Jump to content

Char Dham Railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by DeprecatedFixerBot (talk | contribs) at 05:56, 28 June 2018 (Removed deprecated parameter(s) from Template:Div col using DeprecatedFixerBot. Questions? See Template:Div col#Usage of "cols" parameter or msg TSD! (please mention that this is task #2!))). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Char Dham Railway
चार धाम रेलवे
Overview
StatusProposed
LocaleUttarakhand
Termini
Websitehttp://www.indianrailways.gov.in
Service
SystemBroad Gauge
ServicesTwo separate Y-fork railways with a total of four individual routes
Operator(s)Indian Railways
Technical
Line length327 km (203 mi)
Track length327 km (203 mi)
Track gauge1,676 mm (5 ft 6.0 in)
Highest elevation1,733 m (5,686 ft)

The Char Dham Railway (Hindi: चार धाम रेलवे) is Indian Railways's proposed twin railway lines, will compliment the Char Dham Highway project by connecting the holiest places of Hinduism called Chota Char Dham, from the existing Doiwala railway station near Dehradun to Gangotri and Yamunotri via a fork at Uttarkashi and another set of twin rail links from the upcoming railway station at Karnaprayag to Kedarnath and Badrinath via a fork at Saikot. The line is also of strategic military importance and has designated a national project.[1][2]

Railway routes

The Char Dham Railway has two different Y-shaped railways, with total of the following four individual rail lines:

Strategic importance

Once this railway line is completed, India-China border will be closer to the rest of India by railway. The time taken to reach the strategic border military stations from Delhi will be reduced by providing safe and quick mode of public transport for personnel and equipment.[1]

Challenges

After the Konkan Railway and Jammu–Baramulla line, this line will be the most challenging railway project in Indian Railways due to high mountains, a large number of tunnels and high bridges and severe cold weather in flood, landslide and earthquake prone high altitude mountainous area.[1][2]

Current status

Char Dham Railway project's 327 km long construction, costing INR ₹43,292 crore (USD $6.6 billion), began with the foundation stone laying and commencement of INR ₹120 crore Final Location Survey (FSL) in May 2017 by the Union Railway minister Suresh Prabhu.[1][2] In January 2018, Reconnaissance Survey was complete, and Final Survey using airborne electromagnetic technique was underway by Turkish-Ukrainian company, which will be completed in 2 years, after which track laying would begin in December 2019.[3]

See also

References

  1. ^ a b c d Chardham to get rail connectivity; Indian Railways pilgrimage linking project to cost Rs 43.29k crore, India.com, 12-May-2017
  2. ^ a b c Railway minister lays foundation stone for final location survey on char dham route, India Times news, 13-May-2017
  3. ^ a b c d e f Good news for Chardham rail line, approved budget for this big work, Live Hindustan, 18 January 2018.
  4. ^ 采编 (26 November 2005). "中印边境自卫反击作战史". 中国国防资讯网. Retrieved 26 November 2005.
  5. ^ a b Achilles Heel in India's Border Defence with China!, Indian Defence Review, 20 June 2017.
  6. ^ After 24 years of work, strategic military outpost near India-China border connected with motorable road, Times of India, 11 Nov 2016.
  7. ^ Coming soon: India’s longest railway tunnel on Rishikesh–Karnaprayag route, Hindustan Times news, 19-Sept-2016