A total of 360 [[electric multiple unit]] traincars have been procured to operate on the line, with 104 of these being the 8-car ''Sustina Commuter'' trainsets to be built by the [[Japan Transport Engineering Company]] (J-TREC), successor to the Tokyu Car Corporation that has provided rolling stock to the Philippines from 1955 to 1976. The trainsets are based on [[East Japan Railway Company|JR East]] commuter stock such as the [[E233 series]] but adapted to standard gauge. The trains are also designed to be interoperable with the [[Metro Manila Subway]]. The first batch of the commuter trains are expected to arrive in December 2021<ref name=":12" /><ref>{{Cite web|title=DOTr - TUGADE: PNR CLARK, CALAMBA TRAINS TO ARRIVE IN DECEMBER 2021|url=https://dotr.gov.ph/55-dotrnews/3535-tugade-pnr-clark-calamba-trains-to-arrive-in-december-2021.html|website=dotr.gov.ph|agency=[[Department of Transportation (Philippines)|Department of Transportation]]|access-date=May 29, 2021|archive-date=June 2, 2021|archive-url=https://web.archive.org/web/20210602212418/https://dotr.gov.ph/55-dotrnews/3535-tugade-pnr-clark-calamba-trains-to-arrive-in-december-2021.html|url-status=live}}</ref><ref>{{Cite news|first=Arjay L.|last=Balinbin|title=North-South rail, subway trains to start arriving in December|url=https://www.bworldonline.com/north-south-rail-subway-trains-to-start-arriving-in-december/|work=BusinessWorld|date=July 21, 2021|access-date=July 23, 2021|archive-url=https://web.archive.org/web/20210721091836/https://www.bworldonline.com/north-south-rail-subway-trains-to-start-arriving-in-december/|archive-date=July 21, 2021|url-status=live}}</ref> A mock-up model of the commuter train was revealed to the public on June 28, 2021,<ref>{{Cite web|first=Drei|last=Laurel|title=DOTr shows off operator cabin of PNR Tutuban-Malolos Railway|url=https://www.topgear.com.ph/news/motoring-news/dotr-cabin-pnr-tutuban-malolos-railway-a962-20210630|work=Top Gear Philippines|date=June 30, 2021|access-date=July 1, 2021|archive-date=July 2, 2021|archive-url=https://web.archive.org/web/20210702091545/https://www.topgear.com.ph/news/motoring-news/dotr-cabin-pnr-tutuban-malolos-railway-a962-20210630|url-status=live}}</ref> and was delivered to the Philippines from [[Japan]] in August 2021. As of October 8, the first trainset was completed and it's currently undergoing factory acceptance test.<ref>{{Cite web|title=These are the new trains that will run along PNR Clark Phase 1|url=https://www.topgear.com.ph/news/motoring-news/pnr-clark-phase-1-trains-testing-a4354-20211008|access-date=2021-10-08|website=topgear.com.ph|language=en}}</ref> The trainsets have been designated as the EM10000 class in October 2021.<ref name="EM10000delivery">{{Cite AV media|title=マニラ南北線EM10011Mとマニラ南北線EM10011Lが株式会社総合車両製作所(J-TREC)から陸送!【令和3年(西暦2021年)10月18日月曜日】|trans-title=Manila North-South Line EM10011M and Manila North-South Line EM10011L being shipped by land from [the] Japan Transport Engineering Company (J-TREC)! (Monday, October 18, 2021)|url=https://www.youtube.com/watch?v=SMQDLHpen3c|date=October 18, 2021|access-date=October 19, 2021|lang=ja|medium=[[YouTube]]}}</ref> |
A total of 360 [[electric multiple unit]] traincars have been procured to operate on the line, with 104 of these being the 8-car ''Sustina Commuter'' trainsets to be built by the [[Japan Transport Engineering Company]] (J-TREC), successor to the Tokyu Car Corporation that has provided rolling stock to the Philippines from 1955 to 1976. The trainsets are based on [[East Japan Railway Company|JR East]] commuter stock such as the [[E233 series]] but adapted to standard gauge. The trains are also designed to be interoperable with the [[Metro Manila Subway]]. The first batch of the commuter trains are expected to arrive in December 2021<ref name=":12" /><ref>{{Cite web|title=DOTr - TUGADE: PNR CLARK, CALAMBA TRAINS TO ARRIVE IN DECEMBER 2021|url=https://dotr.gov.ph/55-dotrnews/3535-tugade-pnr-clark-calamba-trains-to-arrive-in-december-2021.html|website=dotr.gov.ph|agency=[[Department of Transportation (Philippines)|Department of Transportation]]|access-date=May 29, 2021|archive-date=June 2, 2021|archive-url=https://web.archive.org/web/20210602212418/https://dotr.gov.ph/55-dotrnews/3535-tugade-pnr-clark-calamba-trains-to-arrive-in-december-2021.html|url-status=live}}</ref><ref>{{Cite news|first=Arjay L.|last=Balinbin|title=North-South rail, subway trains to start arriving in December|url=https://www.bworldonline.com/north-south-rail-subway-trains-to-start-arriving-in-december/|work=BusinessWorld|date=July 21, 2021|access-date=July 23, 2021|archive-url=https://web.archive.org/web/20210721091836/https://www.bworldonline.com/north-south-rail-subway-trains-to-start-arriving-in-december/|archive-date=July 21, 2021|url-status=live}}</ref> A mock-up model of the commuter train was revealed to the public on June 28, 2021,<ref>{{Cite web|first=Drei|last=Laurel|title=DOTr shows off operator cabin of PNR Tutuban-Malolos Railway|url=https://www.topgear.com.ph/news/motoring-news/dotr-cabin-pnr-tutuban-malolos-railway-a962-20210630|work=Top Gear Philippines|date=June 30, 2021|access-date=July 1, 2021|archive-date=July 2, 2021|archive-url=https://web.archive.org/web/20210702091545/https://www.topgear.com.ph/news/motoring-news/dotr-cabin-pnr-tutuban-malolos-railway-a962-20210630|url-status=live}}</ref> and was delivered to the Philippines from [[Japan]] in August 2021. As of October 8, the first trainset was completed and it's currently undergoing factory acceptance test.<ref>{{Cite web|title=These are the new trains that will run along PNR Clark Phase 1|url=https://www.topgear.com.ph/news/motoring-news/pnr-clark-phase-1-trains-testing-a4354-20211008|access-date=2021-10-08|website=topgear.com.ph|language=en}}</ref> The trainsets have been designated as the EM10000 class in October 2021.<ref name="EM10000delivery">{{Cite AV media|title=マニラ南北線EM10011Mとマニラ南北線EM10011Lが株式会社総合車両製作所(J-TREC)から陸送!【令和3年(西暦2021年)10月18日月曜日】|trans-title=Manila North-South Line EM10011M and Manila North-South Line EM10011L being shipped by land from [the] Japan Transport Engineering Company (J-TREC)! (Monday, October 18, 2021)|url=https://www.youtube.com/watch?v=SMQDLHpen3c|date=October 18, 2021|access-date=October 19, 2021|lang=ja|medium=[[YouTube]]}}</ref> |
||
On the other hand, an order for 200 more commuter cars and the 56 airport express trainsets are being procured as of 2019.<ref name="gma">{{Cite news|date=October 16, 2019|title=1 local, 5 foreign firms bid for P50.8-B PNR Clark Phase 2|website=GMA News|url=https://www.gmanetwork.com/news/money/companies/711902/1-local-5-foreign-firms-bid-for-p50-8-b-pnr-clark-phase-2/story/|access-date=February 15, 2020|archive-date=February 15, 2020|archive-url=https://web.archive.org/web/20200215041640/https://www.gmanetwork.com/news/money/companies/711902/1-local-5-foreign-firms-bid-for-p50-8-b-pnr-clark-phase-2/story/|url-status=live}}</ref><ref name="adb">{{Cite report|url=https://www.adb.org/sites/default/files/project-documents/52220/52220-001-eia-en.pdf|title=Environmental Impact Assessment|date=July 1, 2020|publisher=[[Department of Transportation (Philippines)]] and the [[Asian Development Bank]]|work=Proposed Multitranche Financing Facility Republic of the Philippines: South Commuter Railway Project|accessdate=May 17, 2021|archive-date=May 17, 2021|archive-url=https://web.archive.org/web/20210517055727/https://www.adb.org/sites/default/files/project-documents/52220/52220-001-eia-en.pdf|url-status=live}}</ref> On February 26, 2021, a suggested preliminary design based on the [[E259 series|E259]] and [[E353 series]] was published.<ref name="ps1">{{Cite report |title=BIDDING DOCUMENTS FOR PROCUREMENT OF PACKAGE CP NS-03: ROLLING STOCK - LIMITED EXPRESS TRAINSETS Volume II of III |url=https://ps-philgeps.gov.ph/home/images/BAC/ForeignAssitedProjects/2021/PH-P270/CP%20NS-03/Volume%20II%20of%20III%20Part%202%20-%20Employer's%20Requirements.pdf |publisher=[[Philippine National Railways]] |date=February 2021 |access-date=August 19, 2021 |archive-date=August 21, 2021 |archive-url=https://web.archive.org/web/20210821131037/https://ps-philgeps.gov.ph/home/images/BAC/ForeignAssitedProjects/2021/PH-P270/CP%20NS-03/Volume%20II%20of%20III%20Part%202%20-%20Employer's%20Requirements.pdf |url-status=live }}</ref> On May 10, the Department of Transportation later announced it will acquire the airport express trainsets from Japanese manufacturers.<ref>{{Cite web|date=May 10, 2021|title=Philippines: Philippines to engage Japanese manufacturers for NSCR Express trainsets|url=https://uic.org/com/enews/article/philippines-philippines-to-engage-japanese-manufacturers-for-nscr-express|publisher=[[International Union of Railways]]|accessdate=May 17, 2021|archive-date=May 17, 2021|archive-url=https://web.archive.org/web/20210517092504/https://uic.org/com/enews/article/philippines-philippines-to-engage-japanese-manufacturers-for-nscr-express|url-status=live}}</ref> After several months of delays and rescheduling, three bidders have submitted their designs: [[Kawasaki Heavy Industries Rolling Stock Company|Kawasaki Heavy Industries]] and [[Sojitz]] joint venture, [[Marubeni]] and [[Stadler Rail]], and [[Mitsubishi]] and [[Construcciones y Auxiliar de Ferrocarriles]] (CAF).{{Efn|The Mitsubishi-CAF consortium has already been constructing on the [[LRTA 13000 class]] light rail vehicles.}} J-TREC did not participate as the company is already constructing the commuter trainsets.<ref>{{Cite web|title= 交通システム|trans-title=Transportation system|url=http://jknews.jp/category/08yusou/cat.htm|website=jknews.jp|publisher=Heavy & Chemical Industries News Agency|lang=ja|date=October 2021|access-date=October 24, 2021}}<!-- {{registration required}} --></ref> |
On the other hand, an order for 200 more commuter cars and the 56 airport express trainsets are being procured as of 2019.<ref name="gma">{{Cite news|date=October 16, 2019|title=1 local, 5 foreign firms bid for P50.8-B PNR Clark Phase 2|website=GMA News|url=https://www.gmanetwork.com/news/money/companies/711902/1-local-5-foreign-firms-bid-for-p50-8-b-pnr-clark-phase-2/story/|access-date=February 15, 2020|archive-date=February 15, 2020|archive-url=https://web.archive.org/web/20200215041640/https://www.gmanetwork.com/news/money/companies/711902/1-local-5-foreign-firms-bid-for-p50-8-b-pnr-clark-phase-2/story/|url-status=live}}</ref><ref name="adb">{{Cite report|url=https://www.adb.org/sites/default/files/project-documents/52220/52220-001-eia-en.pdf|title=Environmental Impact Assessment|date=July 1, 2020|publisher=[[Department of Transportation (Philippines)]] and the [[Asian Development Bank]]|work=Proposed Multitranche Financing Facility Republic of the Philippines: South Commuter Railway Project|accessdate=May 17, 2021|archive-date=May 17, 2021|archive-url=https://web.archive.org/web/20210517055727/https://www.adb.org/sites/default/files/project-documents/52220/52220-001-eia-en.pdf|url-status=live}}</ref> On February 26, 2021, a suggested preliminary design based on the [[E259 series|E259]] and [[E353 series]] was published.<ref name="ps1">{{Cite report |title=BIDDING DOCUMENTS FOR PROCUREMENT OF PACKAGE CP NS-03: ROLLING STOCK - LIMITED EXPRESS TRAINSETS Volume II of III |url=https://ps-philgeps.gov.ph/home/images/BAC/ForeignAssitedProjects/2021/PH-P270/CP%20NS-03/Volume%20II%20of%20III%20Part%202%20-%20Employer's%20Requirements.pdf |publisher=[[Philippine National Railways]] |date=February 2021 |access-date=August 19, 2021 |archive-date=August 21, 2021 |archive-url=https://web.archive.org/web/20210821131037/https://ps-philgeps.gov.ph/home/images/BAC/ForeignAssitedProjects/2021/PH-P270/CP%20NS-03/Volume%20II%20of%20III%20Part%202%20-%20Employer's%20Requirements.pdf |url-status=live }}</ref> On May 10, the Department of Transportation later announced it will acquire the airport express trainsets from Japanese manufacturers.<ref>{{Cite web|date=May 10, 2021|title=Philippines: Philippines to engage Japanese manufacturers for NSCR Express trainsets|url=https://uic.org/com/enews/article/philippines-philippines-to-engage-japanese-manufacturers-for-nscr-express|publisher=[[International Union of Railways]]|accessdate=May 17, 2021|archive-date=May 17, 2021|archive-url=https://web.archive.org/web/20210517092504/https://uic.org/com/enews/article/philippines-philippines-to-engage-japanese-manufacturers-for-nscr-express|url-status=live}}</ref> After several months of delays and rescheduling, three bidders have submitted their designs: [[Kawasaki Heavy Industries Rolling Stock Company|Kawasaki Heavy Industries]] and [[Sojitz]] joint venture, [[Marubeni]] and [[Stadler Rail]], and [[Mitsubishi]] and [[Construcciones y Auxiliar de Ferrocarriles]] (CAF).{{Efn|The Mitsubishi-CAF consortium has already been constructing on the [[LRTA 13000 class]] light rail vehicles.}} J-TREC did not participate as the company is already constructing the commuter trainsets.<ref>{{Cite web|title= 交通システム|trans-title=Transportation system|url=http://jknews.jp/category/08yusou/cat.htm|website=jknews.jp|publisher=Heavy & Chemical Industries News Agency|lang=ja|date=October 2021|access-date=October 24, 2021}} <!-- {{registration required}} --></ref> [[Hitachi]] also opted not to participate and instead made a commitment to provide 67 [[elevator]]s for Phase 1,<ref>{{Cite web|title=Hitachi Elevator Philippines Receives 67 Elevators and Escalators Order for Its First Railway System Project|url=https://www.hitachi.com/New/cnews/month/2021/09/210908.html|publisher=[[Hitachi]]|date=September 8, 2021|access-date=November 11, 2021}}</ref><ref>{{Cite news|first=Miguel|last=Camus|title=Japan industrial giant Hitachi to supply elevators, escalators to key PH rail project|url=https://business.inquirer.net/330648/japan-industrial-giant-hitachi-to-supply-elevators-escalators-to-key-ph-rail-project|work=[[Philippine Daily Inquirer]]|date=September 13, 2021|access-date=November 11, 2021}}</ref> while its Italian subsidiary [[Hitachi Rail STS]] joined as a bidder for the supply of the project's signaling equipment.<ref>{{Cite web|title=NORTH-SOUTH COMMUTER RAILWAY PROJECT (MALOLOS-TUTUBAN) N1CP04: ELECTRICAL AND MECHANICAL SYSTEMS AND TRACKWORKS |url=https://dotr.gov.ph/component/k2/item/1169-north-south-commuter-railway-project-malolos-tutuban-n1cp04-electrical-and-mechanical-systems-and-trackworks.html|publisher=[[Department of Transportation (Philippines)]]|date=August 25, 2021|access-date=November 5, 2021}}</ref> |
||
{| class="wikitable" |
{| class="wikitable" |
Revision as of 05:05, 11 November 2021
North–South Commuter Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Under construction | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Department of Transportation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Central Luzon, Metro Manila, Calabarzon | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 36 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Urban rail transit (S-train) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Philippine National Railways | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Philippine National Railways | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Various, see rolling stock | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 2021 (partial) 2025 (full)[a] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 148 km (92 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track length | 296 km (184 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | Double-track[b] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Elevated[c] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 1,500 V DC overhead lines | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 160 km/h (99 mph)[d] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Signalling | ETCS Level 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Highest elevation | 130 m (430 ft) at Clark International Airport station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The North–South Commuter Railway (NSCR), also known as the Clark–Calamba Railway, is a 148 km (92 mi) urban rail transit system under construction in the island of Luzon, Philippines, primarily in the Greater Manila Area.[1][2] Running from New Clark City in Capas, Tarlac to Calamba, Laguna with 36 stations and four services, the railway will be a transportation backbone of the region. It will be integrated into existing and future railway lines such as the LRT Line 1, LRT Line 2, MRT Line 3, and the Metro Manila Subway.[3][4]
Originally planned in the 1990s, the project has been repetitively halted after disagreements on funding and allegations of overpricing.[5][6][7] The first proposal was the 32 km (20 mi) "Manila–Clark rapid railway" with Spain in the 1990s,[5] and during the 2000s, the NorthRail project with China that was discontinued in 2011.[5][8][9][10] The current railway line began development in 2013,[11] with initial funding being obtained in 2015,[12] and construction beginning in 2019.[13][14] Upon its completion, the railway will supersede the existing PNR Metro Commuter Line.
Route
The North–South Commuter Railway will comprise two sections corresponding to the Philippine National Railways' old main lines. The first is the 91 km (57 mi)[15] fully-elevated PNR Clark which is being built over the mostly-defunct North Main Line in northern Metro Manila and Central Luzon.[16][17] The construction of PNR Clark is further subdivided into two sections: the 38 km (24 mi) PNR Clark 1 between Tutuban and Malolos, and the 53 kilometres (33 mi) PNR Clark 2 from Malolos to New Clark City.[18] The second component is the 56 km (35 mi)[15] PNR Calamba which will use the existing PNR Metro Commuter Line right of way between Tutuban and Calamba, which were historically parts of the South Main Line and will have elevated, at-grade and depressed sections.[19]
The table below shows the proposed train operation schedule and stations for the system.[2][20][21]
Services
There are three classes of services on this line. The following are:[20]
- Commuter is the basic commuter rail service and has the least priority. It stops at all stations within its route. There are three routes planned for this class; Tutuban–New Clark City, Tutuban–Calamba, and Clark International Airport–Calamba. The maximum speed for this service will be 120 km/h (75 mph) for the entire line.
- Commuter Express is the limited-stop service for the line, succeeding the Commex service during the Metrotren era in the early 2000s. Although it will run faster than regular Commuter trains, it will still use the same routes and rolling stock.
- The Airport Limited Express is the temporary designation for the planned airport rail link and limited express service between Clark International Airport and Alabang station. As the flagship NSCR service, it will use dedicated rolling stock complete with intercity-grade amenities plus baggage space for people arriving from the airport. It will have a maximum speed of 160 km/h (99 mph) along the NSCR North. Its final name is yet to be determined.
- Subway through-service is the proposed augmentation between the NSCR and the Metro Manila Subway. It will serve the southernmost areas of Metro Manila and neighboring Laguna, branching from the subway line at FTI station while the remainder of the line will go towards the direction of NAIA Terminal 3 in Pasay. It will use the Subway trainsets instead of the NSCR ones, although both are from the Sustina family.
Stations
Phase | Station | Services | Transfers | Location | |||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Commuter | Commuter express | Limited express | Through service to/from Metro Manila Subway[20] | ||||||||
NCC–Tutuban | CIA–Calamba | Tutuban–Calamba | NCC–Tutuban | CIA–Calamba | Tutuban–Calamba | ||||||
PNR Clark 2 | New Clark City | ● | — | — | ● | — | — | — | — | none | Capas, Tarlac |
Clark International Airport | | | ● | | | ● | ● | Clark International Airport | Mabalacat, Pampanga | ||||
Clark | ● | ● | ● | ● | | | none | |||||
Angeles | ● | ● | | | | | | | Angeles, Pampanga | |||||
San Fernando | ● | ● | ● | ● | | | San Fernando, Pampanga | |||||
Apalit | ● | ● | | | | | | | Apalit, Pampanga | |||||
Calumpit | ● | ● | | | | | | | Calumpit, Bulacan | |||||
Malolos | ● | ● | ● | ● | | | Malolos, Bulacan | |||||
PNR Clark 1 | |||||||||||
Malolos South | ● | ● | | | | | | | ||||||
Guiguinto | ● | ● | | | | | | | Guiguinto, Bulacan | |||||
Tuktukan | ● | ● | | | | | | | ||||||
Balagtas | ● | ● | | | | | | | Balagtas, Bulacan | |||||
Bocaue | ● | ● | ● | ● | | | Bocaue, Bulacan | |||||
Tabing Ilog | ● | ● | | | | | | | Marilao, Bulacan | |||||
Marilao | ● | ● | ● | ● | | | ||||||
Meycauayan | ● | ● | | | | | | | Meycauayan, Bulacan | |||||
Valenzuela | ● | ● | ● | ● | | | Valenzuela | |||||
Valenzuela Polo | ● | ● | | | | | | | ||||||
Malabon | ● | ● | | | | | | | Malabon | |||||
Caloocan | ● | ● | ● | ● | | | Caloocan | |||||
Solis | ● | ● | | | | | | | Manila | |||||
Tutuban | ● | | | ● | ● | | | ● | | | Tutuban | |||
PNR Calamba | Blumentritt | — | ● | ● | — | ● | ● | | | Blumentritt | ||
España | ● | ● | ● | ● | | | none | |||||
Santa Mesa | ● | ● | ● | ● | | | Pureza | |||||
Paco | ● | ● | | | | | | | none | |||||
Buendia | ● | ● | ● | ● | ● | Makati | |||||
EDSA | ● | ● | ● | ● | | | 3 Magallanes | |||||
Nichols | ● | ● | | | | | | | None | Taguig | ||||
FTI | ● | ● | ● | ● | ● | MMS 16 TITX | |||||
Bicutan | ● | ● | | | | | | | ● | MMS 25 Bicutan |
Parañaque | |||
Sucat | ● | ● | ● | ● | ● | ● | PNR Bicol 25 Sucat |
Muntinlupa | |||
Alabang | ● | ● | ● | ● | ● | ● | none | ||||
Muntinlupa | ● | ● | ● | ● | — | ● | |||||
San Pedro | ● | ● | | | | | ● | San Pedro, Laguna | |||||
Pacita | ● | ● | | | | | ● | ||||||
Biñan | ● | ● | | | | | ● | Biñan, Laguna | |||||
Santa Rosa | ● | ● | ● | ● | ● | Santa Rosa, Laguna | |||||
Cabuyao | ● | ● | ● | ● | ● | Cabuyao, Laguna | |||||
Gulod | ● | ● | | | | | ● | ||||||
Banlic | ● | ● | | | | | ● | PNR Bicol | Calamba, Laguna | ||||
Calamba | ● | ● | ● | ● | ● | none | |||||
Stations in italics will open in 2030. |
Extensions and additional stations
The 2014 JICA study proposed a 38 km (24 mi) branch line that will split in Angeles City. The line will have 12 stations and shall end in Tarlac City.[22] The study also proposed a 58 km (36 mi) extension of the NSCR to Batangas City.[22] This will be built parallel to the PNR South Long Haul Project which was approved in 2017, with the line being a single-track, standard-gauge line without electrification, and will be built at-grade similar to the present PNR network.[23] The PNR has also requested for a feasibility study for a commuter line connecting Tarlac City and San Jose, Nueva Ecija in 2019. The length of the line and the number of stations will be determined once a proposal has been submitted.[24]
The North–South Commuter Railway will also have provisions for infill stations: Valenzuela Polo, Tabing Ilog, Tuktukan, and Malolos South.[20]
History
Background
Predecessors of the Philippine National Railways (PNR) operated various local trains between Manila and its neighboring provinces. By the 1920s, trains ran from Tutuban to Naic in Cavite, Pagsanjan in Laguna, Montalban in Rizal, and Bulacan.[25] The network was heavily damaged in the Battle of Manila during World War II,[26] but was mostly reestablished after the war.[27]
The Metro Manila Commuter Service started on April 6, 1970 which started at Manila North Harbor and ended in Biñan, Laguna.[28] After numerous expansions, the commuter service enjoyed thousands of daily riders in its system and had an expansive network in and out of Metro Manila.[29] In 1978, at the request of the Philippine government, the Japan International Cooperation Agency conducted a study on the electrification of the commuter service.[30] The plan was made to keep up with the increasing demand for transportation in the Manila area. It called for the replacement of the diesel-run trains and the electrification of the PNR commuter line. Two experts from the Japanese National Railways were sent to conduct the study.[30] These would not materialize as the government shifted its focus to road-based infrastructure.
Services north of Manila started to decline in the 1980s. However, commuter services were briefly extended to Malolos starting in 1990 under the Metrotren project but later ceased in 1997.[31] Since then, railway services have been mostly confined to the south, with the contemporary Metro Commuter Line being predominantly aligned to the South Main Line.
Manila–Clark rapid railway system
During the 1990s, President Fidel Ramos signed a memorandum of agreement with Juan Carlos I of Spain for the construction of a railway line from Manila to Clark in September 1994.[5] This would be known as the Manila–Clark rapid railway system. On August 24, 1995, North Luzon Railways (NLRC) was formed as a subsidiary of Bases Conversion and Development Authority (BCDA).[5] The NLRC then entered into an engineering, procurement and construction contract with the Spanish Railways Corporation on February 7, 1996, but the contract was later terminated on August 14, 1998, after the parties disagreed on the source of funding for the project.[5]
In September 1999, the NEDA-ICC approved the railway project, with the initial phase covering a segment from Caloocan to Calumpit. The source of funding was to be the Obuchi Fund from the Japan Bank for International Cooperation.[5] Pre-construction activities such as right-of-way clearing and relocation of affected informal settlers began, but a presidential directive later halted the clearing activities and the JBIC loan was not granted.[5]
NorthRail
Under the presidency of Gloria Macapagal Arroyo, a successor to the Manila–Clark rapid railway system, the NorthRail project, was conceived. On September 14, 2002, a memorandum of understanding was signed by NorthRail and China National Machinery and Equipment Group (CNMEG) for the project.[5] It was later approved on August 5, 2003.[5] The project was estimated to cost around US$500 million, and the funding was to be covered by a US$400 million by the Export–Import Bank of China, and the rest to be shouldered by the government through BCDA and NLRC.[5][9][32]
The project involved the upgrading of the existing single track to an elevated dual-track system, converting the rail gauge from narrow gauge to standard gauge, and linking Manila to Malolos in Bulacan and further on to Angeles City, Clark Special Economic Zone and Clark International Airport.[5] The first phase of the project covered the Caloocan to Malolos segment. Preparatory construction began in early November 2006. Due to delays in the construction work, it was soon renegotiated with the Chinese government. Construction temporarily continued in January 2009 with the support of the North Luzon Railways Corporation.[5]
The NorthRail project was cancelled in March 2011 due to a series of delays, work stoppages, a controversy and anomalies with the foreign contractor.[9][10][6] According to Interior and Local Government Secretary Mar Roxas, the Chinese were open to reconfiguring the project, and that he was meeting with his Chinese counterpart in a month's time.[8][10]
In March 2012, the Philippine Supreme Court authorized a lower court to hear the case for voiding the contract. Instead of paying the US$184 million owed by the government in 2012, the Department of Finance was to pay the Export-Import Bank of China four installments of US$46 million from September 2012 onwards.[33] National Economic and Development Authority (NEDA) Director-General Arsenio Balisacan said the 80-kilometer NorthRail project would resume within the term of President Benigno Aquino III,[33] but despite this announcement, the NorthRail project was scrapped and replaced with the NSCR project.[34]
In November 2017, DOTr, BCDA, and North Luzon Railways reached an out-of-court settlement with Sinomach, resolving the five-year dispute.[9][35]
Development
With the termination of the NorthRail project, the Department of Transportation and Communications considered restarting the project by commissioning a feasibility study by CPCS Transcom Ltd. of Canada. Part of the study examined having a Malolos–Tutuban–Calamba–Los Baños commuter line.[34][36] The feasibility study was still ongoing when the NEDA included the North–South Commuter Railway in the Metro Manila Dream Plan, which it approved in 2014.[37]
The plan for the North–South Commuter Railway (NSCR), a component of the North–South Railway Project,[38] included the 37-kilometer NSCR Phase 1, an electrified narrow-gauge[39] commuter railway from Tutuban to Malolos and funded through overseas development assistance; and the second phase which included the reconstruction of the Tutuban–Calamba commuter line and the rehabilitation of long-haul services with an extension up to Matnog, Sorsogon and a branch line from Calamba to Batangas. It was to be funded through a Public–private partnership (PPP) scheme.[38][40][41]
On February 16, 2015, the National Economic and Development Authority board approved the NSCR Phase 1 project.[40][42] After President Aquino met with Japanese Prime Minister Shinzo Abe in Japan in June 2015, Abe expressed his commitment to fund the project. On November 19, 2015, representatives of both countries exchanged notes on the project in the presence of Abe and Aquino.[12] The Japan International Cooperation Agency (JICA) was chosen by the Japanese government to look into financing the project, and on November 27, 2015, seven months before Aquino would end his term, JICA and the Department of Finance signed a loan agreement worth ₱97.3 billion ($1.99 billion) for the financing of the first phase.[43][44][45]
The succeeding administration included the project under the Build! Build! Build! Infrastructure Program.[46] In addition, numerous changes to the project were made. The railway's gauge was changed to standard gauge,[47] and the railway was extended to New Clark City. In addition, the PPP scheme for the south commuter line was abandoned in favor of overseas development assistance from Japan. On June 25, 2017, Transportation Secretary Arthur Tugade announced the new name for the project and unveiled the locations of the first five stations during a press tour of the old PNR line.[48]
Pre-construction work such as clearing of the right of way was started on January 6, 2018.[49] The contract packages for the construction of the three phases underwent bidding on numerous dates. The first package for the construction of PNR Clark 1 to be awarded, Package 2, was awarded to Japan's Sumitomo Mitsui Construction on December 27, 2018. This covers the construction of the railway from Malolos to Bocaue. In December 2020, the subcontract for the construction of the railway viaduct from Tutuban to Bocaue was awarded to VSL International, a subsidiary of Bouygues.[50] Package 1, which covered civil works from Bocaue to Solis, was awarded to the Filipino-Japanese consortium of Taisei Corporation and DMCI Holdings on May 21, 2019.[51][52]
On the other hand, the first three contracts for the construction of PNR Clark 2 were opened in August 2019. Eleven firms from various ADB member countries participated in the bid.[53] The first packages were awarded on August 2020.[54] Package 4, was awarded to the consortium of EEI Corporation and Acciona. Package 5 was awarded to Posco. The Filipino-Korean consortium of Megawide Construction Corporation, Hyundai Engineering & Construction, and Dong-ah Geological Engineering Company won the bid for Package 1 on September 18, 2020,[55][56] with the contract signed on April 21, 2021.[57]
Bidding for the construction of PNR Calamba was opened on July 14, 2021,[58][59] with 34 bidders expressing interest in the project.[60]
Construction
The North–South Commuter Railway is being built in three phases and divided into two primary sections.
PNR Clark
PNR Clark is the northern section of the NSCR. Construction was divided into two phases. PNR Clark 1 involves the 38 km (24 mi) Tutuban–Malolos railway, while PNR Clark 2 involves the 53 km (33 mi) Malolos–Clark railway. The 91-kilometer railway line, when fully completed, will run from Tutuban station in Manila to New Clark City (NCC), with a link to Clark International Airport (CIA).[61][62]
The groundbreaking of PNR Clark 1 was held on February 15, 2019, and construction started after.[13][63] PNR Clark 1 is expected to start partial operations in 2021, while full operations are expected in the second quarter of 2024.[51][64] Its initial route, the Malolos-Valenzuela section, is expected to start operations by December 2021.[65] PNR Clark 2, on the other hand, is scheduled to begin operations by 2023.[53] As of July 2021[update], PNR Clark 1 is 48% complete, while PNR Clark 2 is 27.79% complete.[66]
PNR Calamba
PNR Calamba, also known as PNR Clark Phase 3,[67] is the southern section of the NSCR. It involves the reconstruction of the existing Metro Commuter Line as an electrified standard-gauge railway with elevated, at-grade, and depressed sections.[19][68] The 56 km (35 mi) railway will run from Solis, Manila to Calamba, Laguna. Construction is set to begin by 2022,[58] with partial operations slated for 2025 and full operations by 2028.[69]
Infrastructure
The line will be the first commuter rail system in the country to be mostly grade-separated. Trains are designed to run on standard gauge track at a design speed of 120 km/h for regular trains and 160 km/h for airport express trains. The line will also use a signaling system based on ETCS Level 2.[70][71] The line will also feature an Elastic Sleeper Direct Fasten (ESDF) type ballastless track with plastic/fiber-reinforced foam urethane railroad ties.[20]
Station layout
All stations will have a standard layout, with a concourse level and a platform level.[20] The stations are designed to adhere to both Philippine and Japanese standards.[20] Stations will either have island platforms or side platforms with platform screen doors. The stations are designed to be barrier-free,[72] and trains shall have spaces for passengers using wheelchairs.[20] Historical stations will be preserved.[73] All stations will have access to intermodal facilities.[20] The FTI station in particular is connected to the Taguig Integrated Terminal Exchange.
Rolling stock
A total of 360 electric multiple unit traincars have been procured to operate on the line, with 104 of these being the 8-car Sustina Commuter trainsets to be built by the Japan Transport Engineering Company (J-TREC), successor to the Tokyu Car Corporation that has provided rolling stock to the Philippines from 1955 to 1976. The trainsets are based on JR East commuter stock such as the E233 series but adapted to standard gauge. The trains are also designed to be interoperable with the Metro Manila Subway. The first batch of the commuter trains are expected to arrive in December 2021[46][74][75] A mock-up model of the commuter train was revealed to the public on June 28, 2021,[76] and was delivered to the Philippines from Japan in August 2021. As of October 8, the first trainset was completed and it's currently undergoing factory acceptance test.[77] The trainsets have been designated as the EM10000 class in October 2021.[78]
On the other hand, an order for 200 more commuter cars and the 56 airport express trainsets are being procured as of 2019.[79][80] On February 26, 2021, a suggested preliminary design based on the E259 and E353 series was published.[81] On May 10, the Department of Transportation later announced it will acquire the airport express trainsets from Japanese manufacturers.[82] After several months of delays and rescheduling, three bidders have submitted their designs: Kawasaki Heavy Industries and Sojitz joint venture, Marubeni and Stadler Rail, and Mitsubishi and Construcciones y Auxiliar de Ferrocarriles (CAF).[e] J-TREC did not participate as the company is already constructing the commuter trainsets.[83] Hitachi also opted not to participate and instead made a commitment to provide 67 elevators for Phase 1,[84][85] while its Italian subsidiary Hitachi Rail STS joined as a bidder for the supply of the project's signaling equipment.[86]
Rolling stock | Commuter train[20][87] | Airport express[88][81] |
---|---|---|
Image | ||
Year | 2021 | TBD |
Manufacturer | Japan Transport Engineering Company | TBD[f] |
Model number | PNR Class EM10000 | TBD |
Number to be built | 104 cars (8 per train) | 56 cars (8 per train) |
Length | 20,000 mm (65 ft 7 in) | 20,000 mm (65 ft 7 in) |
Width | 2,950 mm (9 ft 8 in) | 2,950 mm (9 ft 8 in) |
Height when the pantograph is lowered height | 4,150 mm (13 ft 7 in) | 4,150 mm (13 ft 7 in) |
Floor height | 1,130–1,150 mm (3 ft 8 in – 3 ft 9 in) | 1,130–1,150 mm (3 ft 8 in – 3 ft 9 in) |
Body material | Lightweight stainless steel | Aluminum alloy and stainless steel |
Tare weight | 270 metric tons (300 short tons) | 315 metric tons (347 short tons) |
Capacity | Leading car: 266 standing, 45 seated Intermediate car: 285 standing, 54 seated |
Leading car: 40 seated Intermediate car: 52 seated PWD seating: 8 wheelchair spaces |
Seat layout | Rapid transit-style longitudinal seating | Airline-style open coach seating |
Doors per side | 4 | 2 |
Traction power | 1,500 V overhead catenary | 1,500 V overhead catenary |
Pantograph type | 1 single-arm pantograph | 2 single-arm pantographs, outward facing |
Top speed | 120 km/h (75 mph) | 160 km/h (100 mph) |
Train configuration | Trailer lead car–Motor trailer car–M–Trailer car–T–M–M–Tc | Tc–M–M–M–M–M–M–Tc |
Other features | — | Toilets, luggage racks |
Status | First trainset undergoing delivery[78] | To be ordered |
See also
- Philippine National Railways
- Department of Transportation (DOTr)
- Transportation in the Philippines
- Transportation in Metro Manila
- Rail transportation in the Greater Manila Area
- Metro Manila Dream Plan
Footnotes
- ^ The project will be implemented in three phases which will have its own opening dates.
- ^ May use quadruple-track at stations.
- ^ May be through viaduct or embankment. Also includes an at-grade section between EDSA and FTI stations, a depressed section around Nichols station, and an underground section around Clark International Airport station.
- ^ Up to 120 kilometers per hour (75 mph) for commuter trains while 160 kilometers per hour (99 mph) for airport express trains.
- ^ The Mitsubishi-CAF consortium has already been constructing on the LRTA 13000 class light rail vehicles.
- ^ Three bidders have submitted their designs: Kawasaki Railcar, Marubeni, and Mitsubishi.[89]
References
- ^ "Record number of bids for Philippine North-South Commuter Railway". International Railway Journal. July 26, 2021. Archived from the original on July 28, 2021. Retrieved September 3, 2021.
- ^ a b "Railways Sector". www.dotr.gov.ph. Department of Transportation (Philippines). Archived from the original on May 26, 2021. Retrieved June 10, 2021.
- ^ Camus, Miguel R. "DOTr plans to integrate new railway lines". business.inquirer.net. Archived from the original on February 16, 2019. Retrieved February 16, 2019.
- ^ Pateña, Aerol John (April 30, 2019). "DOTr awards contract to DMCI Consortium for PNR North Phase 1 Project". Philippine News Agency. Archived from the original on November 11, 2020. Retrieved May 27, 2021.
- ^ a b c d e f g h i j k l m News, ABS-CBN (July 15, 2008). "Off track: Northrail timeline". ABS-CBN News. Archived from the original on February 17, 2019. Retrieved February 17, 2019.
{{cite web}}
:|last=
has generic name (help) - ^ a b "U.P. study finds North Rail contract illegal, disadvantageous to government". The PCIJ Blog. September 9, 2005. Archived from the original on August 12, 2014. Retrieved July 29, 2014.
- ^ Nicolas, Jino (November 6, 2017). "Northrail dispute settled". BusinessWorld. Archived from the original on June 26, 2021. Retrieved June 26, 2021.
- ^ a b Bordadora, Norman. "China open to reconfiguring NorthRail project, says Roxas". newsinfo.inquirer.net. Archived from the original on April 1, 2019. Retrieved February 16, 2019.
- ^ a b c d Inquirer, Philippine Daily. "WHAT WENT BEFORE: The Northrail Project". newsinfo.inquirer.net. Archived from the original on February 14, 2019. Retrieved February 16, 2019.
- ^ a b c "Philippines: China-funded Northrail project derailed". Financial Times. Archived from the original on August 17, 2018. Retrieved February 17, 2019.
- ^ "DOTC eyes elevated railway from Malolos to Los Banos". ABS-CBN News. July 22, 2013. Archived from the original on August 22, 2015. Retrieved April 23, 2019.
- ^ a b "Japan Commits JPY241.991 Billion ODA For North-South Commuter Railway Project (Malolos - Tutuban)". www.ph.emb-japan.go.jp (Embassy of Japan in the Philippines). November 19, 2015. Archived from the original on December 24, 2020. Retrieved December 24, 2020.
- ^ a b Mercurio, Richmond. "Construction of North-South Commuter Railway kicks off". Philstar.com. Archived from the original on September 1, 2021. Retrieved September 1, 2021.
- ^ "Department of Transportation – Philippines". www.facebook.com. Archived from the original on July 2, 2021. Retrieved February 18, 2019.
- ^ a b Share; Twitter. "Civil works start for Metro Manila-Bulacan railway segment". www.pna.gov.ph. Archived from the original on June 3, 2020. Retrieved January 22, 2020.
{{cite web}}
:|last2=
has generic name (help) - ^ "Project_Details – BUILD". build.gov.ph. Archived from the original on August 14, 2020. Retrieved April 27, 2019.
- ^ "Project Details – Build". Build.gov.ph. June 1, 2018. Retrieved January 9, 2020.[permanent dead link ]
- ^ "PH, Japan sign P78-b loan for Luzon railway network". Manila Standard. Archived from the original on November 25, 2018. Retrieved February 17, 2019.
- ^ a b Dela Paz, Chrissie (September 13, 2017). "NEDA Board approves Manila subway, longest railway". Rappler. Archived from the original on September 14, 2017. Retrieved September 15, 2017.
- ^ a b c d e f g h i j Department of Transportation The Republic of the Philippines (October 2018). "FEASIBILITY STUDY ON THE NORTH SOUTH RAILWAY PROJECT-SOUTH LINE (COMMUTER)(NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT) IN THE REPUBLIC OF THE PHILIPPINES" (PDF). jica.go.jp. Archived (PDF) from the original on April 11, 2021. Retrieved April 26, 2019.
- ^ "Chapter 6". Route Plan and Railways System (PDF). Study on railway strategy for Clark-metro Manila for the greater capital region in the Republic of the Philippines: final report. (Report). Vol. II. Japan International Cooperation Agency. June 2013. Retrieved September 11, 2021.
- ^ a b "Roadmap for Transport Infrastructure Development for Metro Manila and its Surrounding Areas (Region III and Region IV-A)" (PDF). Japan International Cooperation Agency. March 30, 2014. Archived (PDF) from the original on June 27, 2020. Retrieved May 7, 2020.
- ^ Dela Paz, Chrisee (September 13, 2017). "NEDA Board approves Metro Manila Subway". Rappler. Archived from the original on September 14, 2017. Retrieved September 14, 2017.
- ^ Villanueva, Joann (January 22, 2019). "PNR asks for feasibility of Cabanatuan-Makati line". Philippine News Agency. Archived from the original on November 5, 2020. Retrieved August 2, 2020.
- ^ Orbon, Glenn; Dungca, Joana (2015). "The Philippine Railway System". Movement Systems.
- ^ Gamble, Adrian (March 10, 2017). "Manila's Long-Lost 'Tranvias' Once the Envy of Asia". skyrisecities.com. Skyrise Cities. Archived from the original on June 21, 2020. Retrieved June 21, 2020.
- ^ "Chapter I: Present Conditions". Report of Survey of the Manila Railroad Company and the Preliminary Survey of Railroads for Mindanao (Report). Chicago: De Leuw, Cather & Company. 1951. pp. 1–12.
- ^ "Carmona's Commuter Train". Times Journal. April 1973. Archived from the original on July 13, 2021. Retrieved July 23, 2020.
- ^ "Brief history of PNR". Philippine National Railways (February 27, 2009). Archived from the original on February 27, 2009. Retrieved November 4, 2011.
- ^ a b "REPORT ON STUDY OF THE ELECTRIFICATION OF THE PNR COMMUTER SERVICE" (PDF). Japanese International Cooperation Agency (JICA). December 1978. Archived (PDF) from the original on May 22, 2021. Retrieved February 15, 2021.
- ^ "Metrotren Inaugural". Manila Chronicle. May 11, 1990. Archived from the original on July 13, 2021. Retrieved May 6, 2021.
- ^ "RP, China break ground for Manila–Ilocos railway". Malaya. April 6, 2004. Archived from the original on May 9, 2010.
- ^ a b Basa, Mick. "Northrail project up for NEDA-ICC approval soon". Rappler. Archived from the original on February 18, 2019. Retrieved February 17, 2019.
- ^ a b "DOTC eyes elevated railway from Malolos to Los Banos". ABS-CBN News. July 22, 2013. Archived from the original on August 22, 2015. Retrieved April 23, 2019.
- ^ Paz, Chrisee Dela. "PH gov't ends dispute with China's Sinomach over Northrail project". Rappler. Archived from the original on November 25, 2018. Retrieved February 16, 2019.
- ^ "Archived copy". Archived from the original on January 2, 2014. Retrieved January 1, 2014.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ Main Points of the Roadmap (PDF) (Report). Japan International Cooperation Agency. September 2014. Archived from the original (PDF) on October 11, 2014.
- ^ a b "New north-south commuter railway set". www.officialgazette.gov.ph. December 1, 2015. Archived from the original on July 2, 2021. Retrieved December 24, 2020.
- ^ "Bidders line up for Philippines North-South line". International Railway Journal. August 20, 2015. Archived from the original on May 17, 2021. Retrieved May 17, 2021.
- ^ a b "P287-B North-South Railway project eyed for 2020 operation". PPP Center. February 18, 2015. Archived from the original on July 2, 2021. Retrieved December 24, 2020.
- ^ "PNR lines up new railway project for PPP". Philstar.com. Retrieved November 3, 2021.
- ^ "NEDA Board approves six transport infra projects". www.officialgazette.gov.ph. February 16, 2015. Archived from the original on July 2, 2021. Retrieved December 25, 2020.
- ^ Camus, Miguel (January 29, 2016). "PH, Japan seal P97-B commuter rail project". Philippine Daily Inquirer. Archived from the original on December 24, 2020. Retrieved December 24, 2020.
- ^ Diangson, Louie (January 29, 2016). "PH, Japan signs deal for the Php97 billion commuter railway". www.yugatech.com. Archived from the original on December 24, 2020. Retrieved December 24, 2020.
- ^ Dela Paz, Chrisee (November 28, 2015). "PH, Japan sign $1.99B loan for North-South commuter railway". rappler.com. Archived from the original on November 25, 2018. Retrieved December 25, 2020.
- ^ a b "Tugade: PNR Clark, Calamba trains to arrive in December 2021". Philippine Information Agency. Archived from the original on June 26, 2021. Retrieved June 26, 2021.
- ^ "Philippines adopts standard gauge for new lines". International Railway Journal. August 9, 2016. Archived from the original on April 23, 2021. Retrieved May 17, 2021.
- ^ Dela Paz, Chrisee. "17 stations of Manila–Clark railway announced". Rappler. Archived from the original on March 22, 2019. Retrieved February 17, 2019.
- ^ Pateña, Aerol John (January 6, 2018). "Preps begin for Phase 1 of PNR Clark railway project". Philippine News Agency. Archived from the original on June 26, 2021. Retrieved June 26, 2021.
- ^ "Viaduct contract awarded for Philippines' NSCR". International Railway Journal. December 22, 2020. Archived from the original on May 17, 2021. Retrieved May 17, 2021.
- ^ a b Pateña, Aerol John. "DOTr awards contract to DMCI Consortium for PNR North Phase 1 Project". www.ptvnews.ph. Archived from the original on May 10, 2019. Retrieved May 10, 2019.
- ^ "DMCI, Japanese partner bag P54-B contract for North-South Commuter Railway project". GMA News Online. Archived from the original on May 28, 2019. Retrieved May 28, 2019.
- ^ a b "Malolos-Clark rail auction draws 11 firms". BusinessWorld Online. Archived from the original on August 29, 2019. Retrieved August 30, 2019.
- ^ "Philippines awards North-South Commuter Railway contracts". International Railway Journal. August 4, 2020. Archived from the original on May 17, 2021. Retrieved May 17, 2021.
- ^ Manuel, Pilar (September 21, 2020). "Megawide, 2 Korean firms secure construction for part of Malolos-Clark Railway". CNN Philippines. Archived from the original on October 18, 2020. Retrieved May 5, 2021.
- ^ Loyola, James A. (September 21, 2020). "Megawide, Korean partners win P28-B railway project". Manila Bulletin. Archived from the original on July 2, 2021. Retrieved May 5, 2021.
- ^ Amojelar, Darwin G. (May 4, 2021). "Megawide signs P2.9-b concrete supply contract for Malolos-Clark railway". Manilastandard.net. Archived from the original on July 2, 2021. Retrieved May 5, 2021.
- ^ a b "DOTr - TUGADE: PNR CALAMBA PROJECT TO GENERATE OVER 10,000 DIRECT JOBS". dotr.gov.ph. Archived from the original on July 13, 2021. Retrieved July 13, 2021.
- ^ "PNR Calamba to employ over 10,000 during construction". Manila Bulletin. July 14, 2021. Archived from the original on July 14, 2021. Retrieved July 15, 2021.
- ^ Abadilla, Emmie V. (July 22, 2021). "PNR Calamba project draws 34 bidders". Manila Bulletin. Archived from the original on July 22, 2021. Retrieved July 22, 2021.
- ^ Dela Paz, Chrisee. "17 stations of Manila–Clark Railway revealed". Rappler. Archived from the original on March 22, 2019. Retrieved June 25, 2017.
- ^ Aning, Jerome (June 25, 2017). "DOTr leads marking of Manila–Clark railway's 5 future stations". Philippine Daily Inquirer. Archived from the original on June 12, 2018. Retrieved June 25, 2017.
- ^ "Department of Transportation – Philippines". www.facebook.com. Archived from the original on July 2, 2021. Retrieved February 18, 2019.
- ^ "Completion of PNR Clark Phase 1, 2 on track". Philippine News Agency. March 8, 2021. Archived from the original on March 8, 2021. Retrieved March 9, 2021.
- ^ Velasco, Shane F. (May 26, 2021). "Tagalog News: Malolos-Valenzuela, inisyal na ruta ng NSCR Project Phase 1". Philippine Information Agency (in Filipino). Archived from the original on May 26, 2021. Retrieved May 27, 2021.
- ^ Escocio, Jan (September 20, 2021). "Tugade: PNR Malolos to Clark segment to generate 7,000 direct jobs". Philippine Daily Inquirer. Archived from the original on September 21, 2021. Retrieved September 21, 2021.
- ^ "DOTr - TUGADE: PNR CLARK, CALAMBA TRAINS TO ARRIVE IN DECEMBER 2021". dotr.gov.ph. Archived from the original on June 2, 2021. Retrieved July 13, 2021.
- ^ Leyco, Chino S. (September 13, 2017). "NEDA Board approves big infra projects". Manila Bulletin. Archived from the original on September 14, 2017. Retrieved September 15, 2017.
- ^ Devio, Lea (July 14, 2021). "PNR Calamba segment to be operable by 2025". The Manila Times. Archived from the original on July 14, 2021. Retrieved July 14, 2021.
- ^ "The Malolos–Clark Railway Project and the North South Railway Project-South Line (Commuter) PACKAGE CP NS-01: E&M SYSTEMS AND TRACK WORKS". DOTr. Retrieved September 1, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ LIVE: North-South Commuter Railway Extension Project (NSCR-Ex) Contract Package (CP) NS-01 E&M System and Track Works (Facebook Watch). Department of Transportation (Philippines). April 16, 2021. Retrieved April 19, 2021.
The outline of Signaling System is as follows: a) Signaling system to be based on ETCS Level 2 with a maximum speed of 160 km/h.
- ^ "Proposed Multitranche Financing Facility Republic of the Philippines: Malolos–Clark Railway Project" (PDF). Asian Development Bank. April 2019. Archived (PDF) from the original on July 13, 2021. Retrieved July 13, 2021.
- ^ INQUIRER.net. "PNR to preserve old train stations in Bulacan". newsinfo.inquirer.net. Archived from the original on July 27, 2020. Retrieved April 18, 2020.
- ^ "DOTr - TUGADE: PNR CLARK, CALAMBA TRAINS TO ARRIVE IN DECEMBER 2021". dotr.gov.ph. Department of Transportation. Archived from the original on June 2, 2021. Retrieved May 29, 2021.
- ^ Balinbin, Arjay L. (July 21, 2021). "North-South rail, subway trains to start arriving in December". BusinessWorld. Archived from the original on July 21, 2021. Retrieved July 23, 2021.
- ^ Laurel, Drei (June 30, 2021). "DOTr shows off operator cabin of PNR Tutuban-Malolos Railway". Top Gear Philippines. Archived from the original on July 2, 2021. Retrieved July 1, 2021.
- ^ "These are the new trains that will run along PNR Clark Phase 1". topgear.com.ph. Retrieved October 8, 2021.
- ^ a b マニラ南北線EM10011Mとマニラ南北線EM10011Lが株式会社総合車両製作所(J-TREC)から陸送!【令和3年(西暦2021年)10月18日月曜日】 [Manila North-South Line EM10011M and Manila North-South Line EM10011L being shipped by land from [the] Japan Transport Engineering Company (J-TREC)! (Monday, October 18, 2021)] (YouTube) (in Japanese). October 18, 2021. Retrieved October 19, 2021.
- ^ "1 local, 5 foreign firms bid for P50.8-B PNR Clark Phase 2". GMA News. October 16, 2019. Archived from the original on February 15, 2020. Retrieved February 15, 2020.
- ^ Environmental Impact Assessment (PDF). Proposed Multitranche Financing Facility Republic of the Philippines: South Commuter Railway Project (Report). Department of Transportation (Philippines) and the Asian Development Bank. July 1, 2020. Archived (PDF) from the original on May 17, 2021. Retrieved May 17, 2021.
- ^ a b BIDDING DOCUMENTS FOR PROCUREMENT OF PACKAGE CP NS-03: ROLLING STOCK - LIMITED EXPRESS TRAINSETS Volume II of III (PDF) (Report). Philippine National Railways. February 2021. Archived (PDF) from the original on August 21, 2021. Retrieved August 19, 2021.
- ^ "Philippines: Philippines to engage Japanese manufacturers for NSCR Express trainsets". International Union of Railways. May 10, 2021. Archived from the original on May 17, 2021. Retrieved May 17, 2021.
- ^ "交通システム" [Transportation system]. jknews.jp (in Japanese). Heavy & Chemical Industries News Agency. October 2021. Retrieved October 24, 2021.
- ^ "Hitachi Elevator Philippines Receives 67 Elevators and Escalators Order for Its First Railway System Project". Hitachi. September 8, 2021. Retrieved November 11, 2021.
- ^ Camus, Miguel (September 13, 2021). "Japan industrial giant Hitachi to supply elevators, escalators to key PH rail project". Philippine Daily Inquirer. Retrieved November 11, 2021.
- ^ "NORTH-SOUTH COMMUTER RAILWAY PROJECT (MALOLOS-TUTUBAN) N1CP04: ELECTRICAL AND MECHANICAL SYSTEMS AND TRACKWORKS". Department of Transportation (Philippines). August 25, 2021. Retrieved November 5, 2021.
- ^ BIDDING DOCUMENTS FOR PROCUREMENT OF PACKAGE CP NS-02: ROLLING STOCK - COMMUTER TRAINSETS Volume II of III (Report). Philippine National Railways. September 2020. Archived from the original on August 12, 2021. Retrieved August 10, 2021.
- ^ Valdez, Denise (July 17, 2019). "DoTr, Japan firms ink P12-B contract for train cars". BusinessWorld. Archived from the original on April 14, 2021. Retrieved April 14, 2021.
- ^ LIVE: Bid Opening for the Contract Package NS-03 - Limited Express Rolling Stock (16:9 720p) (Facebook Live). Department of Transportation (Philippines). October 15, 2021. Retrieved October 16, 2021.