Peddapalli–Nizamabad line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 157.44.250.60 (talk) at 20:36, 31 August 2018. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Peddapalli-Nizamabad Line
Route Map
Overview
StatusOperational
OwnerIndian Railway
LocaleTelangana
Termini
Stations~16
Service
SystemDiesel (Electrification in progress)
ServicesDelhi-Chennai line
Secunderabad-Manmad section
Operator(s)South Central Railway Zone (India)
History
Opened25 March 2017
Technical
Line length177 km
Track gaugeBroad gauge 1,676 mm (5 ft 6 in)

Peddapalli-Nizamabad Railway Line is a single broad gauge railway line in the Indian state of Telangana. It connects Nizamabad city (Hyderabad Division)of Nizamabad District to Peddapalli town (Secunderabad Division) of Peddapalli District under South Central Railway zone. It reduces the distance between North Telangana Cities Nizamabad-Karimnagar-Warangal (262 km) when compared to present running route of Nizamabad-Secunderabad-Warangal(303 km).

Peddapalli Railway station is located on Kazipet-Balharshah section of Delhi-Chennai line which is known as Grand Trunk(G.T) line while Nizamabad Railway Station is located on Secunderabad-Manmad railway line.

km
on New Delhi–Chennai main line
0
Peddapalli Junction
13
Sultanabad
35
Karimnagar
44
Kottapalli
57
Gangadhara
63
Podur
73
Mallai-Nukapalli
83
Lingampet-Jagityal
91
Medipalli
104
Koratla
112
Metapally
133
Morthad
140
Anksapur
142
Lakkora
149
Armur
162
Mamidipalli
178
Nizamabad Junction
on Secunderabad–Manmad section

History

Peddapalli-Karimnagar-Nizamabad railway line (177 km) was sanctioned by the Late Shri.P.V. Narasimha Rao[1] who was the 10th Prime Minister of India in the year of 1993.[2] It took 23 years to be completed in a phased manner.[3]

The section between Peddapalli and Karimnagar was completed and train services were started in 2001. It took another 6 years to complete the stretch between Karimnagar and Jagityal and passenger trains were extended till Jagityal from 2007. On 29 December 2016 upon the completion of railway tracks between Jagityal and Morthad, the demu trains were further extended till Morthad mandal of Nizamabad district and passenger trains began moving between Karimnagar-Morthad and Peddapalli-Jagityal. After the fund allocation for the remaining section between Morthad and Nizamabad, the works were accelerated and within a year the Peddapalli-Nizamabad line via Karimnagar was ready for operations and the services began from 25 March 2017.

Stations

  • Peddapalli Junction (PDPL)
  • Sultanabad (STBD)
  • Karimnagar (KRMR)
  • Kothapalli(haveli) (KPHI)
  • Gangadhara (GDRA)
  • Podur (PUDR)
  • Mallial Nukapalli (NPML)
  • Lingampet-Jagityal(LPJL)
  • Medipalli (MDPLI)
  • Korutla (KRLA)
  • Metpally(MTPI)
  • Morthad (MRTD)
  • Anksapur (AKSP)
  • Armoor (ARMR)
  • Mamidipalle (MMDPL)
  • Nizamabad Junction (NZB)

Electrification

Single line electrification is sanctioned between Peddapalli and Lingampet Jagityal section (83 km) under Phase 1 Construction.

Passenger Trains

  • Karimnagar-Tirupati-Karimnagar Super Fast Express (12762/12761)
  • Kacheguda- Karimnagar- Kacheguda PASS (57601/02)
  • Karimnagar-Sirpur Town-Karimnagar DEMU (77255/77256)
  • Karimnagar-Lingampet Jagityal-Karimnagar DEMU (77274/77273)
  • Peddapalli-Lingampet Jagityal-Peddapalli DEMU (77258/77257)
  • Nizamabad-Karimnagar-Nizamabad DEMU (77260/77259)

References

  1. ^ "P V Narasimha Rao's projects in North Telangana neglected". Deccan Chronicle. Retrieved 30 August 2014.
  2. ^ "Peddapalli-Nizamabad rail services soon". The Hindu. Retrieved 30 August 2014.
  3. ^ http://www.thehindu.com/news/cities/Hyderabad/23-year-wait-for-railway-line-ends/article17619586.ece

External links