Jump to content

Sahibganj loop

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Itsme.bikashsingh (talk | contribs) at 15:40, 10 October 2018 (Electrification). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Sahibganj loop
Overview
StatusOperational
OwnerIndian Railway
LocaleWest Bengal, Jharkhand, Bihar
Termini
Service
Operator(s)Eastern Railway
History
Opened1866
Technical
Line length410 km (255 mi)
Number of tracks1/ 2
Track gauge1,676 mm (5 ft 6 in) broad gauge
Sahibganj loop
Up arrow
427
301
Kiul Junction
Down arrow
424
Rampur Halt
421
Dhanauri
418
Pawai Brohmasthan Halt
415
Uren
411
Kajra
406
Ghogi Bariarpur
404
Abhaipur
400
Masudan
394
Dharhara
388
Dasharathpur
387
Sarobag Halt
382
Jamalpur Junction
Up arrow
Down arrow
394
Sabdalpur
Munger Rail cum Road Bridge
over Ganga river
387
Munger
386
Purab Sarai
385
Sandalpur
384
Hatkarota Halt
383
Safiasarai
378
Patam Halt
376
Ratanpur
373
Rishikund Halt
Left arrow
to Mananpur (planned)
371
Bariarpur
367
Kalyanpur Road
364
Ghorghat Halt
362
Khariapipra Halt
360
Ganganiyan
357
Kamarganj
Left arrow
352
Sultanganj
Left arrow
350
Abjuganj
347
Maheshi
342
Akbarnagar
339
Chhit Makhanpur
337
Murarpur
332
Nathnagar
328
Bhagalpur Junction
Left arrow
321
Sabaur
314
Lailakh Mamalkha
308
Ghogha
302
Ekchari
Down arrow
Kahalgaon Super Thermal
Power Station
298
Kahalgaon
290
Bikramshila
287
Shivanarayanpur
284
Lakshmipur Bhorang
Left arrow
278
Pirpainti
273
Ammapali
269
Mirza Cheuki
263
Karamtola
254
Sahibganj Junction
246
Sakrigali
247
Sakrigali Ghat
240
Maharajpur
233
Karanpurato
226
Taljhari
221
Kalian Chak
228
Rajmahal
220
Murli Halt
216
Tinpahar Junction
211
Dhamdhamia
207
Bakudi
179
Barharwa Junction
Right arrow
172
Gumani
Right arrow
165
Kotalpokhar
157
Tilbhita
Left arrow
153
Pakur
PANEM Coal Depot
147
Nagarnabi
136
Rajgram
130
Banshlai Bridge
125
Murarai
117
Chatra
Right arrow
108
Nalhati Junction
101
Swadinpur
Left arrow
94
Rampurhat Junction
87
Tarapith Road
81
Mallarpur
78
Gadadharpur
Right arrow
71
Sainthia Junction
Left arrow
63
Bataspur
58
Ahmadpur Junction
Right arrow
49
Kopai
Up arrow
Siuri
Down arrow
Purandarpur
Abinashpur
Mongoldihi
Salan
Kasba
Bolpur-Prantik-Siuri line
(planned)
43
Prantik
39
Bolpur Shantiniketan
31
Bhedia
26
Pichkurir Dhal
20
Guskara
15
Noadar Dhal
10
Banpas
4
Jhapater Dhal
Up arrow
Left arrow
102
Sitarampur
Up arrow
0
Khana Junction
Down arrow

The Sahibganj loop is a railway line connecting Khana Junction and Kiul Junction. Originally a part of the Howrah-Delhi main line, it was opened to traffic in 1866. With the construction of a shorter railway line for a part of the route, the 410 kilometres (250 mi) stretch was assigned a separate identity.

History

Railway transportation was introduced in India within 30 years of its maiden run in England.

The East Indian Railway Company which was formed on 1 June 1845, completed its survey for a railway line from Kolkata, then called Calcutta, to Delhi via Mirzapur in 1846. The company initially became defunct on refusal of government guarantee, which was given in 1849. Thereafter, an agreement was signed between East Indian Railway Company and the East India Company, for the construction and operation of an "experimental" line between Kolkata and Rajmahal, which would later be extended to Delhi via Mirzapur. Construction began in 1851.

On 15 August 1854, the first passenger train in the eastern section was operated up to Hooghly, 39 kilometres (24 mi) away. On 1 February 1855 the first train ran from Hooghly to Raniganj, 195 kilometres (121 mi) from Howrah. The priority accorded to the Raniganj section was because of the assurance of coal transportation.

The Khana Junction-Rajmahal section was complete in October 1859, crossing Ajay River on the way. The first train ran from Howrah to Rajmahal via Khana on 4 July 1860.[1][2] The Loop from Khana Junction to Kiul via Jamalpur, including the Monghyr branch, was ready in February 1862.[2]

From Rajmahal, construction progressed rapidly, moving westward along the banks of the Ganges, reaching Bhagalpur in 1861, Munger in February 1862, and opposite Varanasi (across the Ganges) in December 1862 and then on to Naini on the bank of the Yamuna. The work included EIR's first tunnel at Jamalpur and first major bridge across the Son River at Arrah.

During 1863-64, work progressed rapidly on the Allahabad-Kanpur-Tundla and Aligarh-Ghaziabad sections. The Yamuna bridge near Delhi was completed in 1864 and EIR established the Delhi terminus. The Yamuna bridge at Allahabad opened on 15 August 1865 and in 1866 Kolkata and Delhi were directly linked. The 1 Dn/ 2 Up Mail started running.

With the completion of the 406-kilometre (252 mi) long line connecting Raniganj with Kiul in 1871, a "shorter main line" was in position. Initially, it was called the chord line. However, as it attracted more traffic it was designated the main line and the original line became the Sahibganj loop.

Branch lines

In 1863, the Indian Branch Railway Company, a private company opened the Nalhati–Azimganj branch line. The 27 kilometres (17 mi) track was initially a 4' gauge line. The track was subsequently converted to 5' 6" broad gauge. The Indian Branch Railway Company was purchased by the Government of India in 1872 and the line was renamed Nalhati State Railway. It became a part of the East Indian Railway Company in 1892.[3]

In 1913, the Hooghly–Katwa Railway constructed a line from Bandel to Katwa, and the Barharwa–Azimganj–Katwa railway constructed the Barharwa–Azimganj–Katwa loop line.

The Andal-Sainthia Branch Line was built in 1913.

The 53 kilometres (33 mi) long Ahmedpur Katwa Light Railway connecting Ahmedpur and Katwa, built on 760 millimetres (30 in), was opened to traffic on 29 September 1917.[4]

Developments

Only Kahalgaon to Bhagalpur and Ratanpur to Jamalpur of the Sahibganj Loop is still having single track. Twenty-one pairs of trains ply on the single track between Bhagalpur and Sahibganj. Work for doubling the 111-kilometre long (69 mi) stretch started in 2010.[5]

Work on the new 130-kilometre (81 mi) long Rampurhat-Dumka-Mander Hill broad gauge line is progressing.[6]

Jamalpur Workshop

Jamalpur Workshop, the first full-fledged railway workshop facility in India, was opened on 8 February 1862, at a time when the Howrah-Delhi main line, passing through Jamalpur was under construction. It was felt that communities of gun smiths and other craftsmen in the area handling mechanical engineering jobs could pick up the skills required in a railway workshop. It undertook repairs of wagons, coaches, cranes and tower cars, and locomotives, as well as manufacture of some tower cars, break-down cranes and various kinds of heavy-duty lifting jacks. They also produced their own locomotives, starting with the CA 764 Lady Curzon in 1899. It has also produced ticket printers and other ticket machines (slitting, counting, and chopping). With fairly extensive workshop facilities, it was a fairly self-contained.[7]

Electrification

Electrification of the Khana-Sainthia-Pakur section was announced in the rail budget for 2010-11.[8] The electrification of Ahmedpur-Sainthia-Murarai section is expected to be completed during the last months of 2013.The first electric train service is started from 29 September 2016 through HWH-RPH express. Also the electrification of Bonidanga Link Cabin-Barharwa-Sahibganj-Kiul section Including the Tinpahar-Rajmahal section (Announced by Pt. Deen Dayal Upadhyaya in Bihar Package) has been started from September 2017 and is yet expected to be completed by the end of February 2019. Sources confirmed that the works of electrification is in faster progress between Kiul - Jamalpur Section and Jamalpur - Bhagalpur Section by Green Power International Company.

References

  1. ^ George Huddleston (1906). History of the East Indian Railway. p. 28.
  2. ^ a b Rao, M.A. (1988). Indian Railways. New Delhi: National Book Trust. p. 19.
  3. ^ "The Oudh & Rohilkhand Railway" (PDF). Archived from the original (PDF) on 21 June 2013. Retrieved 1 December 2011. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  4. ^ "Ahmadpur-Katwa Railway". Retrieved 2 December 2011.
  5. ^ Sarkar, Gautam (21 September 2010). "Green light to double rail on oldest route - 135-year-old Kiul-Sahebganj loop section will finally get twin railway lines". The Telegraph. Archived from the original on 4 September 2015. Retrieved 15 November 2011. {{cite news}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  6. ^ "ER revenue up 25% at Rs 1144 crore". Business Standard. 22 August 2007. Retrieved 15 November 2011.
  7. ^ "Production Units & Workshops". Jamalpur Workshop. IRFCA. Retrieved 15 November 2011.
  8. ^ "Electrification of new rail sections". Press information Bureau. Archived from the original on 24 March 2014. Retrieved 28 November 2011. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)