Jump to content

Beijing–Tangshan intercity railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 07:30, 15 January 2021 (Task 18 (cosmetic): eval 5 templates: del empty params (4×); hyphenate params (2×); del |url-status= (1×);). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Beijing–Tangshan intercity railway
京唐城际铁路
Overview
StatusUnder Construction
LocaleBeijing
Hebei
Tianjin
Termini
Stations8
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
Technical
Line length163 km (101 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed350 km/h (217 mph)
Route map

Template:BS-map
Beijing–Tangshan intercity railway
Simplified Chinese京唐城际铁路
Traditional Chinese京唐城際鐵路
Transcriptions
Standard Mandarin
Hanyu PinyinJīng-Táng Chéngjì Tiělù

Beijing–Tangshan intercity railway is a high-speed railway connecting Beijing and Tangshan in eastern Hebei. Construction on the railway was originally scheduled to start in 2009[1] but the completion has been delayed after a nationwide rail review following the 2011 Wenzhou Rail Incident. Construction was eventually started on December 29, 2015.[2] From Beijing Sub-Center railway station to Baodi South railway station, the Beijing–Binhai intercity railway will share its northern segment with the Beijing–Tangshan intercity railway before continuing southeast-ward to Binhai railway station.[3]

The railway is expected to open in 2022.[4]

Overview

The railway will begin at Beijing Sub-Center railway station, which is located in Tongzhou District of Beijing. And then it crossing into Hebei's Xianghe County. Next it crosses Tianjin's Baodi District to re-enter Hebei at Tangshan City's Yutian County and Fengrun District. Finally, it will terminate at Tangshan railway station. Total line length of will be approximately 163 km (101 mi), with a total of 8 stations and a design speed of 350 km/h (220 mph).[5]

Stations

Station
Name
Chinese Total distance (km) Travel Time High-speed rail
transfers
& Airports
Metro and local rail
transfers
Platforms Tracks served
by platform
Location
Beijing Sub-Center 北京城市副中心 0 0  Intercity Railway Connector  (Beijing Subway  6  via Beiyunhe East) Beijing Tongzhou
Yanjiao 燕郊
Dachang 大厂
Xianghe 香河
Baodi South 宝坻南 Beijing–Binhai intercity railway (under construction)
Tianjin–Chengde intercity railway (planned)
Yahongqiao 鸦鸿桥
Tangshan Airport 唐山机场
Tangshan 唐山

References

  1. ^ 京张京唐城际铁路下半年动工. Archived from the original on 2015-09-23. Retrieved 2015-11-20.
  2. ^ Cao Zheng (曹政) (2015-12-30). 京唐京滨城际先期工程昨开工 明年上半年全线建设. Beijing Daily. Retrieved 2015-12-30.
  3. ^ Beijing–Binhai New Area Intercity Railway EIA Report (PDF). State Reform and Development Commission. January 2016. Retrieved 16 January 2016.[permanent dead link]
  4. ^ "京唐铁路2022年建成 唐山39分钟可达北京城市副中心". 高铁网. 31 December 2020. Retrieved 1 January 2021.
  5. ^ 京唐城际铁路暂定7车站 设计速度350公里/小时. Xinhua.