History of rail transport in Great Britain 1995 to date
- This article is part of a series on the History of rail transport in Great Britain.
The period from 1995 covers the history of rail transport in Great Britain following the privatisation of British Rail. During this period, passenger volumes have grown rapidly,[1] safety has improved,[2][3] and subsidies per journey have fallen. However, there is debate as to whether this is due to privatisation or to better government regulation. See impact of the privatisation of British Rail for more information. During this period, High Speed 1 and the West Coast Main Line upgrade were completed and more construction projects are currently under way.
Overall rail subsidies have risen, as shown in the graph, although spend per journey has decreased. Rail subsidies have increased from £3.4bn in 1992–93 to £4.5bn in 2015–16 (in current prices), although subsidy per journey has fallen from £4.57 to £2.61.[5][6] However, this masks great regional variation: for instance, in 2014–15 funding varied from "£1.41 per passenger journey in England to £6.51 per journey in Scotland and £8.34 per journey in Wales."[6]
Due to the increase in passenger numbers and the prospect of high speed rail both within Great Britain and connecting to Europe, this period has been called the start of a new Golden Age of rail travel.[7][8] However quickly increasing passenger numbers have meant many trains are very crowded at peak times.[9] Peak-time fares have increased by over 200% (since privatisation) to deter people from travelling at these times,[5] whereas the price of advance tickets has halved in the same period.[10]
Government policy
Reform under the Labour government (1997–2010)
The Labour government (elected in 1997 after the majority of the privatisation process had been completed) did not completely reverse the railway privatisation of the previous administration. Initially it left the new structure largely in place, however its main innovation in the early years was the creation of the Strategic Rail Authority (SRA), initially in shadow form until the Transport Act 2000 received Royal Assent, as well as the appointment of Tom Winsor as Rail Regulator, who took a much harder line with the rail industry, and Railtrack in particular.[12]
In the wake of the Hatfield rail crash in 2000, Railtrack entered into financial meltdown and the industry was in deep crisis. Labour refused to continue to bail out Railtrack and the company was put into Railway Administration in 2001 and a new company, Network Rail emerged to replace Railtrack in 2002. Since September 2014, Network Rail has been classified as a "government body".[13][14]
The Strategic Rail Authority lasted just five years. Following the passing of the Railways Act 2005, its business was wound up and its functions transferred to the Department for Transport Rail Group and the Office for Rail Regulation.[15] Further changes followed, which saw the government take back a greater degree of control.
Another important development occurred in the aftermath of the Potters Bar accident in May 2002 when a commuter train derailed (coincidentally on the same stretch of the East Coast Main Line as Hatfield) due to poorly maintained points. This resulted in Network Rail taking all track maintenance back in-house and the industry went on to enjoy the longest period in modern times without a fatal accident due to industry error. This came to an end in February 2007 when a Virgin Trains West Coast Class 390 Pendolino derailed near Grayrigg in Cumbria, killing one person. The cause of the accident was identical to that in Potters Bar nearly five years earlier – once again calling into question Network Rail's maintenance procedures.
In 2007, the government's preferred option was to use diesel trains running on biodiesel, its White Paper Delivering a Sustainable Railway,[16] ruling out large-scale Railway electrification in Great Britain for the following five years.
Following Gordon Brown's appointment as Prime Minister in 2007, Andrew Adonis was appointed Transport Secretary. He immediately began work on plans for a new high-speed route between London and Birmingham (later known as High Speed 2), which would augment the West Coast Main Line. Adonis also announced plans to electrify the Great Western Main Line from London as far as Swansea, as well as infill electrification schemes in the North West of England to remove diesel traction from certain key routes. Late in 2009, the InterCity East Coast franchise collapsed for the second time in three years when incumbent operator National Express East Coast (NXEC) proved unable to meet its financial obligations. Adonis transferred the franchise to the state-owned Directly Operated Railways to operate the route under its East Coast subsidiary.
Reform under the Coalition government (2010–2015)
After the 2010 General Election, the new Conservative led Coalition continued Labour's rail policies largely unaltered after a pause to review the finances. There was continuing support for the High Speed 2 scheme and further developing plans for the route, although great debate still rages over the scheme's benefits and costs. Whilst initially showing scepticism towards the electrification schemes of the Great Western route, they later gave the project its backing and work began formally in 2012. Plans were also mooted to electrify the remainder of the Midland Main Line.
In 2012, the franchising system again came under criticism after FirstGroup was awarded the InterCity West Coast franchise. Incumbent Virgin Rail Group initiated a judicial review against the decision, citing the fact that First's bid was even more ambitious than the one which had scuttled National Express East Coast less than three years earlier. Before the review took place however, newly-installed Transport Secretary Patrick McLoughlin scrapped the entire bidding process for the franchise and granted Virgin an extension to its contract when "severe technical flaws" were discovered in the original bidding competition.
The Conservative government (2015–present)
The Government has moved towards allowing more competition on the intercity network through open access operators. In 2015 it approved a service run by Alliance Rail Holdings to operate between London Euston and Blackpool, and in 2016 it allowed FirstGroup to run open access services on the East Coast Main Line from 2021 under the operating name East Coast Trains.[17][18]
Much debate continues over annual fare increases, although the government has now pledged to keep regulated rail fare increases at Retail Prices Index (RPI) inflation for the remainder of this Parliament.[19] In addition much debate has continued over the financing of various rail schemes driven primarily by the huge cost and time overrun on the GWML route modernisation and electrification scheme. In connection with this, and to coincide with the Chancellor's Autumn statement in November 2015, the Bowe and Hendy reports were produced.[20][21]
In March 2016, the National Infrastructure Commission said that Crossrail 2 should be taken forward "as a priority" and recommended that a bill should pass through Parliament by 2019 and the line should be open by 2033.[22] Crossrail 2 is a North-South railway through London, similar to the East-West railway Crossrail which is currently under construction.
Since April 2016, the British railway network has been severely disrupted on many occasions by wide-reaching rail strikes, affecting rail franchises across the country.[23] The industrial action began on Southern services as a dispute over the planned introduction of driver-only operation,[24] and has since expanded to cover many different issues affecting the rail industry;[23] as of February 2018, the majority of the industrial action remains unresolved, with further strikes planned.[25] The scale, impact and bitterness of the nationwide rail strikes have been compared to the 1984–85 miners' strike by the media.
In July 2017, Chris Grayling, the secretary of state for transport announced a number of electrification schemes were to be suspended indefinitely citing the disruptive nature of electrification works and the availability of bi-mode technology. The schemes included aspects of the GWML including Cardiff to Swansea, the Midland Mainline from Kettering to Sheffield via Derby and Nottingham and Oxenholme to Windermere in the Lake District.[26]
In February 2018, the five-year plan was published by Network Rail with significant investment though much of this was for renewals and smaller projects rather than major projects.[27][28] In March 2019 the Railway Industry Association published a paper Electrification Cost Challenge.[29]
In July 2019, the Urban Transport Group released a report that showed regional rail travel had experienced a 29% growth in the ten years to 2017/18.[30]
On 24 July 2019, Grant Shapps was appointed Secretary of State for Transport under the new Prime Minister Boris Johnson[31]
Infrastructure projects
Completed projects
The British railway system continues to be developed. Contemporary projects include:
- The West Coast Main Line upgrade was a long-term project covering a series of technical aspects. Improvements included the four-tracking (from three) of the Trent Valley (a bypass of the West Midlands), redesigning the layout of several junction/stations e.g. Rugby and other associated work to increase line speed. This culminated in tilting trains at 125 mph being extended to Glasgow in 2005. The cost overruns of the programme are infamous - attributed to the wide scope of the programme (the promise to Virgin to build a 140 mph railway which would require moving block signalling) and poor project management by the defunct Railtrack.
England
- High Speed 1, a project to construct a 67-mile high-speed rail line from London to the British end of the Channel Tunnel, and involving a great deal of complex civil engineering including a 1404-yard bridge over the River Medway, a 2-mile tunnel under the Thames near Dartford, a 2-mile tunnel through the North Downs, 12-mile twin tunnels running into central London, a major new railway station extension to London St Pancras, and a complex redesign and rebuild of the King's Cross St Pancras tube station. The southern phase 1 of the project opened in September 2003, and northern phase 2 opened in November 2007.
- The electrification of both the Liverpool to Manchester line and Liverpool to Wigan lines were completed in 2015 and electric Class 319 trains (on the Liverpool to Manchester Airport service) and Class 350s (on the Manchester Airport to Scotland services) have replaced diesel units. The lines between Preston and Blackpool North and also Preston - Manchester have been electrified with completion in 2018.
- Electrification of the Cross-City Line to Bromsgrove has been completed, which allowed electric trains to run from summer 2018.[32][33]
Scotland
- The Stirling-Alloa-Kincardine railway, a 13-mile (21 km) extension to the network, to the north of the Firth of Forth in Scotland. A Bill for the railway was passed by the Scottish Parliament and received Royal Assent in August 2004. Work commenced in September 2005, with services running by early 2008. The line re-establishes a railway decommissioned in 1983; the new line provided passenger connections to Glasgow, and freight links between the site of Kincardine power station, now used as a loading point for coal from open-cast sites, to avoid heavy traffic through Kincardine, and Longannet power station, and the coal terminals at Hunterston Deep Water Port. Longannet power station closed in 2016. The passenger part of the scheme, from Stirling to Alloa was in any case secure, and the Scottish Parliament appear to be in favour of passenger services being extended to Rosyth. This could possibly result in passenger stations serving the communities of Clackmannan, Kincardine, and Culross or Valleyfield, and through trains once more from Stirling to Dunfermline.
- A short extension of the Glasgow-Hamilton-Motherwell, which once again links Larkhall to the railway network after 40 years. Larkhall has for some time been the largest town in Scotland without a railway station. The new £35m line follows an existing formation, and services to Larkhall railway station resumed on 12 December 2005.[34] The new section of route is electrified and is served with trains from Dalmuir, via Glasgow Central Low Level, with connections from other northern suburbs of Glasgow such as Milngavie.
- The Airdrie-Bathgate Rail Link was completed in December 2010. The Airdrie-Bathgate project was quite extensive insofar as it included double track electrification, the present remnant of the line from just outside Edinburgh to Bathgate having been largely singled some time ago.
- The Glasgow Airport Rail Link was given the go-ahead by the Scottish Parliament in December 2006 but the project was scrapped by the new SNP minority government in September 2009. A new 1.5 mile spur was to be built onto the existing Inverclyde route. An element of the project that did go ahead was upgrading the Glasgow Central - Paisley line to triple track to increase capacity on the Ayrshire and Inverclyde routes. This work was completed in 2012.
- A 35-mile section of the Waverley Route from Edinburgh to Tweedbank in the Scottish Borders has been rebuilt after approval by the Scottish Parliament, which reopened on 6 September 2015. This project, also known as the Borders Railway, restored rail services to communities which have lacked access to the National Rail network since the Beeching cuts.
- The line between Glasgow Queen Street railway station and Edinburgh Waverley railway station via Falkirk High railway station was electrified and electric trains started running in December 2017.
- The rolling programme of electrification in Scotland saw lines from Edinburgh and Glasgow electrified to Stirling, Dunblane and Alloa.
- The Edinburgh to Glasgow Central line via Shotts was completed on time and on budget.[35]
Wales
- The Welsh Assembly Government re-opened the Vale of Glamorgan Line between Barry and Bridgend in 2005 and the Ebbw Valley Railway between Ebbw Vale Parkway and Cardiff Central in 2008. An extension of the line to Ebbw Vale Town opened in 2015.
Current developments
- High Speed 2 (HS2) is a planned[36][37] high-speed railway which will initially link the cities of London and Birmingham, followed by further extension to North West England and Yorkshire. Construction of the first phase of HS2 began in 2017 with a planned opening date of 2026, while completion of the entire network is expected in 2033. Phase One of HS2 will run between London Euston and the proposed new Birmingham Curzon Street station. Phase two will create two branches: a western leg to Manchester Piccadilly, and an eastern leg to the proposed Leeds New Lane station via the East Midlands Hub (serving Derby, Nottingham and Leicester) and Meadowhall Interchange (serving Sheffield).
- The Thameslink Programme started in 2009 and is expected to be completed in December 2019. The project includes the lengthening of platforms, station remodelling, new railway infrastructure (e.g. viaducts) and additional rolling stock, which will allow Govia Thameslink Railway to expand their Thameslink services further north and south.
- The Northern Hub is a rail project across Northern England aimed at stimulating economic growth by increasing train services, reducing journey times and electrifying lines between the major cities and towns in the north.[38] The project was announced as the Manchester Hub, entailing a series of upgrades to cut journey times between cities in Northern England by alleviating rail bottlenecks around Manchester.[39][40] Central to the project is the resolution of rail bottlenecks around Manchester city centre allowing more capacity and faster journey times between the northern cities. The construction of two through platforms at Piccadilly will allow an increase to 14 trains per hour from 10. Manchester Victoria station is being modernised to become the east-west rail interchange in northern England. Trains from the north east to Manchester Airport will use a new section of railway, the £85 million Ordsall Chord, between Manchester Victoria and Manchester Oxford Road to access Manchester Piccadilly and continue to the airport without the need to reverse at Piccadilly and without conflicting movements at the station throat. Services from Liverpool to Leeds and beyond will be diverted from the Cheshire Lines route via Warrington Central and Manchester Piccadilly to the electrified line via Newton-le-Willows and Manchester Victoria.
- On the Great Western Main Line, Network Rail plans to spend £5 billion[41] on modernising the GWML and its South Wales branch plus other associated lines like the North Cotswolds[42] which was completed in 2011. The modernisation plans were announced at separate times but their development time-scales overlap each other to represent a comprehensive modernisation plan for the Great Western and its associated lines during the second decade of the 21st century. The modernisation includes: electrification, resignalling, new rolling stock and station upgrades. According to Network Rail, the modernisation started in June 2010 and will end in 2017.[43] On 8 November 2016 the government announced that several elements of the Great Western Main Line electrification programme would be indefinitely deferred due to cost overruns and delays.[44][45] This was confirmed by Chris Grayling in July 2017 stating specifically Cardiff -Swansea electrification was cancelled and bi-mode availability made this possible without disruptive electrification works.[26]
- Crossrail is a 118-kilometre (73-mile) railway line under construction in London and its environs. It is expected to begin full operation in 2021 with a new east-west route across Greater London. Work began in 2009 on the central section of the line—a new tunnel through central London—and connections to existing lines that will become part of Crossrail.[46] Crossrail's aim is to provide a high-frequency commuter/suburban passenger service that will link parts of Berkshire and Buckinghamshire, via central London, to Essex and South East London.
- Scotland
- The Edinburgh to Glasgow Improvement Programme or "EGIP" is an initiative started by the Scottish Government to upgrade the main railway line between Edinburgh and Glasgow via Falkirk High. The route via Shotts was then to follow. It is expected to cost around £650 million. In May 2017 a further delay was announced due to a safety critical component on the via Falkirk High route needing to be replaced.[47]
- Wales
- The Welsh Assembly Government proposes to extend the Ebbw Valley line between Ebbw Vale and Cardiff into Newport in the future. The Assembly Government is also looking into opening the Hirwaun to Aberdare route in the Cynon Valley.
Timeline of improvements
2015
- May: The Todmorden Curve reopened, allowing direct trains to operate between Manchester and east Lancashire. The Curve had been closed in 1965 with the tracks lifted in 1972.[48]
- December: Apperley Bridge station reopened, after being closed in 1965. It is the first of two stations between Leeds and Shipley in West Yorkshire to be reopened.[49]
2016
- February: The first of 27 Class 387/2 Electrostar units were introduced on the Gatwick Express route between London Victoria and Gatwick Airport, replacing the Class 442s.[50]
- March: The Norton Bridge flyover on the West Coast Main Line was brought into use.[51]
- June: The first of 115 Class 700 Desiro City units entered service on Thameslink.[52]
- June: Kirkstall Forge station opened.[53]
- July: The new Bromsgrove station opened.[32]
- December: The western-most segment of the western section of East West Rail opened, extending the line from Oxford Parkway to Oxford,[54] and thus establishing a new Oxford-Marylebone service via Bicester Village.
2017
- April: Ilkeston station in Derbyshire, served by trains between Nottingham and Leeds, opened[55] and Low Moor station on the Caldervale line between Bradford and Halifax reopened after being closed in 1965.[56]
- April: Redoubling of track from Rossett to Chester on the Shrewsbury to Chester Line was completed.[57]
- May: Cambridge North station opened.[58]
- May: Electric 387 trains started running between London Paddington and Maidenhead following completion of electrification work.[59]
- June: The first of 66 Class 345 Aventra units entered service on Crossrail. These will replace the 44 TfL Rail Class 315 units that presently operate this service.[60]
- August: The first of 30 Class 707 Desiro City units entered service with South West Trains.[61]
- October: The first Class 800 Intercity Express trains were introduced on the Great Western Main Line.[62]
- December: The Ordsall Chord opened to passenger traffic.[63]
- December: As part of the Edinburgh to Glasgow Improvement Programme, the first electric trains ran from Edinburgh to Glasgow via Falkirk High.[64]
2018
- January: The line from Preston to Blackpool South including Kirkham and Wesham reopened on time with completely new signaling.[65]
- January: Electric trains started running between Paddington and Didcot following completion of electrification work on this section of the Great Western Main Line.[59]
- January: Infrastructure work on the Thameslink project allows 20 trains per hour between Blackfriars and St Pancras.[66]
- January: The first passenger train ran on the completed Bermondsey dive-under.[67][68]
- April: Kenilworth station opened on the line between Leamington Spa and Coventry.[69][70]
- May: The first electric trains ran between Preston and Blackpool North.[71]
- May: Services between Paddington and Heathrow Terminal 4 as well as Heathrow Central and Heathrow Terminal 4 transferred from Heathrow Express to Crossrail.[72]
- May: Resignalling on the Halton Curve that will allow trains to travel in both directions (presently trains can only travel on the line in a northbound direction) from Chester to Liverpool Lime Street (via Runcorn) was completed, allowing trains to run from May 2019.[73][74][75]
- May: Electrification of the Cross-City Line to Bromsgrove was completed, allowing electric trains to run in July 2018.[32][33][76]
- June: Maghull North station opened on Merseyrail's Northern line.[77]
- July: Class 385 electric trains started running on the Edinburgh to Glasgow route.[78]
- August: Class 802 trains entered service with Great Western Railway on the West of England line.[79]
- August: Mark 5A coaches hauled by Class 68 locomotives began testing on the mainline prior to their introduction with Transpennine Express.[80]
- September: Great Northern started introducing Class 717 trains on services to and from Moorgate.[81]
- December: Electric trains started running on the Stirling-Dunblane-Alloa line.[82]
- December: Four-tracking of the Great Western Main Line at Filton Bank between Dr Days Junction and Filton Abbey Wood was completed.[83]
- December: Manchester to Preston electrification was completed and Virgin Pendolino test trains ran.[84][85]
2019
- April: Electrification of the Shotts Line between Edinburgh and Glasgow was completed, allowing electric trains to run from May.[86]
- April: Vivarail Class 230 units started operating on the Marston Vale line for West Midlands Railway.[87]
- April: Mark 5 coaches entered service on the Caledonian Sleeper.[88]
- May: Electric trains started running on the Chase Line to Walsall.[89]
- May: Class 710 Aventra units entered service for London Overground on the Lea Valley Lines, Gospel Oak to Barking Line, Watford DC Line and the Romford to Upminster Line.[90]
- May: The first Class 800 Super Express trains were introduced on the East Coast Main Line.[91]
- June: Refurbished Class 442 units entered service with South Western Railway on London Waterloo to Portsmouth/Southampton services.[92]
- July: The first Class 195 Civity and Class 331 Civity units started running services on Arriva Rail North's network.[93]
- July: Greater Anglia started their complete fleet replacement by introducing their first Class 755 units.[94]
- September: Class 801 units made their debut for London North Eastern Railway on London to Leeds services.[95]
- November: The first of twelve 5-car Class 397 Civity trains entered service for TransPennine Express.[96]
- December: Services between Paddington and Reading transferred from Great Western Railway to Crossrail.[97]
- December: Robroyston and Warrington West stations open with the December timetable change.[98][99]
- December: All of the Pacer (Class 142, Class 143 and Class 144) units were to be withdrawn from service by the end of December 2019 unless they receive modifications to comply with the Disability Discrimination Act of 2005.[100] However, it has been confirmed that some will remain in service past the December 2019 deadline[101][102].
- December: The Thameslink Programme is scheduled for completion, allowing for 24 trains per hour between Blackfriars and St Pancras.[103]
- December: Class 387s specially converted for use on the route will enter service for Heathrow Express.[104]
- Class 769 bi-mode units converted from electric Class 319 trains were scheduled to enter service with Northern.[105]
2020
Dates after November 2020 are plans, not events, and are subject to extensive revision.
- January: The first Class 745 trains began operating for Greater Anglia.[106]
- January: The first electric trains ran on the Great Western Main Line to Cardiff.[107]
- February: Worcestershire Parkway railway station opened.[108]
- Merseyrail start introducing the first of 52 new four-car Class 777 trains to replace the three-car Class 507 and Class 508 trains they currently operate.[109]
- South Western Railway start introducing their new Class 701 trains.[110]
- Greater Anglia plan to introduce the Class 720 into service.[111]
- West Midlands Trains start introducing their new fleet of 107 trains.[112]
- Electrification of the Midland Main Line to Corby is scheduled for completion.[113]
2021
- May: Open access operator East Coast Trains start running services on the ECML.[114][115]
- c2c start introducing their new fleet of six 10-car Bombardier Class 720 trains.[116]
- The central section of Crossrail (Paddington to Abbey Wood) will open.[117]
2022
- Electrification of the TransPennine Line from Manchester to York is scheduled for completion.[118]
- All of the initial fleet of CAF Class 197 Civity DMUs will have entered service with Transport for Wales Rail.[119]
- Stadler Class 398 Citylink tram-trains and Class 231 & Class 756 Flirt trains are due to begin operating with Transport for Wales Rail.[120]
- Class 810 units will come into service for East Midlands Railway.[121]
- Avanti West Coast will begin introducing their new fleet.[122]
2024
- Services due to start running on the western section of the East West Rail from Oxford to Bletchley.[123]
- * ETCS signalling will be installed on the ECML between London and Peterborough.[124]
Present locomotives and rolling stock
Diesel locomotives
* BR Class 73 is an electro-diesel locomotive which allows electrified and non electrified route workings.
Electric locomotives
Image | Class | Operator(s) | Image | Class | Operator(s) |
---|---|---|---|---|---|
86 | • Freightliner | 88 | • Direct Rail Services | ||
90 | • Abellio Greater Anglia • DB Cargo UK • Freightliner • Locomotive Services Limited |
91 | • London North Eastern Railway | ||
92 | • DB Cargo UK • GB Railfreight |
73a | • GB Railfreight • Network Rail | ||
Eurotunnel Class 9 | • Eurotunnel |
a BR Class 73 and 88 are electro-diesel locomotives which allow both electrified and non electrified route workings.
Diesel multiple units
AC electric multiple units
Image | Class | Operator(s) | Image | Class | Operator(s) |
---|---|---|---|---|---|
315 | • London Overground • TfL Rail |
• Abellio Greater Anglia (317) • London Overground (317) • Abellio ScotRail (318) | |||
320 321 322 |
• Abellio Greater Anglia (321) |
323 | • Northern • West Midlands Trains | ||
331 | • Northern | ||||
332 333 |
• Heathrow Express (332) • Northern (333) |
334 | • Abellio ScotRail | ||
345 | • TfL Rail | 350 | • West Midlands Trains | ||
357 | • c2c | 360 | • Abellio Greater Anglia • TfL Rail | ||
365 | • Great Northern | 373 374 |
• Eurostar | ||
• Abellio Greater Anglia | 380 | • Abellio ScotRail | |||
385 | • Abellio ScotRail | ||||
390 | • Avanti West Coast | 397 | • TransPennine Express |
Dual AC/DC electric multiple units
Image | Class | Operator(s) | Image | Class | Operator(s) |
---|---|---|---|---|---|
• Southern | 319 | • Northern • West Midlands Trains | |||
325 | • DB Cargo UK for Royal Mail | 375 377 378 |
• London Overground (378) • Southeastern (375, 377) • Southern (377) | ||
395 | • Southeastern | ||||
387 | • c2c • Gatwick Express • Great Western Railway • Great Northern • Heathrow Express | ||||
700 | • Thameslink | 717 | • Great Northern |
DC electric multiple units
Image | Class | Operator(s) | Image | Class | Operator(s) |
---|---|---|---|---|---|
442 | • South Western Railway | • South Western Railway | |||
455 | • Southern • South Western Railway |
456 | • South Western Railway | ||
458 | • South Western Railway | 376 | • Southeastern | ||
• Southeastern | • Merseyrail |
Bi-mode diesel/electric multiple units
Coaches
Image | Model | Operator(s) | Image | Model | Operator(s) |
---|---|---|---|---|---|
Mark 2 | • Abellio ScotRail • Direct Rail Services • Locomotive Services Limited • Network Rail • Riviera Trains • Transport for Wales • West Coast Railways |
Mark 3 | • Abellio Greater Anglia • Abellio ScotRail (HST) • East Midlands Railway (HST) • Great Western Railway (HST) • Network Rail (HST) • Transport for Wales | ||
Mark 4 | • Grand Central • London North Eastern Railway • Transport for Wales |
Mark 3 Sleeper | • Great Western Railway | ||
Mark 5 Mark 5A |
• Caledonian Sleeper • TransPennine Express |
Details of withdrawn locomotives and rolling stock: See article Withdrawn British Rail stock
Future rolling stock
Image | Class | Operator(s) | Type | Image | Class | Operator(s) | Type |
---|---|---|---|---|---|---|---|
710 | • London Overground (710) | EMU | |||||
769 | • Great Western Railway • Northern • Rail Operations Group • Transport for Wales |
Bi-mode | 777 | • Merseyrail | DC EMU |
See also
References
- Wolmar, Christian (2005). On the Wrong Line: How Ideology and Incompetence Wrecked Britain's Railways (rev. ed.). London: Aurum Press. ISBN 1-85410-998-7.
- ^ "Growth of 6.9% in 2010 takes demand for rail travel to new high levels". Association of Train Operating Companies. February 2011. Archived from the original on 25 February 2015. Retrieved 25 February 2015.
- ^ "NATIONAL RAIL TRENDS 2009-10 YEARBOOK" (PDF). Archived (PDF) from the original on 4 May 2011. Retrieved 21 February 2011.
- ^ "Railway safety statistical report 2007" (PDF). Archived (PDF) from the original on 4 May 2011. Retrieved 21 February 2011.
- ^ "ORR Rail finance 2016/17" (PDF). p. 2. Archived (PDF) from the original on 14 December 2017. Retrieved 14 December 2017.
- ^ a b Have train fares gone up or down since British Rail? Archived 14 March 2018 at the Wayback Machine, BBC News, 22 January 2013
- ^ a b "Rail industry financial information 2015-16 | Office of Rail and Road" (PDF). orr.gov.uk. Archived (PDF) from the original on 22 February 2017. Retrieved 27 July 2017.
- ^ Beanland, Christopher (10 July 2014). "Striking new stations, high-speed links and (whisper it) better services - the UK's railways are entering a new golden age". The Independent. London.
- ^ "Archived copy". Archived from the original on 16 September 2016. Retrieved 11 December 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ Massey, Ray (10 September 2014). "Cattle truck UK: More than half of train passengers forced to stand". Daily Mail. London. Archived from the original on 24 September 2015. Retrieved 5 August 2015.
- ^ "The facts about rail fares - Stagecoach Group". Stagecoach.com. 6 December 2013. Archived from the original on 31 March 2016. Retrieved 3 June 2016.
- ^ "Department for Transport Statistics: Passenger transport: by mode, annual from 1952". Archived from the original on 5 February 2016. Retrieved 20 January 2016.
- ^ "Getting back on track -- rail regulator, Tom Winsor has come up with a three-year plan to repair the shattered reputation of Railtrack". Law Society Gazette. 11 May 2001. Archived from the original on 25 February 2018. Retrieved 24 February 2018.
- ^ Stewart, Heather. "Network Rail to be 'government body', adding £30bn to UK national debt". The Guardian. Archived from the original on 19 December 2013. Retrieved 22 December 2013.
- ^ ONS decision on the classification of Network Rail Archived 13 March 2016 at the Wayback Machine Department for Transport 17 December 2013
- ^ "Department for Transport – GOV.UK". Dft.gov.uk. Archived from the original on 19 July 2008. Retrieved 3 June 2016.
- ^ Delivering a Sustainable Railway - White Paper CM 7176 Archived 29 December 2007 at the Wayback Machine
- ^ "London – Blackpool open access service approved". Archived from the original on 14 December 2015. Retrieved 17 November 2015.
- ^ "ORR to decide on Alliance Rail open access application this summer". Archived from the original on 18 November 2015. Retrieved 17 November 2015.
- ^ "Earnings outstrip rail fare increases for first time in a decade". Archived from the original on 18 November 2015. Retrieved 17 November 2015.
- ^ "Bowe Report". Archived from the original on 9 December 2015. Retrieved 27 November 2015.
- ^ "Hendy Report". Archived from the original on 1 December 2015. Retrieved 27 November 2015.
- ^ "Crossrail 2 must be developed 'as a priority' and delivered by 2033 – NIC". Archived from the original on 11 March 2016. Retrieved 11 March 2016.
- ^ a b "Strikes under way in train safety row". 18 November 2018. Archived from the original on 18 November 2018. Retrieved 18 November 2018 – via www.bbc.co.uk.
- ^ "Southern rail strike causes disruption". 26 April 2016. Archived from the original on 18 November 2018. Retrieved 18 November 2018 – via www.bbc.co.uk.
- ^ "RMT announces new strike on Southern rail". 22 February 2018. Archived from the original on 18 November 2018. Retrieved 18 November 2018 – via www.bbc.co.uk.
- ^ a b "Rail electrification plans scrapped". 20 July 2017. Archived from the original on 1 April 2019. Retrieved 21 June 2018 – via www.bbc.com.
- ^ "Network Rail reveals significant investment, more services and fewer delays in its five-year plan – Network Rail". www.networkrail.co.uk. Archived from the original on 21 February 2018. Retrieved 20 February 2018.
- ^ "Network Rail CP6 plan: Route details revealed". www.railtechnologymagazine.com. Archived from the original on 13 March 2018. Retrieved 12 March 2018.
- ^ "Electrification Cost Challenge Report". www.riagb.org.uk. Archived from the original on 27 March 2019. Retrieved 14 March 2019.
- ^ "Massive 29% rise in rail over last decade uncovered by survey". www.railtechnologymagazine.com. Retrieved 26 July 2019.
- ^ "Secretary of State for Transport - GOV.UK". www.gov.uk. Retrieved 6 August 2019.
- ^ a b c "Bromsgrove's new railway station on track to open in the spring". Archived from the original on 17 February 2016. Retrieved 15 February 2016.
- ^ a b "First electric train travels between Birmingham and Bromsgrove". Archived from the original on 29 May 2018. Retrieved 28 May 2018.
- ^ "Glasgow - News, views, gossip, pictures, video - Daily Record". Iclanarkshire.icnetwork.co.uk. Retrieved 3 June 2016.[dead link]
- ^ "Shotts line electrification completed on time and on budget". Network Rail Media Centre. Archived from the original on 21 April 2019. Retrieved 25 April 2019.
- ^ "HS2: Phase one of high-speed rail line gets go-ahead". BBC News. 10 January 2012. Archived from the original on 16 July 2018. Retrieved 21 June 2018.
- ^ "Go-ahead given to new railway". Department for Transport. January 2012. Archived from the original on 15 May 2012. Retrieved 5 August 2015.
- ^ "Northern Hub". Northern Hub. Archived from the original on 29 September 2012. Retrieved 27 December 2013.
- ^ "Northern Hub Technical Study" (PDF). Archived from the original (PDF) on 23 October 2014. Retrieved 13 April 2013.
- ^ "The Northern Way - Manchester Hub Phase 1" (PDF). Northern Way. April 2009. Archived from the original (PDF) on 28 December 2013. Retrieved 16 February 2013.
- ^ "Modernising the Great Western (page 8)" (PDF). Network Rail. Archived from the original (PDF) on 13 April 2013.
- ^ "Modernising the Great Western (page 7)" (PDF). Network Rail. Archived from the original (PDF) on 13 April 2013.
- ^ "Modernising the Great Western (page 13 timeline)" (PDF). Network Rail. Archived from the original (PDF) on 13 April 2013.
- ^ "Great Western electrification: Intercity line work 'deferred'". BBC News. 8 November 2016. Archived from the original on 9 November 2016. Retrieved 10 November 2016.
- ^ Paul Maynard (8 November 2016). "Written statement to Parliament, Rail update: rail investment in the Great Western route". gov.uk. Archived from the original on 8 November 2016. Retrieved 8 November 2016.
- ^ Thomas, Nathalie (26 August 2013). "Going underground on Crossrail: A 40-year project is taking shape". The Telegraph. London. Archived from the original on 29 April 2018. Retrieved 5 April 2018.
- ^ "Edinburgh-Glasgow rail electrification delayed again". www.scotsman.com. Archived from the original on 21 May 2017. Retrieved 18 May 2017.
- ^ Northern Rail. "New direct train services between Accrington, Burnley and Manchester". Archived from the original on 18 May 2015. Retrieved 17 May 2015.
- ^ "Apperley Bridge's new railway station opens". BBC News. December 2015. Archived from the original on 16 December 2015. Retrieved 13 December 2015.
- ^ "Late-February debut for Gatwick Express Class 387/2s". Archived from the original on 15 February 2016. Retrieved 12 February 2016.
- ^ "£250m upgrade provides better railway near Stafford as new Norton Bridge flyover opens - News - Network Rail". Archived from the original on 20 September 2016. Retrieved 11 September 2016.
- ^ "Our commitments : Thameslink and Great Northern". Archived from the original on 15 March 2016. Retrieved 10 March 2016.
- ^ "Leeds Kirkstall Forge railway station opens". BBC News. BBC. 19 June 2016. Archived from the original on 24 June 2016. Retrieved 19 June 2016.
- ^ "NR lays down Oxford tracks ahead of London Marylebone service in December". Archived from the original on 23 November 2016. Retrieved 22 November 2016.
- ^ "Opening date for Ilkeston train station finally revealed". 17 January 2017.[permanent dead link]
- ^ "New station runs into further delay". Bradford Telegraph and Argus. Archived from the original on 15 July 2016. Retrieved 26 July 2016.
- ^ Kelly Williams. "Chester to Wrexham train line upgrade work finally complete - Cheshire Live". chesterchronicle.co.uk. Archived from the original on 11 September 2018. Retrieved 27 March 2019.
- ^ "Cambridge North 80% complete following Christmas work". Archived from the original on 5 January 2017. Retrieved 4 January 2017.
- ^ a b "Great Western electrification: London and Maidenhead link completed". Archived from the original on 7 October 2018. Retrieved 21 June 2018.
- ^ Clinnick, Richard (31 May 2017). "Delayed start for first Crossrail Aventra". Rail Magazine. Archived from the original on 31 May 2017. Retrieved 1 June 2017.
- ^ "Class 707s enter service on Windsor routes". Global Rail News. 18 August 2017. Archived from the original on 2 September 2017. Retrieved 19 August 2017.
- ^ "New high-speed Japanese train will shave 20 minutes off journey times between South Wales and London". Archived from the original on 14 August 2017. Retrieved 14 August 2017.
- ^ "Hendy Report January 2016" (PDF). Archived (PDF) from the original on 4 February 2016. Retrieved 30 April 2016.
- ^ "First electric trains to run on Edinburgh-Glasgow main line on Sunday". Archived from the original on 11 December 2017. Retrieved 10 December 2017.
- ^ "Blackpool rail route reopens but electrification work hits problems". www.blackpoolgazette.co.uk. Archived from the original on 29 January 2018. Retrieved 31 January 2018.
- ^ "Network Rail Enhancements Delivery Plan" (PDF). p. 8. Archived from the original (PDF) on 22 December 2017. Retrieved 31 December 2017.
- ^ "Passengers thanked as the first part of the Bermondsey Dive Under goes live". Archived from the original on 5 January 2017. Retrieved 4 January 2017.
- ^ "Thameslink begins testing at redeveloped London Bridge". Archived from the original on 19 February 2018. Retrieved 18 February 2018.
- ^ "Kenilworth station to open at end of April". BBC News. BBC. 20 April 2018. Archived from the original on 21 April 2018. Retrieved 21 April 2018.
- ^ "WATCH: First train in 53 years finally serves Kenilworth Station". Leamington Courier. Archived from the original on 30 April 2018. Retrieved 30 April 2018.
- ^ "First pendolino train due to set off from Blackpool today". Archived from the original on 22 May 2018. Retrieved 21 May 2018.
- ^ "Crossrail opening timeline". Archived from the original on 4 May 2016. Retrieved 30 April 2016.
- ^ "Final phase of £18.75m Halton Curve revamp is complete – and regular passenger services start later this year". Archived from the original on 11 September 2018. Retrieved 31 May 2018.
- ^ Fuller, Mike (21 March 2016). "Direct trains from Frodsham and Helsby to Liverpool proposed after Halton Curve reopens". Chester Chronicle. Archived from the original on 15 June 2016. Retrieved 3 June 2016.
- ^ "£18.75m Halton Curve project delayed a further six months". www.railtechnologymagazine.com. Archived from the original on 15 November 2018. Retrieved 14 November 2018.
- ^ "Railway history made this morning as electric trains serve Bromsgrove for the first time". Archived from the original on 21 September 2018. Retrieved 20 September 2018.
- ^ "New railway station opens on Merseyside". Archived from the original on 18 June 2018. Retrieved 18 June 2018.
- ^ ""Deeply disappointing" delay to introduction of new hourly rail service for Broughty Ferry and Angus - The Courier". Archived from the original on 28 August 2018. Retrieved 21 August 2018.
- ^ "GWR launches Class 802s in service". www.railmagazine.com. Archived from the original on 20 August 2018. Retrieved 21 August 2018.
- ^ "Main line testing of new TPE Mk 5As under way". www.railmagazine.com. Archived from the original on 12 September 2018. Retrieved 12 September 2018.
- ^ "New Great Northern Class 717 carries first passengers". Archived from the original on 1 October 2018. Retrieved 11 October 2018.
- ^ "First electric train for Stirling-Dunblane-Alloa line". Archived from the original on 30 November 2018. Retrieved 30 November 2018.
- ^ "Network Rail Enhancements Delivery Plan" (PDF). p. 98. Archived from the original (PDF) on 22 December 2017. Retrieved 31 December 2017.
- ^ "VIDEO: Watch first successful electric train tests through Bolton". The Bolton News. Archived from the original on 19 December 2018. Retrieved 2 January 2019.
- ^ "Next three Saturdays: buses replace trains between Wigan and Manchester as engineers upgrade the railway". Archived from the original on 21 November 2018. Retrieved 21 November 2018.
- ^ "Shotts line electrification completed on time and on budget". Archived from the original on 21 April 2019. Retrieved 21 April 2019.
- ^ "First Class 230 begins passenger services between Bletchley and Bedford". Archived from the original on 23 April 2019. Retrieved 9 May 2019.
- ^ Caledonian Sleeper launches new CAF coaches Railway Gazette International 29 April 2019
- ^ "West Midlands Railway promises more carriages on line after electric upgrade". Archived from the original on 10 May 2019. Retrieved 10 May 2019.
- ^ "Delayed Aventras start running on London Overground". Archived from the original on 24 May 2019. Retrieved 24 May 2019.
- ^ "LNER introduces first Azuma multiple unit". Archived from the original on 26 May 2019. Retrieved 15 May 2019.
- ^ "SWR refurbished trains running after safety concerns delay".
- ^ "New trains launch 'genuine transformation' of Northern services". 1 July 2019. Retrieved 1 July 2019.
- ^ "New Greater Anglia Class 755 enters traffic". www.railmagazine.com. 29 July 2019. Retrieved 29 July 2019.
- ^ September 16 launch for Class 801 Azumas on London-Leeds route RAIL; 1 August 2019
- ^ https://www.railwaygazette.com/uk/nova-2-enters-service-at-last/55261.article
- ^ https://www.newcivilengineer.com/latest/crossrail-services-begin-running-to-reading-17-12-2019/
- ^ New Robroyston station opens as rail timetables change BBC News 15 December 2019
- ^ "Warrington West: Town's new £20.5m railway station opens". BBC. 16 December 2019. Retrieved 17 December 2019.
- ^ "Pacers: The train that the UK has struggled to get rid of". Archived from the original on 11 February 2018. Retrieved 21 June 2018.
- ^ editor, Helen Pidd North of England (1 July 2019). "Northern's Pacer trains to run into 2020 despite retirement pledge". The Guardian. ISSN 0261-3077. Retrieved 6 August 2019.
{{cite news}}
:|last=
has generic name (help) - ^ "Pledge to scrap Pacer trains this year set to be broken due to defects with Northern's new fleet". www.yorkshirepost.co.uk. Retrieved 6 August 2019.
- ^ "Completion of London's Thameslink rail project delayed until December 2019". Archived from the original on 27 August 2018. Retrieved 20 September 2018.
- ^ "GWR will soon operate Heathrow Express". Archived from the original on 30 March 2018. Retrieved 29 March 2018.
- ^ "EXCLUSIVE: Northern to introduce converted bi-modes next year". Archived from the original on 3 November 2018. Retrieved 19 November 2018.
- ^ https://www.edp24.co.uk/news/first-greater-anglia-inter-city-train-runs-from-norwich-1-6455415
- ^ https://www.railpro.co.uk/news/gwr-runs-first-trains-under-electric-traction-from-cardiff
- ^ "First trains stop at Worcestershire Parkway station". BBC News. Retrieved 23 February 2020.
- ^ "Merseytravel names five international bidders in new fleet and depot shortlist". Rail Technology Magazine. Rail Technology Magazine. Archived from the original on 19 May 2017. Retrieved 16 December 2016.
- ^ "SWR: Class 701".
- ^ {{cite web |url=https://www.railmagazine.com/news/network/bombardier-class-720s-to-enter-greater-anglia-service-late |title=Bombardier Class 720s to enter Greater Anglia service late
- ^ Jones, Tamlyn. "Over 100 new trains West Midlands trains - with wi-fi and speeds up to 110mph". Birmingham Post. Birmingham Post. Archived from the original on 18 October 2017. Retrieved 19 October 2017.
- ^ "Network Rail Enhancements Delivery Plan" (PDF). p. 36. Archived from the original (PDF) on 22 December 2017. Retrieved 31 December 2017.
- ^ First Group to run Edinburgh to London budget rail service Archived 16 May 2016 at the Wayback Machine BBC News 12 May 2016
- ^ VTEC and FirstGroup granted East Coast Main Line paths Archived 12 December 2017 at the Wayback Machine Railway Gazette International 12 May 2016
- ^ "c2c Signs major deal for brand-new British trains". Archived from the original on 15 December 2017. Retrieved 14 December 2017.
- ^ "Crossrail to be delayed again until autumn 2021, TfL boss confirms". Retrieved 8 January 2020.
- ^ "Trans-Pennine and Midland Main Line electrification by 2023 as work unpaused". Archived from the original on 26 August 2016. Retrieved 10 September 2016.
- ^ Ltd, DVV Media International. "CAF to supply Wales & Borders regional train fleet". Archived from the original on 12 September 2018. Retrieved 12 September 2018.
- ^ "Stadler is Named Preferred Bidder to Supply 71 trains for Wales & Borders". Archived from the original on 13 September 2018. Retrieved 12 September 2018.
- ^ https://modern-railways.keypublishing.com/2019/12/18/emr-bi-mode-specification-confirmed/
- ^ First Trenitalia awarded West Coast Partnership Railway Gazette International 14 August 2019
- ^ "Chancellor accepts East West Rail targets and strengthens plans with extra cash". www.railtechnologymagazine.com. Archived from the original on 1 December 2017. Retrieved 5 December 2017.
- ^ "£1.8 billion Network Rail deal to see faster trains with more capacity between Peterborough and London King's Cross". Archived from the original on 6 November 2018. Retrieved 5 November 2018.