Jump to content

Abbey Wood railway station: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Tags: Mobile edit Mobile web edit
Rescuing 2 sources and tagging 0 as dead. #IABot (v1.2.4)
Line 49: Line 49:


==Future==
==Future==
Abbey Wood is being rebuilt in preparation for [[Crossrail]], due to commence operation in 2018.<ref name="Crossrail 2018">{{cite news | url=http://www.google.com/hostednews/ukpress/article/ALeqM5gKH5fiQT63-FLo6vMfXKorAteqrA?docId=B308521287593766A00 | title=Capital's key services protected, says Johnson | publisher=The Press Association | date=20 October 2010 | accessdate=21 October 2010 }}</ref> Abbey Wood is the terminus of one of two eastern branches of Crossrail and will offer [[cross-platform interchange]] between terminating Crossrail services (at 12 trains per hour on new line) and existing Southeastern services (along existing tracks). This is instead of continuing services to {{Stnlnk|Ebbsfleet International}} along existing tracks as those lines are congested and may delay Crossrail services.<ref>{{cite web|url=http://www.railway-technology.com/projects/crossrail/ |title=Crossrail, London |publisher=Railway Technology |date=15 June 2011 |accessdate=2012-06-08}}</ref><ref>{{cite web|author=Dave Arquati |url=http://www.alwaystouchout.com/project/1 |title=Crossrail |publisher=alwaystouchout.com |date= |accessdate=2012-06-08| archiveurl = http://www.webcitation.org/5msYfDhzk | archivedate = 2010-01-18| deadurl=no}}</ref>
Abbey Wood is being rebuilt in preparation for [[Crossrail]], due to commence operation in 2018.<ref name="Crossrail 2018">{{cite news | url=http://www.google.com/hostednews/ukpress/article/ALeqM5gKH5fiQT63-FLo6vMfXKorAteqrA?docId=B308521287593766A00 | title=Capital's key services protected, says Johnson | publisher=The Press Association | date=20 October 2010 | accessdate=21 October 2010 }}</ref> Abbey Wood is the terminus of one of two eastern branches of Crossrail and will offer [[cross-platform interchange]] between terminating Crossrail services (at 12 trains per hour on new line) and existing Southeastern services (along existing tracks). This is instead of continuing services to {{Stnlnk|Ebbsfleet International}} along existing tracks as those lines are congested and may delay Crossrail services.<ref>{{cite web|url=http://www.railway-technology.com/projects/crossrail/ |title=Crossrail, London |publisher=Railway Technology |date=15 June 2011 |accessdate=2012-06-08}}</ref><ref>{{cite web|author=Dave Arquati |url=http://www.alwaystouchout.com/project/1 |title=Crossrail |publisher=alwaystouchout.com |date= |accessdate=2012-06-08 |archiveurl=http://www.webcitation.org/5msYfDhzk?url=http%3A%2F%2Fwww.alwaystouchout.com%2Fproject%2F1 |archivedate=18 January 2010 |deadurl=yes |df=dmy }}</ref>


Crossrail will provide a link north west to [[ExCeL London]] and [[Canary Wharf]], then onwards to the city centre, [[London Heathrow Airport|Heathrow Airport]] and [[Maidenhead]]. There are proposals to extend Crossrail further east to [[Gravesend station|Gravesend]]; the route is safeguarded but it is not intended to be implemented as part of the current phase.<ref>{{cite web|url=http://www.crossrail.co.uk/route/safeguarding/abbey-wood-to-hoo-junction |title=Abbey Wood to Hoo Junction |publisher=Crossrail |date= |accessdate=2012-06-08}}</ref> A proposed extension of the [[London Overground]] to Thamesmead and Abbey Wood was proposed in August 2015.<ref>{{cite web|url=http://www.citymetric.com/transport/forget-road-bridges-tfl-should-extend-london-overground-thamesmead-and-abbey-wood-1310|title= Thamesmead & Abbey Wood Extension|accessdate= 11 August 2015}}</ref>On 8 December 2015 it was proposed that a DLR Extension across the Gallions Reach Crossing could link with Thamesmead, Abbey Wood and Woolwich.<ref>{{cite web|url=http://www.wharf.co.uk/news/local-news/vision-east-london-8-new-10561396|title= Vision for East London 8 new crossings|accessdate= 8 December 2015}}</ref>
Crossrail will provide a link north west to [[ExCeL London]] and [[Canary Wharf]], then onwards to the city centre, [[London Heathrow Airport|Heathrow Airport]] and [[Maidenhead]]. There are proposals to extend Crossrail further east to [[Gravesend station|Gravesend]]; the route is safeguarded but it is not intended to be implemented as part of the current phase.<ref>{{cite web|url=http://www.crossrail.co.uk/route/safeguarding/abbey-wood-to-hoo-junction |title=Abbey Wood to Hoo Junction |publisher=Crossrail |date= |accessdate=2012-06-08}}</ref> A proposed extension of the [[London Overground]] to Thamesmead and Abbey Wood was proposed in August 2015.<ref>{{cite web|url=http://www.citymetric.com/transport/forget-road-bridges-tfl-should-extend-london-overground-thamesmead-and-abbey-wood-1310|title= Thamesmead & Abbey Wood Extension|accessdate= 11 August 2015}}</ref>On 8 December 2015 it was proposed that a DLR Extension across the Gallions Reach Crossing could link with Thamesmead, Abbey Wood and Woolwich.<ref>{{cite web|url=http://www.wharf.co.uk/news/local-news/vision-east-london-8-new-10561396|title= Vision for East London 8 new crossings|accessdate= 8 December 2015}}</ref>
Line 96: Line 96:
* [http://www.railway-technology.com/projects/crossrail/crossrail3.html The remodelled exterior of Abbey Wood station] Image at Crossrail, London
* [http://www.railway-technology.com/projects/crossrail/crossrail3.html The remodelled exterior of Abbey Wood station] Image at Crossrail, London
* [http://www.fereday-pollard.co.uk/projects/crossrail-abbey-wood-station fereday pollard]
* [http://www.fereday-pollard.co.uk/projects/crossrail-abbey-wood-station fereday pollard]
* [http://www.marksbarfield.com/project.php?projectid=48 marks barfield]
* [https://web.archive.org/web/20100504215807/http://www.marksbarfield.com:80/project.php?projectid=48 marks barfield]
* [http://www.npemap.org.uk/tiles/map.html#546,179,1 Abbey Wood station on navigable O.S. map]
* [http://www.npemap.org.uk/tiles/map.html#546,179,1 Abbey Wood station on navigable O.S. map]



Revision as of 08:38, 2 October 2016

Abbey Wood National Rail
Abbey Wood railway station (2008)
LocationAbbey Wood
Local authorityRoyal Borough of Greenwich
Grid referenceTQ473789
Managed bySoutheastern
Station code(s)ABW
DfT categoryC2
Number of platforms2
AccessibleYes[1]
Fare zone4
National Rail annual entry and exit
2010–11Increase 3.030 million[2]
2011–12Increase 3.134 million[2]
2012–13Increase 3.175 million[2]
2013–14Increase 3.282 million[2]
2014–15Increase 3.319 million[2]
Other information
External links
London transport portal

Abbey Wood railway station serves the suburb of Abbey Wood in south east London. It is served by Southeastern, and is between Plumstead and Belvedere stations on the North Kent Line. The station will be served by Crossrail from 2018, giving a direct service to Central London and onto Heathrow, Maidenhead and Reading.

It is the closest railway station to the suburb of Thamesmead (buses run from the station to Thamesmead proper). Alphabetically, it is the second station in the UK, after Abbey Road DLR station.

History

Station platforms, looking eastbound

Opened by the South Eastern Railway on 30 July 1849, the operations of which were handed over to the South Eastern and Chatham Railway in 1899, it became part of the Southern Railway during the grouping of 1923. The line then passed on to the Southern Region of British Railways on nationalisation in 1948. When BR was divided into sectors in the 1980s the station was served by Network SouthEast until the privatisation of British Railways.

During the 1860s William Morris famously used a decorated wagon to commute between this station and his new home at Red House, Bexleyheath, occasionally with his eccentric and artistic house guests.

The ticket office at Abbey Wood (NLC5131) was APTIS-equipped by November 1986, making it one of the very first stations with the ticketing system which was eventually found across the UK at all staffed British Rail stations by the end of the 1980s.[citation needed]

The station has been rebuilt twice over the past 50 years to cater for the changing nature of the area.[3] The station was to be served by the proposed Greenwich Waterfront Transit, however the project was cancelled by Mayor of London Boris Johnson due to lack of funds.[4]

Future

Abbey Wood is being rebuilt in preparation for Crossrail, due to commence operation in 2018.[5] Abbey Wood is the terminus of one of two eastern branches of Crossrail and will offer cross-platform interchange between terminating Crossrail services (at 12 trains per hour on new line) and existing Southeastern services (along existing tracks). This is instead of continuing services to Ebbsfleet International along existing tracks as those lines are congested and may delay Crossrail services.[6][7]

Crossrail will provide a link north west to ExCeL London and Canary Wharf, then onwards to the city centre, Heathrow Airport and Maidenhead. There are proposals to extend Crossrail further east to Gravesend; the route is safeguarded but it is not intended to be implemented as part of the current phase.[8] A proposed extension of the London Overground to Thamesmead and Abbey Wood was proposed in August 2015.[9]On 8 December 2015 it was proposed that a DLR Extension across the Gallions Reach Crossing could link with Thamesmead, Abbey Wood and Woolwich.[10]

Station building

When the southeastern main line was opened in 1847 the first station building opened. It was a typical 1800s brick station with metal platform shelters. In 1987 a new station was constructed which, in 2014, was replaced by Network Rail with an interim station whilst the new Crossrail station is constructed. The Crossrail station has been designed by architects Fereday Pollard and will include step free interchange between platforms and bus connections with the Harrow Manorway, a dual carriageway which runs above the station.

Services

The typical off-peak service from the station is:[11]

Westbound;

Eastbound;

Preceding station National Rail National Rail Following station
Woolwich Arsenal   Southeastern
North Kent Line
  Dartford
Plumstead   Southeastern
Greenwich Line
  Belvedere
  Future Development  
Preceding station   Crossrail   Following station
Template:LCR linesTerminus
  Disused Railways  
Church Manor Way Halt   Southern Railway
North Kent Line
  Belvedere

Connections

London Buses routes 180, 229, 244, 469, B11 and 602 and night route N1 serve the station.

References

Notes
  1. ^ "London and South East" (PDF). National Rail. September 2006. Archived from the original (PDF) on 6 March 2009.
  2. ^ a b c d e "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
  3. ^ David Glasspool (2007). "Abbey Wood". Kent Rail. Retrieved 29 March 2007.
  4. ^ "Boris Spins Another Cancellation". Boris Watch. 31 March 2009. Retrieved 8 June 2012.
  5. ^ "Capital's key services protected, says Johnson". The Press Association. 20 October 2010. Retrieved 21 October 2010.
  6. ^ "Crossrail, London". Railway Technology. 15 June 2011. Retrieved 8 June 2012.
  7. ^ Dave Arquati. "Crossrail". alwaystouchout.com. Archived from the original on 18 January 2010. Retrieved 2012-06-08. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  8. ^ "Abbey Wood to Hoo Junction". Crossrail. Retrieved 8 June 2012.
  9. ^ "Thamesmead & Abbey Wood Extension". Retrieved 11 August 2015.
  10. ^ "Vision for East London 8 new crossings". Retrieved 8 December 2015.
  11. ^ Table 200 National Rail timetable, May 2016
Bibliography
  • R.V.J.Butt, (1995). The Directory of Railway Stations. Patrick Stephens Ltd.{{cite book}}: CS1 maint: extra punctuation (link) ISBN 978-1-85260-508-7
  • A. Jowett, (2000). Jowett's Nationalised Railway Atlas. Atlantic Publishing.{{cite book}}: CS1 maint: extra punctuation (link) ISBN 978-0-906899-99-1