Sydney Metro
Sydney Metro | |
---|---|
Overview | |
Owner | NSW Government (via the Transport Asset Holding Entity) |
Locale | Sydney |
Transit type | Rapid transit |
Number of lines |
|
Number of stations |
|
Daily ridership | 74,000 (2023/24)[1] |
Annual ridership | 19,738,171 (2022/23)[2] |
Chief executive | Peter Regan[3] |
Website | sydneymetro.info |
Operation | |
Began operation | 26 May 2019 |
Operator(s) | Metro Trains Sydney |
Character | Elevated, open cut and underground |
Number of vehicles | 22 6-car Metropolis Stock sets (132 cars) |
Train length |
|
Headway | 4 minutes (peak) 10 minutes (off-peak) |
Technical | |
System length | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | Overhead catenary:
|
Top speed | 100 km/h (62.1 mph)[8] |
Sydney Metro is a fully automated rapid transit system in Sydney, New South Wales, Australia. The first component, the Metro North West Line, opened on 26 May 2019, running between Tallawong and Chatswood. It currently consists of 13 stations and 36 km (22.4 mi) of twin tracks, mostly underground. Work is progressing to extend this line from Chatswood to Bankstown as part of the City & Southwest project, which will run under Sydney Harbour and the Sydney Central Business District (CBD), with a scheduled 2025 completion.[9] When completed, the entire line from Tallawong to Bankstown will have 66 km (41.0 mi) of twin tracks and 31 stations.[10]
Two additional lines are also under construction, as part of the Sydney Metro West and Western Sydney Airport projects. The Western Sydney Airport project will construct a line approximately 23 km (14.3 mi) from St Marys to the new Aerotropolis station in Badgerys Creek. It will comprise six stations and service the Western Sydney International (Nancy-Bird Walton) Airport, which is also currently under construction, upon its opening in 2026.
Sydney Metro West will run approximately 24 km (14.9 mi) from Westmead to a new station at Hunter Street in the Sydney CBD. It will comprise nine stations, serviced by fully underground twin tracks. The line will service Parramatta and Sydney Olympic Park upon opening in 2032.[11]
The Metro North West Line of the Sydney Metro is Australia's only fully automated heavy rail system.[12][13] It is controlled by the Sydney Metro agency, under the umbrella of Transport for NSW. Services are operated by Metro Trains Sydney and integrated with the established Sydney Trains network.
It is the first metro system in Australia and Oceania.
History
Earlier proposals
The first proposals for a metro system in Sydney were put forward in 2001, when Co-ordinator-General of Rail Ron Christie released his "Long-term Strategic Plan for Rail" report, outlining long-term goals for the expansion of the rail network.[14] He suggested that some "metro" lines—operationally independent from the existing network—should be constructed past 2020 due to capacity constraints.[15] This was later dismissed by the New South Wales Government as only a "shopping list" of potential projects.[16]
The idea for a metro resurfaced in late 2007 when discussions about an underground 'Anzac Line' took place within the NSW Government. The line would have run from West Ryde in Sydney's northwest to Malabar in the southeast but did not come to fruition.[17][18] In early 2008, following the shelving of various heavy rail expansion projects from the 2005 Metropolitan Rail Expansion Program (MREP), the Government officially announced the 37 km (23 mi) North West Metro.[19] Expected to cost $12 billion, it would have linked Rouse Hill in Sydney's northwest with the CBD, with construction starting in 2010 and finishing in 2017.[20]
The construction of the North West Metro was dependent upon the privatisation of the electricity network,[21] but, after a change of the state's Premier in late 2008, it was cancelled due to budgetary concerns. Its replacement was the 9 km (5.6 mi), $4 billion CBD Metro, a shortened route running from Rozelle in the inner-west and into the CBD through to Central railway station.[22] Construction was scheduled to start in 2010, like its predecessor, but finished earlier in 2015. The CBD Metro was to have formed the "central spine" of a future metro network, with a planned West Metro extension to Westmead and Parramatta to be constructed soon after, subject to Federal funding.[23]
Reception to the plans was mixed, with Opposition leader Barry O'Farrell accusing the Premier of "making it up as he goes along" after costings were not released until after the press conference;[24] criticism came from the Greens because the route seemed designed to pass through marginal electoral seats.[25] The Government's initial submission to Infrastructure Australia for funding was rejected due to "a lack of integrated planning".[26] It was later revealed that the cost had jumped from $4 billion to $5.3 billion in six months,[27] as well as that internal estimates showed that the metro would run at only 15% of its maximum capacity.[28]
The CBD Metro was cancelled in early 2010 after the Premier was deposed a few months before in 2009.[29][30] The Government had spent almost $410 million on the project.[31] The new Premier Kristina Keneally chose instead to focus on the expansion of the existing heavy rail network, including the North West Rail Link and South West Rail Link.[32]
Revival
In mid-2012, the newly elected Coalition government announced Sydney's Rail Future and the NSW Transport Masterplan.[33] Under this proposal, the North West Rail Link would be built as a single-deck, privately operated metro connecting to a future second harbour crossing.[34] These plans received criticism on the basis that they might not have the capacity of existing double-deck trains[35] and concerns over the inability of trains on the existing network to use the new crossing.[36] Later, the route was extended and the name changed to Sydney Metro.[37]
In 2014, the Government announced the second harbour crossing under the name Sydney Rapid Transit, as part of the 'Rebuilding NSW' infrastructure plan funded through the sale of electricity infrastructure.[38][39] The new railway would cross Sydney Harbour, tunnel beneath the CBD, and join a converted portion of the Bankstown line up to Bankstown railway station.[40]
The system was officially renamed 'Sydney Metro' in June 2015 following the passage of power privatisation bills.[41] Opposing parties warned the government that the sale of the power infrastructure may not provide the capital needed.[42]
In July 2018, Sydney Metro was established as a statutory authority, tasked with leading the delivery of the metro system.[43] As of March 2021[update], Peter Regan is the Chief Executive of the agency.[3]
In January 2023, it was announced that the emergency exits in tunnels on the Metro West and Metro Western Sydney Airport lines will be spaced at 240 metres (260 yd) where possible, matching the existing lines.[44]
In February 2023, as part of the 2023 state election campaign, the government of Dominic Perrottet announced business cases would be produced for a further 100 km of extensions for the Sydney Metro network.[45][46] This included the following links:
- Tallawong to St Marys
- Westmead to the Aerotropolis
- Bankstown to Glenfield via Liverpool
- Macarthur to the Aerotropolis[45]
Operations
Sydney Metro services are operated by Metro Trains Sydney, a joint venture between MTR Corporation, John Holland Group, and UGL Rail, who will operate and maintain the network under a 15-year contract.[47] The network is fully automated to the GoA4 level[48] and uses CBTC signalling throughout.[49]
Network
The Metro North West Line is currently the only line in the Sydney Metro network, linking Tallawong to Chatswood with 13 stations along a 36 km (22 mi) distance.[50] Since July 2019, services take 37 minutes from end to end, at a frequency of every 4 minutes during peak hours and every 10 minutes at all other times.[51][52] Before that, for the first few weeks after opening, the line operated once every 5 minutes during the peak hours until it was increased to every 4 minutes.[53][54]
Services began in May 2019. For the first 6 months of operation, they were supplemented with trackwork-style rail replacement buses for late-night services from Sundays to Wednesdays.[55][56]
Capacity
Stage 1 (Metro North West) operates with 6-car trains running on 4-minute headways. After the addition of the Stage 2 extension to Bankstown, the stations’ platforms will be configured to allow for future use of 8-car trains and the signalling system designed to allow for 2-minute headways, both of which are planned to be introduced once sufficient patronage demands it. Eight-car trains have a design capacity of 1,539 customers and increasing the running frequency to ultimately 30 trains per hour (2-minute headway) would provide a maximum capacity of 46,170 passengers per hour per direction.[57]
Rolling stock
This section needs to be updated. The reason given is: gradual introduction up to a total of 45 trains in 2023/24.(October 2023) |
The network operates using 22 6-car Metropolis Stock trains, which are fully automated electric multiple units. Each single-deck train features two dedicated areas for prams, luggage and bicycles. There are three doorways per side per carriage and no internal doors between the carriages.[58] In a 6-car configuration, the trains have a seating capacity of 378 people, with a total capacity of 1,100.[59] Seating arrangements on the Alstom trains are longitudinal, following the style of most other metro trains.[60] The trains utilise Alstom's trademark Urbalis 400 Grade-of-Automation signalling system that ensures that trains are capable of operating automatically at all times including door closing, obstacle detection and emergencies.
Before the introduction of services, a full-scale model of the new train was built for use on public display, including at the annual Sydney Royal Easter Show.[61][62] The trains were built at Alstom's rolling stock manufacturing facility in India,[63][64] with the first six-car Sydney Metro train arriving in Rouse Hill in September 2017 to undergo testing.[65]
In February 2018, dynamic testing on the first of the trainsets began.[66] Testing was done on brakes, passenger information displays, lighting and door operation.[67]
Patronage
The following table lists patronage figures for the network during the corresponding financial year. Major events that affected the number of journeys made or how patronage is measured are included as notes.
Year[a] | 2018–19 | 2019–20 | 2020–21 | 2021–22 | 2022-23 | |||
---|---|---|---|---|---|---|---|---|
Patronage (millions) |
2.0 [b] |
18.9 [c] |
14.2 | 10.7 [d] |
19.7 | |||
References | [68] | |||||||
|
- ^ Australia's financial years start on 1 July and end on 30 June.
- ^ Sydney Metro opened in May 2019.
- ^ Patronage was lower than anticipated due to people staying at home and not taking public transport to school or work during the COVID-19 pandemic.
- ^ Patronage grew greatly through the year. The last 4 months of the fiscal year accounted for 5.7 Million, or 54% of all trips.
Mode | Patronage | % of total |
---|---|---|
Metro |
23,297,166 | 4.02 |
Train |
278,134,346 | 47.93 |
Bus |
220,944,633 | 38.08 |
Ferry |
17,270,282 | 2.98 |
Light rail |
40,598,539 | 6.99 |
Total | 580,244,966 | 100.00 |
Ticketing and costs
Sydney Metro uses the Opal card ticketing system. The fare system is fully integrated with the Sydney Trains network and the NSW TrainLink Intercity network, trips involving suburban, metro and intercity services are calculated as a single fare and there is no interchange penalty. Students who use the Sydney Metro network to get to and from schools can apply for a free School Opal card. Opal is also valid on bus, ferry, and light rail services but separate fares apply for these modes. The following table lists Opal fares for reusable smartcards and single trip tickets:[70]
As of 1 Jul 24 | 0–10 km | 10–20 km | 20–35 km | 35–65 km | 65 km+ |
---|---|---|---|---|---|
Adult cards & contactless (peak) | $4.20 | $5.22 | $6.01 | $8.03 | $10.33 |
Adult cards & contactless (off-peak) | $2.94 | $3.65 | $4.20 | $5.62 | $7.23 |
Other cards (peak) | $2.10 | $2.61^ | $3.00^ | $4.01^ | $5.16^ |
Other cards (off-peak) | $1.47 | $1.82 | $2.10 | $2.80^ | $3.61^ |
Adult single trip | $5.00 | $6.30 | $7.20 | $9.60 | $12.40 |
Child/Youth single trip | $2.50 | $3.10 | $3.60 | $4.80 | $6.20 |
^ = $2.50 for Senior/Pensioner cardholders
As there are no return or periodical options available, reusable Opal cards include several caps to reduce the cost for frequent travellers:
[71] | As of 1 Jul 24Adult cards | Other concession cards |
Senior/pensioner cards |
---|---|---|---|
Daily Mon–Thu | $18.70 | $9.35 | $2.50 |
Daily Fri, Sat and Sun | $9.35 | $4.65 | $2.50 |
Weekly | $50.00 | $25.00 | $17.50 |
Weekly airport station access fee |
$35.16 | $31.51 | $31.51 |
Projects
Sydney Metro Northwest
The first stage connects Sydney's north-western suburbs to Chatswood. It consists of 23 km (14 mi) of new track between Rouse Hill and Epping, which includes eight new stations. At Epping, the line connects to the existing 13 km (8.1 mi) Epping to Chatswood rail link, which was separated from the Sydney Trains network and converted to allow the operation of single-deck autonomous trains with platform screen doors.[72] Passengers can interchange with the existing system at both Epping and Chatswood. Construction on Sydney Metro Northwest began in late 2013.[73] The line opened in May 2019.
In November 2016, Sydney Metro, in particular, the John Holland Group, Dragados and Transport for NSW, were awarded the 2016 NSW Premier's Award for Building Infrastructure for the 15 km (9.3 mi) twintunnels in Bella Vista and Epping, which are currently the longest tunnels constructed in Australia.[74] The completion of these tunnels in early 2016 marked the completion of the first stage of Sydney Metro Northwest. The NSW Premier's award recognises "infrastructure projects in the state that make a difference to the local community".[74]
Sydney Metro City & Southwest
The second stage will extend the Metro North West Line 30 km (19 mi) from Chatswood on the North Shore, to Central in the south of the city centre. The centrepiece of the project is a new twin-tunnel rail crossing under Sydney Harbour. From Central, new track will be built to Sydenham railway station. From Sydenham, a portion of the existing Bankstown railway line will be converted to allow the operation of driverless trains as far as Bankstown railway station. Construction on the City & Southwest project began in mid-2017.[75] The project is scheduled for completion in 2024, with the Bankstown line conversion set to open a year later.[76]
Together with planned improvements to the Main Western line, the project is expected to increase capacity on the Sydney rail network by up to 60%, and allow for the movement of over 100,000 extra commuters across the network every hour.[77] The City & Southwest extension represents the first phase of the "southern sector conversion" envisaged in Sydney's Rail Future.[33]
Sydney Metro West
Sydney Metro West is a separate line between the Sydney CBD and Westmead. The line was announced as an official project in November 2016,[78] with up to 12 stations being considered including station locations at Parramatta, Sydney Olympic Park, Five Dock, the Bays Precinct and the CBD. In March 2018, the government announced that an additional station would be built at Westmead, as well as one that connected to either of the existing stations at Concord West or North Strathfield.[79][80]
The 2019–2020 New South Wales state budget in June 2019 allocated funding of $6.4 billion over four years to the project, with construction to be fast-tracked to start in 2020.[81][82][83]
The government announced and confirmed seven station locations along the line in 2019,[84][85][86] with a further 2 stations announced in 2021.[87] Initial work site works began in 2020, and tunnelling commenced in mid 2022. The line is expected to completed by 2032.[88]
Sydney Metro Western Sydney Airport
In March 2018, the federal and state governments signed the Western Sydney City Deal and announced the development of stage 1 of the North-South Link as part of the deal.[89] Stage 1 of the Western Sydney Airport line will operate between St Marys and Badgerys Creek Aerotropolis via Western Sydney Airport. Construction commenced in late 2020 and will be completed by 2026, coinciding with the opening of the airport.[90][91]
In the 2019–2020 federal budget in April 2019, the federal government announced a contribution of $3.5 billion to deliver stage 1 of the rail link.[92][93] This funding includes $50 million towards the business case process for the North-South Rail Link and $61 million for the Elizabeth Drive overpass. In the 2019–2020 New South Wales state budget in June 2019, the state government announced an investment of $2.0 billion to begin the construction of stage 1 for the next 4 years.[94]
This line will utilise a much higher voltage than that of the North West, City & Southwest lines, this time a single-phase alternating current at 25 kV 50 Hz. As such, this line will operate with a different class of rolling stock, manufactured by Siemens Mobility.[6]
Potential extensions
Western Sydney
The Northwest line is proposed to be extended to St Marys to the west via Schofields, connecting to the Western Sydney Airport line and North Shore & Western lines.[45] Previous plans have shown connections between the Northwest line and Western Sydney Airport line potentially occurring at either Schofields, extending both lines, or Tallawong, through extension of the Western Sydney Airport line. It will not be possible for the two lines to be connected as a single line due to incompatible train lengths and power systems, 1500V DC vs 25kV AC.
The Western Sydney Airport line is planned to be extended to the Airport & South Line at Macarthur and Glenfield to the south.[95][45]
The West line would be extended from Westmead to the Aerotropolis[45] or Western Sydney Airport.[95]
South Western Sydney
The City & Southwest line is being planned to be extended from Bankstown to Glenfield[45] via Liverpool,[95] with a further potential extension to the Aerotropolis via the existing South West Rail link that serves Leppington.[46] The second phase of the southern sector conversion would see two of the four tracks between Sydenham and Hurstville, part of the Sydney Trains Illawarra line, converted to form part of the Sydney Metro network. This would increase rail capacity between Hurstville and the city by 10 trains per hour. Though a precise construction timeframe was not provided, the plan envisages all work being completed by 2031. The Hurstville conversion would add eight stations and 9 km (5.6 mi) to the metro network.[33] Developing plans for this extension has proven difficult, and the Sydney Morning Herald reported in February 2016 that the project may have been dropped.[96]
South Eastern Sydney
The South East Sydney Transport Strategy of the New South Wales government envisions a metro line starting from the CBD with stations at Green Square, Randwick, two at Maroubra, Malabar and La Perouse built by 2041, as well as another one from Randwick to Eastlakes and, via the Domestic and International terminals of Sydney Airport, further on to Brighton-Le-Sands and then Kogarah by 2056.[97]
In media
A Seven News documentary on the early construction of part of the Sydney Metro aired on the Seven Network in July 2016 titled World's Best Metro.[98]
A multi-part SBS documentary on the tunnelling for the metro titled Sydney's Super Tunnel aired in 2020.[99]
See also
References
- ^ "Monthly comparison of Metro trips by Operator and Line". Transport for NSW. 7 July 2023. Archived from the original on 2 September 2021. Retrieved 7 July 2023.
- ^ "Monthly comparison of Metro trips by Operator and Line". Transport for NSW. 7 July 2023. Archived from the original on 2 September 2021. Retrieved 7 July 2023.
- ^ a b New Transport Leadership Confirmed Archived 26 March 2021 at the Wayback Machine Transport for NSW 26 March 2021
- ^ a b "Sydney Metro". urbanrail.net. Archived from the original on 15 September 2019. Retrieved 16 September 2019.
- ^ "About Sydney Metro". Sydney Metro. Archived from the original on 9 February 2021. Retrieved 27 May 2019.
- ^ a b "Chapter 7: Project description - operation" (PDF). Sydney Metro – Western Sydney Airport. Archived from the original (PDF) on 25 October 2021. Retrieved 25 October 2021.
- ^ O'Sullivan, Matt (29 May 2023). "Why Sydney will end up with three incompatible metro train lines". The Sydney Morning Herald. Retrieved 17 June 2023.
- ^ "Metro train passes 100km/h speed test". Sydney Metro. 13 August 2018. Archived from the original on 24 May 2019. Retrieved 27 May 2019.
- ^ "Minns Labor Government will deliver Sydenham to Bankstown section of City and Southwest Metro | NSW Government". August 2023.
- ^ "NSW government commits to converting south-west Sydney rail line to metro". ABC News. 31 July 2023. Retrieved 12 October 2023.
- ^ "Metro West to supercharge housing supply across Sydney | NSW Government". 7 December 2023.
- ^ "Sydney's first metro line a revolution for Australian transport". International Railway Journal. Archived from the original on 16 January 2021. Retrieved 14 January 2021.
- ^ "Australia's first metro system opened in Sydney". Urban Transport Magazine. 29 May 2019. Archived from the original on 16 January 2021. Retrieved 14 January 2021.
- ^ Ron, Christie (June 2001). "1. Introduction". Long-Term Strategic Plan for Rail (Report). Archived from the original on 17 February 2020. Retrieved 15 June 2015.
- ^ Ron, Christie (June 2001). "5. Beyond 2010: Overcoming the critical inner city constraint and implementing a longer term vision". Long-Term Strategic Plan for Rail (Report). Archived from the original on 17 February 2020. Retrieved 15 June 2015.
- ^ "Christie Report". Action for Public Transport. Archived from the original on 17 February 2020. Retrieved 14 June 2015.
- ^ Besser, Linton (14 September 2007). "New east-west line may cut congestion". Sydney Morning Herald. Fairfax Media. Retrieved 14 June 2015.
- ^ "Long Term Strategic Plan for Rail" (PDF). catalyst.com.au. June 2001. Archived from the original (PDF) on 30 July 2018. Retrieved 13 June 2015.
- ^ Besser, Linton (26 February 2008). "Bye heavy rail, now for a north-west metro". Sydney Morning Herald. Fairfax Media. Retrieved 14 June 2015.
- ^ Iemma, Morris. "Premier Iemma unveils Sydney's first Euro-style metro rail project" (PDF). NSW Government. Archived from the original (PDF) on 20 July 2008. Retrieved 14 June 2015.
- ^ Gittins, Ross (17 March 2008). "Iemma's reasons for privatising electricity". The Sydney Morning Herald. Fairfax Media. Archived from the original on 24 September 2015. Retrieved 14 June 2015.
- ^ Benson, Simon (31 October 2008). "Northwest Metro rail link officially shelved". The Daily Telegraph. Retrieved 14 June 2015.
- ^ "Metro: The future of Sydney's transport" (PDF). NSW Government. 30 June 2009. Archived from the original (PDF) on 4 July 2009.
- ^ "Metro-sexual Rees flags new rail link". The Daily Telegraph. 24 October 2008.
- ^ Clennel, Andrew; Besser, Linton (21 April 2009). "CBD Metro cost jumps $1.3b in six months". The Sydney Morning Herald. Fairfax Media. Archived from the original on 24 September 2015. Retrieved 14 June 2015.
- ^ Smith, Alexandra (6 February 2009). "'Inadequate' submission puts NSW down the list". The Sydney Morning Herald. Fairfax Media. Archived from the original on 24 September 2015. Retrieved 15 June 2015.
- ^ Ralston, Nick (24 October 2008). "Rees reveals new Sydney Metro plan". The Sydney Morning Herald. Fairfax Media. Archived from the original on 24 September 2015. Retrieved 14 June 2015.
- ^ Besser, Linton (4 May 2009). "CBD Metro will run almost empty". The Sydney Morning Herald. Fairfax Media. Archived from the original on 24 September 2015. Retrieved 15 June 2015.
- ^ "Keneally rolls Rees and takes top job". ABC News. AAP. 4 December 2009. Archived from the original on 3 August 2016. Retrieved 15 June 2015.
- ^ "Keneally scraps CBD Metro plans". ABC News. ABC/AAP. 22 February 2010. Archived from the original on 22 January 2016. Retrieved 15 June 2015.
- ^ Haynes, Rhys (3 December 2010). "Metro rail plan was 'wasteful'". The Daily Telegraph.
- ^ Newman, Peter (23 February 2010). "An end to Sydney's transport lost years?". The Sydney Morning Herald. Fairfax Media. Archived from the original on 24 September 2015. Retrieved 15 June 2015.
- ^ a b c Transport for NSW (June 2012). Sydney's rail future: modernising Sydney's trains (PDF). Archived from the original (PDF) on 26 June 2014.
- ^ Saulwick, Jacob (20 June 2012). "Sydney transport shake-up: plan for single deck metro-style trains and second harbour crossing". The Sydney Morning Herald. Fairfax Media. Archived from the original on 28 June 2014. Retrieved 15 June 2015.
- ^ Saulwick, Jacob (23 September 2013). "Secret report casts doubt on train plan". The Sydney Morning Herald. Fairfax Media. Archived from the original on 25 April 2014. Retrieved 15 June 2015.
- ^ Saulwick, Jacob (4 July 2012). "Tunnel too small could make rail link a bridge too far". Drive. Fairfax Media. Archived from the original on 15 March 2016.
- ^ "NSW tests the market over Sydney Metro construction". The Australian. 23 June 2015. Retrieved 13 July 2015.
- ^ "Transforming Sydney: Sydney Rapid Transit" (PDF). Transport for NSW. November 2014. Archived from the original (PDF) on 31 March 2015. Retrieved 15 June 2015.
- ^ "Rebuilding NSW". NSW Government. November 2014. Archived from the original on 23 June 2015. Retrieved 15 June 2015.
- ^ Geralthy, Sarah; Liz, Foschia (11 June 2014). "Sydney rapid transit rail build could begin in three years, NSW Transport Minister Gladys Berejiklian says". ABC News. Archived from the original on 12 June 2014. Retrieved 11 June 2014.
- ^ "Funding secured: Sydney Metro to be a reality". Transport for NSW. 4 June 2015. Archived from the original on 23 June 2015.
- ^ Gerathy, Sarah (4 June 2015). "Power vote means Sydney Harbour rail crossing is less than a decade away: NSW Premier Mike Baird". ABC News. Archived from the original on 16 November 2015. Retrieved 15 June 2015.
- ^ "New transport era as Sydney Metro authority comes into effect". Transport for NSW. 5 July 2018. Archived from the original on 11 July 2018. Retrieved 27 May 2019.
- ^ O'Sullivan, Matt (25 January 2023). "Major backflip on emergency exits for Sydney Metro rail tunnels". The Sydney Morning Herald. Archived from the original on 25 January 2023. Retrieved 25 January 2023.
- ^ a b c d e f NSW, Infrastructure (12 February 2023). "Metro boost for Western Sydney | NSW Government". Archived from the original on 13 February 2023. Retrieved 13 February 2023.
{{cite journal}}
: Cite journal requires|journal=
(help) - ^ a b Ward, Mary (11 February 2023). "Construction on four new metro lines could begin this year". The Sydney Morning Herald. Archived from the original on 13 February 2023. Retrieved 13 February 2023.
- ^ "About Us". Metro Trains Sydney. Archived from the original on 6 May 2019. Retrieved 29 May 2019.
- ^ "Case Studies: Sydney Metro – Western Sydney Airport Proposal – Australia". northstarconsultancy.com. Retrieved 28 January 2024.
- ^ Pearce, Connor (14 July 2020). "Integrated signalling systems providing reliability on Sydney Metro". Rail Express. Retrieved 28 January 2024.
- ^ "Sydney Metro – Information, Route Map, Fare & Timings". The Metro Rail Guy. Retrieved 30 March 2020.
- ^ "M1: Metro North West line timetable". Transport for NSW.
- ^ "Metro North West Line timetable – 1 July 2019". Transport for NSW. Archived (PDF) from the original on 18 June 2019. Retrieved 27 August 2019.
- ^ "Metro North West Line timetable – 27 May 2019" (PDF). Transport for NSW. Archived from the original on 8 May 2019. Retrieved 25 August 2019.
- ^ "North West opening date announced". Sydney Metro. 5 May 2019. Archived from the original on 5 May 2019. Retrieved 6 May 2019.
- ^ "NW1 Timetable – May 2019" (PDF). Transport Info NSW. Archived (PDF) from the original on 5 May 2019. Retrieved 10 May 2019.
- ^ "NW2 Timetable – May 2019" (PDF). Transport Info NSW. Archived (PDF) from the original on 5 May 2019. Retrieved 10 May 2019.
- ^ "Sydney Metro City & Southwest |page 51 Business Case Summary" (PDF). Transport for NSW. Archived (PDF) from the original on 17 January 2017. Retrieved 28 February 2017.
- ^ "Case study: North West Rail Link, Sydney, Australia". Alstom. Archived from the original on 4 March 2016. Retrieved 14 October 2015.
- ^ O'Rourke, Jim (5 November 2015). "Sydney Metro Northwest: Transport minister unveils life-size model of Metropolis carriage". The Daily Telegraph. Retrieved 7 November 2015.
- ^ "Alstom's first 'Make in India' Metro inaugurated in Kochi". raillynews.com. 19 June 2017. Archived from the original on 21 January 2018. Retrieved 21 January 2018.
- ^ "Check out the Sydney Metro train". Archived from the original on 2 September 2021. Retrieved 29 July 2017.
- ^ "Transport for NSW Sydney Metro Marquee at the Sydney Royal Easter Show 2016 - Proj-X Design". www.proj-x.com.au. Archived from the original on 28 March 2019. Retrieved 29 July 2017.
- ^ "Sydney Metro Receives First Indian Built Alstom Train". The Metro Rail Guy. 28 September 2017. Archived from the original on 12 November 2020. Retrieved 30 March 2020.
- ^ "First metro trains arrive for new $8.3 billion line to Sydney's north west". Sydney Morning Herald. 26 September 2017. Archived from the original on 21 January 2018. Retrieved 20 January 2018.
- ^ "First Sydney Metro train arrives". NSW Government. 26 September 2017. Archived from the original on 12 February 2021. Retrieved 27 September 2017.
- ^ UK, DVV Media. "Sydney metro train on test". Metro Report. Archived from the original on 24 March 2019. Retrieved 11 February 2018.
- ^ "First Metro Train Testing". www.sydneymetro.info. Archived from the original on 31 July 2019. Retrieved 11 February 2018.
- ^ "Metro Patronage Monthly Comparison". Transport for NSW. 21 August 2019. Archived from the original on 2 September 2021. Retrieved 15 February 2023.
- ^ See Transport for NSW patronage in Sydney by mode for sources
- ^ "Opal fares". transportnsw.info. Transport for NSW. Archived from the original on 27 March 2023. Retrieved 22 June 2019.
- ^ "Getting to and from Sydney Airport". transportnsw.info. Transport for NSW. Retrieved 1 July 2024.
- ^ "Green light for the North West Rail Link" (PDF). Transport for NSW. June 2013. Archived from the original (PDF) on 4 March 2016. Retrieved 7 November 2015.
- ^ "Construction ramps up as Showground Station site is cleared". Transport for NSW. 23 October 2013. Archived from the original on 7 November 2015. Retrieved 7 November 2015.
- ^ a b "Sydney Metro receives awards for excellence". Trenchless Australasia. 28 November 2016. Archived from the original on 28 November 2016. Retrieved 28 November 2016.
- ^ Sanda, Dominica (22 June 2017). "Work on Sydney Harbour tunnels to start". News Limited. Australian Associated Press. Archived from the original on 25 June 2017. Retrieved 22 June 2017.
- ^ "Sydney Metro City & Southwest Line Construction Enters New Phase". 5 August 2020. Archived from the original on 20 October 2020. Retrieved 20 October 2020.
- ^ Walker, Ian. "Construction begins on second Sydney Harbour rail crossing". The Daily Telegraph. Retrieved 23 April 2015.
- ^ "Sydney Metro West: a new railway, more trains for Western Sydney". Transport for NSW. 14 November 2016. Archived from the original on 29 April 2017. Retrieved 14 November 2016.
- ^ "Further Sydney Metro West stations revealed". Sydney Metro. Transport for NSW. 23 March 2018. Archived from the original on 23 March 2018. Retrieved 23 March 2018.
- ^ O'Sullivan, Matt (23 March 2018). "The Sydney suburbs on list of station sites for new metro line". The Sydney Morning Herald. Archived from the original on 23 March 2018. Retrieved 23 March 2018.
- ^ "Government getting it done on Metro West". Transport for NSW. 18 June 2019. Archived from the original on 8 November 2019. Retrieved 19 June 2019.
- ^ "$3.4bn added to fast-forward Sydney metro west". Global Construction Review (GCR). 18 June 2019. Archived from the original on 18 June 2019. Retrieved 19 June 2019.
- ^ "Infrastructure Statement 2019–2020 Budget Paper No.2" (PDF). NSW Government. Archived (PDF) from the original on 19 June 2019. Retrieved 12 September 2019.
- ^ "Construction of the Western Sydney Metro to start next year". Transport for NSW. 21 October 2019. Archived from the original on 21 October 2019. Retrieved 21 October 2019.
- ^ "NSW Government confirms seven new Sydney train stations for Metro West project". ABC News. 21 October 2019. Archived from the original on 21 October 2019. Retrieved 21 October 2019.
- ^ "Sydney Metro West stations confirmed" (PDF). Sydney Metro. NSW Government. 21 October 2019. Archived (PDF) from the original on 21 October 2019. Retrieved 21 October 2019.
- ^ "City buildings to be acquired by NSW government for construction of two new metro rail stations". ABC News. 12 May 2021. Archived from the original on 12 May 2021. Retrieved 12 May 2021.
- ^ Lock, Maeve Bannister and Samantha (7 December 2023). "'Reset' for troubled rail project with late launch date". St George & Sutherland Shire Leader. Retrieved 25 January 2024.
- ^ "Western Sydney City Deal to deliver rail, investment and jobs". Transport for NSW. 4 March 2018. Archived from the original on 6 March 2018. Retrieved 6 March 2018.
- ^ "Western Sydney City Deal –Connectivity". Department of Infrastructure, Regional Development and Cities. Archived from the original on 16 March 2018. Retrieved 16 March 2018.
- ^ "Scott Morrison announces construction on Western Sydney Airport metro line to start this year". 7News. 1 June 2020. Archived from the original on 9 June 2020. Retrieved 1 June 2020.
- ^ "Western Sydney North South Rail Link Package". Department of Infrastructure, Transport, Cities and Regional Development. Archived from the original on 24 September 2019. Retrieved 12 September 2019.
- ^ "Federal Budget 2019: Western Sydney Airport rail line, North–South Rail Link included in NSW $7.3b infrastructure boost". Sydney Morning Herald. 2 April 2019. Archived from the original on 3 July 2019. Retrieved 12 September 2019.
- ^ "Infrastructure Statement 2019–2020 Budget Paper No.2" (PDF). NSW Government. Archived (PDF) from the original on 19 June 2019. Retrieved 12 September 2019.
- ^ a b c "Sydney Metro Corporate Plan" (PDF). Archived from the original (PDF) on 12 November 2020.
- ^ O'Sullivan, Matt; Saulwick, Jacob (3 February 2016). "Plan to extend Sydney metro line south hits growing list of hurdles". The Sydney Morning Herald. Archived from the original on 15 November 2016. Retrieved 4 September 2016.
- ^ "South East Sydney Transport Strategy" (PDF). Archived (PDF) from the original on 1 November 2020. Retrieved 5 September 2020.
- ^ "Airdate: Seven News Presents: Worlds Best Metro". Decider TV. 11 July 2016. Retrieved 15 July 2016.
- ^ Knox, David (13 August 2020). "Airdate: Sydney's Super Tunnel | TV Tonight". Archived from the original on 28 September 2020. Retrieved 4 September 2020.