Dalian Metro
Dalian Metro | |||
---|---|---|---|
File:Dalian Metro Logo Image Only.svg | |||
Overview | |||
Locale | Dalian, Liaoning, China | ||
Transit type | Rapid transit | ||
Number of lines | 4 | ||
Number of stations | 69 | ||
Daily ridership | 431,000 (2017 Daily Avg.)[1] | ||
Annual ridership | 157.2 million (2017)[1] | ||
Operation | |||
Began operation | 2003 | ||
Operator(s) | Dalian Public Transportation Group Co. Ltd. (Line 3 & 12) Dalian Metro Co. Ltd. (Line 1 & 2) | ||
Technical | |||
System length | 153.54 km (95 mi) | ||
Electrification | 1,500 V DC | ||
|
Dalian Mass Transit System | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 大连轨道交通 | ||||||
Traditional Chinese | 大連軌道交通 | ||||||
| |||||||
Dalian Metro | |||||||
Simplified Chinese | 大连地铁 | ||||||
Traditional Chinese | 大連地鐵 | ||||||
| |||||||
Dalian Rapid Transit (DRT) | |||||||
Simplified Chinese | 大连快轨 | ||||||
Traditional Chinese | 大連快軌 | ||||||
|
The Dalian Metro or Dalian Subway is a rapid transit system in the city of Dalian, Liaoning, China.[2] The metro opened on 1 May 2003. The system currently in operation consists of 4 lines: Line 1, Line 2, Line 3, and Line 12.
Network
Map of Dalian Metro with under construction lines. |
Line | Terminals (District) |
Commencement | Newest Extension |
Length km |
Stations | Operator | |
---|---|---|---|---|---|---|---|
1 | Template:DLM stations (Ganjingzi) |
Template:DLM stations (Ganjingzi) |
2015 | 2017 | 26.46 | 22 | File:Dalian Metro Logo Image Only.svg |
2 | Template:DLM stations (Ganjingzi) |
Template:DLM stations (Zhongshan) |
2015 | 2018 | 25.75 | 21 | File:Dalian Metro Logo Image Only.svg |
3 | Template:DLM stations (Zhongshan) |
Template:DLM stations(Jinzhou) Jiuli(Jinzhou) |
2003 | 2008 | 61.76 | 18 | |
12 | Template:DLM stations (Ganjingzi) |
Template:DLM stations (Lüshunkou) |
2013 | 2017 | 39.57 | 8 | |
Total | 153.54 | 69 |
Line 1
Line 1, opened in 2015 currently in operation, connects east southeast central Dalian with north Dalian. The total length is 28.34 kilometers, with 22 underground stations.
Line 2
Line 2, opened in 2015 currently in operation, connects east central Dalian with west central Dalian. The total length is 42.56 kilometers, with 29 underground stations. The line is "C" shaped.
Line 3
Line 3, also known as Jinzhou Eastern Line, connects the Dalian Development Zone and Jinshitan with Dalian city center. It is a serpentine line, mostly elevated or at grade, and runs from the Dalian railway station to Jinshitan Station. The northern area of the city, where the Economic and Technology Development Zone is located, is not well-served by buses. The metro line beginning at the downtown commercial center (near the Dalian railway station) runs through five administrative districts of the city and serves as an express transport between the northern (developing) region and the downtown area. The line extends northward to Golden Pebble Beach (Jinshitan Scenic Area), a national scenic park 50 km (31 mi) from the city center. A branch route was open on 2008 and this line connects central Dalian with Jinzhou with 14.3 km² with seven station from south to north. This line begins at Kaifuqu Station and stretches northwest ending at Jiuli Station.
All stations have side platforms. Tracks in the platform area have no ballast (gravel); however, tracks outside the station are on ballast. All stations are covered by a combination of transparent corrugated sheets and a concrete roof.
Line 12
Line 12, also known as Tram Route 202 Extension Line, was opened in 2013 and connects central Dalian with Lüshunkou. The total length is 40.38 km (25.09 mi) with eight stations from west to east. This line begins at Lüshunxingang Station and stretches east ending at Hekou Station, which is the future interchange station with Line 2 (M2).
Alignment and interchanges
Both Line 3 are almost completely at grade or above ground; 13.89 kilometres (8.63 mi) is elevated, 1.123 kilometres (0.698 mi) is underground and 31.39 kilometres (19.50 mi) is at grade. Six stations are elevated, and the remainder are at grade. Transfers to trams and suburban trains are possible at the railway station stop.
Lines under construction and future expansions
Lines under construction
in km |
|||||||
2 | Phase II North and East | Jichang | Dalianbei Station | TBD | 42.56 | 29 | |
5 | Hutanxinqu | Houguancun | TBA | 24.0 | 18 | ||
13 | Jiuli | Zhenxinglu | TBA | 41.9 | 11 | ||
- Line 1
This line will run from Phoenix Peak to the Development Zone. Proposed stations are Phoenix Peak (interchange with the Line 3 branch), Sidalindajie, Wuyilu, Sujia, Maoyingzi, Houguan, Yaojia, Nanguanling Rail Station (interchange with Line 2), Zhonghuaguangzhang, Dongweilu (interchange with Line 4), Shahekou, Xianlu (interchange with Line 2), Convention and Exhibition Center, Heishijiao, Xueyuanguangchang, Xinghai Park, Maritime University, Gaoxinyuanqu, Hekou, Huangnichuan, Longwangtan, College Town, Shuishiying (interchange with Line 4), Shibanqiao, Tieshanzhen and the Development Zone. A branch will be constructed from Wuyilu to Jinbohaian. There will be one station in between (Jinzhou West). The line will be constructed in three phases. Phase one will run from Yaojia to the Convention and Exhibition Centre, phase two to Hekou and the remainder in phase three. After the completion of this line, there will be tram and metro service from Shahekou to Hekou.
- Line 2
This line will run from Houyan to Donghaigongyuan. Proposed stations are Houyan, Nanguanling Rail Station (interchange with Line 1), Sports Centre, Gezhenbu, Qiange, Airport, Zhangqianlu, Xinggongjie, Malanguangchang, Xianlu (interchange with Line 1), Dalian railway station (interchange with Line 3), Shengliguangchang, Gangwanguangchang and Donghaigongyuan. The line will be constructed in two phases: phase one from Airport to Gangwanguangchang, and the remainder in phase two.
2014-2020 expansion plan
in km |
|||||||
13 | Extension Line | Dalianbei railway station | Shijiuju | TBA | 22.0 | 6 | |
4 | Yingchengzi | Longtoushi | TBA | 27.0 | 20 | ||
7 | Baiheshanzhuang | Gangwanguangchang | TBA | 16.0 | 17 | ||
1 | North | Yaojia | New Airport | TBA | 13.0 | 4 | |
11 | Yingchengzi | Shimao | TBA | 14.0 | 4 | ||
Long-term plan
Tickets
The lowest fare between two stations is one yuan; the fare between more than two stations is two yuan. The full fare between Dalian Station and Golden Pebble Beach is eight yuan; between Dalian Station and Jiuli the fare is seven yuan. The Pearl Card is a discounted, monthly smart card.
Rolling stock
The trains were developed and manufactured by DLoco, Dalian Locomotive and Rolling Stock Company. As of 2012, 10 trains are running on line 3 at an average speed of 60 km/h (37 mph).
- Specification
- [3]
- 1500 volts DC voltage
- Train length: 78 meters
- Train width 2.8 metres (9 ft 2 in)
- Train height 3.8 metres (12 ft)
- Axle load: 14 tons
- Capacity: 800 passengers (176 seated)
- Seats: 176
- Traction power for AC drive: 1,440 kilowatts (180 kW × 8)
- Maximum speed: 100 km/h (62 mph)
- Full range of cars equipped with 20 seats (FG0001-0020—includes 0001-0010 as the first batch, 0011-0020 for the second batch; two groups of slightly-different vehicles)
Dalian Metro ordered 38 type B trainsets in six-car formations. 18 and 20 sets will run on the future lines 1 and 2 respectively. They will have a similar lightweight, corrosion-resistant stainless-steel body. The design speed is set to 80 km/h (50 mph); each train will have a capacity of 1,440 passengers.[4]
Future plans
In 2009 the Dalian government announced plans for nine metro lines spanning a total of 262.9 kilometres (163.4 mi), which would include the existing Line 3 and Line 7 (are the only lines to be completed, as of 2012). The completion date for the other two lines was scheduled for 2012, but no date has been announced yet for the remainder.
Four lines have been finalized as of 2012. The expansion project (in accordance with Chinese standards for the design and construction of metros) will use around 70 percent local labor and materials. Trains will be equipped with ATO, and stations will use an automatic fare-collection system. When lines open, they will initially operate at 38,000 p/h/d; over time, with the addition of more trains and decreasing headway, a capacity of 43,200 p/h/d is planned. The expansion program will ease traffic in Dalian (improving travel around the city for the 12th National Games of China, which will be held in Liaoning in 2013).
According to a National Development and Reform Foundation (2009) document, the urban rail transit construction plan (2009–2016) in Dalian was approved. According to the plan, the Dalian transit project is expected to invest ¥22 billion from 2009 to 2016 to build lines one through five.
On July 25, 2009, the Dalian Metro groundbreaking ceremony was held at Harbor Square for metro lines one and two. The project's total investment is more than ¥220 billion; it includes the east port, the airport, South Guanling and the estuaries, and is planned to open by the end of 2012. As of November 2009 the Academy Square to the Maritime University, China Spring Station Square to test section two, and portions of lines one and two are in operation.
- Line 4 (M4): This line will run from Houyan to Lüshun. Proposed stations are Houyan, Zhonghualu, Dashihua, Ganjingzi, Jinjiajie (interchange with Line 3), Dongweilu (interchange with Line 1), Airport (interchange with Line 3), Dongjia, Youjia, Muchengyi, Yingchengzi, Shanjianbu, Shuishiying (interchange with Line 4), Sanliqiao, Bus Station and Lüshun. The line will also be constructed in two phases: phase one from Jinjiajie to Yingchengzi, and the remainder in phase two.
- Line 5 (M5): This line will run from Dalian railway station to Hutanxinqu. Proposed stations are Dalian railway station (interchange with Line 3), Changchunlu, Qingyunjie, Bayilu, Medical University and Hutanxinqu. The line will be constructed in the second phase.
Naming
Operation name | Plan name |
---|---|
Line 1 | M1 |
Line 2 | M2 |
Line 3 | R3 |
Line 4 | M4 |
Line 5 | M5 |
Line 6 | M6 |
Line 7 | M7 |
Line 8 | M8 |
Line 9 | M9 |
Line 10 | M10 |
Line 11 | R1, R9, R10 |
Route 202 Ext. Line → Line 12 | R2 |
Line 13 | R4 |
Line 14 | R5 |
Line 15 | R6 |
Line 16 | R7 |
Line 17 | R8 |
Line 18 | P1 |
Line 19 | P2 |
Line 20 | P3 |
See also
References
- ^ a b "2017年统计报告". 中国城市轨道交通协会. 2018-04-19. Retrieved 2018-04-28.
- ^ 大连地铁 [Dalian Metro] (in Chinese). 拜读百科. 2012-12-36. Retrieved 2013-01-07.
{{cite web}}
: Check date values in:|date=
(help) - ^ "Dalian metro railway car".
- ^ 大连自造地铁列车 车型与北京沈阳地铁相同. 大连天健网. 2012-08-26. Retrieved 2012-08-26.
{{cite web}}
: templatestyles stripmarker in|publisher=
at position 1 (help)
Notes
External links
- [dalianmetro.net Official Website of Dalian Metro Corp.]
- UrbanRail.net's page on the Dalian Metro