Jump to content

British Rail Class 319: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Doomotron (talk | contribs)
m Removed empty section.
Tags: Visual edit Mobile edit Mobile web edit
Line 312: Line 312:
{{Wide image|Class 319 Northern 2016 Diagram.png|1200px|Northern livery, 2016 – present|centre}}
{{Wide image|Class 319 Northern 2016 Diagram.png|1200px|Northern livery, 2016 – present|centre}}


==Notes==
{{reflist|group=nb}}
{{reflist|group=nb}}



Revision as of 23:20, 6 March 2019

British Rail Class 319
Northern 319379 in September 2017
The refurbished interior of a Northern 319/3
In service1987-current
ManufacturerBritish Rail Engineering Limited[1]
Order no.
  • 319/0:
  • 31022 (77291-381, DTSO, odd nos.)
  • 31038 (77431-457, DTSO, odd nos.)
  • 31023 (62891-936, MSO)
  • 31039 (62961-974, MSO)
  • 31024 (71772-817, TSOL)
  • 31040 (71866-879, TSOL)
  • 31025 (77290-380, DTSO, even nos.)
  • 31041 (77430-456, DTSO, even nos.)
  • 319/1:
  • 31063 (DTCO)
  • 31064 (MSO)
  • 31065 (TSOL)
  • 31066 (DTSO)[2]
Built atBREL York
Family nameBR Second Generation (Mark 3)
ReplacedClass 317
Class 321
Constructed1987–88, 1990[3]
Entered service1987-1990
Number built86 units
Number in service47 units (39 converted to Class 769)
Formation
  • 4 carriages
  • 319/0: DTSO+PMSO+MSOL+DTSO
  • 319/1: DTCO+PMSO+MSOL+DTSO
  • (as built)[2]
Diagram
  • 319/0:
  • EE233 (DTSO, odd nos.)
  • EC209 (MSO)
  • EH234 (TSOL)
  • EE234 (DTSO, even nos.)
  • 319/1:
  • EE310 (DTCO)
  • EC214 (MSO)
  • EH238 (TSOL)
  • EE240 (DTSO)[2]
Fleet numbers
  • 319/0 (as built):
  • 319001-319060 (sets)
  • 77290-77381, 77430-77457 (DTSO)
  • 62891-62936, 62961-62974 (MSO)
  • 71772-77817, 71866-71879 (TSOL)
  • 319/1 (as built):
  • 319161-319186 (sets)
  • 77458-77497, 77973-77983 (DTCO, odd nos.)
  • 63043-63062, 63094-63098 (MSO)
  • 71929-71948, 71979-71984 (TSOL)
  • 77458-77496, 77974-77984 (DTSO, even nos.)[3]
Capacity
  • 319/0 (as built):
  • 319S (total)
  • 82S (DTSO A)
  • 82S (MSO)
  • 77S (TSOL)
  • 78S (DTSO B)
  • 319/1 (as built):
  • 16F/256S (total)
  • 16F/54S (DTCO)
  • 79S (MSO)
  • 74S (TSOL)[3]
Operators
Depots
Lines served
Specifications
Car body constructionSteel [4]
Car length
  • 19.83 m (65.1 ft) (DTCO, DTSO)
  • 19.92 m (65.4 ft) (MSO, TSOL)[1][3]
Width2.82 m (9 ft 3 in)[1]
Height3.58 m (11 ft 9 in)[1]
DoorsBi-parting sliding, [3] emergency end doors [3]
Wheelbase14.170 m (46.49 ft)[4]
Maximum speed100 mph (161 km/h)[1][3]
Weight140.3 t (138.1 long tons; 154.7 short tons)[1]
Axle load
  • 7.25 t (7.14 long tons; 7.99 short tons) (DTSO A)
  • 12.65 t (12.45 long tons; 13.94 short tons) (MSO)
  • 7.75 t (7.63 long tons; 8.54 short tons) (TSOL)
  • 7.425 t (7.308 long tons; 8.185 short tons) (DTSO B)[1]
Traction motors4 × GEC G315BZ[3]
Power output4 × 247.5 kW (331.9 hp)[2]
HVACElectric[4]
Electric system(s)
Current collector(s)
UIC classification2'2'+Bo'Bo'+2'2'+2'2'
Bogies
  • BREL P7-4 (MSO)
  • BREL T3-7 (others)[2][3]
Braking system(s)Westinghouse 3 step friction brake,[1] disc,[2] air (Westcode)[3]
Safety system(s)
Coupling systemTightlock
Multiple working
Headlight typeFluorescent[4]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The British Rail Class 319 is a dual-voltage electric multiple unit train capable of operating on 25 kV 50 Hz AC from overhead wires or 750 V DC from a third rail. They were built by BREL York for use on north-south cross-London services.

Built in two batches in 1987–88 and 1990, the units were primarily used on the then-new Thameslink service operating from Bedford to Brighton and various other destinations south of London. The majority of the fleet remained in use on the Thameslink route after its reshaping and privatisation in 1997. Some of the fleet was also used on various other services operating out of London Victoria, including flagship expresses to Brighton.

Since delivery of new Class 700 rolling stock for Thameslink services commenced in 2015, the Class 319 units have been redeployed for use in the North West of England by Northern on newly electrified lines.

Of the 86 Class 319s that were built, 39 remain in active service - 27 with Northern and 12 with West Midlands Trains. 39 units due to be converted to Class 769 while the remaining 14 units are in storage at Long Marston.

Description

A Network SouthEast Class 319/0 No. 319058 at Bedford

Plans for north-south railways across central London go back to the 1940s at least, when there were several proposals in the 1943 County of London Plan which were developed further in a following report[6] in 1946.

The Victoria Line, which opened in stages from 1968, was one of the routes suggested in these plans, but reviving the Farringdon to Blackfriars route for passenger trains began to be considered seriously in the 1970s. The British Railways Board then developed plans for what would become Thameslink, and the newly-created business sector of Network SouthEast inherited responsibility for the project in 1986. Services between Bedford, Farringdon, Blackfriars and Brighton began under the Thameslink brand in 1988.

As the Thameslink service was to use a route with 25 kV AC OHLE north of Farringdon and along the branch to Moorgate, and 750 V DC third-rail electrification south of Farringdon, the Class 319 trains were equipped for dual-voltage operation, making them very versatile.[7] They were also the first British Rail units to use modern thyristor control in place of a camshaft and resistor bank.[8]

The body shape of the Class 319 is slightly different from contemporary electric units due to restrictions in the loading gauge in Kings Cross tunnel, which meant that other dual-voltage units were not suitable.[citation needed] They were also required to have emergency end doors in the cabs,[9] due to the twin single-bore layout of Smithfield tunnel preventing normal train evacuation.

Two sub-classes of Class 319 units, 60 Class 319/0s and 26 Class 319/1s, were originally built.[10] Over the years, units have been refurbished, creating five sub-classes, of which four still exist.

Class 321 passenger units and Class 325 postal units were developed from the Class 319 design,[8] using similar traction equipment and the same steel body design, with revised cab designs.

Class 319/0

The first batch of 60 units, built in 1987–88, was classified as Class 319/0. Units were numbered in the range 319001–060 and had a maximum speed of 100 mph (161 km/h). Each unit consisted of four steel carriages: two outer driving trailers, an intermediate motor with a roof-mounted Stone Faiveley AMBR pantograph and four DC GEC G315BZ traction motors (two per bogie), and an intermediate trailer housing a compressor, motor alternator and two toilets. Seating was standard-class only, in 2+3 layout.

The technical description of the unit formation is DTSO(A)+MSO+TSO+DTSO(B). Individual vehicles were numbered as follows:

  • 77291–77381 (odd) and 77431–77457 (odd) — DTSO(A)
  • 62891–62936 and 62961–62974 — MSO
  • 71772–71817 and 71866–71879 — TSO
  • 77290–77380 (even) and 77430–77456 (even) — DTSO(B)

Vehicles were numbered in two ranges, corresponding to units 319001–046 and 319047–060. The gaps in the number series (e.g. 77382–77429) were filled by the Class 442 units, built around the same period.

DTSO(B) originally featured a lockable sliding door between the driving cab and the first set of power doors and tip-up longitudinal seating to enable parcels to be carried securely. This facility was rarely used and the sliding door has since been removed.

Units 319001–013 are the remaining members of the 319/0 subclass; all others were converted to Class 319/2 or Class 319/4 in the late 1990s.

Class 319/1

Built in 1990, this second batch of 26 units was numbered in the range 319161–186. The formation of the second batch of sets was similar to that of the earlier units, with the addition of first-class seating at one end of the train for use on longer-distance Bedford to Brighton services.[7] Like the first batch, standard-class seating was of a 2+3 layout in standard class. First-class seating was in 2+2 layout.

Units were formed in the arrangement DTCO+MSO+TSO+DTSO. Individual vehicles were numbered as follows:

  • 77459–77497 (odd) and 77973–77983 (odd) — DTCO
  • 63043–63062 and 63093–63098 — MSO
  • 71929–71948 and 71979–71984 — TSO
  • 77458–77496 (even) and 77972–77984 (even) — DTSO

Vehicles were numbered in two ranges, corresponding to units 319161–180 and 319181–186. A more modern Brecknell Willis high speed pantograph was also fitted.

All 319/1 units were converted to Class 319/3 in the late 1990s.

Class 319/2

In the late 1990s, seven of the Class 319/0 sets were converted especially for use on Connex South Central express services between London Victoria and Brighton.[11] Work carried out at Railcare Wolverton included new, lower-density seating, a disabled toilet, and a special 'lounge' seating area in the saloon space below the pantograph in the MSO, where stowage for a refreshment trolley and a small serving counter were also fitted.

Units involved were renumbered from the series 319014–020 to 319214–220. They retain their low-density layout, but the lounge area has been replaced by standard seating since their return to use on Thameslink services.

Class 319/3

In the period 1997-99,[11] Thameslink arranged for all of its 319/1 units to be converted at Eastleigh Works for use on the shorter-distance Luton to Sutton/Wimbledon services, then known as 'Thameslink CityMetro'. These units lost their first-class seating and were renumbered into the 319/3 series. They were painted in a navy-blue and yellow livery at this time.

Various refurbishments have taken place since 1999, including:

  • Minor refresh by Thameslink including new seat covers between 2003 and 2005
  • Relivery and interior refresh by Railcare Wolverton for First Capital Connect completed in 2010
  • New passenger information system, new seat covers and an internal and external repaint for units transferring to Northern Rail and similar work for those remaining on Thameslink in the interim, starting in 2014.

Class 319/4

Units 319021-060 were refurbished for Thameslink at Railcare Wolverton in 1997/98. Work included the installation of a first-class compartment at one end, in the DTSO(A) vehicle[11] and the removal of some seating in the centre of each vehicle to give 2+2 layout. Cosmetic improvements included new carpets and seat coverings, as well as application of the navy-blue Thameslink livery.

Upon completion, these units were renumbered as 319421-460 and moved on to the Bedford to Brighton service, branded as 'Thameslink Cityflier'.

From 2003 to 2005, during the Thameslink blockade, some minor interior updating took place such as recovering seats with an updated Thameslink moquette. First-class compartments were refurbished with new carpet, retrimmed seats and chrome-plated heater panels, apart from unit 319444, which retained its 1997-designed interior.

A later refresh was unveiled by the then new operator First Capital Connect on 26 October 2006. Unit 319425 was renamed Transforming Travel for the occasion and showcased the following improvements:

  • Emergency brake pressure increased to the +12% G standard, giving an extra 1 Bar brake cylinder pressure in emergency
  • Emergency brake 'timeout' period reduced from 2 minutes to 20 seconds
  • DC traction motors rewound to improve reliability
  • Improved motor control hardware with a new Remote Communications Frame
  • New 'easy to clean' flooring
  • Retrimmed seats into the First Capital Connect moquette
  • Some seats in standard class were removed and vertical luggage stacks installed in their place; a further two seats were removed in the TSO vehicle to allow easier access to the toilet
  • Repainted dado side panels and wall ends
  • Existing stanchions painted pink
  • New stanchions leading from some seats to the overhead luggage rack to provide standing passengers with something to hold on to and more support
  • Improved, brighter fluorescent lighting diffusers

The refresh took place at Railcare Wolverton works and also featured both a mechanical overhaul (under the solebar) and a full exterior relivery, again in vinyl. Some Class 319/4 units have had their Stone Faiveley AMBR air and spring pantograph replaced by the more modern Brecknell Willis High Speed air-only pantograph design.

Current operations

After the withdrawal of the final six Class 319 units from the Thameslink network on 27 August 2017, less than half of the original Class 319 fleet is currently in service, with the majority currently in storage at Long Marston. 35 units (25 319/3s and ten 319/4s) are currently allocated to Northern, with their 319/4 units due to be converted to Class 769 Flex bi-mode units by 2018. West Midlands Trains is the only other operator of the Class 319, with two 319/0, two 319/2 and five 319/4 units currently on fleet. Great Western Railway have 1 Class 319 which is 319440 and is currently based in Reading Traincare Depot just out side of Reading station for the use of crew training for readiness for the Class 769s.

Northern

To operate on newly electrified routes in the North West of England, Northern Rail received twenty Class 319/3 units after they were replaced by brand new Class 387 units. The first Northern Rail service to be operated by Class 319s was the Liverpool Lime Street to Manchester Airport via Chat Moss service on 5 March 2015.[12] From 17 May 2015, the Liverpool Lime Street to Wigan North Western via Huyton route followed suit.[13]

The first batch of units which transferred to Northern Rail underwent a light refurbishment at Wolverton works and were repainted into a dedicated Northern Electrics livery, although all of these units had been repainted into Northern's livery by mid 2018. The 750 V direct current (DC) third rail equipment was also removed.[citation needed].

Other services now operated by Class 319s include Manchester Victoria to Liverpool via Earlestown, Liverpool to Warrington Bank Quay and Liverpool to Preston. In April 2016, these units transferred to new franchise operator Northern, who have since leased an additional fifteen Class 319s to operate on newly electrified services from Blackpool North, with these commencing in May 2018.

In December 2016, it was announced that Northern's allocation of 319/4s are to be converted to Class 769 Flex bi-mode multiple units by Brush Traction at Loughborough,[14] with the remaining 319/3s due to operate on existing and future electrified services.

West Midlands Trains

London Midland's 319433 at St Albans Abbey

Seven units were transferred to London Midland in 2015 to operate the Watford Junction to St Albans service and some peak West Coast Main Line services out of London Euston.[15] These replaced the seven Class 321 units that transferred to Abellio ScotRail.[16][17] In April 2017, one of the five Class 319/4 units, 319455, was swapped for 319433, with the latter receiving a light refresh and a repaint before entering service.

In December 2017, West Midlands Trains (a consortium of Abellio, JR East and Mitsui) took over the operation of the West Midlands rail franchise, with the seven Class 319 units initially leased by London Midland transferring to the new operator.

A week after the start of the new franchise, West Midlands Trains leased additional Class 319 units, enabling the company to take their Class 350/1 and 350/3 Desiro units out of service for their planned refurbishment.[18]

West Midlands Trains' allocation of Class 319s will be replaced during the current franchise.

Former operations

The first refurbished Class 319/4 for First Capital Connect was 319425, seen here at Bedford
Southern 319215 at Sutton

With the first units entering service for Thameslink in 1987, Class 319s were a mainstay on the Thameslink network for almost three decades. In early 2015, the first batch of units were withdrawn from the network after being displaced by Class 387 units.

Twenty Class 319/3s transferred to Northern Rail for newly electrified lines in the North West, with the first units entering service in March 2015 after a light refurbishment. A further seven units left the network in 2015, transferring to London Midland to replace their Class 321 units, which had transferred to Abellio ScotRail.

Since the introduction of the new Class 700 units in June 2016, Class 319s departed the network as new trains have entered service. A further batch of twelve units transferred to the North West of England for service with Northern, with the remainder being placed into storage at Long Marston. The six remaining Class 319 units were withdrawn from Thameslink service on 27 August 2017, around 30 years after their initial introduction to service.[19]

Since their withdrawal, a number of additional units have been allocated to Northern and West Midlands Trains to boost capacity.

Southern

When British Rail was privatised in the mid-1990s, the first 13 units (319001–013) were used for outer-suburban services by Connex South Central, with some temporarily losing their 25 kV AC overhead equipment.

Seven more of the Class 319/0 sets (319014–020) were refurbished and dedicated to express services between London Victoria and Brighton,[11] before later finding work on peak-only London Victoria to Guildford via West Croydon and London Victoria to Horsham via Three Bridges services. The dual-voltage capability was also used to introduce new services linking Rugby and Gatwick Airport[20] via the West Coast and West London Lines in the 1990s.

Successor company Southern continued to operate the fleet and reliveried it into its own colour scheme. It later went on to sublease Class 319/0 units to First Capital Connect for use on the Thameslink route, before eventually releasing the entire fleet.[citation needed]

Notable units

319008 operating "Tunnel Explorer" excursions into the Channel Tunnel on 7 May 1994 from Sandling railway station; the first public-carrying passenger trains through the tunnel
Nameplate commemorating crossing on 10 December 1993

Units 319008 Cheriton and 319009 Coquelles are notable for two reasons:

  • On 10 December 1993, they travelled through the Channel Tunnel to Calais-Fréthun and back with a party of invited guests, after the construction consortium TransManche Link (who were responsible for the construction of the Tunnel) had transferred responsibility for operations and management over to Eurotunnel. Their pantographs were modified at Selhurst Depot beforehand to account for the higher OHL height at Cheriton and in the tunnel. For the subsequent "Folkestone 1994" event on 7 May 1994, which saw the first paying members of the public taken into the tunnel by train. On 26 March 1994 units 319008 and 319009 were named Cheriton and Coquelles respectively at Victoria and plaques adorned with the Union Flag and Tricolore were installed on their motor carriages.[11][21]
  • On 26 March 1994, they set a record for the shortest London to Brighton journey time, at 37 minutes 57 seconds. This record stood until 2005 when the "Speed Run" event, organised by Southern, using Class 377 units 377 472 and 377 474 set a slightly quicker record of 36 minutes 56 seconds.[22]

Named units

Named units are as follows:[23]

Accidents

Future

Conversion to bi-mode

In December 2016, Arriva UK Trains subsidiary Northern and Porterbrook announced a plan to convert eight Class 319/4 electric multiple units to bi-mode units, to allow through working between electrified and non-electrified routes. These units, which were initially marketed as "Class 319 Flex" before being designated as Class 769 under TOPS, will use two diesel powered alternators fitted under each of the driving trailer vehicles, to power the traction motors through the train's existing DC bus.

The modifications, which will be carried out by Brush, will enable units to operate on electrified and non-electrified routes, using both 25 kV AC overhead wires and 750 V DC third rail. Each generator set will consist of a MAN D2876 diesel engine driving an ABB alternator.[28] The first units were expected to enter service with Northern by spring 2018,[29][30] but were delayed until 2019.[31]

Other planned operators of the Class 769 include Transport for Wales[32][33] and Great Western Railway,[34] with the allocation for the latter retaining their third rail pick up shoes.

One Class 319 unit will be converted to run on hydrogen.[35]

Fleet details

Class Operator No. Built Year Built Unit nos.
Class 319/0 West Midlands Trains 2 1987–88 319005, 319013
Stored 4 319004, 319009–011
Converted to Class 769 7 319001–003, 319006–008, 319012
Class 319/2 West Midlands Trains 6 319214–216, 319218–220
Stored 1 319217
Class 319/3 Northern 26 1990 319361–386
Class 319/4 Northern 2 1987–88 319426, 319446
West Midlands Trains 5 319429, 319433, 319441, 319457, 319460
Stored 6 319421, 319444, 319451, 319453–319455
Converted to Class 769 27 319422–425, 319427–428, 319430–432, 319434–440, 319442–443, 319445, 319447–450, 319452, 319456, 319458–459

Livery Details

Network SouthEast livery, 1987 – 1996
Connex South Central livery, 1996 – 2001
Thameslink livery, 1996 – 2004
Thameslink livery, 2004 – 2005
Southern livery, 2001 – 2016
First Capital Connect livery, 2006 – 2017.
Thameslink livery 2014 – 2017
Northern Rail livery 2015 – 2016
London Midland livery, 2015 – present
Northern livery, 2016 – present

References

  1. ^ a b c d e f g h "Class 319 Electric Multiple Unit" (PDF) (01) (A ed.). Porterbrook. August 2012. Archived from the original (PDF) on 21 April 2015. Retrieved 23 January 2014. {{cite journal}}: Cite journal requires |journal= (help); Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  2. ^ a b c d e f Fox 1994, pp. 32–34
  3. ^ a b c d e f g h i j k "Class 319". The Railway Centre. Archived from the original on 27 September 2007. Retrieved 3 February 2016.
  4. ^ a b c d e "Vehicle Diagram Book No.210 for Electrical Multiple Units (including A.P.T.)" (PDF). Barrowmore MRG. BRB Residuary Ltd. EC209, EE233, EE234, EH234, EH238. Retrieved 20 February 2016.
  5. ^ Connex South Eastern: Train Operating Manual Classes 365,465,466. p.A.6 (Unit information) January 1998.
  6. ^ Railway (London Plan] Committee: Report to the Minister for War Transport, 21 January 1946. London, 1946
  7. ^ a b Class 319 - Welcome to the Southern E-Group Web Site. Retrieved 20 March 2011.
  8. ^ a b Green & Vincent 2014
  9. ^ Thameslink - Moorgate Branch: Local instructions/Working over book (July 1999)
  10. ^ Marsden 2008, p. 138
  11. ^ a b c d e Class 319 2 Page. Southern E-Group. Retrieved 20 March 2011.
  12. ^ "Northern '319s' in service". Modern Railways. Key Publishing. 5 March 2015. Retrieved 11 March 2015.
  13. ^ "Electric services to Wigan and Manchester Victoria start in May". RAIL. 13 March 2015. Retrieved 31 May 2015.
  14. ^ "Porterbrook and Northern to introduce bi-mode Class 319 Flex trains". Porterbrook. Porterbook. Retrieved 18 December 2017.
  15. ^ "Train accessibility". London Midland. Retrieved 3 December 2015.
  16. ^ "ScotRail to receive LM Class 321/4s" Rail Magazine issue 766 21 January 2015 page 27
  17. ^ "London Midland 321s Scotland Bound" Railways Illustrated September 2015 page 10
  18. ^ "News In Brief - '319/0' refurbishment". RAIL Magazine, Issue RAIL 857. Page 29: Bauer Media. 18 July 2018.{{cite magazine}}: CS1 maint: location (link)
  19. ^ Thameslink replaces last of 30 year old Class 319 fleet Rail Technology Magazine 1 September 2017
  20. ^ "Track Record". BBC News. 29 November 1999. Retrieved 3 December 2015.
  21. ^ Class 319. Kent Rail. Retrieved 20 March 2011.
  22. ^ Duff, Colin. "Southern's Speed Run 2005". Southern Electric Group. Archived from the original on 4 February 2012. Retrieved 20 March 2011.
  23. ^ "EMU Formations". AbRail. Retrieved 20 March 2015.
  24. ^ "'Northern Powerhouse' joins Northern Rail's electric fleet" (Press release). Northern Rail. 20 March 2015.
  25. ^ "JC Days RSI Technical log - Unit 319369: 'Pan Up/Down EP Valve' failed in the Up position". Retrieved 7 March 2017.
  26. ^ "Railway Group Safety Performance Monitoring – Definitions and Guidance - Section B 8.5 Train accidents" (PDF). RSSB. Retrieved 4 March 2017.
  27. ^ "Thameslink train hits roof at London's Blackfriars station - BBC News". Bbc.co.uk. 2 January 2014. Retrieved 28 November 2018.
  28. ^ Clinnick, Richard (1–14 February 2017). "Flex... and flexibility". Rail Magazine (819): 60–65.
  29. ^ "Porterbrook and Northern to develop electro-diesel MU". Railway Gazette. 22 December 2016. Retrieved 22 December 2016.
  30. ^ "Porterbrook and Northern to Introduce bi-mode Class 319 Flex Trains". Porterbrook Leasing Company. 22 December 2016.
  31. ^ Clinnick, Richard. "EXCLUSIVE: Northern to introduce converted bi-modes next year". Rail Magazine. Rail Magazine. Retrieved 7 December 2018.
  32. ^ "Four more 769s for TfW". Today's Railways. No. 204. December 2018. p. 72.
  33. ^ Class 319 Flex electro-diesel multiple-units for Wales Railway Gazette International 17 July 2017
  34. ^ "GWR to lease Class 769 Flex 'trimode' trainsets". Railway Gazette. 20 April 2018. Retrieved 20 April 2018.
  35. ^ Dobell, Malcolm. "Hydroflex - the next iteration of the Flex concept". Rail Engineer. Rail Engineer. Retrieved 7 December 2018.

Sources

Further reading

  • Knight, Steven (12–25 February 1997). "All aboard the Connex Express". RAIL. No. 298. EMAP Apex Publications. pp. 30–33. ISSN 0953-4563. OCLC 49953699.