Garden State Parkway

Route map:
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Bumm13 (talk | contribs) at 01:05, 6 February 2015 (→‎Picnic areas: minor link fix/update). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Garden State Parkway

Route information
Maintained by the New Jersey Turnpike Authority
Length172.40 mi[1] (277.45 km)
Existed1947–present
RestrictionsNo commercial vehicles north of exit 105[2]
Major junctions
South end Route 109 in Lower Township
Major intersections US 40 / US 322 in Egg Harbor Township
A.C. Expressway in Egg Harbor Township
US 30 in Galloway
I-195 in Wall
US 9 / Route 440 in Woodbridge
I-95 / N.J. Turnpike in Woodbridge Township
US 1 in Woodbridge Township
I-78 in Union/Hillside
I-280 in East Orange
I-80 in Saddle Brook Township
North endG.S. Pkwy. Connector to I-87 / I-287 / New York Thruway at Ramapo
Location
CountryUnited States
StateNew Jersey
CountiesCape May, Atlantic, Burlington, Ocean, Monmouth, Middlesex, Union, Essex, Passaic, Bergen
Highway system
New Jersey Turnpike Authority
Route 440444 Route 445

The Garden State Parkway (GSP) is a 172.4-mile (277-km)[1] limited-access toll parkway that stretches the length of New Jersey from the New York line at Montvale, New Jersey, to Cape May at New Jersey's southernmost tip. Its name refers to New Jersey's nickname, the "Garden State." Most New Jersey residents refer to it as simply "the Parkway" or "the Garden State". The Parkway's official, but unsigned, designation is Route 444. At its north end, the Parkway becomes the Garden State Parkway Connector, a component of the New York State Thruway system that connects to the Thruway mainline in Ramapo. The Parkway has been ranked as the busiest toll highway in the country based on the number of toll transactions.[3][4] The parkway is the longest highway in the state.

Route description

Garden State Parkway northbound at mile marker 6 in Middle Township

The Garden State Parkway begins in Lower Township at an interchange with Route 109 (traffic light at the southbound terminus).[1] State Route 444, which is mostly concurrent with Parkway, extends further south.

For the first three and a half miles, the Parkway crosses over streams. At 3.48 miles (5.60 km), the Parkway crosses over Taylor Creek and enters Middle Township. Exit 4 (signed 4A/4B southbound) is for Route 47 North to Rio Grande and Wildwoods.[1] At 6.54 miles (10.53 km), Parkway exit 6, for Route 147 and North Wildwood, leaves to the right of the southbound lanes; there is no northbound exit, only an entrance, and no southbound entrance.

The first at grade (traffic light) interchange is at Exit 9 to Shellbay Avenue. The second at grade interchange is Exit 10 to County Route 657, also known as Stone Harbor Blvd. The Cape Regional Medical Center, the county's only hospital, is at this intersection. Exit 11 is for U.S. Route 9 at the Cape May County Park & Zoo. An unsigned southbound exit/entrance at East Mechanics Street was removed in August 2011, between Exits 9 and 10. In May 2009, guardrails were installed in between the northbound and southbound lanes from mile markers 7 to 11.5, due to the previous year's many fatal head-on crashes resulting from cars crossing the median.[citation needed] The at-grade interchanges are being reconstructed to put the parkway on overpasses above those roads, scheduled to complete in 2015. When this work is finished, there will no longer be any traffic lights or other intersections on the entire length of the Parkway.[5]


Exit 13 is for Avalon Boulevard. At 14.85 miles (23.90 km), the Parkway enters Dennis Township after crossing Uncle Aaron's Creek. At 17.5 miles (28.2 km), exit 17 leaves to the right for County Route 625.[1] At milepost 19.38, the Parkway enters its first toll, the Cape May Toll Plaza. A little more than 20 miles (32 km) in, exit 20 leaves for Route 50. In Upper Township, exit 25 leaves for County Route 623. At 27.77 miles (44.69 km), the Parkway enters Atlantic County.[1]

Just before exit 29 (northbound only) for U.S. Route 9, the Parkway enters the Great Egg Toll Plaza.[1] Exit 30 (southbound only) leaves to the right at milepost 30 for Laurel Road in Somers Point which leads to Ocean City via the Route 52 causeway. Now in Egg Harbor Township, exit 36 opens onto County Route 563 southbound and County Route 651 northbound. Exit 37 is the Parkway's interchange with the Black Horse Pike (US 40/322). Exit 38 interchanges with the Atlantic City Expressway. Eastbound travelers on the expressway take the last few miles to Atlantic City. Westbound travelers head for Camden and Philadelphia. Now entering Galloway Township, U.S. Route 30 interchanges with the Parkway at exit 40.[1] exit 44 is next, leading to County Route 561 Alternate. Just after exit 48 for U.S. Route 9 near the Mullica River and Bass River State Forest, the Parkway enters Burlington County. Exit 50 is for Route 9 as well, while exit 52 is for Burlington County Route 654.

Picture of exit 67 sign in Barnegat, New Jersey

Now in Ocean County, exit 58 is for County Route 539, exit 63 is for Route 72, and exit 67 is for County Route 554. Exit 69 leaves to the right in both directions at milepost 70.45. Exit 74 leaves to the right, which heads to Forked River. Exit 77 is for Bayville. Exits 80 and 81 are for county roads and U.S. Route 9. Route 9 then merges in for a few miles.[1]

Between exits 80 and 83, the Parkway has a concurrency with U.S. Route 9 just south of the Toms River Toll Plaza. It was from here that the Driscoll Expressway was to start (south of exit 83) and run to the New Jersey Turnpike.

Route 37 interchanges with the Parkway at exits 82 and 82A in Toms River.[1] At exit 83, U.S. Route 9 leaves the Parkway and heads north. Exit 88 comes at 89.4 miles (143.9 km) for Route 70. In Brick Township, exit 90 (northbound) and exit 91 (southbound), leave for County Route 549. At this point the road is in Monmouth County. Exit 98 leads to Interstate 195, Route 34 and Route 138. Exit 100 leaves southbound for Route 33. Route 66 also exits northbound. Exit 102, a southbound only exit leaves for Neptune Township.[1]

Heavy traffic on the Parkway in Wall
Vietnam Memorial sign (exit 116)

Exit 105 for Route 18 and Route 36 leading to Long Branch is the point at which all trucks are forced to leave the Parkway.[2] At Exit 105, the Parkway divides into a local and express lanes configuration.[1] The express lanes have no direct access to any exits, except for exit 105 in Tinton Falls (southbound only) and exit 117 in Hazlet. Exits 109 and 114 are for Red Bank and Holmdel. The next exit, exit 116, is for the PNC Bank Arts Center in Holmdel. Exit 117 is for Routes 35 and 36. Exit 117A (southbound only) is for Lloyd Road in Aberdeen. Exit 120 is for Laurence Harbor Road and Cheesequake State Park.

At this point, the road enters Middlesex County in Old Bridge Township. Southbound exits 123 and 124 leave to the right, but only on the local lanes. The express and local lanes merge and become one highway again shortly after. Northbound exit 125 makes a sudden exit for Route 35.[1] Afterwards, the route crosses the Driscoll Bridge over the Raritan River. After the bridge, exit 127 leaves for Routes 9, 440 and Interstate 287. At milepost 129.5, the New Jersey Turnpike leaves to the right at exit 129. Southbound exits 127 and 129 are merged into one exit, which is marked as exit 129. A southbound only exit, exit 130 is for U.S. Route 1. The next three exits are marked 131, 131A and 131B. The lettered ones are for Metropark, while exit 131 is for Route 27.

Signage at the end of the Parkway thanking drivers for using it

Exit 135 is for Clark Township in Union County.[1] Exits 136 and 137 are for Cranford Township and Route 28. Exit 138 is in Kenilworth for County Route 509. Exits 139A and 139B are northbound exits only for a local road (Chestnut Street) and U.S. Route 22. Exits 140 and 140A are for U.S. Route 22 and NJ Route 82. Exit 141 is for Vauxhall Road and exit 142 is for Interstate 78.[1] The 143s are for Lyons Avenue, exit 144 is for Irvington and 145 is for Interstate 280. Exit 147 is for Springdale Avenue in East Orange, and exit 148 is for Bloomfield Avenue in Bloomfield. Exits 149, 150, and 151 are for Essex County roads.[1] Exits 153A and 153B are for Route 3 and U.S. Route 46 in Passaic County.

As the Parkway leaves Clifton, it heads into Elmwood Park by crossing the Passaic River. Exit 156, which comes before the river, is for U.S. Route 46 and New Jersey Route 20. There is also access to New Jersey Route 21 just south of the interchange. Cedar Lawn Cemetery is also located northbound along 20 from exit 156. As the Parkway continues to the northeast, it interchanges with Route 46 again in Garfield. Riverside Cemetery is accessible off exit 157 by going east along 46. At exit 159, the Parkway interchanges with Interstate 80 in Saddle Brook. Going southbound, there is also access to Bergen County Route 67 (Midland Avenue). The Bergen Toll Plaza is next, before crossing over Saddle River County Park.

Exit 160 comes next, as the Parkway enters Paramus and interchanges with West Passaic Street, which heads to New Jersey Route 208. Not far afterwards, at exit 161 is New Jersey Route 4. Westfield Garden State Plaza is visible from the Parkway and is off exit 161. Exit 163 is for New Jersey Route 17 in Paramus, which heads north to Ridgewood, Saddle River, Upper Saddle River, Ramsey and Mahwah before entering Rockland County, New York (on the southbound side of the Parkway, the exit is for New Jersey Route 17 south toward the Meadowlands area and Hudson County). The Parkway goes between Paramus Park Mall and Bergen Regional Medical Center as it heads north. Just after, exit 165 intersects for Bergen County Route 80 (Oradell Avenue and East Ridgewood Avenue) in Paramus. The Parkway turns to the northwest and heads into the Pascack Valley Toll Plaza going northbound. There is a plaza southbound along the Parkway as well as exit 166 for Bergen County Route 110 (Linwood Avenue).

As the Parkway inches closer and closer to New York, exit 168 comes along, interchanging for County Route 502, which heads towards Ho-Ho-Kus and Alpine. 3 miles (4.8 km) later, at exit 171, the Parkway interchanges with Glen Road, which terminates soon after at Chestnut Ridge Road (CR 73). The Parkway's Montvale Service Area comes at milepost 171 after exit 172 which is for Bergen County Route 94. There is also access to CR 94 from the Montvale Service Area's service road. At 172.4 miles (277.5 km), the Parkway becomes the Garden State Parkway Connector at the New York state line.[1]

Spur routes

Two short spurs are given numbers by the New Jersey Department of Transportation. Route 444R is the connector at exit 117 (in Hazlet) to Route 35 at the north end of Route 36 in Keyport. Route 444S is the connector at exit 105 to the south end of Route 36 at Hope Road (CR 51) near Eatontown.

Emergency assistance

On the Garden State Parkway, the emergency assistance number is #GSP, which is #477 in number form.

History

The old alignment at the Beesley's Point Bridge heading southbound. Notice the white center line (instead of yellow).
The old alignment where it meets U.S. Route 9

Route S101 was a northern extension of Route 101 planned from Hackensack through Paramus to the New York state line near Montvale. The section from Hackensack to Paramus was never built; the section from Paramus to the state line would become part of the Garden State Parkway.

The Parkway was originally designated as the Route 4 Parkway when it was started in 1947 in Union County, but, due to lack of funds, only 11 miles (18 km) were completed by 1950. The solution was for the state to establish the New Jersey Highway Authority in 1952 to oversee construction and operation as a self-liquidating toll road.[6] Much of the original section, between exits 129 and 140, was long administered by the New Jersey Department of Transportation, and has always been untolled. The segment can be distinguished by the stone facing on the overpasses.

The Parkway was constructed between 1946 and 1957 to connect suburban northern New Jersey with resort areas along the Atlantic coast and to alleviate traffic on traditional north–south routes running through each town center, such as US 1, US 9, and Route 35. Unofficially, it has two sections: the "metropolitan section" north of the Raritan River and the "shore section" between the Raritan River and Cape May. Only 18 miles (29 km) had been constructed by 1950, but taking a cue from the successful New York State Thruway, on April 14, 1952, the New Jersey Legislature created the New Jersey Highway Authority, empowered to construct, operate, and maintain a self-sufficient toll parkway from Paramus to Cape May.

The landscape architect and engineer in charge of the newly named "Garden State Parkway" was Gilmore David Clarke, of the architectural firm of Parsons, Brinkerhof, Hall and MacDonald,[6] who had worked with Robert Moses on the parkway systems around New York City. Clarke's design prototypes for the Parkway combined the example of the Pennsylvania Turnpike, a model of efficiency with parallels in the German Autobahn routes of the 1930s, with the Merritt Parkway model that stressed a planted "green belt" for beauty. Both design models featured wide planted medians to prevent head-on collisions and mask the glare of on-coming headlights. The Garden State Parkway was designed to have a natural feel. Many trees were planted, and the only signs were those for exits—there were no distracting billboards. Most of the signs were constructed from wood, or a dark-brown metal, instead of the chrome bars used on most other highways. The guardrails were also made from wood and dark metal. Most early overpasses were stone, but then changed to concrete, with green rails and retro etchings, popular around the 1950s and 1960s. These are now in decay and being replaced by sleek, new bridges. The Parkway was designed to curve gently throughout its length so that drivers would remain alert and not fall asleep at the wheel.

Most of the metropolitan section is like any other expressway built in the 1950s through heavily populated areas. The shore section parallels U.S. Route 9 and runs through unspoiled wilderness in the New Jersey Pine Barrens. In Cape May County, the Parkway has three traffic lights (at exits 8, 10, and 11 respectively), but these will be eliminated in the future, with construction of an overpass at exit 10 in Cape May Court House and Stone Harbor scheduled to begin in September 2012.

The Parkway had an old alignment before the Great Egg Harbor Bridge was completed. It was detoured onto U.S. Route 9 and over the Beesley's Point Bridge. This old alignment still exists today and is slowly being consumed by nature.

The Garden State Parkway was off-limits to motorcycles until Malcolm Forbes pushed successfully for legislation to allow them.[7]

On July 9, 2003, Governor of New Jersey Jim McGreevey's plan to merge the operating organizations of the Garden State Parkway and the New Jersey Turnpike into one agency was completed.[8]

Literature from the time of the Parkway's construction indicates that the Parkway would become toll-free once bonds used for its construction were paid off. However, additional construction projects, plus the expectation that the Parkway will pay for its own maintenance and policing (and the massive E-ZPass project) make it unlikely it will become toll-free in the foreseeable future.

The Parkway was also planned to be the southern terminus for NJ 55 at milemarker 19. This was cancelled after the conclusion that the highway ran through too many wetland areas. The idea is still being revisited after frequent traffic jams on NJ 47.

On July 22, 2014, the New Jersey Turnpike Authority filed a federal lawsuit against Jersey Boardwalk Pizza, a pizza chain in Florida, for using a logo too similar to the signs for the Garden State Parkway.[9]

Later construction

  • In the first half of the 1980s, exit 171 was added in Woodcliff Lake, serving the mushrooming office complexes replacing farmland along nearby Chestnut Ridge Road.[10]
  • On May 1, 1993, a travel center was opened at the Montvale Service Area, replacing one that burned to the ground in 1991.[11]
  • In 2003, the Lakewood section received a brand-new southbound exit and northbound entrance, exit 89. In order to expand the Parkway for the interchange, the Cedar Bridge Road bridge had to be torn down and rebuilt. The whole project was completed in November 2003 and cost about $16.23 million.[12]
  • In Waretown, a $16.4 million project was completed for new bridges at exit 69. The construction was completed in March 2007. Along with the new interchange came two new toll plazas. The Parkway was widened at the location it goes under County Route 532.[13]
  • The same company who did the exits 69 and 89 construction had also done work on exit 100, 20 years before the exit 69 construction. That project included demolishing all then-current bridges and building new ones along the newly rerouted Route 66 and Route 33. This project, in Tinton Falls, cost $21.67 million to complete.[14]
  • Installation of Variable Message Signs along the Parkway began 1992 with the installation of approximately 25 Daktronics signs. Some VM signs were installed on new sign structures while others were added to existing GO signs. Initially, the signs were provided with telephone service. A controller with a modem was installed in a cabinet near the signs. Messages on the signs were changed manually using software on personal computers in the GSP headquarters building in Woodbridge.

Usage

Typical entrance sign for the parkway

The speed limit on the parkway is 65 mph (105 km/h) with the following exceptions: 55 mph (89 km/h) between mileposts 123.5 and 163.3, 55 mph (89 km/h) between mileposts 80.0 and 100.0, 50 mph (80 km/h) between mileposts 8.0 and 11.5, and 45 mph (72 km/h) between mileposts 27 and milepost 29, approaching and traversing the Great Egg Harbor Bridge, and between milepost 126.7 and 127.7, approaching and traversing the Driscoll Bridge.

Commercial trucks with a registered weight of over 7,000 pounds (3.18 metric tons) are not allowed to use the northern parts of the parkway. All trucks must exit at exit 105, just past the Asbury Park toll plaza. From Tinton Falls to the southern end of the parkway at Cape May, trucks are allowed, but must pay additional tolls. Buses are allowed for the entire length of the parkway.[15] The "truck" ban includes all vehicles with a gross vehicle weight rating (the vehicle's maximum fully loaded weight including fuel, passengers and cargo) over 7000 pounds, which encompasses dozens of large passenger vehicles, such as the Chevrolet Suburban, which can weigh in at 8,500 pounds, though in practice police do not ticket such vehicles.[16] In April 2011, New Jersey Transportation Commissioner James Simpson announced the NJTA was looking into the possibility of allowing trucks on the northern portion of the Garden State Parkway.[17] However, the idea was quickly abandoned after the agency found the road had engineering concerns that would make the consideration of allowing trucks on this segment impossible.[18]

Toll collection

Garden State Parkway tokens, no longer in use after January 1, 2009

Whereas the New Jersey Turnpike uses a system of long-distance tickets, obtained once by a motorist upon entering and surrendered upon exiting at toll gates (a "closed" system), the Garden State Parkway uses no tickets but collects tolls at toll plazas at somewhat regular intervals along its length and at certain exits (an "open" system). As of 2014, the standard car toll is $0.75 on the main road at two-way toll plazas and $1.50 at one-way toll plazas. Some individual exits require a toll of either $0.50, $0.75, or $1.50.

The Parkway has implemented the E-ZPass electronic toll collection system, with the first plaza opening in December 1999 and the system completed September 19, 2000.[19] Parkway tokens continued to be available until January 1, 2002,[20] and were invalidated effective January 1, 2009.[21] Drivers using exact change lanes were now required to pay with coins only in all toll baskets. The Union Toll Plaza was the first to use an automated toll-collection machine. A plaque commemorating this event includes the first quarter collected at its toll booths.[22]

Tokens originally cost $10 for a roll of 40 tokens (the toll was 25 cents when tokens were introduced), but when the toll was increased to 35 cents, rolls were 30 tokens for $10. Before invalidating the tokens, the NJHA gave several months' warning and gave motorists the opportunity to redeem tokens. Tokens were originally brass, but were changed to a bimetallic composition with an outer silver-colored ring and a brass core. There were also larger bus tokens that existed in each composition, primarily for the use of Atlantic City-bound buses. These were sold in rolls of 20 for $20.

Historical picture of a Garden State Parkway toll booth

To reduce congestion, some toll plazas on the roadway were converted into one-way plazas between September 2004 and February 2010, dubbed "one-way tolling".[23] Under this program, a $1.50 toll (70 cents or two tokens when first implemented from September 2004 to November 2008 and $1.00 was implemented from December 2008 to December 2011 which was the first phase of the toll increase) is collected in one direction, and the other direction is toll-free. The Cape May (in Upper Township), Great Egg (in Somers Point), New Gretna (in Bass River Township), Barnegat (in Barnegat Township), Asbury Park (in Tinton Falls), Raritan (in Sayreville), Union (in Hillside Township), Essex (in Bloomfield Township), Bergen (in Saddle Brook Township), and Pascack Valley (in Washington Township) Toll Plazas had been converted to one-way toll plazas. The Toms River (in Toms River Township) Toll Plaza is the only $0.75 toll barrier plaza that is collected in both directions.

Beginning on November 19, 2001, E-Z Pass customers were charged the approximate token rate, that is 33 cents (peak travel) or 30 cents (off-peak travel), instead of 35 cents.[20] Due to tremendous cost overruns in implementing the E-ZPass system on New Jersey's toll highways the discount was eliminated the next year.[24] NJHA E-ZPass customers were charged a $1-per-month account fee,[24] causing many customers to turn in their NJHA E-ZPass transponders in favor of a transponder from an out-of-state authority which did not charge a monthly fee.

Northbound Cape May mainline toll plaza, with Express E-ZPass lanes.

On January 8, 2008, New Jersey Governor Jon Corzine proposed increases of fifty percent in tolls on the Parkway and Turnpike effective in 2010, to be followed by similar fifty percent increases every four years through 2022. Each time tolls increased, there would be an additional increase for inflation since the last toll increase (for the first, since 2006). This increase in tolls, which would take place on all three of New Jersey's toll roads, would, according to Corzine, help pay the state's debt. The roads would be maintained by a nonprofit "public benefit corporation" which would pay back bonds to the state. Without considering inflation, the proposal would have increased the standard 35-cent toll on the Garden State Parkway to approximately $1.80 by 2022, with tolls for the entire length of the northbound Garden State Parkway rising from $4.55 to $30.10 in 2022.[25] It was considered possible that commuters will receive discounts from the higher toll rates.[26] The proposal was not enacted due to fierce opposition from the state of New Jersey. On September 5, 2008, a proposal to increase Parkway tolls substantially was reported. The first phase of the toll increase on the Garden State Parkway went into effect on December 1, 2008. As of January 1, 2012, toll rates on the Garden State Parkway are $0.50 for ramp tolls, $0.75 for two-way toll barriers, and $1.50 for one-way toll barriers.[27][28]

There are three types of toll lanes at the toll plazas, however not all plazas have every type of lane at all times. The first are "E-ZPass only", which only accept vehicles with E-ZPass tags. The speed limit in these lanes is 15 mph, or 55-65 mph for Express E-ZPass lanes, depending on the Parkway's actual speed limit. The E-ZPass lanes were increased from 5 mph to 15 mph since August 2001.

The second type of lane is "exact change". Although they previously accepted both Parkway tokens and/or exact change, the tokens were no longer in used after January 1, 2002 and were no longer accepted on the Parkway on January 1, 2009. Drivers using exact change lanes are now required to pay with coins only. In these lanes, motorists deposit coins in a toll basket and each coin is mechanically counted. Payment of tolls is enforced by photo, a system that went into effect on October 17, 2011.[29]

The third type of toll lane is "cash receipts". These lanes are manned; toll collectors can provide change and receipts to drivers. E-ZPass is also accepted.

Picnic areas

The northbound two lanes of a limited access highway with a sign on the left reading Picnic Area 1 mile keep left rest rooms closed
The Garden State Parkway with an advance sign for the John B. Townsend Shoemaker Holly picnic area

One of the objectives of the Parkway was to become a State Park its entire length and its users would enjoy parklike aesthetics with minimal intrusion of urban scenery. Along the ride, users were permitted to stop and picnic along the roadway to further enjoy the relaxation qualitites the Parkway had to offer. All picnic areas had tall trees that provided shade and visual isolation from the roadway. Grills, benches, running water and restrooms were provided. Over time as the Parkway transformed into a road of commerce, the picnic areas were being closed for a variety of reasons. Their ramp terminals became insufficient to accommodate the high speed mainline traffic and in addition to the decreasing amount of users, the picnic areas were becoming more effective as maintenance yards and were converted as so or closed altogether.

The history of the picnic areas includes an infamous story in the murder of Maria Marshall orchestrated by her husband Robert O. Marshall in the Oyster Creek picnic area on the night of September 7, 1984.[30] The story was made into a novel and television movie on NBC.

The three remaining picnic areas are closed from dusk to dawn. Posted signs within the picnic area prohibit fires and camping.

There were a total of 10 operational picnic areas:

  • Tall Oaks (closed) - southbound only formerly at milepost 137
  • Madison Hill (closed) - northbound only formerly at milepost 134.9
  • Glenside (closed) - southbound only formerly at milepost 130.2
  • Telegraph Hill (open) - exit 116
  • Herbertsville (closed) - southbound only; converted to a maintenance yard of the same name and heavy vehicle weigh station
  • Polhemus Creek (closed) - northbound only formerly at milepost 87.2
  • Double Trouble (closed) - southbound only formerly at milepost 79.0
  • Oyster Creek - located in the median in Lacey Township. The facility is not signed from the mainline Parkway, but there are signs located within the picnic area that state the facility is closed from dusk to dawn and that fires and camping are prohibited similar to the signs posted at the other two picnic areas currently open. The official Garden State Parkway website does not list Oyster Creek as a picnic area. It is possible that this picnic area has for all intents and purposes closed since this section of the Parkway is currently experiencing a major widening construction project and access to it is blocked and most likely will not reopen since the land used for widening the mainline was taken from the picnic area.
  • Stafford Forge (closed) - located in the median at milepost 61.1
  • John B. Townsend Shoemaker Holly (Open) - located in the median at milepost 22.7. John B. Townsend was a physician from Ocean City who became the New Jersey Highway Authority's second Vice Chairman in 1955. The word Shoemaker comes from the last name of the landowner in the way of the Parkway's alignment during its initial construction. The term Holly comes from the Shoemaker's holly tree that was on his property. The tree is presumed to be 300 years old and one of, if not, the oldest holly tree in the United States.[31]

Service areas

All service areas are located in the center median, unless otherwise noted.

  • Montvale (Mile Post 171)
  • Brookdale North - Fuel only. Right side exit northbound.
  • Brookdale South (Mile Post 153.3) Right side exit southbound.
  • Vaux Hall (Mile Post 142) Right side exit northbound.
  • Colonia North - Fuel, convenience store and restrooms only. Right side exit northbound.
  • Colonia South - Fuel, convenience store and restrooms only. Right side exit southbound.
  • Cheesequake (Mile Post 123)
  • Monmouth - formerly Manasquan (Mile Post 100.4)
  • Forked River (Mile Post 76)
  • Atlantic City - formerly Absecon (Mile Post 41.4)
  • Ocean View - formerly Seaville (Mile Post 18.3) Restrooms, vending machines and Tourist Information only 8am - 5pm year round. Fuel from 6am - 10pm except from Memorial Day to Labor Day when 24 hours.

The first service area to open was Cheesequake on May 1, 1955. Prior to that grand opening, the New Jersey Highway Authority had constructed and operated two temporary service areas that offered only gasoline and other vehicular essentials.

  • New Gretna. Located in the median at milepost 53 that has since been converted to a State Police substation.
  • New Shrewsbury. Located in the median at milepost 107.

Park-ettes

In the 1950s, four petroleum companies were hired to provide gasoline and vehicular necessities - Esso, Texaco, Atlantic and Cities Service. The Cities Service company was the petroleum provider at Monmouth, Forked River, Atlantic City (Absecon at the time) and Ocean View (Seaville at the time) and offered a service where female employees were hired for those service area showrooms, wore uniforms and were known as the Park-ettes. Their duties included providing directions and other information to motorists as well as rendering odd bits of service such as sewing a missing button on a patron's coat.[32]

Recent developments

  • Exit 67 received a newly constructed southbound entrance ramp, and a northbound exit ramp. On March 27, 2008, it was revealed that the new ramps would not have toll gates. Construction began in the summer of 2008 and opened on May 20, 2009.[33]
  • Exit 69 (in Ocean Township) was completely reconstructed. The old ramps were demolished, and a partial cloverleaf was constructed in its place. It now features a southbound exit ramp and a northbound entrance ramp. Toll gates were constructed at the southbound exit and northbound entrance ramps. This was finished in March 2007.
  • As of 2014, Exit 80 to 48 was widened from two to three lanes in both directions. There are three phases of the Parkway widening. The first phase is from Exit 80 to 63 was complete in May 2011. The second phase is from Exit 63 to 48 was finished in July 2013. The third phase is from Exit 48 to 30 is underway and scheduled to be finished in either 2015 or 2016.
  • A new diamond interchange, exit 77 (in Berkeley Township) was constructed in 2006. Toll gates exist at the southbound exit ramp and the northbound entrance ramp. To avoid destroying part of the Double Trouble State Park, the southbound interchange was constructed approximately ½ mile north of the northbound interchange.
  • Exit 88 was permanently closed on November 10, 2014 at 7:00 pm. Drivers need to pay the toll at Exit 89 but don't need to pay the toll at Exit 88. However, no changes will affect the toll amount paid. Drivers plan to access Route 70 will now use southbound on the Parkway at Exit 89 and then follow the signs to proceed over a newly constructed service road after the toll plaza. The sign leads to Exit 89B (formerly Exit 88) is for service road to access Route 70 while Exit 89C is for County Route 528 towards Lakewood/Brick.
  • At exit 98 in Wall Township, the overpasses carrying NJ 138 and I-195 over the Parkway have been replaced with newly constructed ones. This project was finished in late 2006. However, this project did not improve 195's exit 35 for NJ 34.
  • The Driscoll Bridge received a new southbound parallel span just west of the original span. This new southbound bridge boasts seven southbound lanes and emergency shoulders (currently the seventh lane is used as a northbound lane during rehab of the old spans). By 2010, a new northbound span will be constructed, consisting of eight northbound lanes and emergency shoulders.[34] On May 20, 2009, the Driscoll Bridge project was completed.[35]
  • New overpasses and ramps were built at exit 145 in the City of East Orange to connect to I-280. New E-ZPass lanes were also built at the interchange toll gate.[36][37]
  • Northbound at the Bergen Toll Plaza and southbound at the Raritan Toll Plaza are the only toll plazas that have the "PAY AHEAD" lanes. The Bergen Toll Plaza have one PAY AHEAD lane leading to a 2 right-lane toll plaza while the Raritan Toll Plaza have two PAY AHEAD lanes leading to a 4 right-lane toll plaza.
  • The Parkway was widened in Wall Township from three to four lanes in the vicinity of Interchange 98 in both directions.
  • On February 20, 2010, the Pascack Valley Toll Plaza in Washington Township began the one-way tolling program. With the northbound tolls being eliminated, the southbound tolls were doubled from $0.50 to $1.00.[38]
  • Exit 142 (in Union Township and Hillside Township) was upgraded with new ramps that now supply what were then missing movements between the Parkway and I-78, since I-278 was canceled between US 1–9 in Linden and the interchange for NJ 24/I-78. On September 17, 2009, a new exit ramp (from the Parkway north to Interstate 78 west) was opened.[36] On December 10, 2010, the ramp between the southbound Garden State Parkway and eastbound I-78 opened.[39]

Future developments

  • Eight new Variable Message Signs will be installed in parts of Cape May County. The locations include mile markers 5.7, 13, and 19.7, southbound and mile markers 6, 11.7, 17.9, 23.9, and 27.1 northbound. Construction is expected to be completed by 2014.
  • The southern terminus of the roadway at Exit 0 in Lower Township will be reconfigured to reduce accidents and congestion and improve traffic flow at the tricky merge with Route 109. The project will add a new traffic signal and turn lanes and will cost around $8 million. This will also improve the flow of traffic coming from the Cape May-Lewes Ferry turning north onto the Parkway. A design contract is expected to be awarded in 2013 with construction starting in the fall of 2014.
  • Overpasses will be constructed to eliminate the only at-grade crossings along the entire main line of the Parkway at interchanges 9, 10 and 11 in Middle Township. The existing traffic lights are to be removed. Construction began in the winter of 2013, years after the scheduled start date due to a wetland mitigation plan that had not been approved by the federal government. The project will cost $125 million and be completed in 2016.[5]
  • The southbound bridge over the Great Egg Harbor Bay will be replaced with a wider span parallel to the older span. Construction will begin in 2013 and continue into 2016. The new southbound bridge will be built to carry both northbound and southbound traffic so the northbound bridge can receive new decking and strengthening. The project includes the demolition of the abandoned Beesley's Point Bridge parallel to the Parkway, and the addition of mixed-use walkway along the new southbound Parkway span that will allow pedestrian and bicycle connections between Upper Township and Somers Point.
  • A $25 million interchange will be built as Exit 41 at Jimmie Leeds Road, north of the Atlantic City service area. An access road currently connects the service area to Jimmie Leeds Road, which will be demolished and will be the future location of a new State Police facility. The project is expected to be completed in 2014.[40]
  • Interchange 44 will be converted to a full interchange in Galloway Township.
  • Governor Codey announced a widening of the Parkway in May 2005 between exit 63 in Stafford Township to exit 80 in the borough of South Toms River. The new Parkway setup would convert from the current two to become three lanes in both directions. However, the Turnpike Authority is now planning to widen the parkway from exit 80 all the way south to exit 30 in the city of Somers Point. As of 2014, the Parkway widening project from Exit 80 to 63 as the first phase and Exit 63 to 48 as the second phase were both complete while Exit 48 to 30 as the third phase is underway.
  • New bridges have been proposed across the Mullica River from the city of Port Republic to Bass River Township. Construction began in 2009 as part of the Parkway widening project.[36]
  • Exit 83 (in Toms River Township) will see improvements, notably a southbound exit ramp and all improvements to make it a full interchange.[41] In addition, a new connector road would be built from just south of Exit 83 to the intersection of Indian Head Road and Intermediate Way North, which motorists would have to use for most northbound parkway movements.
  • Exits 88 and 89 would have major work done to them, especially at Exit 88 which would have a major redesign. New collector/distributor lanes would be built between the two interchanges that would strictly grant access to both exits. In addition, the toll gates at Exit 88 would be demolished and the toll gates at Exit 89 would instead be used for both exits. Exit 89 will have a fourth toll gate added to the three toll gates. Furthermore, both exits would add missing movements for southbound parkway access.
  • Exits 89 and 90 in Lakewood will construct continuous auxiliary lanes. In the northbound direction, the on ramp from Interchange 89 will be continuous to the off ramp at Interchange 90 and in the southbound direction, the on ramp from Interchange 90 will be continuous to the off ramp at Interchange 89. Overhead signing will be installed and the ground mounted signing will be removed.
  • Exit 91 (in Brick Township) will also be upgraded to a full interchange starting sometime around 2009 or 2010.[34][36]
  • Exit 131A in Woodbridge Township will be upgraded with new ramps.
  • Exit 151 in Bloomfield Township will completely replace the Watchung Avenue overpass structure and the Parkway will receive full shoulders underneath the new structure.

Exit list

Many entrances and exits have tolls. In general, exits have tolls when they precede a barrier toll, and exits are free when they follow a barrier toll. Conversely, entrances that precede a barrier toll are free; and tolls are paid at entrances just beyond a barrier toll. This avoids double tolling (e.g., paying a barrier toll and then immediately paying again to exit) and under-tolling (e.g., driving a long distance and then exiting for free just before a barrier toll).

There are no tolls between exits 127 and 141, inclusive, as this was the original road segment that predates the New Jersey Highway Authority.

CountyLocationmi[1]kmExitDestinationsNotes[42]
Cape MayLower Township0.000.000
Route 109 to US 9 – Cape May, North Cape May, Cape May – Lewes Ferry
At-grade intersection
Middle Township3.906.284 Route 47 – Wildwood, Wildwood Crest, Rio Grande$0.50 toll (northbound exit and southbound entrance)
Signed as exit 4A (north) and 4B (south) southbound
6.5410.536North Wildwood, Whitesboro, Burleigh (Route 147)Southbound exit and northbound entrance
8.4013.529
To US 9 (Shell Bay Avenue) – Mayville
At-grade intersection, grade-separation construction slated to complete in 2015.[5]
9.5315.34East Mechanic StreetSouthbound exit and entrance, eliminated as of August 11, 2014.[5]
9.9015.9310 CR 657 – Cape May Court House, Stone HarborAt-grade intersection, signed as exits 10A (west) and 10B (east) Now Northbound Only, Southbound signed as 10 , grade-separation construction slated to complete in 2015, Southbound Completed in 2014.[5]
11.0417.7711
CR 609 (Crest Haven Road) to US 9 – Cape May County Park & Zoo, County Offices, Crest Haven Complex
At-grade intersection, grade-separation construction slated to complete in 2015.[5]
11.8018.9912 US 9Southbound entrance only
13.6021.8913 US 9 (CR 601) – Swainton, Avalon
Dennis Township17.5028.1617Sea Isle City, Dennis Township, Woodbine (CR 625)Southbound exit and northbound entrance
Upper Township19.3831.19Cape May Toll Plaza ($1.50, northbound only) with 2 lanes of Express E-Z Pass
20.2532.5920
Route 50 north / US 9 – Upper Township
Northbound exit and southbound entrance
25.3440.7825
CR 623 / US 9 south – Ocean City, Marmora
South end of US 9 overlap
Great Egg Harbor Bay27.7744.69Great Egg Harbor Bridge
AtlanticSomers Point28.7846.32Great Egg Toll Plaza ($1.50, southbound only)
28.9046.5129
US 9 north – Somers Point, Ocean City
Northbound exit and southbound entrance; North end of US 9 overlap
30.0048.2830Somers Point, Ocean City Downtown (North Laurel Drive)Southbound exit and northbound entrance, $1.50 toll
Egg Harbor Township35.8257.6536 US 40 / US 322 (CR 563 / CR 651) – Northfield, Pleasantville, Atlantic CityNo southbound exit
36.0858.0736 CR 563 – Northfield, MargateSouthbound exit and northbound entrance
36.5958.8937 US 40 / US 322 (CR 608) – Pleasantville, Atlantic CitySouthbound exit and northbound entrance
37.2359.9238 A.C. Expressway – Atlantic City, Camden, PhiladelphiaSigned as exits 38 (east) and 38A (west)
Galloway Township40.0464.4440
US 30 east – Absecon, Brigantine, Atlantic City
Southbound exit and northbound entrance
41.5066.79Atlantic City Service Area (ramp to CR 561)
43.9870.7844 CR 575 (CR 561 Alt.) – PomonaSouthbound exit and northbound entrance
Port Republic48.2977.7248
US 9 south – Port Republic, Smithville
Southbound exit and northbound entrance; South end of US 9 overlap
BurlingtonBass River Township50.6781.5550
US 9 north – New Gretna
Northbound exit and southbound entrance; North end of US 9 overlap
52.7084.8152New Gretna (CR 654)Southbound exit and northbound entrance
53.5486.16New Gretna Toll Plaza ($1.50, northbound only)
OceanLittle Egg Harbor Township58.6994.4558 CR 539 – Little Egg Harbor, Tuckerton, Whiting
Stafford Township64.11103.1863 Route 72 – Long Beach Island, PembertonSigned as exits 63A (east) and 63B (west) northbound
Barnegat Township67.81109.1367 CR 554 – Barnegat, PembertonSigned as exits 67A (east) and 67B (west) southbound
68.61110.42Barnegat Toll Plaza ($1.50, southbound only) with 2 lanes of Express E-Z Pass
Ocean Township70.45113.3869 CR 532 – Waretown$0.75 toll (southbound exit and northbound entrance)
Lacey Township75.34121.2574Forked River (CR 614)$0.50 toll (southbound exit and northbound entrance)
Berkeley Township77.40124.5677Berkeley (CR 618 / CR 619)$0.50 toll (southbound exit and northbound entrance)
South Toms River80.85130.1280

US 9 south / CR 619 south / CR 530 – Beachwood, South Toms River
Southbound exit and northbound entrance; South end of US 9 overlap
Toms River81.85131.7281Lakehurst Road (CR 527) – Toms River
82.35132.5382 Route 37 – Seaside Heights, LakehurstSigned as exits 82 (east) and 82A (west)
84.10135.3583
US 9 north / CR 571 / Route 166 – Lakewood
No southbound exit; North end of US 9 overlap
84.72136.34Toms River Toll Plaza ($0.75, both directions) with 2 lanes of Express E-Z Pass
Lakewood Township89.36143.8188 Route 70 – Lakehurst, Lakewood, Brick TownshipTolls are no longer collected on this Interchange on November 10, 2014. Keep left after the toll plaza at Exit 89B for service Road to access Route 70. Southbound exit and northbound entrance
90.18145.1389 CR 528 – Lakewood, BrickSouthbound exit and northbound entrance, $0.50 toll - Keep right after the toll plaza at Exit 89C for County Route 528 for Lakewood/Brick.
Brick Township91.10146.6190 CR 549 – Brick Township, Lakewood, Point PleasantNorthbound exit and southbound entrance
92.62149.0691 CR 549 – Lakewood, Brick TownshipSouthbound exit and northbound entrance, $0.50 toll
MonmouthWall Township98.23158.0998

I-195 west / Route 138 east / Route 34 – Belmar, Point Pleasant, Trenton
$0.50 toll (southbound exit and northbound entrance)
Tinton Falls101.24–
101.60
162.93–
163.51
100
Route 33 / Route 66 east – Ocean Grove, Bradley Beach, Freehold, Asbury Park
No direct access from Route 33 westbound to Parkway southbound or from Parkway southbound to Route 66 eastbound
103.15166.00102Neptune, Asbury Park (CR 16)Southbound exit and northbound entrance
103.96167.31Asbury Park Toll Plaza ($1.50, northbound only) with 3 lanes of Express E-Z Pass
104.20167.69South end of local-express lanes split
106.12–
106.39
170.78–
171.22
105


Route 18 north / Route 36 east to Route 35 – New Brunswick, Eatontown, Long Branch
$1.50 toll (southbound exit and northbound entrance); North end of commercial vehicle access
Middletown Township110.14177.25109 CR 520 – Red Bank, Lincroft$0.50 toll (southbound exit and northbound entrance)
Middletown Township
Holmdel Township
113.88183.27114Holmdel, Middletown (CR 52)$0.50 toll (southbound exit and northbound entrance)
Holmdel Township115.85186.44116PNC Bank Arts Center
117.00188.29Crossover ramps between express and local lanes
Hazlet Township118.50190.71117 Route 35 / Route 36 – Hazlet, Keyport, Aberdeen$0.50 toll (southbound exit and northbound entrance), Express lane access
Hazlet
Aberdeen Township
118.79191.17117AAberdeen (CR 3)Southbound exit and entrance, $0.50 toll
MiddlesexOld Bridge Township121.13194.94120Laurence Harbor, Matawan (CR 689)
Sayreville124.64200.59123
US 9 south – Sayreville, Old Bridge
Southbound exit and northbound entrance
124.99201.15124Main Street (CR 670) – Sayreville, South AmboySouthbound exit and northbound entrance
125.28201.62North end of local-express lanes split
125.68202.26Raritan Toll Plaza ($1.50, southbound only) with 5 lanes of Express E-Z Pass
126.36203.36125
US 9 south / Route 35 – Sayreville, South Amboy
Northbound exit and southbound entrance
Raritan River127.33204.92Driscoll Bridge
Woodbridge Township128.0206.0127

US 9 north / Route 440 to I-287 – Woodbridge, Staten Island
Signed as exit 129 southbound, southbound exit via New Brunswick Avenue
129.50208.41129 N.J. Turnpike / I-95 – Delaware Memorial Bridge, Meadowlands Sports ComplexExit 11 (NJTP)
129.50208.41129
US 9 / Route 440 to I-287 – Woodbridge, Perth Amboy
Signed as exit 127 northbound
130.63210.23130 US 1 – Trenton, NewarkSouthbound exit and northbound entrance
131.33211.36131A Metropark (CR 649)
131.83212.16131B Metropark (CR 657)Northbound exit and southbound entrance
131.97212.39131 Route 27 – Iselin, Rahway, Metuchen
UnionClark136.22219.22135Clark, Westfield (CR 613)
Cranford137.59221.43136Linden, Roselle, Winfield Park (CR 607 / CR 615)
138.74223.28137 Route 28 – Roselle Park, Elizabeth, Cranford
Kenilworth140.34225.86138 CR 509 – Kenilworth, Roselle Park, Elizabeth
Union Township141.10227.08139AChestnut Street (CR 619)Northbound exit and entrance
139B Route 82 – Union, MorristownSigned as exit 140 southbound
141.70228.04140A
US 22 / Route 82 east – Elizabeth, Somerville, Holland Tunnel
Signed as exit 140 northbound
142.10228.69141Vauxhall Road (CR 630) – UnionSouthbound exit and northbound entrance
Hillside142.66229.59Union Toll Plaza ($1.50, northbound only)
142.80229.81142A

I-78 east to N.J. Turnpike – Newark Airport, Newark
$1.50 toll (northbound exit and entrance); Southbound exit ramp to I-78 east opened December 10, 2010
142.90229.98142B
I-78 west – Springfield
$1.50 toll (northbound exit and entrance); Northbound exit ramp to I-78 west opened September 16, 2009
143.00230.14142CHillside, Maplewood (North Union Avenue)Northbound exit and southbound entrance
EssexIrvington144.0231.7143Springfield Avenue (CR 603) / Lyons Avenue (CR 602) – Irvington, Maplewood, HillsideSigned as exits 143A (Maplewood) and 143B (Hillside) southbound
Newark145.98234.93144 CR 510 (South Orange Avenue)$0.50 toll (northbound exit and southbound entrance)
East Orange146.93–
147.15
236.46–
236.81
145
I-280 / CR 508 to N.J. Turnpike – The Oranges, Newark, Harrison
$0.50 toll (northbound exit and southbound entrance)
148.44238.89147Springdale Avenue – East OrangeSouthbound exit and northbound entrance
Bloomfield149.2240.1148 CR 506 (CR 506 Spur / Bloomfield Avenue)$0.50 toll (northbound exit and southbound entrance)
150.22241.76149Belleville Avenue (CR 506) – Belleville, Glen RidgeSouthbound exit and northbound entrance
150.66242.46Essex Toll Plaza ($1.50, southbound only)
151.1243.2150Hoover Avenue (CR 651) – Bloomfield, BellevilleNorthbound exit and southbound entrance
152.45245.34151Watchung Avenue (CR 655) – Nutley, Montclair$0.75 toll (southbound exit and northbound entrance)
PassaicClifton154.06–
154.45
247.94–
248.56
153

Route 3 to US 46 west – Meadowlands Sports Complex, Lincoln Tunnel
$0.50 toll (southbound exit and northbound entrance), signed as exits 153A (east) and 153B (west) northbound, no access to westbound Route 3 from southbound direction
155.91250.91154 US 46 – Clifton$0.50 toll (southbound exit and northbound entrance)
156.4251.7155P

Route 19 to I-80 west – Paterson
Northbound exit and southbound entrance
156.68252.15155Hazel Street (CR 702)Northbound exit and southbound entrance
158.19254.58156 US 46 / Route 20Module:Jct warning: "road" parameter is deprecatedNorthbound exit and southbound entrance
BergenElmwood Park158.87255.68157
US 46 to Route 20 – Garfield, Elmwood Park
Same directional movements only
Saddle Brook160–
160.35
260–
258.06
159 I-80 – Saddle Brook, Paterson, George Washington Bridge$1.50 toll (northbound exit and southbound entrance); No direct access from Parkway north to I-80 west
160.46258.24Bergen Toll Plaza ($1.50, northbound only)
Paramus161.53259.96160
To Route 208 (CR 62) – Fair Lawn, Hackensack
Northbound exit and southbound entrance
161.88260.52161
Route 4 east – Paramus
Northbound exit and southbound entrance
163.06–
163.29
262.42–
262.79
163
Route 17 to Route 4 – Mahwah, Meadowlands Sports Complex, Paramus, George Washington Bridge
Same directional movements only
164.94265.45165Ridgewood, Oradell (CR 80)$0.50 toll (northbound exit and southbound entrance)
165.93267.04166Washington, Westwood (CR 110)Southbound exit and northbound entrance
Washington Township166.25267.55Pascack Valley Toll Plaza ($1.50, southbound only) with 2 lanes of Express E-Z Pass
167.46269.50168 CR 502 – Washington, Westwood, Ho-Ho-KusNorthbound exit and southbound entrance
Woodcliff Lake170.15273.83171Chestnut Ridge Road (CR S-73) – Woodcliff LakeNorthbound exit and southbound entrance
Montvale171.52276.03172Grand Avenue (CR 94) – Montvale, Park RidgeNorthbound exit and southbound entrance
172.40277.45


To I-87 / I-287 / New York Thruway – New York City, Albany
Continuation into New York via the GSP Connector
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. ^ a b c d e f g h i j k l m n o p q r "Garden State Parkway straight line diagram" (PDF). New Jersey Department of Transportation. Retrieved December 8, 2009.
  2. ^ a b "TITLE 16. DEPARTMENT OF TRANSPORTATION - CHAPTER 32. TRUCK ACCESS" (PDF). New Jersey Department of Transportation. Retrieved August 13, 2010.
  3. ^ Samuel, Peter (January 6, 2003). "15-lane bridge for Garden State Parkway". Tollroads News. Retrieved September 23, 2008. "The Garden State Parkway is America's busiest single tollroad in terms of toll transaction numbers - 609m in 2001 or 1.67m/day average."
  4. ^ Samuel, Peter (January 29, 2008). "USA Today reports dramatically more expensive tolls - lousy data". Tollroads News. Retrieved September 23, 2008.
  5. ^ a b c d e f "Advisory – Mechanic Street Exit from Garden State Parkway To Close Permanently". Middle Township New Jersey. Middle Township Municipality. Retrieved 24 August 2014.
  6. ^ a b Laurie, Maxine N.; Mappen, Marc (2004–2005). Encyclopedia of New Jersey. Rutgers University Press. p. 305. {{cite encyclopedia}}: Missing or empty |title= (help)
  7. ^ Pierson, Melissa Holbrook (1998). The perfect vehicle: what it is about motorcycles. W. W. Norton & Company. p. 82. ISBN 0-393-31809-5.
  8. ^ "Governor McGreevey Announces Planned Improvements from Turnpike Authority Consolidation" (Press release). New Jersey Turnpike Authority. July 10, 2003. Retrieved March 18, 2010.
  9. ^ "New Jersey Sues Florida Pizza Shop". Philadelphia, PA: WCAU-TV. Associated Press. July 24, 2014. Retrieved July 24, 2014.
  10. ^ Photo of Exit 171
  11. ^ Travel Center Opens on Parkway
  12. ^ Garden State Parkway Interchange 89
  13. ^ Garden State Parkway Interchange 69
  14. ^ Garden State Parkway Interchange 100
  15. ^ Garden State Parkway Regulations, State of New Jersey, dated October 23, 1987. Accessed October 17, 2007. "19:8-1.9(b)15: All vehicles except cars, campers, omnibuses, and vehicles entitled to toll-free passage under N.J.A.C. 19:8-3.2 (Toll-free passage) are prohibited from the Parkway north of Interchange 105."
  16. ^ Biederman, Marcia (October 7, 2007). "Motoring; Behind the Beauty of the Parkways Is a Maze of Rules". The New York Times. Retrieved October 17, 2007. In New Jersey, the Garden State Parkway has different rules depending on where you are. There are no truck restrictions south of exit 105 because trucks need to use the parkway to service the commercial needs of the area. North of the exit, vehicles with gross vehicle weight ratings (including passengers and cargo) more than 7,000 pounds are banned.... He said officers who patrolled the area had presented to the New Jersey Turnpike Authority a list of 70 passenger vehicles that exceed the weight limit, hoping the agency would update the rules. He said most troopers applied the rules mainly to commercial vehicles.
  17. ^ "N.J. to consider allowing trucks on Garden State Parkway north of exit 105". The Star-Ledger. Associated Press. April 18, 2011. Retrieved April 19, 2011.
  18. ^ "N.J. won't allow trucks on Garden State Parkway north of exit 105". The Star-Ledger. Associated Press. April 18, 2011. Retrieved April 19, 2011.
  19. ^ "E-ZPass open from N.Y. State to Cape May" (Press release). New Jersey Highway Authority. September 19, 2000.
  20. ^ a b "Parkway to Discontinue Token Sales" (Press release). New Jersey Highway Authority. December 26, 2001.
  21. ^ Strauss, Robert (July 20, 2008). "Soon, Token Non Grata on the Garden State". The New York Times. Retrieved March 18, 2010.
  22. ^ "Union Watersphere". lostinjersey.wordpress.com. March 19, 2009. Retrieved 2012-02-23.
  23. ^ NJ Turnpike and Garden State Parkway Project. Retrieved May 11, 2011.
  24. ^ a b "E-ZPass: A plan that works for NJ" (PDF). July 11, 2002. pp. 9–10. Retrieved June 22, 2009.
  25. ^ McCoy, Craig R. (January 9, 2008). "Corzine calls for 50% toll increase". The Philadelphia Inquirer.
  26. ^ Nussbaum, Paul (January 11, 2008). "Corzine: Toll-hike breaks are likely". The Philadelphia Inquirer.
  27. ^ Samuel, Peter (September 5, 2008). "Threatened by debt default New Jersey Turnpike proposes big toll increases". Tollroads News. Retrieved September 8, 2008.
  28. ^ Toll increase in effect on January 1, 2012 on the NJ Turnpike and the Garden State Parkway [1] Retrieved December 17, 2011.
  29. ^ PAY TOLL Photo Enforced to all exact change lanes [2] Retrieved October 13, 2011.
  30. ^ Sheppard, R.Z. (January 2, 1989). "Books: Serpents in The Garden State". Time. Retrieved May 3, 2010.
  31. ^ Cape May County Points of Interest
  32. ^ "The First Five Years of the Garden State Parkway" published by the New Jersey Highway Authority, page 29.
  33. ^ Barnegat's interchange to open Wednesday May 20, 2009
  34. ^ a b Template:PDFlink
  35. ^ Driscoll Bridge opening May 20, 2009
  36. ^ a b c d NJTPA Online Transportation Information System -- Project Detail
  37. ^ "NJDOT to begin reconstruction of Route I-280/Garden State Parkway Interchange 145" (Press release). New Jersey Department of Transportation. September 15, 2006. Retrieved June 14, 2007.
  38. ^ Pascack Valley One Way Toll
  39. ^ "New ramp linking I-78 and the Garden State Parkway opens today". New Jersey Department of Transportation. December 10, 2010. Retrieved December 14, 2010.
  40. ^ Jennifer Bogdan (2012-05-31). "Jimmie Leeds Road access to parkway service area in Galloway will be closed despite appeals, state says". Press of Atlantic City. Retrieved 2012-05-31.
  41. ^ Template:PDFlink accessed June 18, 2007
  42. ^ Garden State Parkway Exits & Toll Barriers

External links

KML is from Wikidata

Template:NJ Expressways