Central Organisation for Railway Electrification
Company type | Government Owned |
---|---|
Industry | Railways and Locomotives |
Founded | 19 February 1951 |
Headquarters | , |
Area served | India |
Key people | I/C Union Railway Minister: Suresh Prabhu, Chairman Railway Board: A.K.Mittal, General Manager CORE: Satya Prakash Trivedi. |
Products | Railway Electrification |
Parent | Ministry of Railways, Government of India |
Website | www.core.indianrailways.gov.in |
The Central Organisation for Railway Electrification (CORE), (Template:Lang-hi) has its headquarters at Allahabad, India. It is in overall charge of railway electrification over the entire network of Indian Railways. However of late, some electrification works have been entrusted to Rail Vikas Nigam Limited, a Public Sector Undertaking (PSU) under the Ministry of Railways of the Government of India. Additionally small electrification works are being done by zonal railways. The organisation has been functioning since 1961 and is headed by a General Manager. Projects units operate from Ambala, Bhubaneshwar, Chennai, Bangalore, Secunderabad, Lucknow, Kota, Kolkata Gorakhpur, Jaipur, Jabalpur and New Jalpaiguri. The Rajpura-Patiala-Dhuri-Lehra Mohabat or popularly known as RBR, route is also a sanctioned railway electrification project and shall be executed by Rail Vikas Nigam Ltd. This project was sanctioned in the year 2013-14 with a nod from Ministry Of Railway and Railway Board. Rail Vikas Nigam Ltd. is responsible of electrifying the Golden Quadrilateral routes. The Rajpura-Patiala-Dhuri-Lera Mohabat is also a feeder route under Eastern Dedicated Freight Corridor.
History
1500 volt DC
Railway electrification begain with the inauguration of the first electric train between Bombay Victoria Terminus and Kurla Harbour on 3 February 1925 on the then existing Great Indian Peninsula Railway (GIP) at 1500 V DC. Heavy gradients on the Western Ghats necessitated the introduction of electric traction on the Central Railway up to Igatpuri on the North East line and to Pune on the South East line. 1500 volt DC traction was introduced on the suburban section of the Western Railway between Colaba and Borivili on 5 January 1928 and between Madras Beach and Tambaram of the Southern Railway on 11 May 1931. This was primarily to meet the growing traffic on these metros. Thus, before the dawn of Independence, India had 388 km of electrification on DC traction. Only the stretch from Chhatrapati Shivaji Terminus - Thane and Chhatrapati Shivaji Terminus - Panvel of Central Railway is still under DC traction after the conversion of Churchgate - Andheri stretch of Western Railway to 25 kV AC on 5 February 2012.
3000 volt DC
In the post independence era, electrification of the Howrah-Burdwan section of the Eastern Railway was done at 3000 volt DC during the First Five Year Plan period and completed in 1958. The electric multiple unit (EMU) services were inaugurated in Howrah-Sheoraphuli section by Pandit Jawahar Lal Nehru, the first Prime Minister of India on 14 December 1957.
25 kV AC
The 25 kV AC system of traction emerged as an economical system of electrification as a result of research and trials in Europe, particularly on French Railways (SNCF). Indian Railways decided in 1957 to adopt the 25 kV AC system of electrification as a standard, with SNCF as their consultant in the initial stages.
In the wake of industrial development in the Eastern region (due to the setting up of steel plants, large-scale movement of iron and coal, and growth in freight traffic that could not be managed by steam traction) electrification and dieselisation had to be introduced in early 1960s to cope with the growing traffic.
The first section electrified on the 25 kV AC system was Raj Kharswan — Dongoaposi on the South Eastern Railway in 1960. With a view to provide continuity of traction system, the Howrah — Burdwan section of the Eastern Railway and Madras Beach — Tambaram section of the Southern Railway were converted to the 25 kV AC system by 1968.
The manufacture of electric multiple units (EMUs) required for Kolkata suburban services was taken up at Integral Coach Factory (ICF), Chennai and the first EMU rolled out during September 1962.
Conversion
Considering the limitations in the existing 1500 volt DC traction system in the Central Railway and Western Railway, a decision was taken to convert to 25 kV AC traction during 1996-97. Conversion from DC traction to AC traction is completed in the year 2012. Presently the work of conversion over Central Railway is in progress.
Central Organisation
The electrification office was set up in Calcutta as PORE (Project Office for Railway Electrification) during the First Five Year Plan period, when electrification of the Howrah — Burdwan section of the Eastern Railway was taken up.
A General Manager headed the Railway Electrification Organisation set up at Calcutta in 1959. In 1961, the Northern Railway electrification office was set up at Allahabad for the electrification of the Mughalsarai — New Delhi section. This office was headed by an Engineer-in-Chief.
On the recommendation of the J. Raj Committee report in 1978, a number of electrification works were included in the Pink Book, and a Railway Electrification headquarters came into being. Since most of the sanctioned electrification works were falling in the Central and Southern regions of the country, the headquarters of electrification was set up at Nagpur and functioned under the charge of an Additional General Manager from 1982 to 1984. The Railway Electrification office was shifted to Allahabad under the Additional General Manager from January 1985. A regular General Manager was posted at the Central Organisation for Railway Electrification, Allahabad from July 1987 onwards and this continues today.
The Headquarters office of the Central Organisation for Railway Electrification (CORE) is headed by a General Manager and assisted by Electrical, Signal and Telecommunications (S&T), Civil, Store, Personnel, Vigilance and Finance departments. Presently eight Railway Electrification project offices are functioning i.e. Ambala, Bhubaneswar, Chennai, Lucknow, Jaipur and Secunderabad, Gorakhpur, Danapur and New Jalpaiguri and Jabalpur headed by Chief Project Directors.
Planwise progress of electrification on IR
In the wake of industrial development in the Eastern region, electrification and dieselisation had to be introduced in the early 1960s to cope with the growing traffic. After the completion of the second Five Year Plan, Indian Railways had electrified 216 route-kilometres (rkm) on 25 kV AC. During the Third Plan, along with considerable indigenisation, electrification was extended over another 1,678 rkm. The pace of electrification, however, slowed down until the oil crisis of the 1970s. The second oil crisis, in particular, brought to the fore the need for evolving a long term policy for electrification to reduce the dependence of railways on petroleum based energy.
In the context of a shift from petroleum based energy in the transport sector, the Secretaries Committee on energy headed by the Cabinet Secretary decided in July 1980 that the railways should speed up electrification at a pace of 1,000 route km/year. Accordingly, the pace of electrification was considerably speeded up and Indian Railways achieved progress of 2,812 rkm during the 7th Plan, 2,708 rkm during 8th Plan and 2,484 rkm during 9th Plan making a total of 16,001 rkm. In the 10th Plan, electrification of 1,810 rkm was achieved, more than the target of 1,800 rkm. In the recently concluded 11th Plan (2007–12) electrification of 4,556 rkm was achieved, more than the target of 4,500 rkm.[1]
Six major trunk routes of the Golden Quadrilateral and diagonals, viz., Delhi — Mumbai via Central and Western Railways, Delhi — Calcutta, Delhi — Chennai, Mumbai — Calcutta and Howrah — Chennai have already been fully electrified. Electrification of remaining Mumbai — Chennai Route (Nandalur — Daund) is in progress.
A total of 27,999 rkm was electrified by 31 March 2016, mostly on heavy density routes. This constitutes about 42.42% of the total railway network. At present, approximately 51.2% of passenger traffic and 65.2% of freight traffic is operated by electric traction. The 12th Plan target for electrification is set at above 6,500 rkm and the target to be realised during 2012-13 and 2013-14 is 2,667 rkm and 2014-15 is 1089 rkm. Last financial year 2014-15 is 1190 rkm.[2]
Plan | Pre.Indep. | 1st | 2nd | 3rd | Annual Plan | 4th | 5th | Inter Plan | 6th | 7th | Inter Plan | 8th |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Period | 1925-51 | 1951-56 | 1956-61 | 1961-66 | 1966-69 | 1969-74 | 1974-78 | 1978-80 | 1980-85 | 1985-90 | 1990-92 | 1992-97 |
R.K.M Electrified | 388 | 529 | 216 | 1678 | 814 | 953 | 533 | 195 | 1522 | 2812 | 1557 | 2708 |
R.K.M Cumulative | 388 | 529 | 745 | 2423 | 3237 | 4190 | 4723 | 4918 | 6440 | 9252 | 10809 | 13517 |
Plan | 9th | 10th | 11th | 12th |
---|---|---|---|---|
Period | 1997–2002 | 2002-07 | 2007-12 | 2012-17 (till 31.03.2016) |
R.K.M Electrified | 2484 | 1810 | 4556 | 5772 |
R.K.M Cumulative | 16001 | 17811 | 22224 | 27999 |
Technology modernisation
Introduction of Railway Electrification has caused major impetus to Technology upgrades on Indian Railways. Some of these are listed below.
Modernisation of Equipment
With a view to bring down the maintenance cost and improve the reliability of power supply system, Railway Electrification has gone in for state-for-the-art technology as prevalent in the international arena viz., dry cast resin transformers, SF6 or vacuum switchgear, long creep age solid core insulators and PTFE neutral sections. Eight-wheeler self-propelled OHE inspection cars have also been introduced to improve maintenance. Action has also been initiated for the procurement of an OHE recording car for monitoring the performance of overhead equipment.
Signalling and telecommunication systems are also being upgraded by adopting state-of-the-art technology. The semaphore signalling system is being replaced by a colour light signalling system. Use of colour light signals results in better visibility of signalling aspects to the drivers of the running trains and this makes train running safer and operationally more efficient. The interlocking system is also being changed to panel or route relay interlocking. Besides speedier movement of traffic, these up-gradation measures contribute towards increased safely.
Underground cables are provided along with electrification for more reliable and better quality communication.
Supervisory Remote Control & Data Acquisition System (SCADA)
The 220 / 132 / 25 KV power supply network for electrification extends along the track over a zone of about 200/300 km. It is centrally controlled from the division control centre through remote control arrangements to ensure un-interrupted power supply to the track overhead equipment. In the present day electrification projects, a state-of-the-art microprocessor based supervisory control and data acquisition system (SCADA) is being provided as against the earlier electro-mechanical Strowger system of remote control equipment. The SCADA system has facilities for tele-metering of voltage, current, maximum demand and power factor on a real-time basis, enabling control of maximum demand and thereby the charges thereof to be paid to the State Electricity Boards. In addition, this system provides for automatic trouble-shooting and isolation of faulty sections.
Electric Rolling Stock
As of 31 March 2012, the total number of electric locomotives is 4,309.[3] As part of the modernisation plan, Indian Railways imported eighteen 6,000 horsepower thyristor locomotives, with transfer of technology. They are now going to be produced at Chittaranjan Locomotive Works (CLW). Indian Railways have developed chopper technology for DC electric multiple units in collaboration with Bhabha Atomic Research Centre (BARC) and 20 motor coaches with this technology will be inducted progressively in service in the next year. The chopper technology, in addition to being less maintenance intensive, is expected to save energy by 30% to 34% in the suburban services.
Signalling and telecommunication
Optical Fibre Communication
Indian Railway have implemented modern communication technology using optical fibre cable. As on 31 March 2012, 40,332 Route Kilometres of Optical Fibre Cable has been commissioned that is carrying Gigabits of traffic. Railway Control Communication which is quintessential for train operation and control is also being transferred to OFC system. Till date control communication on 37,389 Route Kilometres has been shifted on OFC system.[4]
Train Radio Communication
Optical fibre technology has come in handy for introducing mobile communication from running trains and this was successfully introduced along with electrification. With this technology, the driver and guard can talk to each other, and to the control centre, from a moving train. This will be especially useful in an emergency, such as an accident.
See also
External links
References
- ^ "Electrification work of Itarsi-Jabalpur—Manikpur also taken at CORE conference". ehitavada.com. 7 April 2013. Archived from the original on 29 October 2013. Retrieved 2013-09-04.
{{cite news}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ "CORE current status". Archived from the original on 31 March 2016. Retrieved 2016-06-13.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ "Archived copy" (PDF). Archived from the original (PDF) on 10 October 2013. Retrieved 2013-04-11.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help)CS1 maint: archived copy as title (link) - ^ "Archived copy" (PDF). Archived from the original (PDF) on 11 November 2013. Retrieved 2013-04-11.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help)CS1 maint: archived copy as title (link)