This is an old revision of this page, as edited by SmitaVarma (talk | contribs) at 04:36, 4 January 2020 (Reverted 1 edit by 2401:4900:482B:B67:C5D8:72F3:8BDD:A27B (talk): Unsourced (TW)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Hyderabad Metro
Hyderabad Metro Logo
Overview
OwnerGovernment of Telangana (10%)
Larsen & Toubro (90%)
LocaleHyderabad, Telangana, India
Transit typeRapid Transit
Number of lines2 [1]
Number of stations50[2]
Daily ridership425,000 (November 2019) [3]
Chief executiveN.V.S. Reddy[4]
HeadquartersMetro Bhawan, Begumpet, Hyderabad
WebsiteL&T Metro
HMRL
Operation
Began operation29 November 2017[5]
Operator(s)Hyderabad Metro Rail Ltd. (HMRL)
Headway3.5 - 7 minutes
Technical
System length72 km (45 mi)
58 km (36 mi) (Operational)
No. of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV, AC Overhead catenary
Average speed35 km/h (22 mph)
Top speed80 km/h (50 mph)
Hyderabad Metro Rail

Network map

The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India.[6] It is the second longest operational metro network in India after the Delhi Metro (250 stations) with 48 stations[7][8] and the lines are arranged in a secant model. It is being funded by a Public Private Partnership (PPP)),[9][10] with the state government holding a minority equity stake.[11] A special purpose vehicle company, L&T Metro Rail Hyderabad Ltd (L&TMRHL) was established by the construction company L&T[12][13] to develop Hyderabad metro rail project under Public Private Partnership (PPP) mode.[14][15] A 30 kilometres (19 mi) stretch from Miyapur to Nagole with 24 stations, was inaugurated on 28 November 2017 by Prime Minister Narendra Modi.[16][17] This was the longest rapid transit metro line opened in one go in India.[18][19] It is estimated to cost 18,800 crore (US$2.3 billion). As of October 2019, about 417,000 people use the Metro per day.[20] Trains are crowded during the morning and evening rush hours.[21] A ladies only coach was introduced on all the trains from 7 May 2018.[22]

History

Metro Rail

To respond to rising public transport needs and mitigate growing road traffic in the twin-cities of Hyderabad and Secunderabad, the State Government and the South Central Railway jointly launched the Multi Modal Transport System (MMTS) in August 2003.[23][24] In 2003, as Hyderabad continued to grow, the MMTS had insufficient capacity for public transport, and the Union Ministry of Urban Development approved construction of the Hyderabad Metro Rail Project, directing the DMRC to conduct a survey of the proposed lines.[25] The initial plan was for the metro to connect with the existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase-II were also taken forward.[26] In 2007, N.V.S. Reddy was appointed Managing Director of Hyderabad Metro Rail Limited[27] and the same year, Central Government approved financial assistance of 1639 crore under Viability Gap Funding (VGF) scheme.[28]

The option of underground metro system in Hyderabad was ruled out by L&T due to the presence of hard rocks, boulders and the topography of the soil in Hyderabad.[29] On March 26, 2018, Telangana Govt announced that it would set up a SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad under phase-II after the completion of Phase-I in 2019.

Initial bidding

The bidding process was completed by July 2008 and awarded to Maytas,[30] which failed to achieve financial closure for the project as per schedule By March 2009. In July 2009, the State Government cancelled the contract and called for fresh bids for the project.

Re-bidding

In the July-2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the 121.32 billion (US$1.5 billion) project.[31] L&T came forward to take up the work for about 14.58 billion (US$170 million) as viability gap funding as against the sanctioned 48.53 billion (US$580 million).

Mascot

Prime Minister Narendra Modi taking a ride in Hyderabad Metro in 2017

The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.[32]

Awards and nominations

HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.[33] [34]

L&T Metro Rail Hyderabad Limited (LTMRHL) has been conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management[35]' category.

In 2018, Rasoolpura, Paradise and Prakash Nagar metro stations were awarded Indian Green Building Council's (IGBC) Green MRTS Platinum Award.[36]

Hyderabad Metro was adjudged as the Best Urban Mass Transit Project by the Government of India, in November 2018.[37]

Construction milestones

Hyderabad metro towards HITEC city Cyber Towers
  • Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012[38] the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II.[39] The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets.[40] If the recent bill proposed in Parliament which allows construction within a 100 metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.[41]
  • The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015[42][43]
  • In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.[44]
  • The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015.[45] The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.
  • CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016.[46]
  • The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.[47][48]
  • In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.[49]
  • 16-km Ameerpet-LB Nagar Metro stretch was opened for commercial operations from 24 September 2018.[50]
  • The Ameerpet - Hi-Tec City route was opened on conditional basis on March 20, 2019. The reversal facility after HITEC City metro station was started on 20 August 2019.[51] On 19 May 2019, the construction of all the 2,599 pillars for the 66-km Hyderabad Metro rail (except the 6-km stretch in old city) was completed.[52][53]

Network

Proposed lines of the Hyderabad Metro Rail (Note: JBS is not a Phase one station as shown. it is a Phase 2 station)

Currently, the Hyderabad Metro has 48 stations. Phase I of the Hyderabad metro has 64 stations; they have escalators and elevators to reach the stations, announcement boards and electronic display systems. The stations also have service roads underneath them to for other public transportation systems to drop-off and pick-up passengers.[54] The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.[55]

Otis Elevator Company supplied and maintains the 670 elevators in use on the system.[56]

In May 2018, L&T Metro Rail signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations.[57][58] L&THMRL has setup free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.[59][60] Metro Rail Phase II expansion plan is for about 85 km.[61] In April 2019, K. T. Rama Rao said that 200 kilometres (120 mi) of metro rail was planned for Hyderabad, with metro along entire Outer Ring Road.[62] All metro corridors are scheduled to terminate at Shamshabad, near Rajiv Gandhi International Airport, as planned in Hyderabad Metro Rail Phase-II.[63] In August 2019, KT Rama Rao said that state cabinet has approved the Hyderabad Metro Airport Express Link from Raidurg to the airport.[64]

Current status

Line First operational Last extension Stations Length Terminals Rolling stock Track gauge
(mm)
Power Average Frequency (Minutes)
Red 29 November 2017 24 September 2018 27 29 km (18 mi) Miyapur LB Nagar 1435 25 kV OHE 6.5
Blue 29 November 2017 29 November 2019 23 27 km (17 mi) Raidurg Nagole 1435 25 kV OHE 6.5
50 56 km (35 mi)

Construction phases

The construction work was undertaken in two phases. There are six stages of completion in Phase I.[65]

Phase I

Phase I of the project includes 3 lines covering a distance of around 72 kilometres (45 mi). The metro rail line between Nagole and Secunderabad was originally scheduled open by December 2015; it was partly opened on 29 November 2017 with a new completion date of December 2019.[66] A 5.5 kilometres (3.4 mi)-long green line in the old city will pass through Dar-ul-Shifa, Purani Haweli, Eitebar Chowk, Volta Hotel, Sultan Shahi, Syed Ali Chabutra , Shamsheer Gunj, Moghalpura, Hari Bowli, Shah-Ali-Banda and ends at Falaknuma.[67][68] This stretch is scheduled to be completed by 2022.

  • Line 1 - Red Line - Miyapur – LB Nagar - 29 km (18 mi) 27 stations
  • Line 2 - Green Line - JBS - Falaknuma 15 km (9.3 mi) 15 stations
  • Line 3 - Blue Line - Nagole – Raidurg - 28 km (17 mi) 24 stations

Construction schedule

Stage Target Section Distance Line Line Colour Status Opened
Stage 1 NagoleAmeerpet 16.8 km (10.4 mi) Line III Blue Operational November 29, 2017
Stage 2 MiyapurLB Nagar 28 km (17 mi) Line I Red Operational November 29, 2017
Stage 3/1 AmeerpetHITEC City 8.5 km (5.3 mi) Line III Blue Operational March 20, 2019
Stage 3/2 HITEC CityRaidurg 1.47 km (0.91 mi) Line III Blue Operational November 29, 2019[69]
Stage 4/1 JBSMGBS 9.68 km (6.01 mi) Line II Green Trail Run in Progress Exp. January 2020[70]
Stage 4/2 MGBSFalaknuma 5.36 km (3.33 mi) Line II Green Under Construction N/A
Total 72 km (45 mi)

Note: Stage 4/2 MGBS - Falaknuma section (5.36 km) is also part of the initial phase - I, but has been rumored that the state government might take up this section instead of L&T, but will be completed along with the phase - I work. The Stage 3/2 Hitec City - Raidurg section (1.3 km) of Corridor III was not initial part of phase - I, it was later on added by the newly elected state government. This section is opened on 29th Nov 2019.

Phase II

The Government is planning second phase of metro rail extending further.[71] The construction of Phase II will be taken up solely by the state government, instead of Public Private Partnership (PPP) mode in Phase I.[72] Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II.[73] Metro Rail Phase II expansion plan is for about 85 km,[74] which includes providing link to Shamshabad RGI Airport.[75] The proposed routes are as following:

Target Section Distance (in km) Line
RaidurgGachibowli Shamshabad RGI Airport 30 km (19 mi) Line IV
NagoleLB NagarFalaknumaShamshabad RGI Airport 28 km (17 mi) Line III extension
MiyapurGachibowliTolichowkiLakdi ka pul 20 km (12 mi) Line V
MiyapurBHEL-Patancheru 15 km (9.3 mi) Line I extension
LB NagarHayath Nagar 7 km (4.3 mi) Line I extension
JBSAlwal 8 km (5.0 mi) Line II extension
TarnakaECIL 'X' Roads 7 km (4.3 mi) Line VI

Hyderabad Airport Metro Express

In August 2019, TRS Working President, Minister for Muncipal Administration & Urban Development, Industries and IT&CK. T. Rama Rao said that the work on Hyderabad Metro Airport Express from Raheja Mindspace to Shamshabad RGI Airport will start soon.[76] The 31 km long Hyderabad Metro Airport Express link will cost around 5000 crore.[77] The 31-km Airport Express Metro Corridor is proposed to have 27-km elevated, 1 km on ground and a 2.5-km underground section to connect to the airport terminal.[78] The airport route will have 9 elevated stations and one underground station.[79]

# Station Name
1 Bio-Diversity junction
2 Nanakramguda
3 Narsingi
4 TS Police Academy
5 Rajendranagar
6 Shamshabad
7 Airport Cargo station
8 RGIA Terminal

Lines

Hyderabad Metro
Phase I
Miyapur
JNTU College
Raidurg
KPHB Colony
Hitec City
Kukatpally
Durgam Cheruvu
Balanagar
Madhapur
Moosapet
Peddamma Gudi
Bharat Nagar
Jubilee Hills
Check Post
Erragadda
Road No 5
Jubilee Hills
ESI Hospital
Yusufguda
S.R. Nagar
Madhura Nagar
Ameerpet
Punjagutta
Begumpet
Irrum Manzil
Prakash Nagar
Khairatabad
Rasoolpura
Lakdi-ka-pul
Paradise
Assembly
JBS Parade Ground
Nampally
Parade Ground
Gandhi Bhavan
Osmania
Medical College
Secunderabad
West | Jn | East
Mettuguda
Gandhi Hospital
Tarnaka
Musheerabad
Habsiguda
R.T.C. X Roads
NGRI
Chikkadpally
Stadium
Narayanaguda
Uppal
Sultan Bazaar
Nagole
MG Bus Station
Malakpet
Salarjung Museum
New Market
Charminar
Musarambagh
Shah-Ali-Banda
Dilsukhnagar
Shamsherganj
Chaitanyapuri
Jungametta
Victoria Memorial
Falaknuma
LB Nagar
Red Line
Green Line
Blue Line
Indian Railways lines

Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color.[80] Ameerpet- LB Nagar metro stretch opened on 24 September 2018.[81] HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is opened on 29th November 2019,[82][83] as it involves construction of 49 pillars and the Raidurg terminal station.[84]

Red Line: Miyapur – L.B. Nagar

Route Length — 29.21 km (18.15 mi)
Number of Stations (All elevated) — 27
Link to other Corridors

# Station Name Connections
1 Miyapur None
2 J.N.T.U College None
3 K.P.H.B. Colony None
4 Kukatpally None
5 Balanagar None
6 Moosapet None
7 Bharatnagar None
8 Erragadda None
9 ESI Hospital None
10 S.R Nagar None
11 Ameerpet Blue Line
12 Punjagutta None
13 Errum Manzil None
14 Khairatabad None
15 Lakdi-ka-pul None
16 Assembly None
17 Nampally None
18 Gandhi Bhavan None
19 Osmania Medical College None
20 MG Bus Station Green Line
21 Malakpet None
22 New Market None
23 Musarambagh None
24 Dilsukhnagar None
25 Chaitanyapuri None
26 Victoria Memorial None
27 L.B. Nagar None

Green Line: JBS – Falaknuma

Route Length — 15 km (9.3 mi)
Number of Stations (All elevated) — 14
Link to other Corridors

# Station Name Connections
1 JBS None
2 Parade Ground Blue Line
3 Secunderabad West None
4 Gandhi Hospital None
5 Musheerabad None
6 R.T.C. Cross Roads None
7 Chikkadpally None
8 Narayanguda None
9 Sultan Bazaar None
10 M.G. Bus Station Red Line
11 Salarjung Museum None
12 Charminar None
13 Shah-Ali-Banda None
14 Shamsherganj None
15 Falaknuma None

Blue Line: Nagole - Raidurg

Route Length — 27 km (17 mi)
Number of Stations (All elevated) — 23
Link to other Corridors

# Station Name Connections
1 Nagole None
2 Uppal None
3 Stadium None
4 NGRI None
5 Habsiguda None
6 Tarnaka None
7 Mettuguda None
8 Secunderabad East None
9 Parade Ground Green Line
10 Paradise None
11 Rasoolpura None
12 Prakash Nagar None
13 Begumpet None
14 Ameerpet Red Line
15 Madhura Nagar None
16 Yousufguda None
17 Jubilee Hills Road No. 5 None
18 Jubilee Hills Check Post None
19 Peddamma Temple None
20 Madhapur None
21 Durgam Cheruvu None
22 Hitec City None
23 Raidurg None

Depots

Hyderabad Metro currently has 2 operational depots.[85]

Hyderabad Metro
Depots
Line No. Line Name Number of Depots Location Opening Date
1 Red Line 1
Miyapur Depot, Near Calvary Temple, Nadigada Tanda, Miyapur, Hyderabad, Telangana 28 November 2017
2 Blue Line 1 Uppal Metro Depot, Nagole Rd, Laxmi Narayan Nagar Colony, Uppal, Hyderabad, Telangana 28 November 2017
3 Green Line 1 Falaknuma TBD

Reception

The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1.[86] On the first Sunday of operations, the Metro was used by 240,000 people.[87] As of October 2019, the daily ridership is about 400,000. Although there was hiccups in the beginning of operations in 2017 with meager ridership of less than 100,000 per day, opening the new lines to LB Nagar and Hi-Tech city in 2018-19, ridership has surged and reached milestones from 2 to 4 lakhs in very short duration.

Trains are initially being operated at a frequency of 3 minutes in very peak hours and every 5 minutes in peak hours (between Miyapur-LB Nagar) and 4 minutes in peak hours (between Hi-Tec City/ Ameerpet-Nagole),[88] though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.[89]

In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari.[90][91] Hyderabad Metro timings are available on T-Savari app.[92] Ola Cabs and Uber tied up its services with app.[93]

Hyderabad Metro Rail crossed 30 million cumulative ridership milestone on 15 November 2018.[94]

Cost

The initial official estimated cost of the 72 km long Metro project stood at 14,132 crore (US$1.7 billion). The Central Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost.[95][96] The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to 15,957 crore (US$1.9 billion).[97] This has been further revised upwards to 18,800 crore (US$2.3 billion) (as of November 2017).[21]

Infrastructure

Hyderabad Metro Rail Bhavan

The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25 kV AC 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).[98] L&TMRHL built real- estate projects like Next Galleria malls in Panjagutta, Irrum Manzil, Hitech City and Musarambagh with skywalks,[99] for generating non-fare revenues under Transit Oriented Development (TOD).[15][100][101] In 2019, Hyderabad Metro started a semi-naming policy of metro stations, awarded through an open e-tendering process, to generate non-fare revenues.

CBTC Technology

At the end of 2012, L&T Metro Rail awarded Thales a Rs 7.4bn ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales Group supplied its SelTrac Communications-based train control (CBTC) technology,[102] and trains initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).[103]

Rolling stock

On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem.[104][105] The 18 billion (US$220 million) tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage.[106][107] On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad.[108] The trains will be 3.2m wide and 4m high.[109] There will be 4 doors on each side of each coach.[109]

On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014.[110] On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.[111]

Ticketing and recharge

The L&T Hyderabad project has an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues.[112] Hyderabad Metro Rail smart card acts as a virtual wallet that facilitates seamless travel. A smart card can be purchased from a ticketing office at any Hyderabad Metro station or through TSavaari App. A smart card can be recharged for a minimum amount of 50 and maximum amount of 3000. The smart card can be recharged through TSavaari App, HMR Passenger website (www.ltmetro.com), or Paytm App. There is 10% discount on all trips made through smart card.[113] Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.[112][114] Official Ticket prices were announced on 25 November 2017. The base fare is 10 for up to 2 km.

Hyderabad metro nebula smart card
Slab Distance (km) Metro Fare ()
1 0 - 2 10
2 2 - 4 15
3 4 - 6 25
4 6 - 8 30
5 8 - 10 35
6 10 - 14 40
7 14 - 18 45
8 18 - 22 50
9 22 - 26 55
10 > 26 60

In popular culture

See also

References

  1. ^ https://www.ltmetro.com/#1533558685893-953f7902-67f4
  2. ^ https://www.ltmetro.com/#1533558685893-953f7902-67f4M
  3. ^ https://www-thenewsminute-com.cdn.ampproject.org/v/s/www.thenewsminute.com/article/tsrtc-strike-hyderabad-metro-rail-sees-4-lakh-footfall-protests-continue-110953?amp_js_v=a2&amp_gsa=1&amp&usqp=mq331AQCKAE%3D#referrer=https%3A%2F%2Fwww.google.com&amp_tf=From%20%251%24s&ampshare=https%3A%2F%2Fwww.thenewsminute.com%2Farticle%2Ftsrtc-strike-hyderabad-metro-rail-sees-4-lakh-footfall-protests-continue-110953
  4. ^ "N. V. S. REDDY".
  5. ^ "Hyderabad Metro rail flagged off today: See fares, timings, routes and other features". The Indian Express. 28 November 2017. Retrieved 28 November 2017.
  6. ^ "Project Description". Archived from the original on 11 June 2012. Retrieved 19 June 2012.
  7. ^ "Jubilee Hills Check Post metro station opening today".
  8. ^ "Tryst with Metro history as 2nd longest corridor opens".
  9. ^ "Skywalks to connect Metro with schools & malls: NVS Reddy".
  10. ^ "How metro rail networks are spreading across India".
  11. ^ "EPC vs PPP in metro rail". Projectsmonitor.com. 2 December 2007. Archived from the original on 2 December 2007. Retrieved 18 April 2013.
  12. ^ "The Next Station Is..2014".
  13. ^ "Eyeing non-fare revenues, L&T Metro Hyderabad takes up transit oriented development".
  14. ^ "N.V.S. Reddy to be AP Govt nominee on L&T Metro Rail board".
  15. ^ a b "Hyderabad metro on tricky track, running on losses".
  16. ^ "PM Modi and Manisha inaugurates Hyderabad Metro Rail".
  17. ^ "PM Narendra Modi flags off Hyderabad Metro".
  18. ^ "SR Nagar-Mettuguda was missing link in 30-km Metro rail corridor".
  19. ^ "Metro Rail to get lease of life in November".
  20. ^ https://www-thenewsminute-com.cdn.ampproject.org/v/s/www.thenewsminute.com/article/tsrtc-strike-hyderabad-metro-rail-sees-4-lakh-footfall-protests-continue-110953?amp=&usqp=mq331AQCKAE%3D&amp_js_v=0.1#referrer=https%3A%2F%2Fwww.google.com&amp_tf=From%20%251%24s&ampshare=https%3A%2F%2Fwww.thenewsminute.com%2Farticle%2Ftsrtc-strike-hyderabad-metro-rail-sees-4-lakh-footfall-protests-continue-110953
  21. ^ a b "Hyderabad Metro project delay by L&T pushes up cost by over 30 per cent". India Today. 26 November 2017.
  22. ^ ""Ladies only" coach in Hyderabad metro rail". Deccan Chronicle. 6 May 2018. Retrieved 10 June 2018.
  23. ^ "Advani flags off first MMTS train". The Hindu. Hyderabad. 10 August 2003. Retrieved 18 April 2015.
  24. ^ "After 16 years, MMTS has a long way to go".
  25. ^ "Nod for metro rail project". The Hindu. Hyderabad. 27 October 2003. Retrieved 18 May 2015.
  26. ^ "Rs 4,500-crore MMTS project report under way". Business Standard. Hyderabad. 15 February 2004. Retrieved 18 May 2015.
  27. ^ "Hum Tum: Bonding over work".
  28. ^ "Centre approves Hyderabad Metro Rail Project".
  29. ^ "Hyderabad Metro runs into hard rocks".
  30. ^ "Maytas-Nava consortium wins bid for Hyderabad Metro Rail".
  31. ^ "2010 concessionaire agreement between L&T and AP Govt" (PDF).
  32. ^ "Niz is Hyderabad Metro Rail's mascot". The Hindu. 12 September 2014. Retrieved 3 October 2016.
  33. ^ "TheHindu.com Metro in best 100 global projects". www.thehindubusinessline.com.
  34. ^ "DeccanChronicle.com metro-among-100-global-projects". metro-among-100-global-projects. Archived from the original on 17 December 2012.
  35. ^ "L&T Metro Rail Hyd bags SAP award". 10 December 2015. Retrieved 29 November 2017 – via www.thehindu.com.
  36. ^ "Indian Green Building Council's (IGBC) Green MRTS Platinum Award".
  37. ^ "Hyderabad Metro Rail gets 'Best Urban Mass Transit Project' award". United News of India. 5 November 2018. Retrieved 11 January 2019.
  38. ^ "L&T performs Bhoomi Puja for Hyderabad metro". The Hindu. 26 April 2012.
  39. ^ "L&T metro rail schedule on track". The Hindu. Chennai, India. 7 June 2012.
  40. ^ "Metro Rail works picking up speed". The Deccan Chronicle. 31 August 2011. Archived from the original on 12 October 2012. Retrieved 31 August 2011.
  41. ^ "Monument law amendment buoys Metro dream in Old City, but political will needed".
  42. ^ "Hyderabad Metro Rail phase-I to be completed by 2014". NDTV.com. 21 January 2013. Retrieved 18 April 2013.
  43. ^ Our Bureau. "Hyderabad Metro rail stage I to be flagged off by June 2014 - Business Line". Thehindubusinessline.com. Retrieved 18 April 2013.
  44. ^ Kumar, V. Rishi (20 November 2013). "L&T Hyderabad Metro begins laying of rails". Retrieved 29 November 2017.
  45. ^ Kumar, V.Rishi (7 November 2013). "L&T Hyderabad Metro phase I to be ready by March 2015". Retrieved 29 November 2017.
  46. ^ "CMRS completes 1 day inspection for Hyderabad Metro Stage-II, Miyapur to S.R. Nagar". metrorailnews.info. Archived from the original on 15 September 2016.
  47. ^ "Hyderabad Metro ROB placed at Oliphant Bridge". telanganatoday.com.
  48. ^ "Metro steel bridge crosses Oliphenta railway bridge". thehindu.com.
  49. ^ "L&T Hyderabad Metro Rail gets safety approval".
  50. ^ "Hyderabad Metro chugs on Ameerpet-LB Nagar route".
  51. ^ "Hyderabad Metro to run trains to HiTec City at 3 minute frequency".
  52. ^ "Metro rail's last pier built after seven years of work".
  53. ^ "'2599 metro pillars erected in 2599 days': Work on 66-km stretch of Hyd metro finished".
  54. ^ "Hyderabad Metro to get service lanes". 22 May 2015. Retrieved 29 November 2017.
  55. ^ "No Language Wars Here, Hyderabad Metro to Use 4 Languages".
  56. ^ Bureau, Our (14 April 2011). "Fare structure for Hyderabad metro notified". Retrieved 29 November 2017.
  57. ^ "Hyderabad Metro stations to have electric vehicle charging points". The Economic Times. 19 May 2018. Retrieved 20 May 2018.
  58. ^ "Hyderabad Metro stations do not reflect exact locations".
  59. ^ "Watch videos with free Wi-Fi at Hyderabad metro".
  60. ^ "Hyderabad metro rail celebrates its first anniversary".
  61. ^ "Metro connectivity to airport may take three more years, says L&T official".
  62. ^ "200 km of metro rail planned for Hyderabad".
  63. ^ "All metro corridors to terminate at Shamshabad".
  64. ^ "Metro link work on IT Hub to Hyderabad airport will begin soon, says KT Rama Rao".
  65. ^ http://hmrl.telangana.gov.in/project-description.html
  66. ^ "Metro rail line to Raidurg another two years away". The Hindu. Retrieved 29 November 2017.
  67. ^ "Work in Old City to start in '19, will take three years".
  68. ^ "After much delay work to begin".
  69. ^ https://www.thehansindia.com/telangana/hyderabad-metro-operations-to-be-extended-to-mindspace-on-nov-29-583467
  70. ^ https://indianexpress.com/article/cities/hyderabad/hyderabad-metro-ready-with-qr-code-based-ticketing-system-announcement-soon/
  71. ^ "State to seek Japanese help for Phase II works of Metro Rail Project". 9 August 2017. Retrieved 9 August 2017.
  72. ^ "Metro corridors to crisscross Hyderabad for airport link".
  73. ^ "SPV formed to extend Metro from Raidurg to Hyderabad airport".
  74. ^ "L&T secures extension of repayment deadline from lenders for Hyderabad metro project".
  75. ^ "Metro line to RGIA under study".
  76. ^ "Work on Airport Express metro to begin soon: KTR".
  77. ^ "Hyderabad: Airport Metro line to cost Rs 5,000 crore".
  78. ^ "Hyderabad: Metro's airport service to have underground stretch".
  79. ^ "Airport Metro to have underground section connecting to passenger terminal".
  80. ^ "Archived copy". Archived from the original on 11 January 2014. Retrieved 18 August 2013.{{cite web}}: CS1 maint: archived copy as title (link)
  81. ^ "Telangana Governor To Flag Off New Metro Line On September 24".
  82. ^ "Metro extension to Raidurg by July-end".
  83. ^ "Metro 'Blue Line' likely by July".
  84. ^ "Metro may go the extra mile soon".
  85. ^ "Depot Details".
  86. ^ "Over 2 lakh passengers travel by Hyderabad metro rail on day 1". The Indian Express. 30 October 2017. Retrieved 30 November 2017.
  87. ^ http://www.zeebiz.com/india/news-record-24-lakh-commuters-travel-by-hyderabad-metro-on-sunday-32847
  88. ^ https://timesofindia.indiatimes.com/city/hyderabad/mania-peaks-2-1-lakh-riders-send-metro-in-tizzy/articleshow/61898886.cms
  89. ^ http://www.thehindu.com/news/cities/Hyderabad/full-metro-service-from-launch-day/article19652407.ece
  90. ^ "'TSavaari' app for Hyderabad metro rail passengers".
  91. ^ "Hyderabad Metro Rail app update includes latest timings".
  92. ^ "Hyderabad Metro timings available on T-Savari app, L&T website".
  93. ^ "Ola integrates services with Hyderabad Metro Rail's TSavaari app".
  94. ^ "Hyderabad Metro reaches 30-million ridership".
  95. ^ "Hyderabad Metro Rail Project will be completed by 2017: Andhra Pradesh government". NDTV.com. 8 August 2012. Retrieved 18 April 2013.
  96. ^ "Hyd Metro Rail Project will be completed on schedule: AP govt, IBN Live News". Ibnlive.in.com. 8 August 2012. Retrieved 18 April 2013.
  97. ^ "Metro rail cost overshoots estimates". The Times Of India. 8 March 2012.
  98. ^ "Hyderabad: Women safety is key objective for metro".
  99. ^ "Swanky malls to help L&T mop up revenue".
  100. ^ "L&TMRH to open two more malls".
  101. ^ "L&T plans 3 malls-cum-multiplexes along metro rail corridors in Hyderabad".
  102. ^ "Metro glitches may lead to CBTC tweak".
  103. ^ "L&T Hyderabad Metro awards contracts to Thales". thehindubusinessline.com. 16 November 2012. Retrieved 28 November 2017.
  104. ^ "L&T Metro Rail grants Rs 1,800 cr contract to Hyundai Rotem". Zeenews.india.com. Retrieved 18 April 2013.
  105. ^ [1]
  106. ^ "Hyundai Rotem cars to run on metro tracks". The Times Of India. 12 September 2012. Retrieved 15 September 2012.
  107. ^ "L&T awards rolling stock contract to Hyundai Rotem". Ibnlive.in.com. 14 September 2012. Retrieved 18 April 2013.
  108. ^ "Larsen and Tourbo Hyderabad Metro unveils train car". Retrieved 29 November 2017.
  109. ^ a b "Archived copy". Archived from the original on 20 August 2013. Retrieved 23 October 2013.{{cite web}}: CS1 maint: archived copy as title (link)
  110. ^ "First train for Hyderabad Metro rolls out of Korean factory". IANS. news.biharprabha.com. Retrieved 10 April 2014.
  111. ^ "Metro rail goes on first automatic trial run". 31 December 2014. Retrieved 29 November 2017 – via www.thehindu.com.
  112. ^ a b Our Bureau (18 February 2013). "Samsung bags fare collection system contract for Hyderabad Metro | Business Line". Thehindubusinessline.com. Retrieved 28 September 2013.
  113. ^ "10% off on metro rail smart cards".
  114. ^ Udgirkar, Trushna. "Hyderabad Metro in ticketing deal with Samsung". mydigitalfc.com. Retrieved 28 September 2013.
  115. ^ "Nani- Akkineni Nagarjuna starrer is the first film to be shot in Hyderabad Metro".
  116. ^ "Nagarjuna-Nani starrer becomes first film to shoot in Hyd metro".
  • [2] The Hindu Business Line, Hyderabad January 23, 2018

External links