Electricity in Great Britain
Data | |
---|---|
Electricity coverage | 100% (91.8% grid 2017[1]) |
Continuity of supply | 99.9999% |
Installed capacity | 74.8 GW (2023) [2] |
Production | 292.7 TWh (2023)[2] |
Share of fossil energy | 36.65% (2023)[2] |
Share of renewable energy | 46.39% (2023)[2] |
GHG emissions from electricity generation (2020) | 181 t CO2 per GWh[3] |
Average electricity use (2023) | 3,239 kWh/person |
Transmission & Distribution losses (2017) | 7.5% |
Institutions | |
Responsibility for regulation | Office of Gas and Electricity Markets |
Responsibility for policy-setting | Parliament of the United Kingdom |
Electricity sector law | Electricity Act 1989 |
This article needs to be updated. The reason given is: more on path to net zero in 2035 from https://www.theccc.org.uk/2023/03/09/a-reliable-secure-and-decarbonised-power-system-by-2035-is-possible-but-not-at-this-pace-of-delivery/ already cited. (April 2024) |
The National Grid covers most of mainland Great Britain and several of the surrounding islands, and there are interconnectors to Northern Ireland and to other European countries. Power is supplied to consumers at 230 volts AC with a frequency of 50 Hz. In 2023 about a third of electricity used in Britain was generated from fossil gas and two-thirds was low-carbon power. Wind generates the most low-carbon power, followed by nuclear some of which is imported from France.[5] The government is aiming for greenhouse gas emissions from electricity in Britain to be net zero by 2035.[6]
The use of electricity declined in the 2010s and early 2020s, attributed largely to a decline in industrial activity and a switch to more energy efficient lighting and appliances.[7] However demand is projected to increase considerably due to electrification, such as heat pumps[8] and electric vehicles.[9]
UK energy policy includes capping some residential energy price rates,[10] and wholesale prices for some new low-carbon power can be stabilized by the government.[11]
Nationalisation plans are currently underway following the proposed introduction of Great British Energy subsequent to the 2024 King's Speech, which also oversaw increased dedication towards net-zero targets by 2050. This is further emphasised via GB Energy through heavy investment in renewable energy sources, such as tidal power and offshore windfarms. The future body also intends to operate and manage clean power projects at a state level, in contrast with private entities having done so for several years.
Under the most recent estimates, the plan will amount to £8bn. for the government, a figure criticised by the opposition and media alike, although Energy Secretary Ed Miliband has claimed it will have an environmental impact in forwarding sustainability, as well as predicting that it will reduce average electricity thresholds by £1,400 universally. The entity will remain in preliminary stages before implementation of the Great British Energy Bill, whereupon it shall be established after royal assent given in accordance with the law of the United Kingdom.
History
[edit]In 2008 nuclear electricity production was 53.2 TW·h, equivalent to 860 kWh per person. In 2014, 28.1 TW·h of energy was generated by wind power, which contributed 9.3% of the UK's electricity requirement.[13] In 2015, 40.4 TW·h of energy was generated by wind power, and the quarterly generation record was set in the three-month period from October to December 2015, with 13% of the nation's electricity demand met by wind.[14] Wind power contributed 15% of UK electricity generation in 2017 and 18.5% in the final quarter of 2017.[15] In 2019, National Grid announced that low-carbon generation technologies had produced more electricity than fossil generators for the first time in Britain.[16]
National grid
[edit]This section needs additional citations for verification. (February 2019) |
The first to use Nikola Tesla's three-phase high-voltage electric power distribution in the United Kingdom was Charles Merz, of the Merz & McLellan consulting partnership, at his Neptune Bank Power Station near Newcastle upon Tyne. This opened in 1901,[17] and by 1912 had developed into the largest integrated power system in Europe.[18] The rest of the country, however, continued to use a patchwork of small supply networks.
In 1925, the British government asked Lord Weir, a Glaswegian industrialist, to solve the problem of Britain's inefficient and fragmented electricity supply industry. Weir consulted Merz, and the result was the Electricity (Supply) Act 1926, which recommended that a "national gridiron" supply system be created.[19] The 1926 Act created the Central Electricity Board, which set up the UK's first synchronised, nationwide AC grid, running at 132 kV, 50 Hz.
The grid was created with 4,000 miles of cables: mostly overhead cables, linking the 122 most efficient power stations. The first "grid tower" was erected near Edinburgh on 14 July 1928,[20] and work was completed in September 1933, ahead of schedule and on budget.[21][22] It began operating in 1933 as a series of regional grids with auxiliary interconnections for emergency use. Following the unauthorised but successful short term parallelling of all regional grids by the night-time engineers on 29 October 1937,[23] by 1938 the grid was operating as a national system. By then, the growth in the number of electricity users was the fastest in the world, rising from three quarters of a million in 1920 to nine million in 1938.[24] It proved its worth during the Blitz when South Wales provided power to replace lost output from Battersea and Fulham power stations.[24] The grid was nationalised by the Electricity Act 1947, which also created the British Electricity Authority. In 1949, the British Electricity Authority decided to upgrade the grid by adding 275 kV links.
At its inception in 1950, the 275 kV Transmission System was designed to form part of a national supply system, with an anticipated total demand of 30,000 MW by 1970. This predicted demand was already exceeded by 1960. The rapid load growth led the Central Electricity Generating Board (CEGB) to carry out a study of future transmission needs, completed in September 1960. The study is described in a paper presented to the Institution of Electrical Engineers by Booth, Clark, Egginton and Forrest in 1962.
Considered in the study, together with the increased demand, was the effect on the transmission system of the rapid advances in generator design, resulting in projected power stations of 2,000–3,000 MW installed capacity. These new stations were mostly to be sited where advantage could be taken of a surplus of cheap low-grade fuel and adequate supplies of cooling water, but these locations did not coincide with the load centres. West Burton with 4 × 500 MW machines, sited at the Nottinghamshire coalfield near the River Trent, is a typical example. These developments shifted the emphasis on the transmission system, from interconnection to the primary function of bulk power transfers from the generation areas to the load centres, such as the anticipated transfer in 1970 of some 6,000 MW from The Midlands to the Home counties.
Continued reinforcement and extension of the existing 275 kV systems were examined as possible solutions. However, in addition to the technical problem of very high fault levels, many more lines would have been required to obtain the estimated transfers at 275 kV. As this was not consistent with the CEGB's policy of preservation of amenities, a further solution was sought. Consideration was given to both a 400 kV and a 500 kV scheme as the alternatives, either of which gave a sufficient margin for future expansion. A 400 kV system was chosen, for two main reasons. First, the majority of the 275 kV lines could be uprated to 400 kV, and secondly it was envisaged that operation at 400 kV could commence in 1965, compared with 1968 for a 500 kV scheme. Design work was started, and to meet the 1965 timescale, the contract engineering for the first projects had to run concurrently with the design. This included the West Burton 400 kV Indoor Substation, the first section of which was commissioned in June 1965. From 1965, the grid was partly upgraded to 400 kV, beginning with a 150-mile (241 km) line from Sundon to West Burton, to become the Supergrid.
With the development of the national grid and the switch to using electricity, United Kingdom electricity consumption increased by around 150% between the post war nationalisation of the industry in 1948 and the mid-1960s. During the 1960s growth slowed as the market became saturated.
On the breakup of the CEGB in 1990, the ownership and operation of the National Grid in England and Wales passed to National Grid Company plc, later to become National Grid Transco, and now National Grid plc. In Scotland the grid was already split into two separate entities, one for southern and central Scotland and the other for northern Scotland, connected by interconnectors. The first is owned and maintained by SP Energy Networks, a subsidiary of Scottish Power, and the other by SSE. However, National Grid plc remained the System Operator for the whole British Grid until the creation of the National Energy System Operator on 1 October 2024.
Generation
[edit]The mode of generation has changed over the years. During the 1940s some 90% of the generating capacity was fired by coal, with oil providing most of the remainder.
The United Kingdom started to develop a nuclear generating capacity in the 1950s, with Calder Hall being connected to the grid on 27 August 1956. Though the production of weapons-grade plutonium was the main reason behind this power station, other civil stations followed, and 26% of the nation's electricity was generated from nuclear power at its peak in 1997.
During the 1960s and 70s, coal plants were built to supply consumption despite economic challenges. During the 1970s and 80s some nuclear sites were built. From the 1990s gas power plants benefited from the Dash for Gas supplied by North Sea gas. After the 2000s, renewables like solar and wind added significant capacity.[25] In Q3 2016, nuclear and renewables each supplied a quarter of British electricity, with coal supplying 3.6%.[26][27]
Despite the flow of North Sea oil from the mid-1970s, oil fuelled generation remained relatively small and continued to decline.
Starting in 1993, and continuing through the 1990s, a combination of factors led to a so-called Dash for Gas, during which the use of coal was scaled back in favour of gas-fuelled generation. This was sparked by political concerns, the privatisation of the National Coal Board, British Gas and the Central Electricity Generating Board; the introduction of laws facilitating competition within the energy markets; the availability of cheap gas from the North Sea and elsewhere and the high efficiency and reduced pollution from combined cycle gas turbine (CCGT) generation. In 1990 just 1.09% of all gas consumed in the country was used in electricity generation; by 2004 the figure was 30.25%.[28]
By 2004, coal use in power stations had fallen to 50.5 million tonnes, representing 82.4% of all coal used in 2004 (a fall of 43.6% compared to 1980 levels), though up slightly from its low in 1999.[28] On several occasions in May 2016, Britain burned no coal for electricity for the first time since 1882.[29][30] On 21 April 2017, Britain went a full day without using coal power for the first time since the Industrial Revolution, according to the National Grid.[31]
From the mid-1990s new renewable energy sources began to contribute to the electricity generated, adding to a small hydroelectricity generating capacity.
UK 'energy gap'
[edit]In the early years of the 2000s, concerns grew over the prospect of an 'energy gap' in United Kingdom generating capacity. This was forecast to arise because it was expected that a number of coal fired power stations would close due to being unable to meet the clean air requirements of the European Large Combustion Plant Directive (directive 2001/80/EC).[33] In addition, the United Kingdom's remaining Magnox nuclear stations were to have closed by 2015. The oldest AGR nuclear power station has had its life extended by ten years,[34] and it was likely many of the others could be life-extended, reducing the potential gap suggested by the current accounting closure dates of between 2014 and 2023 for the AGR power stations.[35]
A report from the industry in 2005 forecast that, without action to fill the gap, there would be a 20% shortfall in electricity generation capacity by 2015. Similar concerns were raised by a report published in 2000 by the Royal Commission on Environmental Pollution (Energy – The Changing Climate). The 2006 Energy Review attracted considerable press coverage – in particular in relation to the prospect of constructing a new generation of nuclear power stations, in order to prevent the rise in carbon dioxide emissions that would arise if other conventional power stations were to be built.
Among the public, according to a November 2005 poll conducted by YouGov for Deloitte, 35% of the population expected that by 2020 the majority of electricity generation would come from renewable energy (more than double the government's target, and far larger than the 5.5% generated as of 2008),[36] 23% expected that the majority will come from nuclear power, and only 18% that the majority will come from fossil fuels. 92% thought the Government should do more to explore alternative power generation technologies to reduce carbon emissions.[37]
Plugging the energy gap
[edit]The first move to plug the United Kingdom's projected energy gap was the construction of the conventionally gas-fired Langage Power Station and Marchwood Power Station which became operational in 2010.
In 2007, proposals for the construction of two new coal-fired power stations were announced, in Tilbury, Essex and in Kingsnorth, Kent. If built, they would have been the first coal-fired stations to be built in the United Kingdom in 20 years.[38]
Beyond these new plants, there were a number of options that might be used to provide the new generating capacity, while minimising carbon emissions and producing less residues and contamination. Fossil fuel power plants might provide a solution if there was a satisfactory and economical way of reducing their carbon emissions. Carbon capture might provide a way of doing this; however the technology is relatively untried and costs are relatively high. As of 2006 there were no power plants in operation with a full carbon capture and storage system, and as of 2018 the situation is that there are no viable CCS systems worldwide.
Energy gap disappears
[edit]However, due to reducing demand in the late-2000s recession removing any medium term gap, and high gas prices, in 2011 and 2012 over 2 GW of older, less efficient, gas generation plant was mothballed.[39][40] In 2011 electricity demand dropped 4%, and about 6.5 GW of additional gas-fired capacity is being added over 2011 and 2012.[Out of date] Early in 2012 the reserve margin stood at the high level of 32%.[41]
Another important factor in reduced electrical demand in recent years has come from the phasing out of incandescent light bulbs and a switch to compact fluorescent and LED lighting. Research by the University of Oxford[42] has shown that the average annual electrical consumption for lighting in a UK home fell from 720 kWh in 1997 to 508 kWh in 2012. Between 2007 and 2015, the UK's peak electrical demand fell from 61.5 GW to 52.7.GW.[42][43]
In June 2013, the industry regulator Ofgem warned that the UK's energy sector faced "unprecedented challenges" and that "spare electricity power production capacity could fall to 2% by 2015, increasing the risk of blackouts". Proposed solutions "could include negotiating with major power users for them to reduce demand during peak times in return for payment".[44]
The use of electricity declined 9% from 2010 to 2017, attributed largely to a decline in industrial activity and a switch to more energy efficient lighting and appliances.[7] By 2018 per capita electrical generation had fallen to the same level as in 1984.[45]
In January 2019 Nick Butler, in the Financial Times, wrote: "costs of all forms of energy (apart from nuclear) have fallen dramatically and there is no shortage of supply", partly based on the reserve capacity auction[46] for 2021–2022 achieving extremely low prices.[47][48]
Production
[edit]The electricity sector supplies power to consumers at 230 volts (-6%, +10%) AC with a frequency of 50 Hz.
Production | Supplied | Conventional thermal and other | CCGT | Nuclear | Non thermal renewables | Pumped storage | |
---|---|---|---|---|---|---|---|
2017[49] | 323,157 | 319,298 | 60,681 | 128,153 | 63,887 | 67,394 | 2,862 |
Modes of production
[edit]In 2020, total electricity production stood at 312 TWh (down from a peak of 385 TWh in 2005), generated from the following sources:[50]
- Gas: 35.7% (0.05% in 1990)
- Nuclear: 16.1% (19% in 1990)
- Wind: 24.2% (0% in 1990), of which:
- Onshore Wind: 11.1%
- Offshore Wind: 13%
- Coal: 1.8% (67% in 1990)
- Bio-Energy: 12.6% (0% in 1990)
- Solar: 4.2% (0% in 1990)
- Hydroelectric: 2.2% (2.6% in 1990)
- Oil and other: 3.3% (12% in 1990)
The UK Government energy policy had targeted a total contribution from renewables to achieve 10% by 2010, but it was not until 2012 that this figure was exceeded; renewable energy sources supplied 11.3% (41.3 TWh) of the electricity generated in the United Kingdom in 2012.[51] The Scottish Government has a target of generating 17% to 18% of Scotland's electricity from renewables by 2010,[52] rising to 40% by 2020.[53]
External image | |
---|---|
Current grid status Similar data |
The gross production of electricity was 393 TWh in 2004 which gave the 9th position in the world top producers in 2004.[60]
The 6 major companies which dominate the British electricity market ("The Big Six") are: EDF, Centrica (British Gas), E.ON, RWE npower, Scottish Power and Southern & Scottish Energy.
The UK is planning to reform its Electricity Market. It has introduced a capacity mechanism and a Contract for Difference (CfD) subsidised purchase to encourage the building of new more environmentally friendly generation.[61]
Gas
[edit]Electricity produced with gas was 160 TWh in 2004 and 177 TWh in 2008. In both years the United Kingdom was the fourth highest producer of electricity from gas. In 2005 the UK produced 3.2% of the world total natural gas; ranking fifth after Russia (21.8%), United States (18%), Canada (6.5%) and Algeria (3.2%). In 2009 the UK’s own gas production was less and natural gas was also imported.[60][62]
Due to reducing demand in the late-2000s recession and high gas prices, in 2011 and 2012 over 2 GW of older, less efficient, gas generation plant was mothballed.[63][40]
Coal
[edit]In November 2015, the UK Government announced that all the remaining fourteen coal-fired power stations would be closed by 2025.[64] In November 2017 the UK Government co-founded the Powering Past Coal Alliance. In June 2021, the government said it would end coal power by October 2024.[65][66] This date was met as Ratcliffe-on-Soar, the UK's last operational coal power station, ceased running on 30 September 2024.
The United Kingdom had continuously burned coal for the generation of electricity since the opening of Holborn Viaduct power station in 1882. On several occasions in May 2016, Britain burned no coal for electricity for the first time since 1882.[67][68] Due to lower gas prices, economy of coal plants is strained, and 3 coal plants closed in 2016.[69] On 21 April 2017, the mainland grid burnt no coal to make electricity for the first complete 24 hour period.[70][71]
On 21 April 2017, for the first time since 1882, the GB grid had a full 24-hour period without any generation from coal power.[72] In May 2019 the GB grid went its first full week without any coal power.[73] And in spring/summer 2020 from 10 April, the UK grid ran for 68 days, without burning any coal.[3] In 2020, coal produced 4.4 TWh of electricity and Britain went 5,202 hours free from coal electricity generation, up from 3,665 hours in 2019 and 1,856 in 2018.[74]
In August and September 2021, the UK had to restart coal plants, amidst a lack of wind, as power imports from Europe were insufficient to satisfy demand.[75][76]
Coal supplied just over 1% of UK electricity in 2023,[77] down from 30% in 2014.[78] The last remaining power station in the United Kingdom ceased operating on 30 September 2024 with power output dropping to zero at some point between 15:35 and 15:40 BST.
Nuclear power
[edit]Nuclear power in the United Kingdom generates around a quarter of the country's electricity as of 2016, projected to rise to a third by 2035.[79] The UK has 15 operational nuclear reactors at seven plants (14 advanced gas-cooled reactors (AGR) and one pressurised water reactor (PWR)), as well as nuclear reprocessing plants at Sellafield and the Tails Management Facility (TMF) operated by Urenco in Capenhurst.
Renewable energy
[edit]From the mid-1990s renewable energy began to contribute to the electricity generated in the United Kingdom, adding to a small hydroelectricity generating capacity. Renewable energy sources provided for 11.3% of the electricity generated in the United Kingdom in 2012,[51] reaching 41.3 TWh of electricity generated. As of 2nd quarter 2017, renewables generated 29.8% of the UK's electricity.[80]
Currently, the biggest renewable source of energy in the UK is wind power, and the UK has some of the best wind resources in Europe. The UK has relatively small hydroelectricity deployment and resources, although some pumped storage exists. Solar power is rapidly growing and provides significant power during daylight hours, but total energy provided is still small. Biofuels are also used as a significant sources of power. Geothermal is not highly accessible and is not a significant source. Tidal resources are present and experimental projects are being tested, but are likely to be expensive.
Wind power delivers a growing percentage of the energy of the United Kingdom and by the beginning of February 2018, it consisted of 8,655 wind turbines with a total installed nameplate capacity of over 18.4 gigawatts: 12,083 megawatts of onshore capacity and 6,361 megawatts of offshore capacity.[81] This placed the United Kingdom at this time as the world's sixth largest producer of wind power.[82] Polling of public opinion consistently shows strong support for wind power in the UK, with nearly three quarters of the population agreeing with its use, even for people living near onshore wind turbines.[83][84][85][86][87][88] Wind power is expected to continue growing in the UK for the foreseeable future, RenewableUK estimates that more than 2 GW of capacity will be deployed per year for the next five years.[89] Within the UK, wind power was the second largest source of renewable energy after biomass in 2013.[51]
In 2014, Imperial College predicted that Britain could have 40% of electricity from solar power in sunny days by 2020 in 10 million homes compared to a half a million homes in start of 2014. If a third of households would generate solar energy it could equal 6% of British total electricity consumption.[90]
Diesel
[edit]Britain has a number of Diesel farms for supplying high demand hours of the day, normally in the winter, when other generators such as wind farms or solar farms may happen to have low output. Many of the diesel generators run for fewer than 200 hours a year.[91]
Power stations
[edit]External images | |
---|---|
Map of UK power stations, 2006 Archive | |
Archive of British Grid map 2012 Source | |
British Grid map 2016 Archive |
Storage
[edit]The UK has some large pumped storage systems, notably Ffestiniog and Dinorwig Power Station in Wales which can provide 1.7 GW for over 5 hours, having a storage capacity of about 9 GWh,[92] and Cruachan and Loch Mhòr in Scotland, also at several gigawatt-hours.
It also has significant grid battery storage which can supply several gigawatts for a few hours. In June 2024 the capacity was 4.6 GW of power and 5.9 GWh of energy.[93] Historically, these numbers were 2.4 GW / 2.6 GWh at the end of 2022,[94] and 1.3 GW in May 2021.[95] The batteries provide grid support when large grid elements suddenly fail.[96]
In December 2019, the Minety Battery Energy Storage Project started construction, located near Minety, Wiltshire and developed by Penso Power.[97] Chinese investment provided the finance and the China Huaneng Group is responsible for construction and operation. The designed capacity is 100 MWh and uses LiFePo4 battery technology.[97] It started operation in July 2021.[98] In 2020 Penso Power decided to expand the project by 50 MWh, which is expected to start operation later in 2021.[97][99] It was the biggest storage battery facility in Europe.[98] Several other batteries were built, and many larger ones are under construction.[100][101]
Largest UK grid storage
[edit]Name | Commissioning date |
Energy capacity (MWh) |
Power (MW) |
Duration (hours) |
Type | Area | Refs. |
---|---|---|---|---|---|---|---|
Dinorwig | 1984 | 9100 | 1700 | 5 | Pumped-storage hydroelectricity | Wales | |
Cruachan | 1965 | 7000 | 440 | 15 | Pumped-storage hydroelectricity | Scotland | [102] |
Foyers/Loch Mhòr | 1975 | 6300 | 300 | 21 | Pumped-storage hydroelectricity | Scotland | [102] |
Ffestiniog | 1963 | 1400 | 360 | 4 | Pumped-storage hydroelectricity | Wales | |
Drax | 2024 | 200 | 100 | 2 | Battery | England | [103] |
Consumption
[edit]Lighting
[edit]The European Commission banned low efficiency general-purpose, non-directional incandescent lightbulbs from 2012, and similarly shaped higher-efficiency halogen bulbs were banned in 2018. A few specialised bulb types such as for use in ovens are exempt from the ban.[104]
In 2022-2023, the mean domestic electricity usage was 3,239 kWh and the median usage was 2,475 kWh.[105]
Export/import
[edit]There are 9.8 GW of undersea interconnections between the GB grid and neighbour grids;[106] 2 GW with northern France (HVDC Cross-Channel), a second and third 1 GW connection with France (IFA2 and ElecLink), Northern Ireland (HVDC Moyle), the Isle of Man (Isle of Man to England Interconnector), 1 GW with the Netherlands (BritNed), 1 GW Belgium (NEMO Link), 1.4 GW with Norway (North Sea Link), 500 MW with the Republic of Ireland (EWIC) and 1.4 GW with Denmark (Viking Link).
The longest cables are the North Sea links with Norway and Denmark, at 720-kilometres long.[107]
The export of electricity was 1–3% of consumption between 2004 and 2009. According to IEA the UK was the sixth highest electricity importer, importing 11 TWh, after Brazil (42 TWh), Italy (40 TWh), United States (33 TWh), Netherlands (16 TWh) and Finland (14 TWh).[62]
The 500 MW Greenlink with Ireland, and the 1.4 GW NeuConnect with Germany are under construction. There are also future plans to lay cables to link the GB grid with Iceland (Icelink). The Scotland–Norway interconnector project was abandoned.
Pricing
[edit]The electricity market is deregulated in the UK, and the cost per MWh for much of the generated electricity is paid at the locational marginal price, which is occasionally negative during low consumption and high winds, starting in 2019.[108] The price is traded on a spot market (APX Power UK owned by the APX Group).
Electricity billing
[edit]In the UK, an electricity supplier is a retailer of electricity. For each supply point the supplier has to pay the various costs of transmission, distribution, meter operation, data collection, tax etc. The supplier then adds in energy costs and the supplier's own charge.
Pollution
[edit]This section needs expansion. You can help by adding to it. (January 2021) |
The UK historically had a coal-driven grid that generated large amounts of CO2 and other pollutants including SO2 and nitrogen oxides, leading to some acid rain found in Norway and Sweden. Coal plants had to be fitted with scrubbers which added to costs.[109]
In 2019 the electricity sector of the UK emitted 0.256 kg of CO2 per kWh of electricity.[110]
See also
[edit]- Energy in the United Kingdom
- Energy policy of the United Kingdom
- National Grid (Great Britain)
- Lists of power stations in the United Kingdom
- High-voltage substations in the United Kingdom
- List of high-voltage transmission links in the United Kingdom
- Electric or Electricity Act
References
[edit]- ^ "Digest of UK Energy Statistics (DUKES): electricity". GOV.UK. 27 July 2023.
- ^ a b c d "Digest of UK Energy Statistics (DUKES) 2024: Chapters 1 to 7". GOV.UK. 30 July 2024.
- ^ a b "Record-breaking 2020 becomes greenest year for Britain's electricity | National Grid ESO".
- ^ "Digest of UK energy statistics: 60th Anniversary Report". Retrieved 16 December 2013.
- ^ Evans, Simon (3 January 2024). "Analysis: UK electricity from fossil fuels drops to lowest level since 1957". Carbon Brief. Retrieved 21 April 2024.
- ^ Dooks, Tom (9 March 2023). "A reliable, secure and decarbonised power system by 2035 is possible – but not at this pace of delivery". Climate Change Committee. Retrieved 21 April 2024.
- ^ a b Vaughan, Adam (30 January 2018). "UK electricity use falls – as rest of EU rises". The Guardian. Retrieved 15 January 2019.
- ^ "Heating Could Add 5% to U.K. Electricity Demand in 2030". BloombergNEF. 16 February 2021. Retrieved 21 April 2024.
- ^ "UK Electricity Demand to Double by 2050, Urgent Action Needed for Net Zero Transition". Dalcour Maclaren. Retrieved 21 April 2024.
- ^ "Energy price cap | Ofgem". www.ofgem.gov.uk. Retrieved 22 April 2024.
- ^ "Contracts for Difference" (PDF).
- ^ "Britain's Electricity Explained: 2023 Review". National Grid ESO. 9 January 2024. Retrieved 10 January 2024.
- ^ "RenewableUK News website article". Archived from the original on 9 May 2015.
- ^ "New records set in best ever year for British wind energy generation". renewableuk.com. 5 January 2016. Retrieved 20 October 2016.
- ^ "Record year for wind energy – Government releases official figures". 29 March 2018. Archived from the original on 27 March 2019. Retrieved 18 April 2018.
- ^ Unwin, Jack (24 June 2019). "Zero-carbon sources overtake fossil fuel for UK power generation". Power Technology. Retrieved 24 August 2023.
- ^ Alan Shaw (29 September 2005). "Kelvin to Weir, and on to GB SYS 2005" (PDF). Royal Society of Edinburgh. Archived from the original (PDF) on 4 March 2009. Retrieved 28 September 2018.
- ^ "Survey of Belford 1995". North Northumberland Online. Archived from the original on 12 April 2016. Retrieved 28 September 2018.
- ^ "Lighting by electricity". The National Trust. Archived from the original on 29 June 2011.
- ^ Electricity supply in the United Kingdom : a chronology – from the beginnings of the industry to 31 December 1985. Electricity Council. The Council. 1987. ISBN 085188105X. OCLC 17343802.
{{cite book}}
: CS1 maint: others (link) - ^ The Secret Life of the National Grid: Wiring the Nation
- ^ "Power struggle: The National Grid was created to provide energy for all – but that's when the problems really began". The Independent. 23 October 2011. Retrieved 21 August 2016.
- ^ Cochrane, Rob (1985). Power to the People. Newnes. ISBN 0600358755.
- ^ a b Gerard Gilbert (22 October 2010). "Power struggle: The National Grid was created to provide energy for all – but that's when the problems really began". The Independent. Retrieved 17 October 2012.
- ^ "Mapped: How the UK generates its electricity – Carbon Brief". Carbon Brief. 12 October 2015. Retrieved 6 October 2016.
- ^ "UK Energy Statistics, Q3 2016" (PDF). 22 December 2016. Retrieved 24 December 2016.
Low carbon electricity's share of generation accounted for a record high 50.0 percent in the third quarter of 2016, up from 45.3 per cent in the same period of 2015, with increased generation from renewables (wind and solar) and nuclear. Coal's share fell to 3.6%
- ^ "UK hits clean energy milestone: 50% of electricity from low carbon sources". The Guardian. 22 December 2016. Retrieved 24 December 2016.
- ^ a b UK Energy in Brief July 2005, DTI statistics
- ^ Stacey, Kiran (16 May 2016). "Britain passes historic milestone with first days of coal-free power". Financial Times. Retrieved 19 June 2016.
- ^ Gosden, Emily (10 May 2016). "Britain gets no power from coal for 'first time on record'". The Telegraph. Retrieved 19 June 2016.
- ^ "First coal-free day in Britain since Industrial Revolution". BBC News. 22 April 2017. Retrieved 22 April 2017.
- ^ Department of Energy and Climate Change (25 July 2013). "Energy consumption in the UK". GOV.UK. Retrieved 5 October 2013.
- ^ "Directive 2001/80/EC of the European Parliament and of the Council of 23 October 2001 on the limitation of emissions of certain pollutants into the air from large combustion plants". 27 November 2001.
- ^ 10-year life extension at Dungeness B nuclear power station, British Energy, 15 September 2005, archived from the original on 22 March 2006, retrieved 19 June 2008
- ^ Stephen Seawright (13 June 2006), Nuclear stations may stay on line to bridge the gap, London: Daily Telegraph, archived from the original on 15 June 2006, retrieved 30 August 2008
- ^ [1] Archived 31 July 2009 at the Wayback Machine, page 23, Department of Energy and Climate Change, published 2009-07-30, accessed 28 August 2009
- ^ Support for nuclear and renewable energy Archived 19 October 2006 at the Wayback Machine, Deloitte, published 2005-12-02, retrieved 17 March 2007
- ^ Plans for two coal power stations announced, BBC, published 2007-03-14, accessed 17 March 2007.
- ^ Andreas Walstad (2 August 2011). "UK power plants mothballed on higher gas prices". National Gas Daily. Interfax. Retrieved 9 April 2012.
- ^ a b "Centrica idles gas-fired plant amid low spark spreads". Argus Media. 12 March 2012. Archived from the original on 14 May 2014. Retrieved 9 April 2012.
- ^ Kari Lundgren (23 February 2012). "Centrica May Mothball More Gas Plants as Capacity Trims Profits". Bloomberg. Retrieved 9 April 2012.
- ^ a b "Peak Light Bulb". New Scientist. 4 January 2014. p. 4.
- ^ "UK Electricity production and demand 2015" (PDF). p. 124.
- ^ "BBC News – Ofgem warns danger of power shortages has increased". Bbc.co.uk. 27 June 2013. Retrieved 5 October 2013.
- ^ Harrabin, Roger (3 January 2019). "Climate change: LED lights making dent in UK energy demand". BBC News. Retrieved 29 January 2019.
- ^ Massey, John (February 2018). "An Introduction to Britain's Capacity Market". Grey Cells Energy. Archived from the original on 15 January 2019. Retrieved 15 January 2019.
- ^ Butler, Nick (13 January 2019). "After Wylfa – the case for an independent review of UK energy policy". Financial Times. Retrieved 15 January 2019.
- ^ Deign, Jason (27 February 2018). "Lessons Learned From the UK's Latest Capacity Auction". Greentech Media. Retrieved 15 January 2019.
- ^ https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/728465/DUKES_5.1.3.xls Electricity generated and supplied, 1970 to 2017 (DUKES 5.1.3)
- ^ "UK energy in brief 2021". GOV.UK. Retrieved 6 June 2022.
- ^ a b c "Department of Energy and Climate Change: Annual tables: 'Digest of UK energy statistics' (DUKES) – Chapter 6: Renewable Sources of energy". Archived from the original on 7 November 2013. Retrieved 1 September 2013.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 31 October 2013. Retrieved 23 September 2018.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Ministers confirm 40 percent renewables target". Scotland.gov.uk. 25 March 2003. Archived from the original on 7 October 2013. Retrieved 5 October 2013.
- ^ "International – U.S. Energy Information Administration (EIA)". www.eia.gov.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 3 July 2016. Retrieved 14 August 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Archived copy" (PDF). Archived from the original (PDF) on 8 October 2016. Retrieved 14 August 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Energy Trends: UK electricity". GOV.UK. 26 October 2023.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 3 July 2016. Retrieved 14 August 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Archived copy" (PDF). Archived from the original (PDF) on 8 October 2016. Retrieved 14 August 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ a b "IEA Key energy statistics 2006" (PDF). Archived from the original (PDF) on 12 October 2009. Retrieved 21 February 2011.
- ^ Modelling 2050: Electricity System Analysis (PDF) (Report). Department for Business, Energy and Industrial Strategy.
- ^ a b IEA Key energy statistics 2010 pages electricity 27 gas 13,25 fossil 25 nuclear 17
- ^ Andreas Walstad (2 August 2011). "UK power plants mothballed on higher gas prices". National Gas Daily. Interfax. Retrieved 9 April 2012.
- ^ Gosden, Emily (18 November 2015). "UK coal plants must close by 2025, Amber Rudd announces". The Independent. London. Retrieved 7 March 2016.
- ^ "UK to end coal power by 2024". 30 June 2021.
- ^ "End to coal power brought forward to October 2024". gov.uk. Retrieved 7 March 2022.
- ^ Stacey, Kiran (16 May 2016). "Britain passes historic milestone with first days of coal-free power". Financial Times. Retrieved 19 June 2016.
- ^ Gosden, Emily (10 May 2016). "Britain gets no power from coal for 'first time on record'". The Telegraph. Retrieved 19 June 2016.
- ^ Countdown to 2025: Tracking the UK coal phase out 21 July 2016.
- ^ "British power generation achieves first ever coal-free day". The Guardian. 22 April 2017.
- ^ [2] "National Grid can confirm that for the past 24 hours, it has supplied GB's electricity demand without the need for #coal generation."
- ^ "British power generation achieves first ever coal-free day". The Guardian. London. 22 April 2017. Retrieved 24 April 2017.
- ^ "Britain passes one week without coal power for first time since 1882". The Guardian. London. 8 May 2019. Retrieved 10 May 2019.
- ^ "Coal Tracker – MyGridGB".
- ^ "UK fires up coal power plant as gas prices soar". 6 September 2021.
- ^ Joe Wallace (13 September 2021). "Energy Prices in Europe Hit Records After Wind Stops Blowing". The Wall Street Journal. Retrieved 14 September 2021.
U.K. wind farms produced less than one gigawatt on certain days, according to Mr. Konstantinov. Full capacity stands at 24 gigawatts
- ^ "Analysis: UK electricity from fossil fuels drops to lowest level since 1957". CarbonBrief. 21 February 2024 – via www.carbonbrief.org.
- ^ Evans, Simon (10 February 2016). "Countdown to 2025: Tracking the UK coal phase out". Carbon Brief. Retrieved 7 March 2016.
- ^ The Department of Energy & Climate Change: Nuclear power in the UK, page 19, National Audit Office, published 2016-07-13, accessed 10 November 2017
- ^ https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/647388/Electricity.pdf Chart 5.2
- ^ "UK Wind Energy Database (UKWED)". RenewableUK. Retrieved 7 February 2018.
- ^ "Wind power production for main countries". thewindpower.net. Retrieved 31 May 2016.
- ^ "Wind Energy and the Environment" (PDF). Retrieved 17 January 2012.
- ^ "A Summary of Opinion Surveys on Wind Power" (PDF). Retrieved 17 January 2012.
- ^ "Public attitudes to wind farms". Eon-uk.com. 28 February 2008. Archived from the original on 14 March 2012. Retrieved 17 January 2012.
- ^ "The Social Acceptance of Wind Energy". European Commission. Archived from the original on 28 March 2009.
- ^ "Rise in Scots wind farm support". BBC News. 19 October 2010.
- ^ "An investigation into the potential barriers facing the development of offshore wind energy in Scotland" (PDF). 7 March 2012.
- ^ "RenewableUK – The Voice of Wind & Marine Energy". bwea.com. Archived from the original on 21 October 2012.
- ^ "UK should have 10 million homes with solar panels by 2020, experts say". The Guardian. 29 January 2014.
- ^ Davies, Rob (6 December 2016). "Diesel farms make fresh bids to supply National Grid back-up power". The Guardian. Retrieved 21 July 2020.
- ^ MacKay, David JC (2009). Sustainable Energy – without the hot air. Cambridge: UIT. p. 191. ISBN 978-0-9544529-3-3.
- ^ Green, Molly (1 July 2024). "Energy storage deployment continues to see massive growth potential across the UK & Ireland". Solar Power Portal.
- ^ McCorkindale, Mollie (1 February 2023). "800MWh of utility-scale energy storage capacity added in the UK during 2022". Energy Storage News.
- ^ McCorkindale, Mollie (19 May 2021). "Top ten UK battery storage projects forecast for 2021 completion". Solar Power Portal. Retrieved 27 September 2021.
- ^ Ross, Kit Million (9 October 2024). "UK BESS fleet jumped in to provide 1.5GW of power to grid after interconnector trips". Solar Power Portal.
- ^ a b c "Minety Battery Storage Project". NS Energy. Retrieved 16 July 2021.
- ^ a b "Biggest storage battery in Europe built near Wiltshire village". BBC News. 15 July 2021. Retrieved 16 July 2021.
- ^ Grundy, Alice (19 March 2020). "A 50MW expansion to 100MW Minety battery storage project planned". Solar Power Portal. Retrieved 16 July 2021.
- ^ Ross, Kit Million (30 July 2024). "Construction begins on E.ON and Quinbrook's 460MWh Welsh BESS". Solar Power Portal.
- ^ Heynes, George (9 October 2024). "SSE Renewables starts construction of 320MW BESS". Solar Power Portal.
- ^ a b "Pumped Storage Hydro In ScotlandScotland's Renewable Energy Guide". scotsrenewables.com. Archived from the original on 14 April 2019. Retrieved 10 September 2019.
- ^ Green, Molly (11 November 2024). "National Grid substation upgrade enables 100MW BESS to connect to transmission network". Solar Power Portal.
- ^ Carson, Jessica (20 August 2018). "EU halogen light bulb ban: everything you need to know". Which?. Retrieved 31 July 2020.
- ^ "Subnational Electricity and Gas Consumption Statistics Regional and Local Authority, Great Britain, 2022" (PDF). Gov.UK. Department for Energy Security and Net Zero. 25 January 2024. p. 9. Retrieved 1 October 2024.
- ^ "Interconnectors". ofgem.gov.uk.
- ^ "World's longest undersea power cable linking Norway and UK switched on". October 2021.
- ^ Porter, Kathryn (10 January 2020). "Negative electricity prices hit the GB market". Watt-Logic.
- ^ "Acid rain: An environmental crisis that disappeared off the radar". Independent.co.uk. 23 September 2015.
- ^ "Greenhouse gas reporting: Conversion factors 2019". 28 July 2020.