Jump to content

Changzhou Metro

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 21:40, 21 January 2021 (Task 18 (cosmetic): eval 5 templates: hyphenate params (1×); cvt lang vals (2×);). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Changzhou Metro
Overview
LocaleChangzhou, Jiangsu, China
Transit typeRapid transit
Number of lines1
Websitewww.czmetro.net.cn
Operation
Began operation21 September 2019[1]
Technical
System length34.24 km (21.28 mi)[2]

The Changzhou Metro is a rapid transit system in Changzhou, Jiangsu province, China. The system started operation on 21 September 2019, with the opening of its first line, Line 1.[1]

Construction of Line 1 began on 28 October 2014. The line opened on 21 September 2019.[1]

The network is planned to comprise six lines with a total length of about 208 kilometres (129 mi) by 2030.[3][4]

Lines in operation

Line Terminals
(District)
Commencement Length
km
Stations
 1  Template:ChangzhouM stations
(Xinbei)
Template:ChangzhouM stations
(Wujin)
2019 34.24[2] 29

Line 1

Line 1 started operation on 21 September 2019.[1] Construction for Line 1 began on 28 October 2014. The first phase runs from Template:ChangzhouM stations (森林公园) in the north to Template:ChangzhouM stations (南夏墅) in the south. It is 34.24 kilometres (21.28 mi)[2] in length with 29 stations, including 27 underground and 2 elevated. The line will eventually be extended to 42 kilometres (26 mi) long.[3]

Lines under construction

Line 2

Construction for Line 2 began on 13 February 2017.[5] It is 19.79 kilometres (12.30 mi)[5] in length with 15 stations, from Template:ChangzhouM stations to Template:ChangzhouM stations.[5]

Planned

Line 3 is scheduled to be 29 kilometres (18 mi) long, from Changzhou North Railway Station to Miaoqiao Station.[3]

Line 4 is scheduled to be 36 kilometres (22 mi) long, from Xinlong Zutuan Center Station to Jianhu Station.[3]

Line 5 is scheduled to be 28 kilometres (17 mi) long, from Qinglong Station to West Taihu Science City Station.[3]

Line 6 is scheduled to be 37 kilometres (23 mi) long, from Xuejia Station to West Taihu Science City Station.[3]

In addition, a network of 68 kilometres (42 mi) of light rail is planned to be built to connect the Changzhou Metro system to outlying areas and neighbouring cities.[3]

References

  1. ^ a b c d "常州地铁1号线今日正式开通初期运营". 2019-09-21.
  2. ^ a b c "定了!常州市轨道交通1号线本周六上午9:30开通". 2019-09-18. Archived from the original on 2019-09-21. Retrieved 2019-09-18.
  3. ^ a b c d e f g 常州地铁1号线正式开建 2019年试运行 [Construction for Line 1 of Changzhou Metro begins, operation to start in 2019]. Yangtse Evening Post (in Chinese). 29 October 2014. Archived from the original on 2 April 2015. Retrieved 30 March 2015.
  4. ^ 常州地铁1号线正式开工. Xinhua (in Chinese). 29 October 2014. Archived from the original on 4 March 2016. Retrieved 30 March 2015.
  5. ^ a b c "常州地铁2号线一期工程全面开工 2020年试运营". 2017-02-13. Archived from the original on 2019-11-01. Retrieved 2019-11-06.