Spadina–Front GO Station
Appearance
Spadina–Front | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Spadina Avenue & Front Street West, Toronto, Ontario | ||||||||||
Coordinates | 43°38′31″N 79°23′42″W / 43.64194°N 79.39500°W | ||||||||||
Owned by | Metrolinx | ||||||||||
Connections | 510 Spadina streetcar | ||||||||||
Construction | |||||||||||
Parking | No | ||||||||||
History | |||||||||||
Opening | 2024 (expected)[1] | ||||||||||
Services | |||||||||||
|
Spadina–Front GO Station (also referred to as Spadina GO Station) is a planned GO Transit train station to be built by Metrolinx in Toronto, Ontario, as part of the approved GO Transit Regional Express Rail. It will be situated downtown, south of Front Street between Spadina Avenue and Bathurst Street near office and residential towers.[2] The station will be located directly below the future Rail Deck Park, an urban park proposed by the City of Toronto. The main station entrance is planned for the intersection of Spadina Avenue and Front Street West.[3]
Spadina–Front is planned to open in 2024 and will be a stop on the GO Transit Barrie line. Despite being located on the corridor, the station is not planned to be a stop on SmartTrack.
References
- ^ Woo, Leslie (September 14, 2017). "The Draft 2041 Regional Transportation Plan" (PDF). Metrolinx. p. 57. Retrieved December 28, 2017.
- ^ "Spadina-Front GO Station". smarttrack.to. Retrieved December 28, 2017.
- ^ "Spadina-Front Station". Metrolinx. Retrieved December 28, 2017.