Jump to content

Wuhu Rail Transit

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Tjej (talk | contribs) at 10:18, 18 August 2021 (ADDED image route diagram of lines 1 & 2 under construction, from zh:芜湖轨道交通, Chinese page has details of extensions and other three lines planned.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Wuhu Rail Transit
Line 1 and Line 2
Overview
LocaleWuhu, Anhui, China
Transit typeRapid transit
Number of lines0 (2 under construction)
Number of stations0 (35 under construction)
Operation
Operation will start2021 (planned)
Technical
System length46.197 km (28.705 mi) (planned)

Wuhu Rail Transit is a monorail rapid transit system in Wuhu, Anhui, China. Line 1 has been under construction since December 2016.[1] The first phase of Line 2 started construction in 2018.[2] Both lines will use Bombardier Innovia Monorail trains manufactured under a joint venture with CRRC.[3] Both lines are expected to open by the end of 2021.[4]

Lines under construction

Line 1

Station name[5] Connections Distance
km
English Chinese
Baoshunlu 保顺路
Huashanlu 华山路
Taishanlu 泰山路
Hengshanlu 衡山路
Longshanlu 龙山路
Anshanlu 鞍山路
Gangwanlu 港湾路
Yu'anlu 裕安路
Wuyishanlu 武夷山路
Gangyilu 港一路
Tianzhushanlu 天柱山路
Tianmenshanlu 天门山路
Chizhushanlu 赤铸山路
Zheshanlu 赭山路
Zheshangongyuan 赭山公园
Zhongshanbeilu 中山北路
Jiuziguangchang 鸠兹广场  2 
Huanchengbeilu 环城北路
Aotizhongxin 奥体中心
Honghuashanlu 红花山路
Bolanzhongxin 博览中心
Wenjindonglu 文津东路
Henglangshanlu 珩琅山路
Wuhunan Railway Station 芜湖南站
Baimashan 白马山

Line 1 consists of 25 stations and 30.41 kilometres (18.90 mi) of track between Baoshunlu station in the north and Baimashan station in the south.[5][6] It is projected to be completed in 2021.

Line 2 (Phase 1)

Station name[5] Connections Distance
km
English Chinese
Wanchunhulu 万春湖路
Mengxilu 梦溪路
Huizhoulu 徽州路
Haiyanlu 海晏路
Zhengwuzhongxin 政务中心
Yunconglu 云从路
Shenshangongyuan 神山公园
Wuhu Railway Station 芜湖火车站
Shenshankou 神山口
Wenhualu 文化路
Jiuziguangchang 鸠兹广场  1 

The first phase of Line 2 runs between Wanchunhulu station to Jiuziguangchang station, with transfer to Line 1 at Jiuziguangchang station.[5] It consists of 11 stations and 15.787 kilometres (9.810 mi) of track.[6] It is also projected to be completed in 2021.

Planned

Line 2 (Phase 2)

The second phase of Line 2 is under planning and will be completed by 2025. It will extend Line 2 to Jiangbei railway station.[7]

References

  1. ^ 江苏三六五网络有限公司. "高清|墩柱有了"身份证" 芜湖轨道交通1号线建设正酣-芜湖365淘房". news.wh.house365.com. Retrieved 2018-04-08.
  2. ^ 江苏三六五网络有限公司. "芜湖轨道交通2号线建设又有新进展,"轨道交通时代"即将到来!-芜湖365淘房". news.wh.house365.com. Retrieved 2018-04-08.
  3. ^ 江苏三六五网络有限公司. "高清|芜湖轨道交通1、2号线无人驾驶列车居然长这样?-芜湖365淘房". news.wh.house365.com. Retrieved 2018-04-08.
  4. ^ "Wuhu City monorail maintenance contract awarded". International Railway Journal. 4 June 2021. Retrieved 4 July 2021.
  5. ^ a b c d "官宣!芜湖市轨道交通1号线、2号线一期站名正式确定!".
  6. ^ a b "多图!芜湖轨道交通2号线最新进展曝光,赶紧来看!". www.sohu.com.
  7. ^ "芜湖市城市轨道交通建设规划(2021-2025年)环境影响评价公众参与第一次公示". 2020-10-10.