Jump to content

ADNOC Headquarters

Coordinates: 24°27′43″N 54°19′27″E / 24.46194°N 54.32417°E / 24.46194; 54.32417
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 23:17, 29 December 2020 (Task 18 (cosmetic): eval 2 templates: hyphenate params (2×);). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

ADNOC Headquarters
ADNOC Headquarters is located in United Arab Emirates
ADNOC Headquarters
ADNOC Headquarters
General information
StatusCompleted
TypeCommercial - Multi-Storey Project
Town or cityAbu Dhabi
CountryUnited Arab Emirates
Current tenantsAbu Dhabi National Oil Company (ADNOC)
Construction started2009
Completed2014
Cost$316.45 million (estimated)
OwnerAdnoc Company (UAE Government)
Height342 m (1,122 ft)
Technical details
Floor count76
Floor area190,000 square meters
Design and construction
Main contractorSix Construct Co

ADNOC Headquarters is a skyscraper office complex located in Abu Dhabi, United Arab Emirates and is the corporate headquarters of the Abu Dhabi National Oil Company (ADNOC).[1]

The building incorporates energy efficiency and sustainable engineering technologies, such as a double skin façade, LED exterior lighting. Designed by HOK, the overall building complex consists of more than 65 floors with an office tower, corniche club, SPC and Crisis Management Centre, a heritage museum and other supporting facilities.[2] The building and the Etihad towers next door, are featured in the new Fast and Furious movie.

References

  1. ^ "ADNOC Headquarters". The Skyscraper Center. Council on Tall Buildings and Urban Habitat. Retrieved 2013-03-31.
  2. ^ "Double Facade Study - Thesis" (PDF). Retrieved 2015-11-03.

24°27′43″N 54°19′27″E / 24.46194°N 54.32417°E / 24.46194; 54.32417