Jump to content

Beijing–Tangshan intercity railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 20:16, 7 June 2016 (→‎References). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Beijing-Tangshan Intercity Railway
Overview
Native name京唐城际铁路
StatusUnder Construction
LocaleHebei, Tianjin & Beijing,
People's Republic of China
Termini
Stations7
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
Technical
Line length163 km (101 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed350 km/h (217 mph)
Route map

Template:BS-map
Beijing-Tangshan Intercity Railway
Simplified Chinese京唐城际铁路
Traditional Chinese京唐城際鐵路

Beijing–Tangshan Intercity Railway is a Chinese High-Speed Railway connecting the national capital Beijing and Tangshan in eastern Hebei. Construction on the railway was originally scheduled to start in 2009[1] but the completion has been delayed after a nationwide rail review following the 2011 Wenzhou Rail Incident. Construction was eventually started on December 29, 2015.[2] This railway also serves as the northern segment of the Second Beijing-Tianjin Intercity Railway, from Beijing East to Baodi South and then branching south to Binhai Railway Station.[3]

Overview

The length of this intercity railway is about 160 km railway line from the Beijing Railway Station terminus. It then roughly follows along the Beijing-Shenyang Expressway northbound through the Beijing's Tongzhou District before crossing into Hebei's Xianghe County. Next it crosses Tianjin's Baodi District to re-enter Hebei at Tangshan City's Yutian County and Fengrun. Finally it terminates at Tangshan Railway Station. Total line length of will be approximately 163 km, a total of seven stations, with a design speed of 350 km.[4]

Stations

This line starts at Beijing Railway Station, then Beijing East, Yanjiao, Xianghe, Dachang, Baodi South, Yahongqiao, Tangshan Airport before arriving at Tangshan Railway Station.[4]

References

  1. ^ "京张京唐城际铁路下半年动工".
  2. ^ 曹政 (2015-12-30). "京唐京滨城际先期工程昨开工 明年上半年全线建设". 北京日报. Retrieved 2015-12-30.
  3. ^ Beijing-Binhai New Area Intercity Railway EIA Report (PDF). State Reform and Development Commission. January 2016. Retrieved 16 January 2016.
  4. ^ a b "京唐城际铁路暂定7车站 设计速度350公里/小时". Xinhua.