Jump to content

Spadina–Front GO Station

Coordinates: 43°38′31″N 79°23′42″W / 43.64194°N 79.39500°W / 43.64194; -79.39500
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Josvebot (talk | contribs) at 02:07, 10 July 2018 (Bot: fixing WP:CHECKWIKI error #37 (no DEFAULTSORT for article with special character)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Spadina–Front
General information
LocationSpadina Avenue & Front Street West,
Toronto, Ontario
Coordinates43°38′31″N 79°23′42″W / 43.64194°N 79.39500°W / 43.64194; -79.39500
Owned byMetrolinx
Connections  510  Spadina streetcar
Construction
ParkingNo
History
Opening2024 (expected)[1]
Services
Preceding station   GO Transit   Following station
Template:GO Transit lines
Planned Expansion

Spadina–Front GO Station (also referred to as Spadina GO Station) is a planned GO Transit train station to be built by Metrolinx in Toronto, Ontario, as part of the approved GO Transit Regional Express Rail. It will be situated downtown, south of Front Street between Spadina Avenue and Bathurst Street near office and residential towers.[2] The station will be located directly below the future Rail Deck Park, an urban park proposed by the City of Toronto. The main station entrance is planned for the intersection of Spadina Avenue and Front Street West.[3]

Spadina–Front is planned to open in 2024 and will be a stop on the GO Transit Barrie line. Despite being located on the corridor, the station is not planned to be a stop on SmartTrack.

References

  1. ^ Woo, Leslie (September 14, 2017). "The Draft 2041 Regional Transportation Plan" (PDF). Metrolinx. p. 57. Retrieved December 28, 2017.
  2. ^ "Spadina-Front GO Station". smarttrack.to. Retrieved December 28, 2017.
  3. ^ "Spadina-Front Station". Metrolinx. Retrieved December 28, 2017.