Line 23 (Shanghai Metro)
Appearance
Line 23 | |
---|---|
23 | |
Overview | |
Status | Planned |
Locale | Xuhui, Minhang Shanghai, China |
Termini | |
Connecting lines | 3 4 5 12 15 19 |
Stations | 22 |
Website | www |
Service | |
Type | ![]() |
System | ![]() |
Operator(s) | Shanghai No. Metro Operation Co., Ltd. |
Depot(s) | Chengjiang Road depot |
Rolling stock | Type A 6-car trains |
History | |
Planned opening | 2027 |
Technical | |
Track length | 28.5 km (18 mi) |
Number of tracks | 2 |
Character | fully underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Operating speed | 80 km/h (50 mph) |
Line 23 is a planned Shanghai Metro line that would run from Template:SHM stations in Xuhui District to Template:SHM stations in Minhang District. Its It is planned to be 29 kilometres (18 mi) in length, and is planned to have 22 stations. The line was announced by the Shanghai municipal government in 2016.[1][2] It will adopt unmanned driving (GoA4).
The line will not utilise the existing branch Line 5 service between Template:SHM stations and Template:SHM stations stations, with the line planned to be fully underground.[3] Once complete, it will feature interchange stations with Lines 3, 4, 5, 15, and 19.[4] The construction period of this project is expected to be 74 months.
Stations
Service routes
References
- ^ "Shanghai Municipal Government: City mulls plan for nine more Metro projects". publicnow.com. 20 April 2016. Retrieved 24 April 2016.
- ^ 上海市轨道交通近期建设规划(2017-2025)出炉 规划有9条线路 (in Chinese). Shanghai Municipal Government website. 19 April 2016. Retrieved 24 April 2016.
- ^ "上海市轨道交通23号线一期选线专项规划 (草案公示)" (PDF).
{{cite web}}
: CS1 maint: url-status (link) - ^ Huizhi, Chen (2020-12-19). "Have your say in planning of Metro Line 23". Shine. Shanghai Daily. Retrieved 2020-12-26.