Jump to content

Nilambur–Nanjangud line: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Nijusby (talk | contribs)
No edit summary
Nijusby (talk | contribs)
No edit summary
Line 1: Line 1:
[[Image:Railway network schematic map 2009.png|thumb|285px|right|A schematic map of the Indian Railways network, showing the various zones.]]
[[Image:Railway network schematic map 2009.png|thumb|285px|right|A schematic map of the Indian Railways network, showing the various zones.]]
'''The Golden I.T. Corridor'''<ref>http://www.hindu.com/2011/02/25/stories/2011022552980900.htm</ref> (Nilambur–Gudalur Road–Bathery–Nanjangud rail line) is a railway project to create a broad gauge rail connection from the town of [[Nanjangud]] ([[Karnataka]]) to [[Nilambur]] ([[Kerala]]) through [[Wayanad]] district of Kerala and [[Nilagiri]] district of [[Tamilnadu]]. The first proposal for such a line dates back to 1881<ref>http://discuss.itacumens.com/index.php?topic=13988.45.</ref> Among the possible problems with this scheme is that it would go through forested lands, and that it is not certain that the line would be profitable. This railway having a length of 238&nbsp;km starting from Nanjangud near Mysore and passing through Madhur in [[Chamaraj Nagar]] district of Karnataka, [[Sulthan Bathery]] in Wayanad district of Kerala, and Devala in Nilgiri District of Tamilnadu and reaching at Nilambur in Kerala is technically feasible.<ref>Kerala Assembly Document ,Submission answered by Mr.M.Vijayakumar Minister for sports and Raiway affairs dated 22-07-2008</ref><ref>http://twocircles.net/2009aug29/questions_asked_mr_k_e_ismail_during_Rajya_sabha_session_july_aug_2009.html</ref> This BG line would join the existing railhead at Nilambur and lead to [[Trivandrum]]. The estimated cost of this railway is Rs.3384 crores. During 2010 the Planning Commission has sanctioned the estimated project cost of this proposed railway.
'''The Golden I.T. Corridor'''<ref>http://www.hindu.com/2011/02/25/stories/2011022552980900.htm</ref> (Nilambur–Gudalur Road–Sulthan Bathery–Nanjangud rail line) is a railway project to create a broad gauge rail connection from the town of [[Nanjangud]] ([[Karnataka]]) to [[Nilambur]] ([[Kerala]]) through [[Wayanad]] district of Kerala and [[Nilagiri]] district of [[Tamilnadu]]. The first proposal for such a line dates back to 1881<ref>http://discuss.itacumens.com/index.php?topic=13988.45.</ref> Among the possible problems with this scheme is that it would go through forested lands, and that it is not certain that the line would be profitable. This railway having a length of 238&nbsp;km starting from Nanjangud near Mysore and passing through Madhur in [[Chamaraj Nagar]] district of Karnataka, [[Sulthan Bathery]] in Wayanad district of Kerala, and Devala in Nilgiri District of Tamilnadu and reaching at Nilambur in Kerala is technically feasible.<ref>Kerala Assembly Document ,Submission answered by Mr.M.Vijayakumar Minister for sports and Raiway affairs dated 22-07-2008</ref><ref>http://twocircles.net/2009aug29/questions_asked_mr_k_e_ismail_during_Rajya_sabha_session_july_aug_2009.html</ref> This BG line would join the existing railhead at Nilambur and lead to [[Trivandrum]]. The estimated cost of this railway is Rs.3384 crores. During 2010 the Planning Commission has sanctioned the estimated project cost of this proposed railway.
This saves about 70&nbsp;km from Kerala to Bangalore and saves 360&nbsp;km to Mysore.<ref>http://wayanadrailway.com</ref>
This saves about 70&nbsp;km from Kerala to Bangalore and saves 360&nbsp;km to Mysore.<ref>http://wayanadrailway.com</ref>



Revision as of 04:14, 19 December 2012

A schematic map of the Indian Railways network, showing the various zones.

The Golden I.T. Corridor[1] (Nilambur–Gudalur Road–Sulthan Bathery–Nanjangud rail line) is a railway project to create a broad gauge rail connection from the town of Nanjangud (Karnataka) to Nilambur (Kerala) through Wayanad district of Kerala and Nilagiri district of Tamilnadu. The first proposal for such a line dates back to 1881[2] Among the possible problems with this scheme is that it would go through forested lands, and that it is not certain that the line would be profitable. This railway having a length of 238 km starting from Nanjangud near Mysore and passing through Madhur in Chamaraj Nagar district of Karnataka, Sulthan Bathery in Wayanad district of Kerala, and Devala in Nilgiri District of Tamilnadu and reaching at Nilambur in Kerala is technically feasible.[3][4] This BG line would join the existing railhead at Nilambur and lead to Trivandrum. The estimated cost of this railway is Rs.3384 crores. During 2010 the Planning Commission has sanctioned the estimated project cost of this proposed railway. This saves about 70 km from Kerala to Bangalore and saves 360 km to Mysore.[5]

Eco-friendly railway

The new railway would reduce the vehicular traffic in NH-67 and NH-212 since a major chunk of commuters and carriers would shift to railway. This would reduce environmental pollution and hazards in wild life sanctuary and would save valuable fuel also.[6][7]

Financial viability

It is estimated that more than 50,000 people are daily commuting to Mysore and Bangalore from Malabar and Nilagiri region. Around 240 buses are plying to Mysore and Bangalore through NH-212 and NH-67 from this region. By the inception of new railway line journey from Sulthan Bathery to Mysore would take just 1 hour and Banglore 3 hours. The journey from Devala (Gudalur Road) would take 30 minutes more. Ooty could be reached from Gudalur Road in one and a half hour drive so that this rail would be the favourite destination of tourists.More than 800 trucks are passing through NH212 in one direction through Wayanad daily. About 700 trucks are reaching Gudalur through NH67. Destination of this freight is the neighbouring 8 districts. Considering the logistic movement currently in NH 212 and NH67 which is expected to be shifted to the railway and expected increase by the introduction of railway, the freight revenue would be multi fold of the travel revenue.

References

  1. ^ http://www.hindu.com/2011/02/25/stories/2011022552980900.htm
  2. ^ http://discuss.itacumens.com/index.php?topic=13988.45.
  3. ^ Kerala Assembly Document ,Submission answered by Mr.M.Vijayakumar Minister for sports and Raiway affairs dated 22-07-2008
  4. ^ http://twocircles.net/2009aug29/questions_asked_mr_k_e_ismail_during_Rajya_sabha_session_july_aug_2009.html
  5. ^ http://wayanadrailway.com
  6. ^ The Hindu daily,dated nov.03-2008. kozhikode edition
  7. ^ The Hindu Daily.(Palakkad) Date:05/06/2009