Jump to content

IND Queens Boulevard Line

Route map:
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 2603:7000:4300:d85:7047:68d8:cd9b:cdfe (talk) at 19:39, 20 October 2023 (Services). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

IND Queens Boulevard Line
"E" train "F" train "F" express train "R" train
Stations on the IND Queens Boulevard Line
are served by E, F, <F>, and R trains.
Overview
OwnerCity of New York
LocaleNew York City
Termini
Stations25
Service
TypeRapid transit
SystemNew York City Subway
Operator(s)New York City Transit Authority
Daily ridership467,779 (2015, weekday)[a]
Technical
CharacterUnderground
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Route map

Jamaica–179th Street
169th Street
Parsons Boulevard
Sutphin Boulevard
Briarwood
Kew Gardens–Union Turnpike
75th Avenue
Forest Hills–71st Avenue
67th Avenue
63rd Drive–Rego Park
Woodhaven Boulevard
Grand Avenue–Newtown
Elmhurst Avenue
Jackson Heights–Roosevelt Avenue
(unused upper level)
65th Street
express tracks
Northern Boulevard
46th Street
Steinway Street
express tracks
36th Street
Queens Plaza
Court Square–23rd Street
Lexington Avenue–53rd Street
Fifth Avenue/53rd Street
Seventh Avenue

The IND Queens Boulevard Line, sometimes abbreviated as QBL,[2] is a line of the B Division of the New York City Subway in Manhattan and Queens, New York City, United States. The line, which is underground throughout its entire route, contains 23 stations. The core section between 50th Street in Hell's Kitchen, Manhattan, and 169th Street in Jamaica, Queens, was built by the Independent Subway System (IND) in stages between 1933 and 1940, with the Jamaica–179th Street terminus opening in 1950. As of 2015, it is among the system's busiest lines, with a weekday ridership of over 460,000 people.

The Queens Boulevard Line's eastern terminus is the four-track 179th Street station. The line continues westward then northwest as a four-track line with the local tracks to the outside of the express tracks. The Queens Boulevard Line merges with the IND Archer Avenue Line east of Briarwood and with Jamaica Yard spurs west of Briarwood and east of Forest Hills–71st Avenue. The express tracks and the local tracks diverge at 65th Street in Jackson Heights and merge again at 36th Street in Sunnyside. West of 36th Street, the IND 63rd Street Line splits off both pairs of tracks, entering Manhattan via the 63rd Street Tunnel. At Queens Plaza in Long Island City, the line narrows to two tracks, with the local tracks splitting into the 60th Street Tunnel Connection and the IND Crosstown Line. From there, the express tracks of the line provide crosstown service across Manhattan under 53rd Street before turning southwest at Eighth Avenue, ending at the 50th Street station. The two-track section west of Queens Plaza is also known as the IND 53rd Street Line.

The Queens Boulevard Line is served by four overlapping routes. The E train serves the section between 50th Street and Briarwood, normally running express. The F runs express from 36th Street to 71st Avenue and local east of 71st Avenue to 179th Street. The R serves local stops on the route west of 71st Avenue, splitting west of Queens Plaza. The E and F serve the line at all times, while the R runs on the line at all times except late nights. During evenings and weekends, the E runs local between 71st Avenue and Briarwood, and E and F trains make all local stops west of 71st Avenue during late nights to provide local service along the line. The routes experience frequent overcrowding during weekdays, and the Queens Boulevard Line has among the highest rush-hour train frequencies in the system. A planned upgrade to the line, to replace its signals with a communications-based train control system, would add capacity to the line.

The line's construction in the 1920s and 1930s promoted housing growth along the Queens Boulevard corridor and stimulated the urbanization of central Queens. However, there are multiple provisions for spur routes along the Queens Boulevard line that were never built. The most notable of these proposals was the IND Second System, which would have provided a spur to Maspeth from the Jackson Heights–Roosevelt Avenue station; another spur to the Rockaways east of 63rd Drive–Rego Park via the Rockaway Beach Branch; a third spur east of Briarwood along the former Van Wyck Boulevard to South Ozone Park; and an extension of the line eastward past 179th Street. Other proposals included a "super express bypass" that would use the right-of-way of the Long Island Rail Road's Main Line to bypass all stations between 36th Street and 71st Avenue, as well as a spur from the Woodhaven Boulevard station northeast to Queens College via the Long Island Expressway.

Route

The IND Queens Boulevard Line begins with a large storage yard consisting of two levels with four tracks each south of 185th Street and Hillside Avenue. Once the tracks from the lower level merge with the tracks on the upper level, there is the first station Jamaica–179th Street (E, ​F, and <F> trains), and the line continues as a four-track subway under Hillside Avenue.[3] Just after curving north under the Van Wyck Expressway, a flying junction joins the two-track Archer Avenue Line (E train) to the local and express tracks. Soon after, the line turns west under Queens Boulevard.[4]

39th Avenue Ventilation Complex on Northern Boulevard

East of Kew Gardens–Union Turnpike, another flying junction ties the eastward tracks to Jamaica Yard. The other side of the wye curves west to become a lower level of the subway just west of Kew Gardens–Union Turnpike. After passing through 75th Avenue, those tracks join the local and express tracks at another flying junction.[4]

At Forest Hills–71st Avenue, M and ​R trains begin their westward route. West of here, the line (now carrying the E, ​F, <F>, ​M, and ​R trains) runs under Queens Boulevard until it turns north onto Broadway after Grand Avenue–Newtown. Near Jackson Heights–Roosevelt Avenue, an abandoned trackless tunnel for the IND Second System branches off into an unused upper part of the station which is used for storage.[5] At the intersection of Broadway and Northern Boulevard, west of the line's Northern Boulevard station, the express tracks turn west under Northern Boulevard. The local tracks take a longer route, remaining under Broadway, then turning south onto Steinway Street and west again onto Northern Boulevard, where they rejoin the express tracks.[4][6] This is only one of two areas in the subway where the express tracks diverge from the local tracks (the other being the IND Culver Line between Seventh Avenue and Church Avenue.)[2][7]

As the line leaves 36th Street, the two-track IND 63rd Street Line (F and <F> train) splits from both sets of tracks at a flying junction, running to Manhattan under 41st Avenue. The Queens Boulevard Line continues under Northern Boulevard to Queens Plaza (E, ​M, and ​R trains) before line splitting into three parts at another flying junction. The express tracks (E and ​M trains) continue towards Manhattan under 44th Drive, while the local tracks split two ways, with the 60th Street Tunnel Connection (R train) turning northwest and the IND Crosstown Line (no regular service) remaining under Jackson Avenue (Northern Boulevard south of Queens Plaza). From this point on, the Queens Boulevard Line has only two tracks.[4]

The line continues west through the 53rd Street Tunnel under the East River into Manhattan. After Lexington Avenue–53rd Street, the westbound tracks rise above the eastbound tracks. A flying junction after Fifth Avenue/53rd Street, ties the westbound tracks into the southbound local tracks of the IND Sixth Avenue Line, which begin here as a merge of these connection tracks and the IND 63rd Street Line. At that junction, the Sixth Avenue express tracks turn west under 53rd Street, just to the south of the Queens Boulevard Line. The two lines share platforms at Seventh Avenue, but no connecting tracks are present.[4]

Then the Queens Boulevard Line turns south below the IND Eighth Avenue Line with separate lower-level platforms at 50th Street. Then the tracks split to join the local and express tracks of the Eighth Avenue Line north of 42nd Street–Port Authority Bus Terminal. At that station, a special lower platform formerly served a single southbound track from the Queens Boulevard Line, merging with both southbound tracks of the Eighth Avenue Line south of the station;[4][8][9] the long-disused platform was demolished in June 2013 to make way for the extension of the IRT Flushing Line.[10]

Overview of the IND Queens Boulevard Line

Services

The following services use part or all of the IND Queens Boulevard Line:[11]

  Time period[11] Section of line[11]
Rush hours Middays Evenings Weekends Late nights
"E" train
  • express (entire line limited rush hour trips)
  • express (south of Briarwood)
express (south of Briarwood) local (south of Briarwood) full line (limited rush hour trips)
south of Briarwood (other times)
"F" train local east of Fifth Avenue/53rd Street
"F" express train no service east of Fifth Avenue/53rd Street
"R" train no service between Queens Plaza and Forest Hills–71st Avenue (all except late nights)
Briarwood station police headquarters

During daytime hours, the portion of the line between Queens Plaza and Forest Hills–71st Avenue is served by three services: the E, F, and R.[11] The E train runs from the Eighth Avenue Line and 53rd Street to Queens Boulevard before making express stops along the line (except evenings and weekends when it makes all stops east of Forest Hills–71st Avenue and during late night hours when it runs local on the entire line) to the Archer Avenue Line east of Briarwood.[11][12] Limited rush hour E trains also run express to Jamaica–179th Street.[11] The F operates via Sixth Avenue and 53rd Street to Queens Plaza before making express stops to Forest Hills–71st Avenue and local stops to Jamaica–179th Street. The F makes all stops during late nights.[12] The R enters Queens Boulevard from the Broadway Line and the 60th Street Tunnel before making local stops to Forest Hills–71st Avenue at all times except late nights.[12]

The entire line is patrolled by NYPD Transit Bureau District 20, headquartered at Briarwood.[13]

History

Construction

The Queens Boulevard Line, also referred to as the Long Island City−Jamaica Line, Fifty-third Street−Jamaica Line, and Queens Boulevard−Jamaica Line prior to opening,[7][14][15] was one of the original lines of the city-owned Independent Subway System (IND), planned to stretch between the IND Eighth Avenue Line in Manhattan and 178th Street and Hillside Avenue in Jamaica, Queens.[7][15][16]

As originally proposed in 1925, the line's junction with the IND Crosstown Line in Long Island City would have been a T-junction, allowing trains from Manhattan to travel south to Brooklyn via the Crosstown line.[16] A map from June of that year shows a proposed alternate routing for the Queens Boulevard Line,[17] that would have had the line turn via Kew Gardens Road after the Union Turnpike station instead of continuing via Queens Boulevard. After proceeding via Kew Gardens Road, the line would have turned via Hillside Avenue.[18] The proposed route via Kew Gardens Road was supported by Queens Borough President Maurice Connolly because it would have served Richmond Hill as well. He also pointed out that there was considerable opposition to building a subway line in front of Maple Grove Cemetery.[19] The map also shows a two-track line continuing from the Van Wyck Boulevard station to 94th Avenue (Atlantic Avenue) in Richmond Hill via Van Wyck Boulevard (today's Van Wyck Expressway).[18] During construction, only bellmouths were built for the line, however, they were eventually used for the IND Archer Avenue Line. As documented by the map, the Queens Boulevard Line, as originally planned, would have had the express trains travel on a more direct route, via Broadway and Queens Boulevard, while the local trains would take a less direct route hitting larger population centers. There were to be two such instances, however, only one was actually completed. The first one, which was not constructed, would have gone through Winfield (now Woodside), west of the existing Elmhurst Avenue station, and the local tracks would have diverged, continuing via Queens Boulevard before turning onto 69th Street (Fisk Avenue), rejoining the express tracks at Broadway in Woodside. The second instance, the one that was built, was planned to have the local tracks continue via Broadway west of the 65th Street station, and then it would turn south via Steinway Street before rejoining the express tracks at the 36th Street station. The express tracks here would take the more direct route, via Northern Boulevard.[18]

Originally, the New York City Board of Transportation (BOT) did not plan for a 50th Street station on the Queens Boulevard Line. This station was to have only been served by Eighth Avenue trains heading north toward Washington Heights. The Eighth Avenue Association petitioned the BOT for an additional stop at 50th Street. On November 21, 1926, it was announced that the BOT had agreed to construct a stop at this location for the Queens Boulevard Line.[20]

As part of the subway line's construction, underpasses were built at Kew Gardens (top) and Woodhaven Boulevard (bottom).

On February 26, 1927, the New York City Board of Estimate awarded and approved a $10,481,550 contract to the Patrick McGovern Company. Ground was broken at Vernon Boulevard and 44th Drive in Long Island City on April 2, 1927. The first contract for work entirely within Queens was given to the Atwell-Gustin-Morris Company by the BOT on December 14, 1927. The contract covered the section of the line under Jackson Avenue between the junction with the under-construction Crosstown Line near Queen Street and 44th Drive. The section between Arch Street and Steinway Avenue was awarded to the W.G.T. Construction Company, which required moving the support pillars for the elevated IRT Flushing Line to the sides of the street. Triest Construction Company was awarded the next segment, which was between Queen Street and the intersection of Northern Boulevard and 37th Street. The following section was awarded to J.F. Cogan Company, which was required to build the section between the intersection of Steinway Street and Broadway and the intersection of 53rd Street and Northern Boulevard. The remainder of the line was called Route 108, and it was divided into six sections. The first section, between 53rd Street and Pettit Place via Broadway went to Atwell-Gustin-Morris Company, while the section between along Broadway and Queens Boulevard from Pettit Place to 55th Avenue went to George H. Flynn Company. The sections from 55th Avenue to 64th Road and from 64th Road to 71st Road went to Arthur A. Johnson. The final two sections were from 71st Road to Union Turnpike, and from 137th Street (now the Van Wyck Expressway) to Hillside Avenue.[21]

The two tubes of the 53rd Street Tunnel under the East River began construction in spring 1927, and were fully excavated between Queens and Manhattan in January 1929, with a ventilation shaft built on Welfare Island (today's Roosevelt Island).[22] On October 4, 1928, the Board of Estimate approved the construction of the Queens Boulevard Line.[23]

Construction on the line began in December 1928, and the whole line cost $58 million.[24] During the line's construction, several intersections of Queens Boulevard with major roads were grade separated, in a similar manner to Grand Concourse in the Bronx during the building of the IND Concourse Line around that same time.[15][25] At adjacent intersections with Woodhaven Boulevard and Horace Harding Boulevard (now the Long Island Expressway) in Elmhurst, Queens Boulevard's main road was depressed into underpasses.[25][26] In Kew Gardens, Union Turnpike and the Interboro Parkway (now the Jackie Robinson Parkway) were depressed below Queens Boulevard at the level of the Union Turnpike station's mezzanine.[27] From the mezzanine at Union Turnpike, an entrance was built from the Interboro Parkway, allowing passengers from buses and automobiles to be dropped off here instead of from Queens Boulevard. The subway from Long Island City to Roosevelt Avenue and 74th Street was completed by April 1932.[21]

During the 1920s and 1930s, in conjunction with the subway construction project, Queens Boulevard was widened with up to twelve lanes in some places, and a right-of-way of 200 feet (61 m) in width was created.[28] With the widening, Queens Boulevard was wide enough for the construction of a four track subway line without serious disruption of surface travel, with the area alongside the boulevard not built up in many places. More often than not in some places, billboards would be visible instead of buildings. During the construction of the line, electric utility service was temporarily provided by a wooden pole line. Once the construction of the line was completed, the utility service was underground, and the Queens Boulevard trolley line was replaced by bus service (today's Q60), in part due to competition with the newly constructed subway line.[29] Because the construction of the Queens Boulevard Line utilized the cut-and-cover tunneling method, Queens Boulevard had to be torn up and in order to allow pedestrians to cross, temporary bridges were built over the trenches.[30] Like other IND lines, many stations' mezzanines stretched the full length and width of their stations, and are now considered to be overbuilt.[31]

On October 16, 1930, James A. Burke, the chairman of the Hillside Avenue Subway Extension Committee stated that the extension of the line to Springfield Boulevard was a certainty after receiving a letter from the Transportation Commissioner.[32] On December 1, 1930, the BOT announced that a station would be constructed at 178th Street and Hillside Avenue, but would be done under the section between 178th Street and Springfield Boulevard, which was to be constructed simultaneously with the section from 137th Street to 178th Street. This announcement was made in response to a request by the Jamaica Estates Association for a station at 178th Street. At the time, BOT engineers were completing the design for the extension to Springfield Boulevard and the BOT said that bids on its construction might be let in the near future. On December 23, 1930, the contract for the construction of the section between 137th Street and 178th Street, Route 108, Section 11, was let.[33]

On December 18, 1931, it was announced that the completion of the Queens Boulevard Line to Roosevelt Avenue was delayed until January 1, 1933. Previously, it has been announced that the line would open in 1931 or 1932.[34] On January 18, 1933, Chairman of the Board of Transportation announced that work on the first section of the line would be completed by September. In addition, Delaney submitted the capital outlay program for the year, which called for the completion of the extension of the line to 177th Street and Hillside Avenue on January 1, 1935.[35] The line was not completed by January 1 because the funding necessary for the final outstanding contract, which was for the installation of transformers and switch houses, was not registered until January by the Controller. In addition, one of the contractors, the L. I. Waldman Company, fell behind schedule. As a result, the company was fined and ordered to increase its labor force to complete the project on schedule. In March the September opening date was moved to August.[36][37]

Building boom and the growth of communities

Streetscape of Forest Hills, Queens
Neighborhoods in Queens, such as Forest Hills (pictured), sprung up around the new subway.[38]

The construction of the Queens Boulevard subway line offered the possibility of quick commutes to the central business district in Midtown Manhattan. In the late 1920s, speculators, upon learning the route of the proposed line, quickly bought up property on and around Queens Boulevard, and real estate prices soared, and older buildings were demolished in order to make way for new development.[30][39] In order to allow for the speculators to build fifteen-story apartment buildings, several blocks were rezoned.[40] They built apartment buildings in order to accommodate the influx of residents from Midtown Manhattan that would desire a quick and cheap commute to their jobs.[30][41] Since the new line had express tracks, communities built around express stations, such as in Forest Hills and Kew Gardens became more desirable to live. With the introduction of the subway into the community of Forest Hills, Queens Borough President George U. Harvey predicted that Queens Boulevard would become the "Park Avenue of Queens".[30] With the introduction of the subway, Forest Hills and Kew Gardens were transformed from quiet residential communities of one-family houses to active population centers.[38] Following the line's completion, there was an increase in the property values of buildings around Queens Boulevard.[42] For example, a property along Queens Boulevard that would have sold for $1,200 in 1925, would have sold for $10,000 in 1930.[43] The population of Forest Hills in 1930 was 18,000, having increased to 100,000 in 1965.[44]

The construction boom was not limited to express stations, with fifteen-story apartment buildings built by Cord Meyer, an eighty-family apartment house built by the Rego Park Construction Corporation, and 300 one-family homes built along Woodhaven Boulevard by Pherbus Kaplan, all surrounding the 63rd Drive local station. These development companies all sought out to continue to increase the value of their properties in anticipation of the opening of the subway.[45]

Queens Boulevard, prior to the construction of the subway, was just a route to allow people to get to Jamaica, running through farmlands. Since the construction of the line, the area of the thoroughfare that stretches from Rego Park to Kew Gardens has been home to apartment buildings, and a thriving business district that the Chamber of Commerce calls the "Golden Area".[44]

In Elmhurst, almost all of the century-old buildings in the heart of the village were destroyed for the construction of the subway. Land was taken on the west side of the Broadway to avoid the demolition of the Saint James Episcopal Church and the Reformed Church. Many nineteenth century residences and the Wandowenock Fire Company buildings had to be torn down. To allow the subway line to curve into Queens Boulevard from Broadway, the northeast corner of the two streets was removed, in addition to some stores and an old Presbyterian chapel. New buildings were built behind a new curb line once the subway was completed, bringing a new face to Elmhurst. The introduction of the subway stimulated local growth in Elmhurst. Commercial buildings and apartment houses replaced existing structures.[21][46]

From 1940 to 1950, in large part because of the construction of the Queens Boulevard Line, the population of Queens dramatically increased by 248,678, of which, 210,000 lived in areas alongside the new line and the buses that connected to it. By 1940, there were 27.5 square miles of vacant land alongside the line that could be used for housing, compared with only 8 in Brooklyn, 4 in the Bronx, and none in Manhattan.[47]

Opening and expansion

The first section of the line, west from Roosevelt Avenue to 50th Street, opened on August 19, 1933 at 12:01 a.m.[21] E trains ran local to Hudson Terminal (today's World Trade Center) in Manhattan, while the GG (predecessor to current G service) ran as a shuttle service between Queens Plaza and Nassau Avenue on the IND Crosstown Line.[6][48][49] Initially trains ran on four to six-minute headways during rush hours.[50] Later that year, a $23 million loan was approved to finance the remainder of the line, along with other IND lines.[51]

In 1934 and 1935, construction of the extension to Jamaica was suspended for 15 months and was halted by strikes.[52] Construction was further delayed due to a strike in 1935, instigated by electricians opposing wages paid by the General Railway Signal Company.[53] On January 21, 1935, BOT Chairman John Delaney said that express service in Queens would not begin until construction on the proposed IND Sixth Avenue Line was completed.[54] In February 1935, it was expected that work on Jamaica Yard would be completed by August 20. Construction was not begun until piles had been sunk, through mud and fill, into firm sand.[55]

On March 17, 1936, at a hearing of the New York State Transit Commission and the New York State Public Service Commission, the LIRR said that it would seek permission in 1937 to abandon the three stations along its Main Line between Jamaica and Pennsylvania Station—Kew Gardens, Forest Hills, and Woodside. The LIRR had said that it anticipated a loss of annual revenue between $750,000 and $1 million with the opening of the extension of the Queens Boulevard Line to Jamaica.[56]

The opening of the line to Continental Avenue was expected in October as of April 1936. At the same time, it was announced that Jamaica Yard would be placed into service with this extension of service. The installation of third rail and storage tracks were expected to be completed by the early summer.[57]

In April 1936, William Jerome Daly, the secretary of the BOT, stated, in response to requests for a stop at 178th Street, that constructing a station at that location would prevent express service from operating past Continental Avenue. He said that with a final station at 169th Street, expresses could run to Parsons Boulevard, and that if the line was extended to Springfield Boulevard as planned, express service could be extended past 178th Street with a yard east of the new terminal.[58]

In August 1936, construction to Forest Hills was expected to be completed by the end of the year. The tracks were installed all the way to 178th Street, and the stations to Union Turnpike were completed. However, the stops to the east still needed to be tiled, have stairways, turnstiles and lighting installed. Only two additional contracts remained to be put up for bid, both the results of last minute changes. The first of the two changes was for finishing the Ely Avenue station which did not open with the initial segment to Roosevelt Avenue. The second of the two entails the eastern terminal of the line. Initially, express trains were planned to terminate at a station at 178th Street. However, the plans were changed to terminate the express trains at Parsons Boulevard, requiring the installation of switches. Since construction of the tunnel was already completed in this section, a few hundred feet of tunnel wall had to be removed to fit the two switches.[52] In addition, a new tunnel roof and new side supports had to be constructed.[59] Since the line's new terminal would be at 169th Street, the tracks at 178th Street would be used to turn back trains. This change led to protests from the Jamaica Estates Association.[52] This change delayed the opening of the line from Union Turnpike to 169th Street.[59]

On November 19, 1936, Mayor Fiorello La Guardia announced that the line's extension to Union Turnpike would open on December 31, 1936.[60] Accordingly, the line was extended east from Roosevelt Avenue to Union Turnpike on that date.[61][62][21] The day before, a trial run was completed, with Mayor LaGuardia posing for a picture at the controls of the train.[63] This extension cost $27 million, of which $5.8 million was for Jamaica Yard, $1.4 million was for real estate, $2.2 million, and $16.2 million for tunnels and tracks.[64]

In March 1937, the extension to 169th Street was expected to be opened on May 1, requiring work to be finished by April 3 and fully approved and tested by April 20. As of this point, minor station work remained, including the installation of light bulbs, withs the only major work left to be completed the final 200 feet (61 m) in the 169th Street terminal. Workers were working on installing the signaling for the two additional switches required.[59] The Van Wyck Boulevard station was completed at the same time as the section of the line that opened to Union Turnpike on December 31, 1936.[65] Work on the section east of Union Turnpike, including the eastern yard leads to Jamaica Yard, which was initially planned to be completed on October 20, 1936, was completed on March 31, 1937.[66]

Poster announcing the extension of service to 169th Street and the inauguration of express service on April 24, 1937.

On April 9, 1937, Mayor La Guardia announced that the operation of the $14.4 million extension to Jamaica and express service would begin on April 24. The extension to Hillside Avenue and 178th Street, with a terminal station at 169th Street opened as planned on April 24, 1937.[6][61][67][68] Express service was inaugurated during rush hours, with E trains making express stops from 71st–Continental Avenues to Queens Plaza. The express service operated between approximately 6:30 and 10:30 a.m. and from 3:00 p.m. to 7:00 p.m.[69] Express service was also provided on Saturdays between 6:30 a.m. and 4:00 p.m.. During rush hours, GG trains were extended to Continental Avenue from Queens Plaza, taking over the local. During non-rush hours local service was provided by EE trains which operated between 169th Street and Church Avenue in Brooklyn.[70] The sections of the line east of Roosevelt Avenue were built by the Public Works Administration.[69]

This extension was celebrated with a ribbon-cutting ceremony at the Parsons Boulevard station and with a parade along Hillside Avenue.[71] The initial headway for express service was between three and five minutes.[72] 23rd Street–Ely Avenue station opened as an in-fill station on August 28, 1939.[73] Upon its extension into Jamaica, the line drew Manhattan-bound passengers away from the nearby BMT Jamaica Line subway and the Long Island Rail Road.[74]

From April 30, 1939[75] to October 1940, the Queens Boulevard Line served the 1939 New York World's Fair via the World's Fair Railroad. The World's Fair line ran via a connection through the Jamaica Yard and through Flushing Meadows–Corona Park along the current right-of-way of the Van Wyck Expressway.[61][76] The 1939 World's Fair was served by GG trains, some of which were marked as S Special. Trains were extended to the World's Fair Station at all times during the fair, supplemented by PM hour E trains.[77] The fair closed on October 28, 1940, and was demolished later that year.[78] As a result, GG service was truncated to Forest Hills–71st Avenue.[79][80] After calls from public officials such as Queens Borough President George Harvey to make the line a permanent connection to Flushing and northern Queens, the line was demolished in 1941.[48]

After LaGuardia Airport opened on February 21, 1940, the Roosevelt Avenue station became an important transfer point to buses to the airport, including the privately-owned Q33.[6]

"Sixth Avenue Subway Will Be Opened to the Public at 12:01 A.M. Sunday, Dec 15, 1940"

On December 15, 1940, F trains began running via the newly opened IND Sixth Avenue Line, also running express west of 71st–Continental Avenues. 169th Street and Parsons Boulevard were both used as terminal stations during this time, with the E terminating at one station and the F at the other.[81][82][83] This setup was instituted to prevent congestion at both stations.[84]

New terminal

The existing 169th Street station provided an unsatisfactory terminal setup for a four track line, and this required the turning of F trains at Parsons Boulevard, and no storage facilities were provided at the station. The station was overcrowded as it served as a major transfer point for buses heading to areas throughout Eastern Queens. In February 1941, contractors started work on construction two additional staircases at the 169th Street station on each of the eastern corners at 168th Street and Hillside Avenue for $15,500. As a result, on January 30, 1941, Councilman James A. Burke proposed extending the line one stop to a temporary station at 178th Street to the Transit Commission at a conference on the issue of slow bus service.[85][86]

Under his proposal, 169th Street station would continue to be used by riders on buses from Laurelton, Rosedale, Springfield, and from areas to the north of the station, while the 178th Street station would be patronized by riders from Hollis, Bellerose and Queens Village. Burke stated that the plan would cost $100,000 and would not require additional trackage or tunneling. In response to the proposal, BOT engineers analyzed the feasibility of such an extension. They determined that the line would have to be extended between 700 feet (210 m) to 1,000 feet (300 m) under Hillside Avenue to store and switch trains, that it would cost at least $2 million, which the city did not have, and would take between 2 and 3 years. Burke had also proposed two other alternative actions to the Transit Commission: the construction of a bus terminal at the northeast corner of Hillside Avenue and 168th Street, and the construction of a pedestrian tunnel between the 169th Street subway station at Merrick Road to the bus terminal on that street. The BOT engineers determined that it would cost $150,000. Burke had met with Mayor Fiorello LaGuardia and asked him to create a committee to study the matter. The Mayor refused and suggested that a station be built between 175th Street and 178th Street to be used for exiting only during the evening rush hour.[85][86] The Transit Commission recommended Burke's proposed extension to the BOT, which they estimated would cost $150,000, and stated that a BOT drawing dated December 30, 1935, had indicated such a temporary station.[87]

The construction of an extension was planned in 1940, and was ready to bid on in 1942 when it was delayed by World War II.[88] Therefore, the line was going to be extended to 184th Place with a station at 179th Street with two island platforms, sufficient entrances and exits, and storage for four ten-car trains. The facilities would allow for the operation of express and local service to the station.[84] On August 1, 1946, the Board of Estimate approved the plan for the extension of the line, which was estimated to cost $10.3 million, of which, $7,764,000 would go to construction, with the remainder for subway cars, power substations, third rail and signal equipment, and other electrical equipment. The project was expected to be completed within five years of the date that the contract was awarded.[88]

On October 22, 1946, it was revealed that work on the extension might begin in early November as the BOT prepared to award the contract to Van Wagner Construction Company, which submitted a low bid of $5,284,888. The contract called for the extension's completion within two years. The extension was to be constructed using cut-and-cover and required the relocation of underground sewer and electrical lines.[89]

Construction on the extension started in 1947 and was projected to be completed in 1949.[90][91] The extension was completed later than expected and opened on December 11, 1950. E trains were extended there at all times and F trains were extended evenings, nights, and Sunday mornings.[88]

On May 13, 1951, all trains outside of rush hour were extended to 179th Street using the local tracks beyond Parsons Boulevard. On October 8, 1951, trains were extended to 179th Street at all times.[92] During rush hours, F trains skipped 169th Street running via the express tracks. At other times, the F stopped at 169th Street.[93]

Late 20th century

The V route was created in 2001 to add service as part of the connection with the 63rd Street Line, but was eliminated in 2010.[94]

In 1953, the platforms were lengthened at 75th Avenue and Sutphin Boulevard to 660 feet (200 m) to allow E and F trains to run eleven car trains. The E and F began running eleven-car trains during rush hours on September 8, 1953. The extra train car increased the total carrying capacity by 4,000 passengers. The lengthening project cost $400,000.[95] The operation of eleven-car trains ended in 1958 because of operational difficulties. The signal blocks, especially in Manhattan, were too short to accommodate the longer trains, and the motormen had a very small margin of error to properly platform the train. It was found that operating ten-car trains allowed for two additional trains per hour to be scheduled.[96]

Because local service was only offered by the GG trains which only ran into Brooklyn, riders were forced to transfer at express stations to reach Manhattan. This caused overcrowding and delays. The BOT had first proposed a connection between the Queens Boulevard Line and the 60th Street Tunnel in 1940. Fifteen years later, on December 1, 1955, a connection to the 60th Street Tunnel opened, allowing trains from the BMT Broadway Line to serve Queens Boulevard as an additional local from 71st−Continental. This connection was one of the most important links in the system, correcting the 1930s error of insufficient capacity for Queens–Manhattan traffic.[48]: 241  Service was initially provided by QT Broadway−Brighton trains (predecessor to the Q train).[82][97] This service would be replaced by RR trains in 1961, a new EE train in 1967, and N trains in 1976.[82]

On August 27, 1977, GG service was cut back to Queens Plaza during late nights, and local service along Queens Boulevard was provided by the F.[98] Effective May 6, 1985, use of double letters to indicate local service was discontinued, so the GG was relabeled G.[99][100]

On April 20, 1981, Councilman Steven Orlow said the New York City Transit Authority agreed to put a contract to replace the lighting at six stations on the Queens Boulevard Line from 75th Avenue to 169th Street up for bidding in October, with work to be completed by early 1982. The existing lighting at the stations meant that platforms were very dimly lit, and made riders feel unsafe.[101]

Until 1986, 2 E trains and 2 F trains started at Continental Avenue in the morning rush hour with the intention to relieve congestion. These trains were eliminated because they resulted in a loading imbalance as these lightly-loaded trains would be followed by extremely crowded trains from 179th Street, which followed an 8-minute gap of E and F service from 179th Street.[102]: 51 

On May 24, 1987, N and R services swapped terminals in Queens to provide R trains direct access to the Jamaica Yard. As part of the reroute plan, F service along Queens Boulevard was discontinued during late nights (1 a.m. to 5 a.m.). Late night local service was replaced by the R, which ran as a Queens Boulevard Local at all times. F trains were cut back to 57th Street on the Sixth Avenue Line during late nights. In addition, Queens Plaza became the northern terminal for the G train on evenings, weekends and late nights.[82][103][104] In 1986, the TA studied which two services should serve the line during late nights as ridership at this time did not justify three services. A public hearing was held in December 1986, and it was determined that having the E and R run during late nights provided the best service.[102]: 51 

Archer Avenue changes

Originally, the G and N local trains were planned to serve the upper level of the new Archer Avenue Line extension,[105][106][107] while the E and F express trains would have remained on the Queens Boulevard mainline towards 179th Street. The N train was to have been extended from 71st Avenue to Jamaica Center during weekdays, and, when it terminated at 57th Street or 71st Avenue, during evenings and weekends, the G would have been extended to Jamaica Center, and during late nights, a G train shuttle would have run between Jamaica Center and Van Wyck Boulevard.[108]

On December 11, 1988, the Archer Avenue Lines opened, utilizing existing provisions east of the Briarwood station. The E was rerouted to its current terminus at Jamaica Center.[103][109] Its opening was expected to reroute 17,500 riders from Hillside Avenue to Archer Avenue. Two service plans were identified prior to the February 25, 1988 public hearing. The first would have split rush-hour E service between the two branches, with late night service to 179th Street provided by the R, while the second would have had all E trains run via Archer Avenue and would have extended R locals to 179th Street.[110][102]: 9–10  A modified version of the second plan was decided upon. When the Archer Avenue Line opened, the E ran to Jamaica Center via the Queens Boulevard Line's express tracks.[111] The R was extended to 179th Street to serve local stations east of Continental Avenue, replacing local E service to 179th Street, allowing F trains to continue running express to 179th Street. F trains no longer stopped at 169th Street between 10 a.m. and 3:30 p.m.[112][113] During the morning rush hour, some R trains went into service at Continental Avenue, because local ridership from 179th Street during rush hours did not warrant it. All R trains went to 179th Street during the afternoon rush to avoid taking loaded R trains out of service at Continental.[102]: 9–10 

The change in the plan was the operation of some E trains from 179th Street as expresses during the morning rush hour to provide an appropriate level of E service to Archer during the morning rush, to maintain the same level of service to 179th Street while providing express service, and to provide greater choice for riders at the Parsons Boulevard and 179th Street stations on Hillside Avenue. It was decided not to divert some E trains to 179th Street during the afternoon rush hour so that Queens-bound riders would not be confused about where their E train was headed.[102]: 9–10 

It was decided to serve Archer with the E as opposed to the F to minimize disruption to passengers who continued to use Hillside Avenue, to maximize Jamaica Avenue ridership and the length of the peak ridership period, which is longer on the F. It was found that most riders using buses diverted to Archer used the E, while passengers on buses to 179th used the F. Having E trains run local between Continental Avenue and Van Wyck Boulevard was dismissed in order to provide 24-hour express service to the Archer Avenue Line.[102]: 55 

Riders at local stations east of 71st Avenue (169th Street, Sutphin Boulevard, Van Wyck Boulevard and 75th Avenue stations) were angered at losing direct Queens Boulevard Express service in 1988. Local elected officials pressured the MTA to eliminate all-local service at these stations.[114][115] On September 30, 1990 the R was cut back to 71st–Continental Avenue outside of rush hours. Late night service to 179th Street was replaced by G service, while F trains began running local east of 71st Avenue during middays, evenings, and weekends.[116]

In response, the MTA considered three options including leaving service as is, having E trains run local east of 71st Avenue along with R service, and having F trains run local east of 71st Avenue replacing R service. Keeping service as is would have kept the reliability improvement that came with the relocation of the merge between E and F service from 75th Avenue to Van Wyck Boulevard, ensured maximum service capacity, and would have benefited the broad majority of riders on Queens Boulevard in terms of time savings and reliability. The second option would have decreased capacity by eight percent, or two trains per hour, increased travel times for most riders from Eastern Queens by 1-2 minutes, worsened reliability on the E and F, and introduced two merges-one with the R at Van Wyck Boulevard and one with the F at 75th Avenue. The third option was expected to help 13,880 people at former local stops with the introduction of direct express service, while lengthening trips by three minutes for 30,010 riders at Parsons Boulevard and 179th Street. In addition, it would decrease capacity by eight percent, or two trains per hour, reduce the reliability of E and F service, and possibly require more F service and less E service due to increases loads on the F. The third option was chosen to be tested in October or November 1992, and was expected to save the NYCTA $50,000 a year. It was also expected to slightly reduce ridership and revenue due to increased travel times for Eastern Queens riders.[114][117]

On October 26, 1992, R trains were cut back to 71st Avenue at all times. In its place, the F ran local between 71st Avenue and 179th Street at all times, which eliminated express service along Hillside Avenue.[118] This change was implemented for six months on an experimental basis at the request of passengers using the 169th Street, Sutphin Boulevard, Van Wyck Boulevard and 75th Avenue stations, which had lost direct Queens Boulevard Express service in 1988.[115]

After the six months, the change was kept even though 77% of passengers had benefitted from the pre-October 1992 service plan because there was minimal negative passenger reaction and the intensity of the request. The change increased travel time along the F by 3.5 minutes, and reduced travel time for passengers at local stations by one to two minutes.[115] In December 1993, the NYCTA agreed to extend the pilot change for six more months.[119]

Between 1988 and 1990, following the opening of the Archer Avenue extension, ridership decreased by 12 percent at 179th Street, by 60 percent at 169th Street, by 47 percent at Parsons Boulevard, by 70 percent at Sutphin Boulevard, and by 28 percent at Van Wyck Boulevard.[117]

63rd Street changes

As part of the construction of the IND 63rd Street Line in the 1980s, it was proposed to reverse-signal the IND Queens Boulevard Line, to allow three of the line's four tracks to run in a single peak direction.[120]

Beginning on March 23, 1997, due to construction on the connector between the IND 63rd Street Line and the IND Queens Boulevard Line, G trains terminated at Court Square on evenings, nights and weekends. On August 30, 1997, late night G service was permanently cut back from 179th Street to Court Square, being replaced with the F running local east of Queens Plaza, meaning that the G only ran along the Queens Boulevard Line on weekdays.[121][122] On that date, E service began running local in Queens during late nights.[123][122]

On December 16, 2001, the connection to the IND 63rd Street Line (built along with the Archer Avenue subway) opened and F trains were rerouted into it, away from the 53rd Street tunnel. The new peak-hour V train was created to replace the F via 53rd Street while running local on Queens Boulevard, requiring the truncation of the G to Court Square during weekdays.[94][124][125] G service was extended to Forest Hills–71st Avenue at all other times, which represented the reverse of the previous pattern.[121] The G was to be truncated to Court Square at all times to make room for the V, but due to rider opposition, it was cut back only on weekdays until 8:30 pm.[121]

21st century

Starting in August 2007 after a series of severe summer storms, the Metropolitan Transportation Authority (MTA) began installing decorative ventilation grates along the Hillside Avenue section of the line, and sealing other grates, both in order to combat flooding. At the time, the Hillside Avenue subway was considered the most flood-prone area in the subway system, due to its location at the bottom of the terminal moraine which runs across Long Island.[126][127]: 15, 27, 44−55  Additional grates were later installed along Broadway and Steinway Street at the west end of the line.[128]

The decorative subway ventilation grates along Hillside Avenue (left) and Broadway (right), which mitigate flooding

In 2010, budget constraints within the MTA led to service reductions on the line. On April 19, 2010, G service was permanently truncated to Court Square at all hours; thus Crosstown Line trains, which originally were the sole trains to serve the Queens Boulevard local tracks, no longer ran on the line at all.[94] On June 27, 2010, V service was eliminated, and the M train was extended via the Chrystie Street Connection to replace it.[94][129]

The 2015–2019 MTA Capital Plan called for the Queens Boulevard Line's Northern Boulevard, 67th Avenue, and Parsons Boulevard stations, along with 30 others, to undergo a complete overhaul as part of the Enhanced Station Initiative. Updates would have included cellular service, Wi-Fi, USB charging stations, interactive service advisories and maps, improved signage, and improved station lighting.[130][131] However, in April 2018, it was announced that cost overruns had forced the MTA to reduce the number of subway stations included in the program from 33 stations to 20. The stations to be renovated on the IND Queens Boulevard Line were among the 13 stations without funding, which will be pushed back to the 2020–2024 Capital Plan.[132] As part of the 2020—2024 Capital Plan, the Woodhaven Boulevard, Court Square—23rd Street, Steinway Street, Seventh Avenue, Briarwood, Northern Boulevard, and Parsons Boulevard stations will receive elevators to make them compliant with the Americans with Disabilities Act of 1990.[133]

Communications-based train control

Congestion on the line during peak hours has existed for much of the line's history,[109][94][120] and in 2015, the stations along the line had a combined 467,779 entries, making it among the system's busiest.[1] As a result of overcrowding, the MTA is automating the line. Because the line hosts several services, installation of CBTC on the line is more complex than on the IRT Flushing Line and BMT Canarsie Line, which had also received CBTC and which each hosted only one service.[134] The total cost for the entire Queens Boulevard Line is estimated at over $900 million.[135] The automation of the Queens Boulevard Line means that the E, ​F, and <F> services will be able to run three more trains during peak hours, up from 30 tph, and the local tracks' capacity would also be increased.[135]

Phase one equipped the tracks from 50th Street/8th Avenue and 47th–50th Streets–Rockefeller Center to Kew Gardens–Union Turnpike with communications-based train control.[2][94] The $205.8 million contract for the installment of phase one was awarded in 2015 to Siemens and Thales.[136] In January 2017, L.K. Comstock & Company Inc. was selected to fulfill a $223.3-million contract to upgrade existing signals and install communications, fiber-optic, and CBTC infrastructure for the new signal system.[137] The project also included the conversion of 309 sets of R160 subway cars for CBTC compatibility,[138]: 14  which as of April 2022 had been increased to 335 sets.[139]: 15  The final section of phase one was activated in February 2022.[139]: 15 

The 2015–2019 Capital Program was revised in April 2018 to fund to the design for the expedited installation of the Queens Boulevard Line east of Kew Gardens–Union Turnpike, the second phase.[140][141] In December 2021, the MTA Board approved the first of three contracts to install CBTC on the eastern portion of the Queens Boulevard Line.[142]

On March 17, 2023, New York City Transit made adjustments to evening and late night E, F and R service to accommodate long-term CBTC installation on the Queens Boulevard Line between Union Turnpike and 179th Street, which requires using the express tracks west of Forest Hills to be used for overnight train storage.[143] After 9:30 p.m., Queens-bound R trains terminate at Queens Plaza, and Queens-bound E and F trains make local stops in Queens to fill in for R service. Brooklyn-bound F trains run local in Queens after 10:45 p.m..[144][145] The MTA did not specify how long these changes would last.[145]

Provisions for expansion

IND Second System

The Jackson Heights/Roosevelt Avenue station
The Jackson Heights–Roosevelt Avenue station has an unused upper level.[5][7]
The wide median of Hillside Avenue, which would have facilitated the Springfield Boulevard terminal station.

The Queens Boulevard Line was originally planned to extend farther along Hillside Avenue into eastern Queens.[146] The line would have gone at least to the intersection of Hillside, Springfield Boulevard and Braddock Avenue (the latter two both formerly part of Rocky Hill Road) in Queens Village, with later plans to go as far as Little Neck Parkway in Bellerose near the Nassau County border.[48][61][147] The extension to Springfield Boulevard, which on contract drawings was referred to as Route 108-Section 13, would have been a two track extension of the D3 and D4 express tracks, with five stations, at 187th Street, 197th Street, Cross Island Boulevard (today's Francis Lewis Boulevard), 214th Street, and the terminal at Springfield Boulevard. All of these stations, with the exception of Springfield Boulevard, would have had two side platforms.[148] Hillside Avenue was widened in the 1930s between 218th Street and 229th Street, in order to accommodate construction of the proposed Springfield Boulevard station and to accommodate an underpass for Hillside Avenue underneath Springfield Boulevard and Braddock Avenue.[149][150] Six station entrances would have been provided at Springfield Boulevard and Braddock Avenue. The station would have stretched as far east as 88th Avenue. The two tracks would have continued to 229th Street.[151] As part of the extension of the line to 179th Street in 1950, provisions were made to extend this line farther east via Hillside Avenue. East of the 179th Street there are two four track levels both used as train storage. The upper level was intended to be extended eastward, while the lower level was always intended to be used to relay and store trains. The tracks on the upper level are longer than the lower level tracks and the upper level tracks have a wooden partition at the bumper blocks. The tracks continue until 184th Street.[84]

Several stations along the line also have provisions for other extensions as part of the IND Second System. The Roosevelt Avenue station has an additional upper level platform and bellmouth provisions east of the station, which would have gone to a Queens crosstown line to the Rockaways.[5][7] The 63rd Drive station has similar bellmouths, which would have fed directly into the inactive portion of the Long Island Rail Road's former Rockaway Beach Branch near its former junction with the LIRR Main Line (Whitepot Junction).[152][153] One stop west, the Woodhaven Boulevard station has provisions to be converted into an express station.[154] East of the Briarwood station, there were additional trackways built for an extension down Van Wyck Boulevard (today the Van Wyck Expressway) to Rockaway Boulevard, near the current site of John F. Kennedy International Airport.[7][52][147] None of these proposals were ever funded, and only the Briarwood bellmouths were used for future expansion, while the Rockaway line was connected instead to the IND Fulton Street Line.[48][61][109]

Program for Action

When proposed in the mid-1960s under the MTA's Program for Action, the Archer Avenue and 63rd Street subway lines were two parts of a major planned expansion of Queens Boulevard line service.[48][109] The 63rd Street tunnel would have facilitated service between the Queens Boulevard line and the Second Avenue Subway, via bellmouths west of Roosevelt Island which turn south towards Midtown and Lower Manhattan. These turnouts may be used for the third and fourth phases of the Second Avenue Subway.[155][156] The proposed connection to the LIRR Rockaway Beach Branch resurfaced, with proposed branch lines along other LIRR lines to outer Queens areas without rapid transit service.[48] Expected to be completed by the mid-1970s and early 1980s,[157][158] these plans (the most important of which are outlined below) were derailed by the 1970s fiscal crisis, which delayed the completion of the Archer Avenue and 63rd Street lines.[48][109][125]

"Super-express" line

The Woodside LIRR station
A "super-express" bypass of the line would have had a station built at Woodside.[148][159]

The Archer Avenue and 63rd Street lines were planned to be connected by a "super-express" bypass of the Queens Boulevard line,[94][109][158] The bypass would have used the outer two of the six trackways of the LIRR Main Line (formerly used by the Rockaway Beach Branch), which are currently unused, and would have allowed trains to travel at speeds of up to 70 miles per hour (110 km/h). It would stretch from the 63rd Street Line east of 21st Street–Queensbridge, with the possibility of access to the 60th and 53rd Street tunnels. At its east end, it would have left the LIRR right-of-way near Whitepot Junction and ran under Yellowstone Boulevard to the Queens Boulevard Line near 71st Avenue station. The 71st Avenue station would have been converted into a bi-level or tri-level station, with the super express tracks using the lower level(s) built south of the current station, before rejoining the main line Queens Boulevard tracks.[48][155][158]

There were also plans for an intermediate stop at the current Woodside LIRR station, and an additional 63rd Street line station at Northern Boulevard adjacent to Queens Plaza. The bypass and proposed Woodside station would have necessitated the widening of the LIRR Main Line right-of-way onto private property west of Winfield Junction, where the Main Line merges with the Port Washington Branch, and reorganization of the track layout in the Sunnyside Yards.[148][159] Later proposals suggested routing the bypass directly to the Archer Avenue line via the LIRR Montauk Branch (which no longer has passenger service).[155][160]

While plans to construct the bypass existed as late as 1985, the connection to the Queens Boulevard line at Northern Boulevard was built as an alternative to the bypass.[125][160] A bellmouth was built at the end of the tunnel should construction on the bypass ever commence.[161]

Northeast Queens line

Another less publicized plan around this time was a branch line diverging from the Queens Boulevard mainline near Woodhaven Boulevard, and running along the Long Island Expressway (LIE) corridor to Kissena Boulevard at Queens College, and later to Fresh Meadows and Bayside. This "Northeastern Queens" line, or Route 131-C, would have been built in conjunction with the planned widening of the expressway. The subway tracks would have been placed under the expressway or its service roads, or in the median of a widened LIE in a similar manner to the Congress Branch of the Chicago "L".[153][155][158] The Woodhaven Boulevard station, using existing provisions, would be converted to an express station. Three new stations would have been built during the first phase of the line, at 99th Street near LeFrak City, at Main Street, and a terminal station at Kissena Boulevard. At Main Street there would have been three tracks, and two island platforms. East of the terminus at Kissena Boulevard, there would have been two levels of layup tracks, allowing for an extension further east.[148] A similar line along the corridor had been proposed in the 1939 IND Second System plan as an extension of the BMT Broadway Line east of the 60th Street Tunnel, when the road was called Horace Harding Boulevard prior to the construction of the expressway.[48][147]

Southeast Queens line

The most important of the proposed lines along LIRR branches was a "Southeast Queens" extension of the Archer Avenue subway along the Locust Manor branch to Springfield Gardens, which was the original intention of the Queens Boulevard extension to Archer Avenue. This would have used an existing provision east of Jamaica Center, and necessitated the installation of two dedicated subway tracks, construction of new stations and/or the conversion of existing facilities along the right-of-way.[155][157][158]

Station listing

Station service legend
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights
Stops late nights only Stops late nights only
Stops late nights and weekends Stops late nights and weekends only
Stops weekdays during the day Stops weekdays during the day
Stops rush hours in the peak direction only Stops rush hours in the peak direction only
Time period details
Disabled access Station is compliant with the Americans with Disabilities Act
Disabled access ↑ Station is compliant with the Americans with Disabilities Act
in the indicated direction only
Disabled access ↓
Elevator access to mezzanine only
Neighborhood
(approximate)
Disabled access Station Tracks Services Opened Transfers and notes
Queens
Jamaica Disabled access Jamaica–179th Street all E limited rush-hour serviceF all times <F> two rush hour trains, peak direction December 10, 1950[88] Q3 bus to JFK Airport
169th Street local F all times <F> two rush hour trains, peak direction April 24, 1937[67] Q3 bus to JFK Airport
Parsons Boulevard all E limited rush-hour serviceF all times <F> two rush hour trains, peak direction April 24, 1937[67]
Lua error in Module:Adjacent_stations at line 74: attempt to concatenate local 'key' (a nil value). local F all times <F> two rush hour trains, peak direction April 24, 1937[67] Q44 Select Bus Service
IND Archer Avenue Line (E all times) merges
Briarwood Elevator access to mezzanine only Briarwood local E nights after 9:00 p.m., weekends, and limited a.m. rush hour tripsF all times <F> two rush hour trains, peak direction April 24, 1937[67] Q44 Select Bus Service
connecting tracks to Jamaica Yard
Kew Gardens Disabled access Kew Gardens–Union Turnpike all E all timesF all times <F> two rush hour trains, peak direction December 31, 1936[62] Q10 bus to JFK Airport
Forest Hills 75th Avenue local E nights after 9:00 p.m., weekends, and limited a.m. rush hour tripsF all times <F> two rush hour trains, peak direction December 31, 1936[62]
connecting tracks to Jamaica Yard; former connection to IND World's Fair Line
Disabled access Forest Hills–71st Avenue all E all timesF all times <F> two rush hour trains, peak directionM weekdays during the dayR all times except late nights December 31, 1936[62]
Rego Park 67th Avenue local E late nightsF late nightsM weekdays during the dayR all times except late nights December 31, 1936[62]
63rd Drive–Rego Park local E late nightsF late nightsM weekdays during the dayR all times except late nights December 31, 1936[62]
Elmhurst Woodhaven Boulevard local E late nightsF late nightsM weekdays during the dayR all times except late nights December 31, 1936[62] Q52/Q53 Select Bus Service
Grand Avenue–Newtown local E late nightsF late nightsM weekdays during the dayR all times except late nights December 31, 1936[62] Q53 Select Bus Service
Elmhurst Avenue local E late nightsF late nightsM weekdays during the dayR all times except late nights December 31, 1936[62] Q53 Select Bus Service
Jackson Heights Disabled access Jackson Heights–Roosevelt Avenue all E all timesF all times <F> two rush hour trains, peak directionM weekdays during the dayR all times except late nights August 19, 1933[49] IRT Flushing Line (7 all times) at 74th Street–Broadway
Q47 bus to LaGuardia Airport (Marine Air Terminal only)
Q53 Select Bus Service
Q70 Select Bus Service to LaGuardia Airport
Woodside 65th Street local E late nightsF late nightsM weekdays during the dayR all times except late nights August 19, 1933[49]
express tracks go underneath (E all except late nightsF all except late nights <F> two rush hour trains, peak direction)
Northern Boulevard local E late nightsF late nightsM weekdays during the dayR all times except late nights August 19, 1933[49]
express tracks diverge (E all except late nightsF all except late nights <F> two rush hour trains, peak direction)
Astoria 46th Street local E late nightsF late nightsM weekdays during the dayR all times except late nights August 19, 1933[49]
Steinway Street local E late nightsF late nightsM weekdays during the dayR all times except late nights August 19, 1933[49]
express tracks rejoin (E all except late nightsF all except late nights <F> two rush hour trains, peak direction)
Long Island City 36th Street local E late nightsF late nightsM weekdays during the dayR all times except late nights August 19, 1933[49]
IND 63rd Street Line splits (F all times <F> two rush hour trains, peak direction)
Disabled access Queens Plaza all E all timesM weekdays during the dayR all hours except late nights August 19, 1933[49]
local tracks split to IND Crosstown Line (no regular service) and 60th Street Tunnel Connection (R all except late nights)
Disabled access[b] Court Square–23rd Street express E all timesM weekdays during the day August 28, 1939[73] IND Crosstown Line (G all times)
IRT Flushing Line (7 all times <7> rush hours until 9:30 p.m., peak direction​)
Manhattan
53rd Street Tunnel
Midtown Manhattan Disabled access Lexington Avenue–53rd Street express E all timesM weekdays during the day August 19, 1933[49] IRT Lexington Avenue Line (4 late nights6 all times <6> weekdays until 8:45 p.m., peak direction) at 51st Street
Fifth Avenue/53rd Street express E all timesM weekdays during the day August 19, 1933[49]
connection to IND Sixth Avenue Line (M weekdays during the day) splits
Seventh Avenue express E all times August 19, 1933[49] IND Sixth Avenue Line (B Weekday rush hours, middays and early eveningsD all times)
Disabled access[b] 50th Street express E all times August 19, 1933[49] IND Eighth Avenue Line (A late nightsC all except late nights) (transfer in same direction only)
merges with IND Eighth Avenue Line (A all timesC all except late nights)

Footnotes

  1. ^ This total is achieved by adding the total ridership of the stations on the Queens Boulevard Line.[1]
  2. ^ a b Southbound only

References

  1. ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  2. ^ a b c "Capital Program Oversight Committee Meeting: July 2015" (PDF). New York City: Metropolitan Transportation Authority. July 2015. pp. 37–39. Archived from the original (PDF) on September 6, 2015. Retrieved August 11, 2015.
  3. ^ * "Trial Run to Jamaica on Subway Tomorrow: Section From Kew Gardens to 169th Street Will Open to Public in Two Weeks" (PDF). The New York Times. April 9, 1937. Retrieved June 30, 2015.
  4. ^ a b c d e f Dougherty, Peter (2020). Tracks of the New York City Subway 2020 (16th ed.). Dougherty. OCLC 1056711733.
  5. ^ a b c Martin, Douglas (November 17, 1996). "Subway Planners' Lofty Ambitions Are Buried as Dead-End Curiosities". The New York Times. Archived from the original on August 7, 2017. Retrieved June 27, 2015.
  6. ^ a b c d Kramer, Frederick A. (1990). Building the Independent Subway. Quadrant Press. ISBN 978-0-915276-50-9. Archived from the original on October 6, 2022. Retrieved July 17, 2016.
  7. ^ a b c d e f * Duffus, R.L. (September 22, 1929). "Our Great Subway Network Spreads Wider; New Plans of Board of Transportation Involve the Building of More Than One Hundred Miles of Additional Rapid Transit Routes for New York". The New York Times. Archived from the original on June 13, 2018. Retrieved August 19, 2015.
  8. ^ "New IND Platform Will Open Monday" (PDF). The New York Times. August 23, 1952. Archived from the original on June 19, 2022. Retrieved June 30, 2015.
  9. ^ Ingraham, Joseph C. (June 20, 1952). "New IND Platform at 8th and 42d To Expedite Service From Queens" (PDF). The New York Times. Archived from the original on June 19, 2022. Retrieved June 30, 2015.
  10. ^ Donohue, Pete (June 20, 2009). "Abandoned No More: 2nd Life Drilled into Old 7 Subway Platform". New York Daily News. Archived from the original on June 23, 2009. Retrieved January 30, 2010.
  11. ^ a b c d e f "Subway Service Guide" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved September 22, 2019.
  12. ^ a b c "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
  13. ^ "Transit District 20". www.nyc.gov. Archived from the original on December 30, 2018. Retrieved December 29, 2018.
  14. ^ "Queens Subway Work Ahead of Schedule: Completion Will Lead to Big Apartment Building, Says William C. Speers". The New York Times. April 7, 1929. Archived from the original on October 7, 2022. Retrieved September 1, 2015.
  15. ^ a b c "Queens Lauded as Best Boro By Chamber Chief". Brooklyn Daily Eagle. September 23, 1929. p. 40. Archived from the original on October 26, 2016. Retrieved October 4, 2015 – via Newspapers.com.
  16. ^ a b "New Subway Routes in Hylan Program to Cost $186,046,000". The New York Times. March 21, 1925. p. 1. ISSN 0362-4331. Archived from the original on October 7, 2022. Retrieved December 28, 2020.
  17. ^ "1_8aaaf683001d5e21891cb425b64de612-1". Flickr – Photo Sharing!. December 12, 2014. Archived from the original on November 9, 2015. Retrieved September 27, 2015.
  18. ^ a b c * "Possible routing of queens blvd line via kew gardens rd". Flickr. December 12, 2014.
  19. ^ "Movement To Change Subway To Richmond Hill". The Richmond Hill Record. August 28, 1925. p. 1. Archived from the original on October 7, 2022. Retrieved April 24, 2018.
  20. ^ "New Subway Stop Planned; In 8th Av., Between 49th and 51st Streets on Queens Line". The New York Times. November 22, 1926. ISSN 0362-4331. Archived from the original on March 22, 2018. Retrieved March 21, 2018.
  21. ^ a b c d e Seyfried, Vincent F. (1995). Elmhurst : from town seat to mega-suburb. Vincent F. Seyfried. Archived from the original on September 23, 2016. Retrieved September 20, 2016.
  22. ^ "L.I. City-Jamaica Subway To Open Between Plaza and Manhattan Next Year; City Will Extend Service With Completion of Each Section; Sullivan Reveals Plans of Board of Transportation" (PDF). Long Island Daily Star. Fultonhistory.com. March 15, 1930. p. 1. Archived (PDF) from the original on May 4, 2022. Retrieved July 27, 2016.
  23. ^ "$17,146,500 Voted For New Subways; Estimate Board Appropriates More Than $9,000,000 for Lines in Brooklyn. $6,490,000 For The Bronx Smaller Items for Incidental Work --Approves the Proposed Queens Boulevard Route". The New York Times. October 5, 1928. ISSN 0362-4331. Archived from the original on July 26, 2018. Retrieved August 4, 2016.
  24. ^ "More Subway Links To Open". The New York Sun. August 17, 1933. p. 7. Retrieved April 24, 2018.
  25. ^ a b "Plans Are Changed For Queens Subway: Traffic Crossings at Nassau and Woodhaven Boulevards Altered to Avoid Congestion. Viaduct Project Dropped Main Driveway to Be Depressed, Side Routes to Be at Grade-- New Bids Due Soon. How Plans Were Changed. Elimination Plans Received". The New York Times. June 22, 1930. Archived from the original on September 28, 2015. Retrieved September 1, 2015.
  26. ^ "State and City Plans For Long Island Seen As Boost to Realty". Brooklyn Daily Eagle. January 24, 1932. p. 44. Archived from the original on October 28, 2016. Retrieved November 3, 2015 – via Newspapers.com.
  27. ^ "Highway Program Aids Long Island Growth" (PDF). The New York Times. April 27, 1930. Archived from the original on October 7, 2022. Retrieved June 27, 2015.
  28. ^ * "Queens Boulevard Express Highway (NY 25, unbuilt)". www.nycroads.com. Archived from the original on April 1, 2016. Retrieved August 4, 2016.
  29. ^ * "Queensborough Bridge Centennial". New York Division Bulletin. 52 (3). Electric Railroaders Association: 1–5. March 2009. Archived from the original on October 7, 2022. Retrieved January 1, 2016.
  30. ^ a b c d Hirshon, Nicholas; Romano, Foreword by Ray (January 1, 2013). Forest Hills. Arcadia Publishing. ISBN 978-0-7385-9785-0.
  31. ^ * Marks, Seymour (January 19, 1959). "The Phantom Subway: Ideal Spot to Park Underground" (PDF). Long Island Star-Journal. Fultonhistory.com. p. 1. Archived (PDF) from the original on June 29, 2022. Retrieved August 12, 2016.
  32. ^ "New Queens Subway Extension Assured". Standard Union. October 16, 1930. p. 16. Retrieved April 25, 2019.
  33. ^ "178th Street Subway Stop Now Assured. Place Is Designated for Station by Transportation Board". Long Island Daily Press. December 1, 1930. p. 1. Retrieved April 25, 2019.
  34. ^ "SUBWAY OPENING DELAY AGAIN HIT BY E. A. DANGLER". Daily Star. January 4, 1932. p. 14. Retrieved April 24, 2018.
  35. ^ "City Will Open New Subway This Fall". Long Island Daily Press. January 19, 1933. Retrieved April 24, 2018.
  36. ^ "New Queens Subway To Open In August, Is Latest Official Promise". Daily Star. March 20, 1933. p. 1. Retrieved April 24, 2018.
  37. ^ "New Queens Subway Ready For Service In August, Is Latest Word; Work Now Going Ahead At Top Speed". Daily Star. March 20, 1933. p. 12. Retrieved April 24, 2018.
  38. ^ a b * "Demand Is Noted For Queens Homes; Sales in Many Areas Exceed Summer Expectations of Developers; Jamaica Section Active; Buying Interest Reported at Kew Gardens—Open Roslyn Community Today Kew Gardens Activity Open Home Center at Roslyn". The New York Times. July 18, 1937. ISSN 0362-4331. Archived from the original on October 7, 2022. Retrieved April 26, 2016.
  39. ^ * "New Subway Spurs Building on Queens Boulevard: Home Construction to $2,000,000 Value Now Going On, Says Boelsen" (PDF). New York Daily Star. April 17, 1930. p. 2. Archived (PDF) from the original on October 7, 2022. Retrieved August 2, 2016 – via Fulton History.
  40. ^ "Queens To Have 15-Story House; Tall Structure for New Residential Development in Forest Hills Area. Near Boulevard Subway Several Blocks Rezoned for High Buildings Between Jamaica and Kew Gardens. Apartment Height's Increase". The New York Times. March 23, 1930. ISSN 0362-4331. Archived from the original on October 7, 2022. Retrieved April 26, 2016.
  41. ^ Copquin, Claudia Gryvatz (January 1, 2007). The Neighborhoods of Queens. Yale University Press. ISBN 978-0-300-11299-3.
  42. ^ * "Subway Link Aids Realty In Queens; Civic Leaders Urge Careful Planning for the Future Growth of District. Apartment Trend Seen Rising Values Are Predicted for the Forest Hills and Kew Gardens Areas. Views Future With Optimism Cites New Responsibilities Subway Link Aids Realty In Queens Changing Conditions Seen Sales in Rego Park". The New York Times. January 3, 1937. ISSN 0362-4331. Archived from the original on June 15, 2018. Retrieved April 26, 2016.
  43. ^ "Residential Areas In Queens Expand; Plans Are Announced for New Garden Apartment House in Jackson Heights. Many Small Homes Built Queens Boulevard Values Rise-- Construction Activity Reported in Woodhaven Section. Queens Boulevard Values Rise". The New York Times. May 11, 1930. ISSN 0362-4331. Archived from the original on July 26, 2018. Retrieved August 4, 2016.
  44. ^ a b Dougherty, Philip H. (March 10, 1965). "Queens Boulevard, Once Just a Good Route to Jamaica, Is Becoming a 'Golden Area'; Urban Togetherness". The New York Times. ISSN 0362-4331. Archived from the original on July 26, 2018. Retrieved August 4, 2016.
  45. ^ "Queens Boulevard Ready For Building; Subway Completion There Will Stimulate Large Housing Improvements". The New York Times. March 9, 1930. ISSN 0362-4331. Archived from the original on July 26, 2018. Retrieved August 4, 2016.
  46. ^ Seyfried, Vincent F.; Asadorian, William (January 1, 1991). Old Queens, N.Y., in Early Photographs. Courier Corporation. ISBN 978-0-486-26358-8. Archived from the original on October 7, 2022. Retrieved November 1, 2020.
  47. ^ "Queens Population Grew With Subway; 248,678 Gain From 1940 to '50 Followed Opening of Land Areas Along 8th Avenue Line". The New York Times. July 1, 1951. ISSN 0362-4331. Archived from the original on April 5, 2018. Retrieved April 4, 2018.
  48. ^ a b c d e f g h i j Raskin, Joseph B. (2013). The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press. doi:10.5422/fordham/9780823253692.001.0001. ISBN 978-0-82325-369-2.
  49. ^ a b c d e f g h i j k l * "Two Subway Units Open At Midnight; Links in City-Owned System in Queens and Brooklyn to Have 15 Stations" (PDF). The New York Times. August 18, 1933. Archived from the original on December 10, 2021. Retrieved November 7, 2015.
  50. ^ "New Subway Opens Tomorrow Queens Boulevard Route to Manhattan Starts at 12:01 A. M.–Special Run Being Made Today". The Richmond Hill Record. August 18, 1933. p. 8. Archived from the original on October 7, 2022. Retrieved November 19, 2017.
  51. ^ "Unfinished Sections of Subway Lines To Be Completed" (PDF). The New York Sun. Fultonhistory.com. December 13, 1933. p. 47. Retrieved July 30, 2016.
  52. ^ a b c d Neufeld, Ernest (August 23, 1936). "Men Toil Under Earth to Build Subway" (PDF). Long Island Daily Press. Fultonhistory.com. p. 2 (Section 2). Archived (PDF) from the original on January 29, 2022. Retrieved August 12, 2016.
  53. ^ * "500 More Quit Subway Work On Boulevard: General Strike Order Issued Today; 72 Walk Out in Jamaica" (PDF). Long Island Daily Press. Fultonhistory.com. April 2, 1935. p. 2. Archived (PDF) from the original on October 7, 2022. Retrieved July 30, 2016.
  54. ^ "City to Extend Tube to Jamaica in 18 Months: To Push Subway Over Fulton St. Line Into Boro by Then, Says Delaney". Brooklyn Times Union. January 22, 1935. Archived from the original on October 7, 2022. Retrieved December 2, 2021.
  55. ^ "City's New Subway Yards In Kew Gardens Due Aug. 20". New York Daily News. February 27, 1935. Archived from the original on October 7, 2022. Retrieved March 14, 2019.
  56. ^ "L.I.R.R. to Drop Way Trains From N.Y. to Jamaica. Line Anticipates $750,000 Loss When Subway Opens, Is Plea at Hearing". Brooklyn Times Union. March 18, 1936. Archived from the original on December 2, 2021. Retrieved December 2, 2021.
  57. ^ "Kew Gardens Yards In Use This Autumn". New York Daily News. April 24, 1936. Archived from the original on October 7, 2022. Retrieved March 14, 2019.
  58. ^ "Last Jamaica Subway Stop May Be at 169th Street. Can't Have Expresses and Distance, Too, Official Says". Long Island Sunday Press. April 26, 1936. p. 1. Retrieved April 25, 2019.
  59. ^ a b c "Two Crews Rush to Finish Last 200 Feet of Subwav: Work Must End April 3 to Allow Time for Tests". Long Island Daily Press. March 19, 1937. p. 1. Retrieved April 25, 2019.
  60. ^ "Kew Gardens–Times Square Ride to Be 33 Minutes". Long Island Daily Press. November 20, 1936. p. 1. Retrieved April 24, 2018.
  61. ^ a b c d e Roger P. Roess; Gene Sansone (August 23, 2012). The Wheels That Drove New York: A History of the New York City Transit System. Springer Science & Business Media. pp. 416–417. ISBN 978-3-642-30484-2.
  62. ^ a b c d e f g h i *"PWA Party Views New Subway Link: Queens Section to Be Opened Tomorrow Is Inspected by Tuttle and Others" (PDF). The New York Times. December 30, 1936. Retrieved June 27, 2015.
  63. ^ "LaGuardia at Throttle On Subway Joyride. 750 Passengers, Including Celebrities, Guests on Trial Trip Over New $27,000,000 Independent Extension to Kew Gardens". Brooklyn Daily Eagle. December 30, 1936. pp. 1, 3. Retrieved March 14, 2019.
  64. ^ "Kew Gardens To Open On Thursday". New York Daily News. December 27, 1936. Archived from the original on September 15, 2020. Retrieved March 14, 2019.
  65. ^ "Last 200 Feet of Subway Rushed" (PDF). Long Island Daily Press. March 19, 1937. p. 2. Archived (PDF) from the original on October 7, 2022. Retrieved April 25, 2019.
  66. ^ Proceedings of the New York City Board of Transportation. New York City Board of Transportation. 1937. p. 671.
  67. ^ a b c d e *"Subway Link Opens Soon: City Line to Jamaica Will Start About April 24" (PDF). The New York Times. March 17, 1937. Retrieved June 27, 2015.
  68. ^ "New Subway Link to Jamaica Opened; La Guardia, City Officials and Civic Groups Make Trial Run on 10-Car Train". The New York Times. April 25, 1937. Archived from the original on December 6, 2021. Retrieved March 8, 2019.
  69. ^ a b "Trains Testing Jamaica Link Of City Subway". The Brooklyn Daily Eagle. April 10, 1937. p. 3. Archived from the original on October 7, 2022. Retrieved April 24, 2018.
  70. ^ "Jamaica Will Greet Subway". The New York Sun. April 23, 1937. p. 8. Retrieved April 24, 2018.
  71. ^ "LaGuardia Heads Speakers Marking Subway Opening Ceremonies Planned Saturday Celebrating Hillside Avenue Extension". North Shore Daily Journal. April 23, 2017. p. 3. Archived from the original on October 7, 2022. Retrieved November 19, 2017.
  72. ^ "Transit Link Open Today; 8th Ave. Line Extended to Jamaica—Celebration Arranged". The New York Times. April 24, 1937. ISSN 0362-4331. Archived from the original on February 25, 2018. Retrieved August 4, 2016.
  73. ^ a b * "Subway Station Opens Aug. 28" (PDF). The New York Times. August 5, 1939. Retrieved October 4, 2015.
  74. ^ "New Lines Shift City Travel". Brooklyn Daily Eagle. Newspapers.com. July 8, 1937. Archived from the original on April 22, 2022. Retrieved October 31, 2016.
  75. ^ "Subway Service To Start Fair Service April 30". New York Daily News. April 16, 1939. Archived from the original on October 7, 2022. Retrieved March 14, 2019.
  76. ^ "To Build Fair Subway P. T. Cox Co. Wins Award for Extending Independent System The first contract for the World's Fair spur from the Queens Boulevard line of the Independent Subway System was awarded yesterday by the Board of Transportation to the lowest bidder, the P. T. Cox Contracting Company, at the bid price of $308,770" (PDF). The New York Times. October 27, 1937. Archived from the original on October 7, 2022. Retrieved July 6, 2015.
  77. ^ "How To Get To The Fair Grounds; By Subway". The New York Times. April 30, 1939. Archived from the original on July 9, 2015. Retrieved July 7, 2015.
  78. ^ "End of Subway Spur To Fair Now Urged: Transportation Board Asks the Right to Demolish It". The New York Times. November 26, 1940. Archived from the original on July 9, 2015. Retrieved July 7, 2015.
  79. ^ "City Subway Ride To Fair To Cost 10c Board Holds Dime Charge Is Necessary to Pay for Branch Line to the Grounds" (PDF). The New York Times. February 18, 1939. Archived (PDF) from the original on July 8, 2015. Retrieved July 6, 2015.
  80. ^ "New Subway Spur Is Ready To Open: First Train to Start Four Minutes Before the Fair Officially Begins". The New York Times. April 17, 1939. Archived from the original on July 9, 2015. Retrieved July 7, 2015.
  81. ^ "Independent Subway Services Beginning in 1932". thejoekorner.com. August 21, 2013. Archived from the original on November 22, 2019. Retrieved August 2, 2015.
  82. ^ a b c d Sparberg, Andrew J. (October 1, 2014). From a Nickel to a Token: The Journey from Board of Transportation to MTA. Fordham University Press. ISBN 978-0-8232-6190-1.
  83. ^ * Linder, Bernard (December 2008). "Sixth Avenue Subway Service Changes". New York Division Bulletin. 51 (12). Electric Railroaders' Association: 2–4. Archived from the original on August 20, 2020. Retrieved August 6, 2016.
  84. ^ a b c Report including analysis of operations of the New York City transit system for five years, ended June 30, 1945. New York City: Board of Transportation of the City of New York. 1945. hdl:2027/mdp.39015020928621.
  85. ^ a b "178th Street Subway Plan To Take Years. Station to Ease Congestion Will Cost $2,000,000, Engineers Reveal" (PDF). Long Island Daily Press. February 6, 1941. p. 1. Archived (PDF) from the original on October 7, 2022. Retrieved April 25, 2019.
  86. ^ a b "178th Street Subway Plan To Take Years. Station to Ease Congestion Will Cost $2,000,000, Engineers Reveal". Long Island Daily Press. February 6, 1941. p. 22. Retrieved April 25, 2019.
  87. ^ "Burke Proposal For Bus-Subway Relief Approved. Transit Board Supports 178th Street Station On Municipal Line". Long Island Star–Journal. February 28, 1941. p. 8. Retrieved April 25, 2019.
  88. ^ a b c d *"New Subway Link Opening in Queens" (PDF). The New York Times. December 12, 1950. Retrieved June 30, 2015.
  89. ^ "New Subway Spur Work To Start". Long Island Star-Journal. October 22, 1946. p. 20. Retrieved April 25, 2019.
  90. ^ "Subway Ground Broken: Mayor Officiates at Site of Extension in Queens". The New York Times. March 6, 1947. Archived from the original on June 14, 2018. Retrieved August 12, 2016.
  91. ^ Report for the three and one-half years ending June 30, 1949. New York City Board of Transportation. 1949. hdl:2027/mdp.39015023094926.
  92. ^ "All 'F' Trains Will Run to 179 Street". Long Island Star-Journal. Fultonhistory.com. October 4, 1951. p. 1. Archived from the original on October 7, 2022. Retrieved August 12, 2016.
  93. ^ "Queens Subway Changes: Parsons Boulevard, 179th Street Stations Are Accepted" (PDF). New York Times. October 4, 1951. Archived from the original on October 7, 2022. Retrieved January 25, 2016.
  94. ^ a b c d e f g * "Review of F Line Operations, Ridership, and Infrastructure" (PDF). nysenate.gov. MTA New York City Transit Authority. October 7, 2009. Archived from the original (PDF) on May 31, 2010. Retrieved July 28, 2015.
  95. ^ Ingalls, Leonard (August 28, 1953). "2 Subway Lines to Add Cars, Another to Speed Up Service" (PDF). New York Times. Archived from the original on July 2, 2022. Retrieved January 25, 2016.
  96. ^ "16-Point Plan Can Give Boro Relief NOW". Long Island Star–Journal. August 10, 1962. Retrieved April 24, 2018.
  97. ^ "Straphangers Sit As Tunnel Opens". The New York Times. December 2, 1955. Archived from the original on November 2, 2012. Retrieved February 28, 2010.
  98. ^ Service Adjustments on the BMT and IND Lines Effective Midnight, Saturday, August 27 New York City Transit Authority (1977). Flickr. Archived from the original on September 15, 2016. Retrieved June 9, 2016.
  99. ^ Korman, Joe. What's a K train?. TheJoeKorner. Archived from the original on March 4, 2016. Retrieved December 28, 2018.
  100. ^ Hey, What's a "K" train? 1985 Brochure. Flickr. Archived from the original on September 15, 2016. Retrieved June 17, 2016.
  101. ^ Banner, Randy (April 21, 1981). "Orlow Says Contract For IND Lighting Set". Newsday. Retrieved June 16, 2021.
  102. ^ a b c d e f "Archer Avenue Corridor Transit Service Proposal". New York City Transit Authority, Operations Planning Department. August 1988. {{cite web}}: Missing or empty |url= (help)
  103. ^ a b Alternatives Analysis/Supplemental Draft Environmental Impact Statement for the Queens Subway Options Study. United States Department of Transportation, Metropolitan Transportation Authority, Urban Mass Transit Administration. May 1990. Retrieved August 13, 2016.
  104. ^ * "Shifts on N and R Lines Are Planned in Queens". The New York Times. October 16, 1986. p. B10. Archived from the original on August 11, 2016. Retrieved July 29, 2016.
  105. ^ "R46 Subway Car Rollsign". Photobucket. Metropolitan Transportation Authority. Archived from the original on September 15, 2020. Retrieved September 8, 2019.
  106. ^ "R46 Subway Car Rollsign". Photobucket. Metropolitan Transportation Authority. Archived from the original on September 15, 2020. Retrieved September 8, 2019.
  107. ^ "A view of the western car dropoff/pickup area. A sign outlining the proposed services following the opening of the Archer Avenue Subway can be seen - N trains, which served the Queens Boulevard Line until 1987, would have run to Jamaica Center, along with the G, which served the Queens Boulevard Line until 2010. In addition, a sealed passage to the northwestern of Union Turnpike upper level and Queens Boulevard can be made out by the arched ceiling to the right of the subway sign". indsecondsystem.weebly.com. March 8, 2020. Archived from the original on March 13, 2020. Retrieved March 13, 2020.
  108. ^ "R46 Jamaica Image 14".[dead link]
  109. ^ a b c d e f Johnson, Kirk (December 9, 1988). "Big Changes For Subways Are to Begin". The New York Times. Archived from the original on July 5, 2015. Retrieved July 14, 2015.
  110. ^ "Archer Opens Dec. 11 Excerpts From TA Plan". Notes from Underground. 18 (11, 12). Committee For Better Transit. January–February 1988.
  111. ^ Johnson, Kirk (December 9, 1988). "Big Changes For Subways Are to Begin". The New York Times. ISSN 0362-4331. Archived from the original on March 8, 2021. Retrieved June 6, 2016.
  112. ^ Polsky, Carol (December 11, 1988). "New Subway Line Finally Rolling Through Queens". Newsday.
  113. ^ "Archer Avenue Extension Opens December 11". Welcome Aboard: Newsletter of the New York City Transit Authority. 1 (4). New York City Transit Authority: 1. 1988.
  114. ^ a b Henican, Ellis (July 5, 1992). "Locals Sidetrack the F Train". Newsday. p. 4, 37.
  115. ^ a b c "Service Change Monitoring Report Six Month Evaluation of F/R Queens Boulevard Line Route Restructure" (PDF). www.laguardiawagnerarchive.lagcc.cuny.edu. Metropolitan Transportation Authority. April 1993. Archived (PDF) from the original on June 4, 2021. Retrieved December 28, 2018.
  116. ^ "Service Changes September 30, 1990" (PDF). subwaynut.com. New York City Transit Authority. September 30, 1990. Archived (PDF) from the original on October 26, 2014. Retrieved May 1, 2016.
  117. ^ a b "Van Wyck Blvd Station" (PDF). www.laguardiawagnerarchive.lagcc.cuny.edu. Metropolitan Transportation Authority. May 1992. Archived (PDF) from the original on August 6, 2021. Retrieved December 28, 2018.
  118. ^ "October 1992 New York City Subway Map". Flickr. New York City Transit Authority. October 1992. Archived from the original on January 5, 2017. Retrieved October 30, 2016.
  119. ^ Bazzi, Mohamad (December 29, 1993). "F Train To Continue Stops In Eastern Queens". Newsday. Archived from the original on October 7, 2022. Retrieved June 17, 2021.
  120. ^ a b * Levine, Richard (February 7, 1987). "M.T.A. Proposes Opening 63d Street Tunnel in '89". The New York Times. Archived from the original on March 25, 2020. Retrieved October 20, 2011.
  121. ^ a b c "Review of the G Line" (PDF). mta.info. Metropolitan Transportation Authority. July 10, 2013. Archived (PDF) from the original on February 26, 2015. Retrieved August 2, 2015.
  122. ^ a b "Starting August 30, there will be changes in late-night service along Queens Boulevard". New York Daily News. September 2, 1997. Archived from the original on November 6, 2018. Retrieved September 30, 2018.
  123. ^ Bolden, Eric. "NYCT Line by Line History". www.erictb.info. Archived from the original on March 4, 2016. Retrieved June 17, 2016.
  124. ^ * O'Neill, Natalie (April 13, 2012). "History shows it's not the G train 'extension' — it's the G train renewal". The Brooklyn Paper. Archived from the original on July 23, 2015. Retrieved August 2, 2015.
  125. ^ a b c Kennedy, Randy (May 25, 2001). "Panel Approves New V Train but Shortens G Line to Make Room". The New York Times. Archived from the original on November 26, 2010. Retrieved March 20, 2010.
  126. ^ Dunlap, David W. (September 19, 2008). "New Subway Grates Add Aesthetics to Flood Protection". The New York Times. Archived from the original on October 10, 2017. Retrieved February 14, 2017.
  127. ^ "August 8, 2007 Storm Report" (PDF). Metropolitan Transportation Authority. September 20, 2007. Archived from the original (PDF) on October 29, 2007. Retrieved October 27, 2007.
  128. ^ John Hill (2011). Guide to Contemporary New York City Architecture. W.W. Norton & Company. pp. 233, 237. ISBN 978-0-393-73326-6. Retrieved October 13, 2017.
  129. ^ * "Memorandum: Modifications to 2010 NYC Transit Service Reductions" (PDF). mta.info. MTA New York City Transit Authority. March 19, 2010. Archived (PDF) from the original on June 6, 2014. Retrieved August 23, 2015.
  130. ^ Whitford, Emma (January 8, 2016). "MTA Will Completely Close 30 Subway Stations For Months-Long "Revamp"". Gothamist. Archived from the original on August 1, 2016. Retrieved July 18, 2016.
  131. ^ "MTAStations" (PDF). governor.ny.gov. Government of the State of New York. Archived (PDF) from the original on January 4, 2019. Retrieved July 18, 2016.
  132. ^ Berger, Paul (April 3, 2018). "New York Subway Cuts Back Plans to Renovate Stations". Wall Street Journal. ISSN 0099-9660. Archived from the original on April 3, 2018. Retrieved April 3, 2018.
  133. ^ "MTA Announces 20 Additional Subway Stations to Receive Accessibility Improvements Under Proposed 2020-2024 Capital Plan". mta.info. December 19, 2019. Archived from the original on April 21, 2020. Retrieved December 20, 2019.
  134. ^ "Advanced Signaling Makes the Most Out of Old Subways, But Can New York Handle It?". Archived from the original on October 7, 2022. Retrieved August 6, 2016.
  135. ^ a b "Pages 11–12" (PDF). Archived (PDF) from the original on August 16, 2016. Retrieved August 6, 2016.
  136. ^ "MTA | news | $205.8M in Contracts Approved to Install Communications-Based Train Control System". www.mta.info. Archived from the original on July 28, 2016. Retrieved August 6, 2016.
  137. ^ Wanek-Libman, Mischa (January 5, 2017). "MTA awards L.K. Comstock Queens Boulevard Line signaling contract". Retrieved January 31, 2017.
  138. ^ "Capital Program Oversight Committee Meeting June 2019" (PDF). mta.info. Metropolitan Transportation Authority. June 2019. Archived (PDF) from the original on June 23, 2019. Retrieved June 23, 2019.
  139. ^ a b "Capital Program Oversight Committee Meeting April 2022". Metropolitan Transportation Authority. April 25, 2022. Archived from the original on April 28, 2022. Retrieved April 20, 2018.
  140. ^ "T7080341 Install Communication-Based Train Control (CBTC): Lexington Ave Line and Interlockings". web.mta.info. Metropolitan Transportation Authority. November 16, 2018. Archived from the original on November 26, 2018. Retrieved November 26, 2018.
  141. ^ "T7080340 Install Communication-Based Train Control (CBTC): Queens Blvd East and Interlockings". web.mta.info. Metropolitan Transportation Authority. November 16, 2018. Archived from the original on October 7, 2022. Retrieved November 26, 2018.
  142. ^ "MTA Announces Extension of Signal Modernization on the Queens Boulevard Line". mta.info. Metropolitan Transportation Authority. December 15, 2021. Archived from the original on December 15, 2021. Retrieved December 16, 2021.
  143. ^ "Heads up, E/F/R riders: Starting Friday, evening service is changing as we begin the next phase of our CBTC signal modernization project along Queens Blvd". Twitter. March 13, 2023. Retrieved March 16, 2023.
  144. ^ "MTA to Perform CBTC Signal Installation Work on E, F and R Lines in Queens Starting March 17". mta.info. Metropolitan Transportation Authority. February 26, 2023. Retrieved February 27, 2023.
  145. ^ a b Murray, Christian (February 24, 2023). "MTA announces service disruptions to E, F and R lines starting next month". amNewYork. Retrieved February 27, 2023.
  146. ^ "Queens Interlaced With New Arteries: New Boulevards, Parks and Parkways Important Factors in Growth of Borough". The New York Times. May 13, 1928. Archived from the original on July 26, 2018. Retrieved July 8, 2015.
  147. ^ a b c Project for Expanded Rapid Transit Facilities, New York City Transit System, dated July 5, 1939.
  148. ^ a b c d "Mysteries of the Queens Boulevard Subway". September 23, 2015. Archived from the original on June 29, 2016. Retrieved July 10, 2016.
  149. ^ * "1931 Hillside Av Widening Queens Village Bellerose SUBWAY Map NYC New York Map". Worthpoint. December 17, 2013. Archived from the original on March 4, 2016. Retrieved February 5, 2017.
  150. ^ "In The Matter Of The Widening of Hillside Avenue Queens Boro. Petition For Relief From Assessment". November 19, 1937. Archived from the original on October 7, 2022. Retrieved August 9, 2018.
  151. ^ * "Route 108 Section 13 Springfield Boulevard Station June 19, 1931". New York City Board of Transportation. June 19, 1931. Retrieved August 9, 2018.
  152. ^ "City Plans to Buy New Subway Link: Would Take Over Rockaway Branch of Long Island to Connect With Queens" (PDF). The New York Times. December 23, 1933. Archived from the original on October 7, 2022. Retrieved June 30, 2015.
  153. ^ a b Kihss, Peter (April 13, 1967). "3 Routes Proposed to Aid Growing Queens Areas" (PDF). The New York Times. Archived from the original on October 7, 2022. Retrieved June 27, 2015.
  154. ^ "The Express Stop That Never Was". ltvsquad.com. LTV Squad. June 2, 2015. Archived from the original on September 18, 2020. Retrieved June 27, 2015.
  155. ^ a b c d e * "Metropolitan transportation, a program for action. Report to Nelson A. Rockefeller, Governor of New York". Internet Archive. Metropolitan Transportation Authority. November 7, 1967. Retrieved October 1, 2015.
  156. ^ * "Second Avenue Subway Final Environmental Impact Statement (FEIS): Track Diagram, North of 55th Street" (PDF). mta.info. Metropolitan Transportation Authority. Archived (PDF) from the original on September 25, 2015. Retrieved August 27, 2015.
  157. ^ a b Burks, Edward C. (October 24, 1973). "Work Begun on Queens Subway Extension" (PDF). The New York Times. Archived from the original on October 5, 2022. Retrieved September 26, 2015.
  158. ^ a b c d e * "New Line May Get Double Trackage: Transit Unit Studies Shift on Queens Super-Express" (PDF). The New York Times. February 21, 1971. Archived from the original on October 7, 2022. Retrieved September 26, 2015.
  159. ^ a b * Burks, Edward C. (June 6, 1976). "Shortage of U.S. Funds May Delay Subway Link" (PDF). The New York Times. Archived from the original on October 7, 2022. Retrieved September 27, 2015.
  160. ^ a b Daley, Suzanne (November 1, 1984). "63d St. Subway Tunnel: More Setbacks For A Troubled Project". The New York Times. Archived from the original on October 10, 2020. Retrieved September 27, 2015.
  161. ^ "MTA 63rd Street Connector". Metropolitan Transportation Authority. Archived from the original on October 30, 2014. Retrieved October 1, 2015.
KML is from Wikidata