.
- ^ "F-35A releases first air-launched weapon." Flight International, 17 October 2012.
- ^ "F-35A Completes First AIM-120 Amraam Internal Weapons Release." Lockheed Martin press release, 22 October 2012.
- ^ "F-35C Lightning II Hits Weapons Testing Milestone." Globalsecurity.org, 30 November 2012.
- ^ Majumdar, Dave. "MCAS Yuma recieves(sic) first operational F-35B." Flight International, 17 November 2012.
- ^ Time magazine, 25 February 2013, pp. 26-30, "The Most Expensive Weapon Ever Built", by Mark Thompson; restriction on vertical landings cited on page 28.
- ^ F-35B grounded after fueldraulic line failure - Flightglobal.com, 18 January 2013
- ^ Crimped line caused F-35B grounding - DoDBuzz.com, 29 January 2013
- ^ "Engineers discover culprit behind F-35B fueldraulic line failure". Flight International. 28 January 2013. Retrieved 24 February 2013.
- ^ Pentagon clears F-35B to resume test flights - Militarytimes.com, 13 February 2013
- ^ "F-35 fighter jet fleet grounded by Pentagon". BBC. Retrieved 23 February 2013.
- ^ "Pentagon Grounds F-35 Fighter Fleet After Finding Crack in 1 Engine Blade". The Washington Post. Associated Press. 23 February 2013. p. A4.
- ^ Mount, Mike. "Military Clears F-35 Joint Strike Fighter to Fly". CNN, 1 March 2013.
- ^ "F-35s cleared to resume flight operations". Flight International, 28 February 2013.
- ^ F-35A Completes 3-Year Clean Wing Flutter Testing Program Lockheed press release, 11 February 2013
- ^ "F-35B Completes First Vertical Takeoff". Lockheed Martin, 20 May 2013.
- ^ "F-35A Completes First In-Flight Missile Launch". Lockheed Martin, 7 June 2013.
- ^ F-35B STOVL for U.S. Marine Corps completes 500th vertical landing - Airrecognition.com, 7 August 2013
- ^ Schwellenbach, Nick. "Concerns Regarding Plans for the Joint Strike Fighter to Begin Training Flights and Conduct an Operational Utility Evaluation."[dead link] POGO, 31 October 2011.
- ^ "U.S. Senators Press Panetta to Review F-35 Training Safety." Bloomberg News, 9 December 2011.
- ^ Capaccio, Tony. "Air Force Expands F-35 Trials Over Tester’s Objections." Bloomberg BusinessWeek, 28 September 2012.
- ^ Shalal-Esa, Andrea. "USMC Near Start Of F-35 Training Flights."[dead link] Aviation Week. 27 February 2012.
- ^ "Air Force issues flight release for Eglin AFB F-35A[dead link]" www.af.mil. 28 February 2012. Retrieved 5 May 2012
- ^ Majumdar, Dave. "First Air National Guard pilot starts transition to F-35." Flight Magazine, 17 July 2012.
- ^ "Eglin F-35s fly 200th sortie." Flight International, 24 August 2012.
- ^ "Pentagon's Testing Czar Questions F-35 Program's OTE Plan." Aol Defense, 28 August 2012.
- ^ Shalal-Esa, Andrea. "More problems raised at Pentagon F-35 fighter review." Reuters, 10 September 2012.
- ^ Majumdar, Dave. "USAF to start F-35 operational utility evaluation on 10 September." Flight International, 7 September 2012.
- ^ Majumdar, Dave. "F-35 operational utility evaluation proceeding smoothly." "Flightglobal.com, 1 October 2012.
- ^ USAF unit completes F-35 OUE activity - Flightglobal.com, 16 November 2012
- ^ Majumdar, Dave. "Simulation plays vital role in building F-35 tactics and aircraft development." Flight International, 21 November 2012.
- ^ Majumdar, Dave. "US Air Force praises early performance of Lockheed Martin F-35." Flight International, 6 November 2012.
- ^ "F-35 pilot training starts next month at Eglin>" Militarytimes.com, 17 December 2012.
- ^ "Military plans to send jets to S.C., N.C., Calif., Ariz." The Associated Press, December 9, 2010, Susanne M. Schafer.
- ^ a b c Daniel, Lisa. "Plan Improves Navy, Marine Corps Air Capabilities." American Forces Press Service, 14 March 2011.
- ^ a b c Cavas, Christopher P. "More Marines to fly carrier-variant JSFs." Marine Corps Times, 14 March 2011.
- ^ a b c Cifuentes, Sgt Michael S. "Marine Corps continues flying with Joint Strike Fighter program."[dead link] Headquarters Marine Corps, United States Marine Corps, 14 March 2011.
- ^ "F-35 Joint Strike Fighter (JSF) Lightning II – International Partners." Global Security. Retrieved 7 April 2010.
- ^ Merle, Renae. "GAO Questions Cost Of Joint Strike Fighter." The Washington Post, 15 March 2005.
- ^ "Estimated JSF Air Vehicle Procurement Quantities." JSF.mil, Updated as of April 2010.
- ^ Tae-hoon, Lee. "Seoul fears delivery delays of F-35 jets." The Korea Times, 6 March 2012.
- ^ "F-35 Lightning: The Joint Strike Fighter Program, 2012." Defense Industry Daily, 30 October 2012.
- ^ "JSF Global Partners." teamjsf.com. Retrieved 30 March 2007.
- ^ "US, UK sign JAST agreement." Aerospace Daily New York: McGraw-Hill, 25 November 1995, p. 451.
- ^ Schnasi, Katherine V. "Joint Strike Fighter Acquisition: Observations on the Supplier Base." US Accounts Office. Retrieved 8 February 2006.
- ^ "Industry Canada F-35 Joint Strike Fighter (JSF) Canada's Next Generation Fighter Capability." ic.gc.ca. Retrieved 25 November 2010.
- ^ Combat Aircraft Monthly, September 2010, p. 24.
- ^ "Update 1-Turkey keeps plan to buy 100 F-35 fighter jets." Reuters, 23 February 2012.
- ^ "Turkey plans to buy 100 F-35 jet fighters." turkishpress.com, 24 February 2012.
- ^ "Turkey to Buy Two Planes in Second F-35 Shipment." turkishweekly.net, 4 September 2012.
- ^ Harper, Tim. "Tim Harper: The Conservatives and their F-35 fairy tale." Toronto Star, 14 February 2012.
- ^ Vasarri, Chiara. "Italy to Cut F-35 Fighter Jet Orders as Part of Defense Revamp." Bloomberg Business Week, 14 February 2012.
- ^ Postmedia News. "A timeline on Canada's involvement in the F-35 program." Canada.com, 5 April 2012.
- ^ "Video: MPs hold Mackay to account in F-35 scandal." The Canadian Press via Globe and Mail, 4 April 2012.
- ^ Coyne, Andrew. "Peeling back the layers of misconduct in the F-35 fiasco." National Post, 4 April 2012.
- ^ "The F-35 Fiasco." CBC News, 5 April 2012.
- ^ Stewart, Brian. "Super-costly F-35s, a global wrecking ball." Canadian Broadcasting Corporation, 13 December 2012.
- ^ "BUSINESS - F-35 project to 'earn Turkey $12 billion'". Hurriyetdailynews.com. 13 September 2011. Retrieved 30 May 2013.
- ^ "F-35 project to 'earn Turkey $12 billion' - I4U News". I4u.com. 9 May 2013. Retrieved 30 May 2013.
- ^ Pike, John. "F-35A Joint Strike Fighter." Globalsecurity.org. Retrieved 23 November 2009.
- ^ "Flying The F-35: An Interview With Jon Beesley, F-35 Chief Test Pilot."[dead link] lockheedmartin.com. Retrieved 25 November 2010.
- ^ Hebert, Adam J. "Lightning II: So Far, So Good." airforce-magazine.com, Air Force Association, Volume 90, Issue 7, July 2007. Retrieved 3 December 2008.
- ^ Laurenzo, Ron. "Air Force: No Plan To Retire A-10." GlobalSecurity.org, Defense Weekly, 9 June 2003. Retrieved 3 December 2008.
- ^ Waldron, Greg. "IN FOCUS: Tokyo casts wary eye on Chinese airpower developments." Flight International, 2 August 2012.
- ^ "F-35s face communication problems in Arctic." The Canadian Press, 23 October 2011.
- ^ Ewing, Philip. "Lockheed’s comprehensive Q&A on the F-35." DoD Buzz, 19 June 2012.
- ^ Hancock, Ben D. "The STOVL Joint Strike Fighter in Support of the 21st Century Marine Corps." USMC, 1997.
- ^ Bly, Peter. "Constructability of a High Temperature Concrete Pad." Geotechnical & Structures Laboratory US Army Engineer Research & Development Center (ERDC), 14 June 2011.
- ^ Sweetman, Bill. "Numbers Crunch: True cost of JSF program remains to be seen." Defense Technology International, February 2009, p. 22.
- ^ "F-35 HMDS Pulls the Gs". Defense Industry Daily, 25 October 2007.
- ^ Norris, Guy and Graham Warwick. "F-35B First Flight Boosts JSF as F-22 Loses Supporters." Aviation Week, 15 June 2008.
- ^ "F-35B STOVL-mode Flight." defenceaviation.com. Retrieved 25 November 2010.
- ^ Clark, Colin. "JSF Heat Woes Being Fixed: Trautman." Dod Buzz, 19 July 2010.
- ^ "Custom tool to save weeks in F-35B test and evaluation."] Naval Air Systems Command, 6 May 2011.
- ^ Trimble, Stephen. "US Marine Corps aviation branch plans to invest in fighter jets, helicopters, transports and UAVs." Flight International, Reed Business Information, 21 July 2008.
- ^ Sweetman, Bill. "About That Austere-Base Thing..." Aviation Week, 11 March 2010.
- ^ Diamant, Aaron. "JSF construction lands another first." USMC, 22 December 2011.
- ^ Majumdar, Dave. "U.S. Military May Deploy F-35 Before Formal IOC." Defense News, 24 May 2011.
- ^ Majumdar, Dave. "USAF: F-35B cannot generate enough sorties to replace A-10." Flight Magazine, 16 May 2012.
- ^ "Major Projects Report 2008." Ministry of Defence. Retrieved 23 November 2009.
- ^ "US Marines eye UK JSF shipborne technique." Flight International, 15 June 2007.
- ^ Hoyle, Craig. "Cameron: UK to swap JSFs to carrier variant, axe Harrier and Nimrod." Flight International, 19 October 2010.
- ^ Adlam, Jim. "UK Could Revert to STOVL F-35B for Carriers." Air Forces Online. Retrieved 14 March 2012.
- ^ Chuter, Andrew. "It’s Official: U.K. To Switch Back to STOVL F-35." Defense News, 10 May 2012.
- ^ "Royal Air Force's No. 617 Squadron to fly F-35B fighter". Airforce Technology. 19 July 2013. Retrieved 23 July 2013.
- ^ "Dambusters to be first Lightning II squadron". 18 July 2013. Retrieved 23 July 2013.
- ^ "F-35B on Italian "Cavour" aircraft carrier." Military-today.com, 4 December 2011.
- ^ Kovach, Gretel C. "Commandant calls Joint Strike Fighter essential." U-T San Diego, 8 December 2010.
- ^ Jean, Grace V. "Marines Question the Utility of Their New Amphibious Warship." National Defense Industrial Association, September 2008.
- ^ Pew, Glenn. "Pentagon May Cancel STOVL Version of F-35." AvWeb, January 2011.
- ^ Cox, Bob. "F-35 started with recipe for trouble, analysts say." Star Telegram, 29 January 2011.
- ^ Ewing, Philip. "Lockheed: Many F-35B landings won’t be vertical." DoD Buzz, 7 June 2011.
- ^ "Simulations Offer Marines Advanced F-35B Weapons, Training."
- ^ Trimble, Stephen. "VIDEO: F-35B completes first shipboard vertical landing." The DEWline, 4 October 2011.
- ^ "F-35C Carrier Variant Joint Strike Fighter (JSF)." GlobalSecurity.org. Retrieved 16 June 2010.
- ^ "F-35 Navy Version Undergoes Successful Design Review, Readies for Production." Lockheed Martin, 7 June 2007. Retrieved 16 June 2010.
- ^ Grant, Rebecca L., PhD "Navy Speeds Up F-35." Lexington Institute, 14 September 2009. Retrieved 20 September 2009.
- ^ "F-35C Lightning II rolled out." FrontierIndia.net, 29 July 2009.
- ^ "JSF Engine too big for regular transport at sea." Navy Times, 30 November 2010.
- ^ Cavas, Christopher P. "U.S. Navy JSFs Resume Flight Ops After Glitch." Defense News, 24 June 2011.
- ^ "Catapult launches F-35C for the first time." Naval Air Systems Command, 27 July 2011. Retrieved 31 December 2011
- ^ "F-35C completes jet blast deflector testing." NAVAIR, 22 August 2011. Retrieved 23 August 2011.
- ^ Ewing, Philip. "The future is here: EMALS launches F-35." DODbuzz.com, 28 November 2011.
- ^ by Commander, NAFPA [2] f-16.net
- ^ Majumdar, Dave. "US Navy works through F-35C air-ship integration issues." Flight International, 1 October 2012.
- ^ Ben-David, Alon. "Israel To Buy F-35s With Cockpit Mods."[dead link] Aviation Week, 27 August 2010.
- ^ Ben-David, Alon, Amy Butler and Robert Wall. "Israel, U.S. Strike F-35 Technology Deal."[dead link] Aviation Week, 7 July 2011. Retrieved 8 October 2011.
- ^ Harel, Amos. "Israel Air Force crews to try out next-generation fighter jets by 2016." Haaretz Newspaper, 4 November 2012.
- ^ Trimble, Stephen. "Israel sets sights on two-seater F-35." Flight International, 22 January 2010.
- ^ Egozi, Arie. "Israel to boost range of future F-35 fleet." Flight International. 11 January 2008.
- ^ "Israel, U.S. Agree To $450 Million In F-35 EW Work." Aviation Week, 6 August 2012.
- ^ IAI aims to complete F-35 wing facility in mid-2014 - Flightglobal.com, 20 August 2013
- ^ "Canadian DND Reinforces Its Estimates for F-35 Acquisition." Department of National Defence (Canada), 21 March 2011.
- ^ Daly, Brian. "Harper, Ignatieff spar over fighter jets." Calgary Sun, 1 September 2010.
- ^ "Military will contract out air-to-air refuelling if Canada goes with F-35,". O.canada.com. Retrieved 24 February 2013.
- ^ "An Estimate of the Fiscal Impact of Canada’s Proposed Acquisition of the F-35 Lightning II Joint Strike Fighter." Parliamentary Budget Officer, 10 March 2011.
- ^ "Third Joint Strike Fighter for the UK arrives". RAF. 2013-06-28. Retrieved 2013-08-2.
{{cite web}}
: Check date values in:|accessdate=
(help) - ^ "F-35B Lightning II". RAF. 26 April 2013. Retrieved 30 May 2013.
- ^ "UK announces F-35B basing | Australian Aviation Magazine". Australianaviation.com.au. 26 March 2013. Retrieved 31 May 2013.
- ^ Eerste fabrieksvlucht van tweede 'Nederlandse' F-35 - JSF Nieuws - F-35 / JSF. F35.nl. Retrieved on 2013-08-16.
- ^ "F-35B Short Takeoff/Vertical Landing Variant." Lockheed Martin. Retrieved 13 July 2012.
- ^ "F-35C Carrier Variant." Lockheed Martin. Retrieved 13 July 2012.
- ^ "F-35 Lightning II Program Status and Fast Facts." Lockheed Martin, 13 March 2012. Retrieved 22 May 2012.
- ^ "ATK Awarded $55 Million Advanced Anti-Radiation Guided Missile Low Rate Initial Production ..." Reuters, 21 January 2009. Retrieved: 13 July 2011.
- ^ Dupont, Jean and Conal Walker. "MBDA Launches SPEAR High Precision Surface Attack Weapon During Farnborough 2012." MBDA, 9 July 2012.
- ^ Ewing, Philip. "The Navy’s advanced weapons shopping list" Military.com, 3 July 2012.
- ^ "Nuclear Posture Review Report." Department of Defense, Washington, D.C., April 2010. Retrieved: 7 April 2010.
- ^ "F-35 variants." JSF. Retrieved 22 August 2010.
- ^ a b "The Pratt & Whitney F135". Jane's Aero Engines. Jane's Information Group, 2009. (subscription version, dated 10 July 2009).
- ^ "Lockheed Martin F-35 Lightning II". Jane's All the World's Aircraft. Jane's Information Group, 2010. (subscription article, dated 1 February 2010).
- ^ "Pentagon Slackens Difficult-To-Achieve JSF Performance Requirements." Inside Defense. 1 March 2012.
- ^ "F-35 brochure, p. 6."[dead link] Lockheed Martin. Retrieved: 1 April 2009.
- ^ "LockheedMartin F-35B JSF." Airtoaircombat.com. Retrieved 15 August 2009.
- ^ "Lockheed Martin F-35 Flight Test and Production Progress Report." Lockheed Martin. 23 February 2012.
- ^ Freeman, Ben. "JF-35's Range Falls Short of Predictions." Defence Professionals GmbH, 12 May 2011. Retrieved 18 March 2012
Bibliography
- Borgu, Aldo. A Big Deal: Australia's Future Air Combat Capability. Canberra: Australian Strategic Policy Institute, 2004. ISBN 1-920722-25-4.
- Gunston, Bill. Yakovlev Aircraft since 1924. London: Putnam Aeronautical Books, 1997. ISBN 1-55750-978-6.
- Keijsper, Gerald. Lockheed F-35 Joint Strike Fighter. London: Pen & Sword Aviation, 2007. ISBN 978-1-84415-631-3.
- Kopp, Carlo and Peter Goon. "Joint Strike Fighter." Air Power Australia. Retrieved 15 July 2007.
- Lake, Jon. "The West's Great Hope". Air Force Monthly, December 2010.
- Polmar, Norman. The Naval Institute Guide to the Ships and Aircraft of the U.S. Fleet. Annapolis, Maryland: Naval Institute Press, 2005. ISBN 978-1-59114-685-8.
- Spick, Mike. The Illustrated Directory of Fighters. London: Salamander, 2002. ISBN 1-84065-384-1.
- Winchester, Jim. "Lockheed Martin X-35/F-35 JSF". Concept Aircraft: Prototypes, X-Planes and Experimental Aircraft. Kent, UK: Grange Books plc., 2005. ISBN 1-59223-480-1.
External links
- Official JSF web site, Official JSF videos
- Official F-35 Team web site
- JSF UK Team
- F-35 – Royal Air Force
- U.S. Navy Research, Development & Acquisition, F-35 page
- F-35 profile on Scramble Dutch Aviation Society
- U.S. Naval Air Systems Command, NAVAIR news
- F-35 Lightning II Joint Strike Fighter