Jump to content

Manchester Airport station

Coordinates: 53°21′54″N 2°16′23″W / 53.36500°N 2.27306°W / 53.36500; -2.27306
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Redrose64 (talk | contribs) at 22:18, 1 December 2017 (→‎top: let's keep it at five). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Manchester Airport
General information
LocationManchester
Managed byTransPennine Express
Platforms4
Other information
Station codeMIA
Key dates
May 1993Opened
2004Refurbished
2008Third platform opened
2014Metrolink services begin
2015Fourth platform added

Manchester Airport is a railway station at Manchester Airport, England opening simultaneously with a second air terminal in 1993. Manchester Metrolink tram services were extended to the airport in November 2014.

Description

The station is 9+34 miles (15.7 km) south of Manchester Piccadilly at the end of a short branch from the Styal Line constructed by British Rail in 1993. A branch of Manchester Metrolink runs into it. It is accessed via a triangular junction located between Heald Green and Styal. The station platforms are connected by escalator, elevator, ramps and an elevated covered walkway (known as the "Sky Link") to the airport terminal buildings in which is a manned railway ticket office. Throughout the airport complex, the railway station is known as "The Station" and is signposted as such.

History

New platforms

In December 2008, a third platform opened after a year of construction and a total cost of £15 million. The following year Network Rail noted that it had "greatly increased operational flexibility at the station, and reduced the number of times that late-running trains had had to be terminated at Manchester Piccadilly."[1]

In 2009, Network Rail stated that the creation of the third platform has meant that the capacity at Manchester Airport will become constrained by the layover of the trains and congestion at the throat. To solve this issue they have recommended building a line underneath the airport towards Northwich in the 2019 to 2024 period.[2]

In July 2012, support for a fourth rail platform was announced by the Government.[3] The current platforms are eight carriage lengths long, so each can accommodate two trains of four carriages. A fourth platform will allow greater use of longer trains of six carriages or more. This had been recommended as part of the Northern Hub scheme of rail improvements around Manchester by the 2010 Manchester Hub Rail Study and the 2011 Northern Route Utilisation Strategy, with an estimated cost of £23 million.[4]

In February 2014, construction commenced on a new £20m fourth platform at the station. The start of construction was attended by the Chancellor of the Exchequer, George Osborne. Construction of the new platform was completed in May 2015 - three years earlier than the 2018 estimate given in 2012.[5][6] This was to allow engineering work to overlap with that being done on the Manchester Metrolink extension to the airport (see below) so that the fourth platform could be used for the extra traffic generated once the Ordsall Chord link is completed, which is currently scheduled for completion in late 2017, while the fourth platform itself opened to passengers in Autumn 2015.[7][8]

HS2

In January 2013, the Government announced that Manchester Airport would be included in the second phase of the High Speed 2 railway line. This will enable Manchester Airport to be reached from London Euston in 59 minutes. The new line and associated new station will pass to the west of the Airport, away from the existing railway station and transport interchange, giving the airport two disconnected railways stations approximately 1 mile apart. [9]

The proposed Manchester Interchange Station

National Rail services

TransPennine Express Class 185 on platform 2 (was 1a) arriving from Manchester Piccadilly

Northern, TransPennine Express and Arriva Trains Wales are the three current franchise holders that serve Manchester Airport. Services between the airport and Crewe (for connections to Southern England); Manchester Piccadilly; various destinations throughout Northern England and, since December 2007, to Glasgow Central and Edinburgh Waverley via Carlisle.

There is a frequent service from the airport to Manchester Piccadilly. Services also operate during the night to Manchester Piccadilly and beyond including York; Doncaster; Sheffield; Scotland and Blackpool North.

There are currently nine trains per hour to Manchester Piccadilly. There are no long distance services to the airport from the south; a Central Trains service from Manchester Airport to Skegness via Derby was cut back to Crewe in 2003.[10]

From May 2016 Arriva Trains Wales have operated an hourly (off peak) Monday - Saturday service to Llandudno via Chester. They now operate 57 services a week compared to the previous 17.

First TransPennine Express used to run the service to Blackpool North but this was passed on to the new Northern franchise in April 2016.

Infrastructure developments that are part of the Northern Hub system of schemes should allow direct trains to Manchester Victoria and on towards Bradford from December 2016.

Manchester Metrolink

Template:Infobox Manchester Metrolink station

The Manchester Metrolink light rail network was extended from St Werburgh's Road to Manchester Airport as part of the Phase 3 expansion project.[11] The Metrolink station has been built adjacent to the airport station.[12] It is the terminus of the Airport Line.

Following a period of uncertainty due to funding problems, the plans were finally given the go-ahead in May 2009. The confirmed route would not complete the full airport loop as proposed, but trams would run along the northern route via Wythenshawe. Completion of the western side of the loop is subject to further funding in a later project.[13][14] An opening date of Summer 2016 had originally been indicated for opening of the Airport line[15] but the line opened early on 3 November 2014.[16][17]

Services

Trams run between Manchester Airport and Deansgate-Castlefield every 12 minutes. An early morning service runs from 03:19–06:00 am every 20 minutes. Later in 2017, services will run through to Victoria.[16] The Second City Crossing is currently scheduled to have the first trams running on it in Winter 2015/16 and will be fully complete by 2017.[18][19]

References

  1. ^ Connecting local communities: Route Plan 2009 for Route 20 - North West Urban, Network Rail, 2009; page 6
  2. ^ Connecting local communities: Route Plan 2009 for Route 20 - North West Urban, Network Rail, 2009; page 27
  3. ^ Historic day for Greater Manchester's rail network, Transport for Greater Manchester, 16 July 2012
  4. ^ Manchester Hub Rail Study, Network Rail, February 2010
    Northern Route Utilisation Strategy, Network Rail, May 2011, page 7 and pp. 55-56
  5. ^ "Chancellor unveils the start of £600m rail investment in the north of England". Network Rail. 7 February 2014. Retrieved 22 February 2017.
  6. ^ "Manchester Airport station reopens after work to build a fourth platform is completed (news release)". Network Rail. 9 February 2015. Archived from the original on 13 February 2015. Retrieved 13 February 2015.
  7. ^ "And then there were 4".
  8. ^ "Manchester Airport rail station's fourth platform completed ahead of schedule".
  9. ^ https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/69079/hs2-msg-ma0-zz-dr-rt-52805.pdf
  10. ^ "Train services to be cut". BBC News. 17 February 2003.
  11. ^ "Metrolink Future Network" (PDF). GMPTE. 2006. Archived from the original (PDF) on 17 July 2006. Retrieved 28 December 2008. {{cite web}}: Unknown parameter |dead-url= ignored (|url-status= suggested) (help) - map of the proposed network expansion
  12. ^ "Metrolink Network - proposed South Manchester & Manchester Airport extension (map)". GMPTE. 2005. Archived from the original on 20 July 2011. Retrieved 21 May 2009. {{cite web}}: Unknown parameter |dead-url= ignored (|url-status= suggested) (help)
  13. ^ "Metrolink: back on track?". BBC Manchester. 13 May 2009. Retrieved 17 May 2009.
  14. ^ Linton, Deborah (13 May 2009). "£1.4bn transport deal unveiled". Manchester Evening News. Archived from the original on 23 December 2012. Retrieved 17 May 2009. {{cite news}}: Unknown parameter |dead-url= ignored (|url-status= suggested) (help)
  15. ^ "Airport line". Manchester Metrolink. Transport for Greater Manchester. Archived from the original on 13 November 2012. Retrieved 19 May 2013. {{cite web}}: Unknown parameter |dead-url= ignored (|url-status= suggested) (help)
  16. ^ a b "Trams to Manchester Airport to arrive more than A YEAR early". Transport for Greater Manchester. Retrieved 20 June 2014.
  17. ^ "New Metrolink line to Wythenshawe and Manchester Airport to open on November 3 – a year ahead of schedule". Manchester Evening News. 13 October 2014. Archived from the original on 18 October 2014. {{cite news}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  18. ^ "Revealed: First glimpse of Manchester Metrolink's Exchange Square stop on Second City Crossing".
  19. ^ "Second City Crossing".

External links

Preceding station National Rail National Rail Following station
East Didsbury   Arriva Trains Wales
Chester to Manchester Line
  Terminus
Manchester Piccadilly   TransPennine Express
North TransPennine
  Terminus
Heald Green   TransPennine Express
South TransPennine
  Terminus
Heald Green   TransPennine Express
TransPennine North West
  Terminus
Manchester Piccadilly   Northern Electrics
Liverpool Lime Street to Manchester Airport via Newton-le-Willows
  Terminus
Manchester Piccadilly   Northern
Liverpool Lime Street to Manchester Airport via Warrington Central
  Terminus
Heald Green   Northern
Blackpool North/Barrow-in-Furness/Windermere - Manchester Airport
  Terminus
Manchester Piccadilly   Northern
Manchester to Southport Line
  Terminus
Styal   Northern
Styal Line
  Train Reverses
Wilmslow    
Heald Green    
Preceding station   Manchester Metrolink   Following station
TerminusTemplate:MML lines
  Proposed  
Template:MML lines

53°21′54″N 2°16′23″W / 53.36500°N 2.27306°W / 53.36500; -2.27306