Tramlink
London Trams, previously Tramlink and Croydon Tramlink, is a light rail tram system serving Croydon and surrounding areas in South London, England. It began operation in 2000, the first tram system in the London region since 1952. It is managed by London Trams, a public body part of Transport for London (TfL), and has been operated by FirstGroup since 2017. Tramlink is one of two light rail networks in Greater London, the other being the Docklands Light Railway.
The network consists of 39 stops along 28 km (17 mi) of track,[2] on a mixture of street track shared with other traffic, dedicated track in public roads, and off-street track consisting of new rights-of-way, former railway lines, and one right-of-way where the Tramlink track runs parallel to a third rail-electrified Network Rail line.
The network's lines coincide in central Croydon, with eastern termini at Beckenham Junction, Elmers End and New Addington, and a western terminus at Wimbledon, where there is an interchange for London Underground. Tramlink is the fourth-busiest light rail network in the UK behind the Docklands Light Railway, Manchester Metrolink and Tyne and Wear Metro.[3]
History
Inception
In the first half of the 20th century, Croydon had many tramlines. The first to close was the Addiscombe – East Croydon station route through George Street to Cherry Orchard Road in 1927 and the last was the Purley - Embankment and Croydon (Coombe Road) - Thornton Heath routes closed April 1951. However, in the Spring of 1950, the Highways Committee were presented by the Mayor with the concept of running trams between East Croydon station and the new estate being constructed at New Addington. This was based on the fact that the Feltham cars used in Croydon were going to Leeds to serve their new estates on reserved tracks. In 1962, a private study with assistance from BR engineers, showed how easy it was to convert the West Croydon - Wimbledon train service to tram operation and successfully prevent conflict between trams and trains.[4]
These two concepts became joined in joint LRTL/TLRS concept of New Addington to Wimbledon every 15 minutes via East and West Croydon and Mitcham plus New Addington to Tattenham Corner every 15 minutes via East and West Croydon, Sutton and Epsom Downs. A branch into Forestdale to give an overlap service from Sutton was also included. During the 1970s, several BR directors and up-and-coming managers were aware of the advantages. Chris Green, upon becoming managing director, Network South East, published his plans in 1987 expanding the concept to take in the Tattenham Corner and Caterham branches and provide a service from Croydon to Lewisham via Addiscombe and Hayes. Working with Tony Ridley, then managing director, London Transport, the scheme was brought out into the open with Scott Mackintosh being appointed Light Rail Manager in 1989.[4]
The scheme was accepted in principle in February 1990 by Croydon Council who worked with what was then London Regional Transport (LRT) to propose Tramlink to Parliament. The Croydon Tramlink Act 1994 resulted, which gave LRT the power to build and run Tramlink.[5]
Part of its track is the original route of the Surrey Iron Railway that opened in 1803.[6]
Construction
In 1995 four consortia were shortlisted to build, operate and maintain Tramlink:[7]
- Altram: John Laing, Ansaldo, Serco
- Croydon Connect: Tarmac, AEG, Transdev
- CT Light Rail Group: GEC Alsthom, Mowlem, Welsh Water
- Tramtrack Croydon: CentreWest, Royal Bank of Scotland, Sir Robert McAlpine, Amey, Bombardier Transportation
In 1996 Tramtrack Croydon (TC) won a 99-year Private Finance Initiative (PFI) contract to design, build, operate and maintain Tramlink. The equity partners in TC were Amey (50%), Royal Bank of Scotland (20%), 3i (20%) and Sir Robert McAlpine with Bombardier Transportation contracted to build and maintain the trams and FirstGroup operate the service.[8][9] TC retained the revenue generated by Tramlink and LRT had to pay compensation to TC for any changes to the fares and ticketing policy introduced later.[10]
Construction work started in January 1997, with an expected opening in November 1999. The first tram was delivered in October 1998 to the new Depot at Therapia Lane and testing on the sections of the Wimbledon line began shortly afterwards.[11]
Opening
The official opening of Tramlink took place on 10 May 2000 when route 3 from Croydon to New Addington opened to the public. Route 2 from Croydon to Beckenham Junction followed on 23 May 2000, and route 1 from Elmers End to Wimbledon opened a week later on 30 May 2000.[11]
Buyout by Transport for London
In March 2008, TfL announced that it had reached agreement to buy TC for £98 million.[12] The purchase was finalised on 28 June 2008.[13] The background to this purchase relates to the requirement that TfL (who took over from London Regional Transport in 2000) compensates TC for the consequences of any changes to the fares and ticketing policy introduced since 1996. In 2007 that payment was £4m, with an annual increase in rate.[10] FirstGroup continues to operate the service.
In October 2008 TfL introduced a new livery, using the blue, white and green of the routes on TfL maps, to distinguish the trams from buses operating in the area. The colour of the cars was changed to green, and the brand name was changed from Croydon Tramlink to simply Tramlink.[14] These refurbishments were completed in early 2009.
Additional stop and trams
Centrale tram stop, in Tamworth Road on the one-way central loop, opened on 10 December 2005,[15] increasing journey times slightly. As turnround times were already quite tight, this raised the issue of buying an extra tram to maintain punctuality. Partly for this reason but also to take into account the planned restructuring of services (subsequently introduced in July 2006), TfL issued tenders for a new tram. However, nothing resulted from this.
In January 2011, Tramtrack Croydon opened a tender for the supply of 10 new or second-hand trams from the end of summer 2011, for use between Therapia Lane and Elmers End.[16][17][18] On 18 August 2011, TfL announced that Stadler Rail had won a $19.75 million contract to supply six Variobahn trams similar to those used by Bybanen in Bergen, Norway.[18] They entered service in 2012.[19] In August 2013, TfL ordered an additional four Variobahns for delivery in 2015, for use on the Wimbledon to Croydon link, an order later increased to six. This brought the total Variobahn fleet up to ten in 2015,[19][20] and twelve in 2016 when the final two trams were delivered.[21]
Current network
Stops
There are 39 stops, with 38 opened in the initial phase, and Centrale tram stop added on 10 December 2005.[15] Most stops are 32.2 m (105 ft 8 in) long. They are virtually level with the doors and are all wider than 2 m (6 ft 7 in). This allows wheelchairs, prams, pushchairs and the elderly to board the tram easily with no steps. In street sections, the stop is integrated with the pavement. The tram stops have low platforms, 35 cm (14 in) above rail level. They are unstaffed and had automated ticket machines that are no longer in use due to TfL making trams cashless. In general, access between the platforms involves crossing the tracks by pedestrian level crossing.
Tramlink uses some former main-line stations on the Wimbledon–West Croydon and Elmers End–Coombe Lane stretches of line. The railway platforms have been demolished and rebuilt to Tramlink specifications, except at Elmers End and Wimbledon where the track level was raised to meet the higher main-line platforms to enable cross-platform interchange.
All stops have disabled access, raised paving, CCTV, a Passenger Help Point, a Passenger Information Display (PID), litter bins, a ticket machine, a noticeboard and lamp-posts, and most also have seats and a shelter.
The PIDs display the destinations and expected arrival times of the next two trams. They can also display any message the controllers want to display, such as information on delays or even safety instructions for vandals to stop putting rubbish or other objects onto the track.
Routes
Tramlink has been shown on the principal tube map since 1 June 2016, having previously appeared only on the "London Connections" map.
When Tramlink first opened it had three routes: Line 1 (yellow) from Wimbledon to Elmers End, Line 2 (red) from Croydon to Beckenham Junction, and Line 3 (green) from Croydon to New Addington.[22] On 23 July 2006 the network was restructured, with Route 1 from Elmers End to Croydon, Route 2 from Beckenham Junction to Croydon and Route 3 from New Addington to Wimbledon. On 25 June 2012 Route 4 from Therapia Lane to Elmers End was introduced. On Monday 4 April 2016, Route 4 was extended from Therapia Lane to Wimbledon.[23]
On 25 February 2018, the network and timetables were restructured again for more even and reliable services. As part of this change, trams would no longer display route numbers on their dot matrix destination screens.[24] This resulted in three routes:
- New Addington to West Croydon, returning to New Addington every 7–8 minutes (every 10 minutes on Sunday shopping hours and every 15 minutes at late evenings).
- Wimbledon to Beckenham Junction every 10 minutes (every 15 minutes on Sundays and late evening)
- Wimbledon to Elmers End every 10 minutes (every 15 minutes on Sundays and terminates at Croydon in late evening every 15 minutes)
Additionally, the first two trams from New Addington will run to Wimbledon. Overall, this would result in a decrease in 2tph leaving Elmers End, resulting in a 25% decrease in capacity here, and 14% in the Addiscombe area.[25] However, this would also regulate waiting times in this area and on the Wimbledon branch to every 5 minutes, from every 2–7 minutes.[26]
|
|
|
Former lines reused
Tramlink makes use of a number of National Rail lines, running parallel to franchised services, or in some cases, runs on previously abandoned railway corridors. Between Birkbeck and Beckenham Junction, Tramlink uses the Crystal Palace line, running on a single track alongside the track carrying Southern rail services. The National Rail track had been singled some years earlier.[15]
From Elmers End to Woodside, Tramlink follows the former Addiscombe Line. At Woodside, the old station buildings stand disused, and the original platforms have been replaced by accessible low platforms. Tramlink then follows the former Woodside and South Croydon Railway (W&SCR) to reach the current Addiscombe tram stop, adjacent to the site of the demolished Bingham Road railway station. It continues along the former railway route to near Sandilands, where Tramlink curves sharply towards Sandilands tram stop. Another route from Sandilands tram stop curves sharply on to the W&SCR before passing through Park Hill (or Sandilands) tunnels and to the site of Coombe Road station after which it curves away across Lloyd Park.
Between Wimbledon station and Wandle Park, Tramlink follows the former West Croydon to Wimbledon Line, which was first opened in 1855 and closed on 31 May 1997 to allow for conversion into Tramlink.[27] Within this section, from near Phipps Bridge to near Reeves Corner, Tramlink follows the Surrey Iron Railway, giving Tramlink a claim to one of the world's oldest railway alignments. Beyond Wandle Park, a Victorian footbridge beside Waddon New Road was dismantled to make way for the flyover[28] over the West Croydon to Sutton railway line. The footbridge has been re-erected at Corfe Castle station on the Swanage Railway (although some evidence suggests that this was a similar footbridge removed from the site of Merton Park railway station).[29][30]
Feeder buses
Bus routes T31, T32 and T33 used to connect with Tramlink at the New Addington, Fieldway and Addington Village stops. T31 and T32 no longer run, and T33 has been renumbered as 433.[31]
Rolling stock
Current fleet
Tramlink currently uses 35 trams. In summary:[21][32]
Class | Image | Type | Top speed | Length metres |
Capacity | In service |
Orders | Fleet numbers |
Routes operated |
Built | Years operated | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
mph | km/h | Std | Sdg | Total | ||||||||||
Bombardier CR4000 | Tram | 50 | 80 | 30.1 | 70 | 138 | 208 | 23 | — | 2530-2550 2552-2553 |
All lines | 1998–1999 | 2000–present | |
Croydon Variobahn | 32 | 72 | 134 | 206 | 6 | — | 2554-2559 | 2011–2012 | 2012–present | |||||
6 | 2560-2565 | 2014–2016 | 2015–present | |||||||||||
Total | 35 | — |
Bombardier CR4000
The original fleet comprised 24 articulated low floor Bombardier Flexity Swift CR4000 trams built in Vienna numbered beginning at 2530, continuing from the highest-numbered tram 2529 on London's former tram network, which closed in 1952.[33] The original livery was red and white. One (2550) was painted in FirstGroup white, blue and pink livery. In 2006, the CR4000 fleet was refreshed, with the bus-style destination roller blinds being replaced with a digital dot-matrix display. In 2008/09 the fleet was repainted externally in the new green livery and the interiors were refurbished with new flooring, seat covers retrimmed in a new moquette and stanchions repainted from yellow to green.[34][35] One (2551) has not returned to service after the fatal accident on 9 November 2016.
In 2007, tram 2535 was named after Steven Parascandolo,[36] a well known tram enthusiast.[37]
Croydon Variobahn
In January 2011, Tramtrack Croydon invited tenders for the supply of then new or second-hand trams,[16] and on 18 August 2011, TfL announced that Stadler Rail had won a $19.75 million contract to supply six Variobahn trams similar to those used by Bybanen in Bergen, Norway.[18] They entered service in 2012.[19] In August 2013, TfL ordered an additional four Variobahn trams for delivery in 2015, an order which was later increased to six. This brought the total Variobahn fleet up to ten in 2015,[19][20] and 12 in 2016 when the final two trams were delivered.[21]
Ancillary vehicles
Engineers' vehicles used in Tramlink construction were hired for that purpose.
In November 2006 Tramlink purchased five second-hand engineering vehicles from Deutsche Bahn. These were two DB class Klv 53 engineers' trams (numbered 058 and 059 in Tramlink service), and three 4-wheel wagons (numbered 060, 061, and 062).[38] Service tram 058 and trailer 061 were both sold to the National Tramway Museum in 2010.
Fares and ticketing
TfL Bus & Tram Passes are valid on Tramlink, as are Travelcards that include any of zones 3, 4, 5 and 6.
Pay-as-you-go Oyster Card fares are the same as on London Buses, although special fares may apply when using Tramlink feeder buses.
When using Oyster cards, passengers must touch in on the platform before boarding the tram. Special arrangements apply at Wimbledon station, where the Tramlink stop is within the National Rail and London Underground station. Tramlink passengers must therefore touch in at the station entry barriers then again at the Tramlink platform to inform the system that no mainline/LUL rail journey has been made.
EMV contactless payment cards can also be used to pay for fares in the same manner as Oyster cards.[39] Ticket machines were withdrawn on 16 July 2018.[40]
Services
Onboard announcements
The onboard announcements are by BBC News reader (and tram enthusiast) Nicholas Owen.[41] The announcement pattern is as follows: e.g. This tram is for Wimbledon; the next stop will be Merton Park.
Corporate affairs
Ownership and structure
The service was created as a result of the Croydon Tramlink Act 1994 that received Royal Assent on 21 July 1994, a Private Bill jointly promoted by London Regional Transport (the predecessor of Transport for London (TfL)) and Croydon London Borough Council.[42] Following a competitive tender, a consortium company Tramtrack Croydon Limited (incorporated in 1995) was awarded a 99-year concession to build and run the system.[43] Since 28 June 2008, the company has been a subsidiary of TfL.
Tramlink is currently operated by Tram Operations Ltd (TOL), a subsidiary of FirstGroup, who have a contract to operate the service until 2030. TOL provides the drivers and management to operate the service; the infrastructure and trams are owned and maintained by a TfL subsidiary.[44][45][46]
Business trends
The key available trends in recent years for Tramlink are (years ending 31 March):
2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | |||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Passenger revenue[a] (£M) | 23.5 | 24.4 | 22.8 | 25.5 | 24.1 | 23.5 | 22.7 | 11.5 | ||||
'Profit' ("Financial assistance given")[b] (£M) | −32.2 | −45.1 | −22.4 | −28.7 | −29.7 | −39.1 | −37.6 | |||||
Number of passengers[c] (M) | 31.2 | 30.7 | 27.0 | 29.5 | 29.1 | 28.7 | 27.2 | 11.6 | ||||
Customer satisfaction (score) | 89 | 89 | 90 | 87 | 91 | 90 | TBC | TBC | ||||
Number of trams (at year end) | 30 | 30 | 34 | 36 | 35 | 35 | 35 | 35 | ||||
Notes/sources | [1][47] | [1][47] | [1][47] | [1][48] | [1][48] | [1][49] | [1][50] [51] |
[1][52] [53] | ||||
Activities in the financial year 2020/21 were severely reduced by the impact of the coronavirus pandemic.
Passenger numbers
Detailed passenger journeys since Tramlink commenced operations in May 2000 were:
Year | Passenger journeys |
Year | Passenger journeys |
Year | Passenger journeys | ||
---|---|---|---|---|---|---|---|
2000–01 | 15.0M | 2007–08 | 27.2M | 2014–15 | 30.7M | ||
2001–02 | 18.2M | 2008–09 | 27.2M | 2015–16 | 27.0M | ||
2002–03 | 18.7M | 2009–10 | 25.8M | 2016–17 | 29.5M | ||
2003–04 | 19.8M | 2010–11 | 27.9M | 2017–18 | 29.1M | ||
2004–05 | 22.0M | 2011–12 | 28.6M | 2018–19 | 28.7M | ||
2005–06 | 22.5M | 2012–13 | 30.1M | 2019–20 | 27.2M | ||
2006–07 | 24.6M | 2013–14 | 31.2M | 2020–21 | TBC | ||
Estimates from the Department for Transport[54] |
Future developments
Sutton Link
As of 2020, the only extension actively being pursued by the Mayor of London and TfL is a new line to Sutton from Wimbledon or Colliers Wood, known as the Sutton Link.
In July 2013, then Mayor Boris Johnson had affirmed that there was a reasonable business case for Tramlink to cover the Wimbledon – Sutton corridor, which might also include a loop via St Helier Hospital and an extension to The Royal Marsden Hospital.[55] In 2014, a proposed £320m scheme for a new line to connect Wimbledon to Sutton via Morden was made and brought to consultation jointly by the London Boroughs of Merton and Sutton. Although £100m from TfL was initially secured in the draft 2016/17 budget,[56] this was subsequently reallocated.[57]
In 2018, TfL opened a consultation on proposals for a connection to Sutton,[58] with three route options: from South Wimbledon, from Colliers Wood (both having an option of a bus rapid transit route or a tram line) or from Wimbledon (only as a tram line). In February 2020, following the consultation, TfL announced their preference for a north–south tramway between Colliers Wood and Sutton town centre, with a projected cost of £425m, on the condition of securing additional funding. Work on the project stopped in July 2020, as Transport for London could not find sufficient funding for it to continue.[58]
Previous proposals
Numerous extensions to the network have been discussed or proposed over the years, involving varying degrees of support and investigative effort.
In 2002, as part of The Mayor's Transport Strategy for London, a number of proposed extensions were identified, including to Sutton from Wimbledon or Mitcham; to Crystal Palace; to Colliers Wood/Tooting; and along the A23. The Strategy said that "extensions to the network could, in principle, be developed at relatively modest cost where there is potential demand..."[59] and sought initial views on the viability of a number of extensions by summer 2002.
In 2006, in a TfL consultation on an extension to Crystal Palace, three options were presented: on-street, off-street and a mixture of the two.[60] After the consultation, the off-street option was favoured, to include Crystal Palace Station and Crystal Palace Parade.[61] TfL stated in 2008 that due to lack of funding the plans for this extension would not be taken forward.[62] They were revived shortly after Boris Johnson's re-election as Mayor in May 2012, but six months later they were cancelled again.[63]
In November 2014, a 15-year plan, Trams 2030, called for upgrades to increase capacity on the network in line with an expected increase in ridership to 60 million passengers by 2031[64] (although the passenger numbers at the time (2013/14: 31.2 million) have not been exceeded since (as at 2019)). The upgrades were to improve reliability, support regeneration in the Croydon metropolitan centre, and future-proof the network for Crossrail 2, a potential Bakerloo line extension, and extensions to the tram network itself to a wide variety of destinations. The plans involve dual-tracking across the network and introducing diverting loops on either side of Croydon, allowing for a higher frequency of trams on all four branches without increasing congestion in central Croydon. The £737m investment was to be funded by the Croydon Growth Zone, TfL Business Plan, housing levies, and the respective boroughs, and by the affected developers.[65]
All the various developments, if implemented, could theoretically require an increase in the fleet from 30 to up to 80 trams (depending on whether longer trams or coupled trams are used). As such, an increase in depot and stabling capacity would also be required; enlargement of the current Therapia Lane site, as well as sites near the Elmers End and Harrington Road tram stops, were shortlisted.[64]
Accidents and incidents
- On 7 September 2008, a bus on route 468 travelled through a red traffic signal and collided with tram 2534 in George Street, Croydon, causing a fatality.[66][67] The driver of the bus was convicted of causing death by dangerous driving a year later in December 2009 and was sentenced to four years in prison.[68]
- On 13 September 2008, tram 2530 collided with a cyclist at Morden Hall Park footpath crossing between the Morden Road and Phipps Bridge tram stops. The cyclist sustained serious injuries and later died. The immediate cause of the accident was found to be that the cyclist rode onto the crossing without looking at the approaching tram; among the causal factors were that the cyclist may have been wearing headphones, which prevented him hearing the audible warnings.[69]
- On 5 April 2011, a woman tripped over and was dragged under a moving tram. She was taken to hospital in a serious condition. She is believed to have been running to catch the tram outside East Croydon station when she tripped and fell.[70]
- On 17 February 2012, a tram derailed after passing over facing points as it approached the platform at East Croydon station.[71]
- On 7 February 2016, 5 people were injured when a car collided with tram 2535, which was going round a bend near Wellesley Road. It resulted in the tram being derailed.[72]
- On 9 November 2016, tram 2551 derailed on a sharp curved junction 180 metres (590 ft) east from the Sandilands tram stop, killing 7 people and injuring at least 50 more.[73] The British Transport Police arrested the driver on suspicion of manslaughter.[74] Driver error was found to be the cause of the accident, with suspicions that the driver had a microsleep episode approaching the bend.[75][76]
See also
- East London Transit (proposed for tram conversion)
- List of modern tramway and light rail systems in the United Kingdom
- List of town tramway systems in the United Kingdom
References
- ^ a b c d e f g h i j "Light rail and tram statistics (LRT)". Department for Transport. 23 June 2021. Retrieved 18 November 2021.
- ^ "London Trams". Transport for London. Archived from the original on 8 November 2016. Retrieved 9 November 2016.
- ^ Light Rail and Tram Statistics, England: 2017/18 Department for Transport
- ^ a b "Croydon Tramlink (Unofficial Site)". Retrieved 10 January 2008.
- ^ "Croydon Tramlink Act". 1994. Archived from the original on 26 October 2012.
- ^ Wolmar, Christian (2007). Fire & Steam: A New History of the Railways in Britain. London: Atlantic Books. ISBN 978-1-843-54629-0. See p. 7 and note 11 on p. 319.
- ^ Light rail shortlist Railway Gazette International November 1995 page 715
- ^ "Preferred bidder selected for Croydon tram project" Rail issue 279 22 May 1996 page 15
- ^ "Croydon buy out" Railway Gazette International April 2008 page 212
- ^ a b "TfL announces plans to take over Tramlink services" (Press release). Transport for London. 17 March 2008. Archived from the original on 12 April 2008. Retrieved 18 March 2008.
- ^ a b "The Makings of Croydon Tramlink". Retrieved 6 May 2020.
- ^ TfL to take over Tramlink Today's Railways UK issue 77 May 2008 page 24
- ^ AnnualAccounts for year ended 31 March 2008 Transport for London page 158
- ^ Kottegoda, Maheesha (9 October 2008). "It's green for go at Tramlink". Croydon Advertiser. Archived from the original on 9 October 2008. Retrieved 10 October 2008.
- ^ a b c "Croydon Tramlink". railway-technology.com. Archived from the original on 22 February 2014. Retrieved 16 December 2013.
- ^ a b "London Tramlink seeks bids for additional trams". Railway Gazette International. London. 31 January 2011. Archived from the original on 2 November 2012.
- ^ New Trams for Croydon Rail issue 663 9 February 2011 page 16
- ^ a b c "Stadler wins London Tramlink tram order". Railway Gazette International. 18 August 2011. Archived from the original on 17 September 2011.
- ^ a b c d London Tramlink orders more Stadler trams Archived 3 January 2017 at the Wayback Machine Railway Gazette International 21 August 2013
- ^ a b "London Tramlink orders four new trams for Wimbledon branch" (Press release). Transport for London. 30 August 2013. Archived from the original on 1 September 2013. Retrieved 1 September 2013.
- ^ a b c "London Tramlink". British Trams Online / Gareth Prior. 16 October 2016. Archived from the original on 14 November 2016. Retrieved 10 November 2016.
- ^ Tramlink: Your top 10 questions answered… Poster, 1995.
- ^ "Tram-endous boost for travellers". Transport for London. 4 April 2016. Archived from the original on 13 May 2016. Retrieved 19 November 2017.
- ^ Transport for London. "New tram service pattern & timetable". tfl.gov.uk. Archived from the original on 26 February 2018. Retrieved 9 May 2018.
- ^ "Even Westfield now agree there's no need for £28m tram loop". insidecroydon.com. 14 October 2017. Archived from the original on 19 December 2017. Retrieved 9 May 2018.
- ^ "Changes coming to tram timetable: Here's what you need to know". Croydon Guardian. Archived from the original on 6 December 2017. Retrieved 9 May 2018.
- ^ "The Railway Magazine". Vol. 148. 2002. p. 51. ISSN 0033-8923.
{{cite magazine}}
: Cite magazine requires|magazine=
(help) - ^ "Flyover 1". Transport-of-delight.com. Archived from the original on 14 May 2011. Retrieved 9 May 2010.
- ^ Wright, Andrew. "Prestigious national award plaque installed at Corfe Castle on 26th October 2008". Swanage Railway. Archived from the original on 27 September 2011. Retrieved 31 August 2011.
- ^ Wright, Andrew. "Ex-Strategic Rail Authority Chairman officially opens Corfe Castle's historic Victorian railway footbridge on 28th April 2007". Swanage Railway. Archived from the original on 27 September 2011. Retrieved 31 August 2011.
- ^ Proposed changes to bus services in New Addington and Forestdale Transport for London June 2015
- ^ "London Tramlink prepares to put new trams into service". Railway Gazette International. 15 February 2012. Archived from the original on 17 February 2012.
- ^ First Croydon Tram on Test Today's Railways UK issue 36 December 1998 page 57
- ^ Croydon Tramlink opened for business The Railway Magazine issue 1191 July 2000 page 10
- ^ "End of an era as Croydon's last red tram turns green". Archived from the original on 7 October 2010.
- ^ "Croydon Tramlink - The Unofficial Site". www.croydon-tramlink.co.uk. Retrieved 18 April 2021.
- ^ "2535 Stephen Parascandolo naming ceremony".
{{cite web}}
: CS1 maint: url-status (link) - ^ "On Track Plant and Construction Traffic". Stephen Parascandolo. Archived from the original on 28 June 2016. Retrieved 10 November 2016.
- ^ "Fares".
- ^ "TFL confirms trams in Croydon will go 'cashless'".
- ^ "Tramlink celebrates its seventh birthday". Archived from the original on 15 October 2008. Retrieved 3 February 2009.
- ^ [1] Hansard
- ^ [2] TfL
- ^ London Trams Transport for London
- ^ News in Brief Railway Gazette International August 2008 page 479
- ^ [3] FirstGroup
- ^ a b c "Transport for London Annual Report 2015/16" (PDF). TfL. 19 July 2016. Retrieved 3 May 2020.
- ^ a b "Transport for London Annual Report 2017/18" (PDF). TfL. 25 July 2018. Retrieved 3 May 2020.
- ^ "Transport for London Annual Report 2018/19" (PDF). TfL. 24 July 2019. Retrieved 3 May 2020.
- ^ "Transport for London Financial Statements for the year ended 31 March 2020" (PDF). TfL. 29 July 2020. Retrieved 20 March 2021.
- ^ "Transport for London Quarterly performance reports" (PDF). TfL. July 2020. Retrieved 20 March 2021.
- ^ "Transport for London Annual Report and Statement of Accounts 2020/21" (PDF). TfL. 28 July 2021. Retrieved 18 November 2021.
- ^ "Transport for London quarterly performance report" (PDF). TfL. May 2021. Retrieved 18 November 2021.
- ^ "Passenger journeys on light rail and trams by system: England - annual from 1983/84" (downloadable .ods OpenDocument file). Department For Transport. Retrieved 14 June 2019.
- ^ "Boris tells City Hall there is 'reasonable business case' for extending tram route to Sutton". Your Local Guardian. Archived from the original on 4 March 2016. Retrieved 9 May 2018.
- ^ "TfL commits £100m to extending tram network from Wimbledon to Sutton". Sutton Guardian.
- ^ "Why Croydon's tram network may now not be extended to Sutton". 10 December 2016.
- ^ a b "Have your say on the Sutton link". Transport for London. 2020.
- ^ London Dockland and Croydon Tramlink Extensions Archived 13 July 2009 at the Portuguese Web Archive
- ^ "Crystal Palace extension options to reach the Parade" (PDF). tfl.gov.uk. Retrieved 9 May 2018.
- ^ "Croydon Tramlink extension to Crystal Palace". Lambeth Council Website. Lambeth Council. Retrieved 19 August 2013.
- ^ Tramlink extension to Crystal Palace Archived 2 December 2008 at the Wayback Machine
- ^ Austen, Ian (7 December 2012). "Crystal Palace Tramlink extension not backed by Boris Johnson despite manifesto". Croydon Advertiser. Retrieved 19 August 2013.
- ^ a b "Archived copy" (PDF). Archived (PDF) from the original on 19 October 2016. Retrieved 11 July 2017.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Archived copy" (PDF). Archived (PDF) from the original on 20 December 2016. Retrieved 15 December 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Man killed in bus and tram crash". BBC. 7 September 2008. Archived from the original on 8 September 2008. Retrieved 8 September 2008.
- ^ "Bus driver charged over Croydon death crash with tram". Croydon Advertiser. 23 February 2009. Archived from the original on 9 December 2009. Retrieved 9 December 2009.
- ^ Wilson, Cherry (2 December 2009). "Bus driver found guilty of causing passenger's death". Croydon Advertiser. Archived from the original on 13 September 2012. Retrieved 7 June 2010.
- ^ "Fatal accident at Morden Hall Park footpath crossing 13 September 2008" (PDF). RAIB. 12 March 2009. Archived (PDF) from the original on 16 December 2013. Retrieved 14 August 2013.
- ^ Miller, Harry (5 April 2011). "Croydon woman dragged under tram in serious condition". This Is Local London. Archived from the original on 25 January 2012.
- ^ "Report 04/2013: Derailment of a tram at East Croydon". Rail Accident Investigation Branch. 10 December 2014. Retrieved 13 November 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ "Five hurt as tram thrown 15ft off its tracks in crash with car in Croydon". 8 February 2016. Retrieved 8 February 2016.
- ^ "Croydon tram: Five dead and 50 injured after derailment". BBC London. 9 November 2016. Archived from the original on 9 November 2016. Retrieved 9 November 2016.
- ^ "BTP | Updated statement on tram derailment - Croydon". media.btp.police.uk. British Transport Police. Archived from the original on 10 November 2016. Retrieved 9 November 2016.
- ^ "Croydon tram crash: Report says driver 'probably dozed off'". BBC. Retrieved 7 December 2017.
- ^ "Overturning of a tram at Sandilands junction, Croydon 9 November 2016" (PDF). RAIB. Retrieved 7 December 2017.
Further reading
- Walter, Mike (7 April 1998). "Next stop Croydon...". Rail. No. 327. EMAP Apex Publications. pp. 36–37. ISSN 0953-4563. OCLC 49953699.
- "First Croydon tram arrives at brand new depot". Rail. No. 341. EMAP Apex Publications. 20 October 1998. p. 14. ISSN 0953-4563. OCLC 49953699.
- Dunn, Pip (3 November 1998). "This is the modern world!". Rail. No. 342. EMAP Apex Publications. pp. 30–33. ISSN 0953-4563. OCLC 49953699.
External links
- Tramlink
- Transport in the London Borough of Bromley
- Transport in the London Borough of Croydon
- Transport in the London Borough of Merton
- Transport in the London Borough of Sutton
- Light rail in the United Kingdom
- Trams in London
- Tram transport in England
- Croydon 2020
- Railway lines opened in 2000
- Modes of transport in London
- Electric railways in the United Kingdom
- Standard gauge railways in London
- 750 V DC railway electrification