Hyderabad Metro
Overview
OwnerLarsen & Toubro (90%)
Government of Telangana (10%)
Area servedHyderabad , Secunderabad
LocaleHyderabad, Telangana, India
Transit typeRapid Transit
Number of lines3 (Fully operational)
1 (Under Planning)[1]the telangana government started constructing the extended metro line between mindspace and rajiv gandhi international airport which covers 31km distance
Line number
Number of stations57[1]
Daily ridership400,000 (10 Aug 2022) [2]
Chief executiveN.V.S Reddy (Managing director)[3]
HeadquartersMetro Bhawan, Begumpet, Hyderabad
WebsiteL&T Metro
HMRL
Operation
Began operationNovember 29, 2017; 6 years ago (2017-11-29)[4]
Operator(s)Hyderabad Metro Rail Ltd. (HMRL)
Infrastructure manager(s)Telangana
Headway3.5 - 7 minutes
Technical
System length66.5 km (41.3 mi) (Operational)
5.5 km (3.4 mi) (Under Survey)[5]
63 km (39 mi) (Phase 2 DPR submitted)[6]
No. of tracks3
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Average speed70 to 80 km/h (43 to 50 mph)
Top speed80 km/h (50 mph)
Hyderabad Metro
Phase I
Miyapur
JNTU College
Raidurg
KPHB Colony
Hitec City
Kukatpally
Durgam Cheruvu
Balanagar
Madhapur
Moosapet
Peddamma Gudi
Bharat Nagar
Jubilee Hills
Check Post
Erragadda
Road No 5
Jubilee Hills
ESI Hospital
Yusufguda
S.R. Nagar
Madhura Nagar
Ameerpet
Punjagutta
Begumpet
Irrum Manzil
Prakash Nagar
Khairatabad
Rasoolpura
Lakdi-ka-pul
Paradise
Assembly
JBS Parade Ground
Nampally
Parade Ground
Gandhi Bhavan
Osmania
Medical College
Secunderabad
West | Jn | East
Mettuguda
Gandhi Hospital
Tarnaka
Musheerabad
Habsiguda
R.T.C. X Roads
NGRI
Chikkadpally
Stadium
Narayanaguda
Uppal
Sultan Bazaar
Nagole
MG Bus Station
Malakpet
Salarjung Museum
New Market
Charminar
Musarambagh
Shah-Ali-Banda
Dilsukhnagar
Shamsherganj
Chaitanyapuri
Jungametta
Victoria Memorial
Falaknuma
LB Nagar
Red Line
Green Line
Blue Line
Indian Railways lines

The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India.[7][8] It is the second longest operational metro network in India after the Delhi Metro (285 stations) with 57 stations[9][10] and the lines are arranged in a secant model. It is funded by a public–private partnership (PPP),[11][12] with the state government holding a minority equity stake.[13] A special purpose vehicle company, L&T Metro Rail Hyderabad Ltd (L&TMRHL), was established by the construction company L&T[14][15] to develop the Hyderabad metro rail project.[16][17] Hyderabad Metro is the world's largest elevated Metro Rail system based on DBFOT basis (Design, Built, Finance, Operate and Transfer).[18]

A 30-kilometre (19 mi) stretch from Miyapur to Nagole, with 24 stations, was inaugurated on 28 November 2017 by Prime Minister Narendra Modi.[19][20] This was the longest rapid transit metro line opened in one go in India.[21][22] It is estimated to cost 18,800 crore (US$2.3 billion). As of February 2020, about 490,000 people use the Metro per day.[23] Trains are crowded during the morning and evening rush hours.[24] A ladies only coach was introduced on all the trains from 7 May 2018.[25]

History

The Hyundai Rotem rolling stock of the Hyderabad metro [26]

Metro Rail Project was approved by Union government, in 2003.[27] As Hyderabad continued to grow, the Multi-Modal Transport System (MMTS) had insufficient capacity for public transport, and the Union Ministry of Urban Development approved construction of the Hyderabad Metro Rail Project, directing the Delhi Metro Rail Corporation to conduct a survey of the proposed lines and to submit a Detailed Project Report (DPR).[28] To meet rising public transport needs and mitigate growing road traffic in the twin cities of Hyderabad and Secunderabad, the state government and the South Central Railway jointly launched the MMTS in August 2003.[29][30] The initial plan was for the Metro to connect with the existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase II were also taken forward.[31]

In 2007, N. V. S. Reddy was appointed Managing Director of Hyderabad Metro Rail Limited,[32] and the same year, Central Government approved financial assistance of 1639 crore under a Viability Gap Funding (VGF) scheme.[33] The option of an underground metro system in Hyderabad was ruled out by L&T due to the presence of hard rocks, boulders and the topography of the soil in Hyderabad.[34] Hyderabad Metro initially began under the Andhra Pradesh Municipal Tramways (Construction, Operation and Maintenance) Act, 2008[35] and later on, it came under the Central Metro Act which permitted revision of fares.[36] On 26 March 2018, the Government of Telangana announced that it would set up an SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad, under Phase II after the completion of Phase I in 2020.

Initial bidding

The bidding process was completed by July 2008 and awarded to Maytas,[37] which failed to achieve financial closure for the project as per schedule by March 2009.

Re-bidding

The State government cancelled the contract and called for a fresh rebidding for the project. In the July 2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the 121.32 billion (US$1.5 billion) project.[38] L&T came forward to take up the work for about 14.58 billion (US$170 million) as viability gap funding as against the sanctioned 48.53 billion (US$580 million). The Nallari Kiran Kumar Reddy government proactively pursued the project, but it was delayed due to separate state agitation and later due to the apprehensions of the new government.

Mascot

Prime Minister Narendra Modi taking a ride in the Hyderabad Metro in 2017

The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.[39]

Construction milestones

A view of the Hyderabad metro towards HITEC City
  • Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012[40] the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II.[41] The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets.[42] If the recent bill proposed in Parliament which allows construction within a 100-metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.[43]
  • The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015[44][45]
  • In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.[46]
  • The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015.[47] The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.
Raidurg metro station near Raheja Mindspace
  • CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016.[48]
  • The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.[49][50]
  • In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.[51]
  • 16-km Ameerpet - LB Nagar Metro stretch was opened for commercial operations from 24 September 2018.[52]
  • The Ameerpet - HITEC City route was opened on conditional basis on 20 March 2019. The reversal facility after HITEC City metro station was started on 20 August 2019.[53]
  • On 19 May 2019, the construction of all the 2,599 pillars for the 66.5-km Hyderabad Metro rail (except the 5.5-km stretch in old city) was completed.[54][55]
  • The Green Line Corridor from Jubilee Bus Station to Mahatma Gandhi Bus Station was issued the Safety Certificate by the Commissioner of Metro Rail Safety and inauguration of services on the section was done on 7 February 2020 by the Chief Minister of Telangana, K. Chandrashekar Rao.[citation needed]

Network

Hyderabad metro rail network

Currently, the Hyderabad Metro has 56 stations. Phase I of the Hyderabad metro has 64 stations; they have escalators and elevators to reach the stations, announcement boards and electronic display systems. The stations also have service roads underneath them to for other public transportation systems to drop-off and pick-up passengers.[56] The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.[57]

Otis Elevator Company supplied and maintains the 670 elevators in use on the system.[58]

In May 2018, L&T Metro Rail signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations.[59][60] L&THMRL has set up free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.[61][62] Metro Rail Phase II expansion plan is for about 85 km.[63] In April 2019, K. T. Rama Rao said that 200 kilometres (120 mi) of metro rail was planned for Hyderabad, with metro along entire Outer Ring Road.[64] All metro corridors are scheduled to terminate at Shamshabad, near Rajiv Gandhi International Airport, as planned in Hyderabad Metro Rail Phase-II.[65] In August 2019, KT Rama Rao said that state cabinet has approved the Hyderabad Metro Airport Express Link from Raidurg to the airport.[66]

Current status

Line First operational Last extension Stations Length Terminals Average Frequency (Minutes)
Red 29 November 2017 24 September 2018 27 29 km (18 mi) Miyapur LB Nagar 4 and a half minutes (Peak Hours)

7 minutes (Non-Peak hours)

Blue 29 November 2019 23 27 km (17 mi) Raidurg Nagole
Green 7 February 2020 Yet to start construction 9 10.5 km (6.5 mi) JBS PG MGBS
59 66.5 km (41.3 mi)

Construction phases

The construction work was undertaken in two phases. There are six stages of completion in Phase I.[67]

Phase 1 Network
No. Stage Line Name Terminals Distance Line Opening Date
1 Stage 1 Red Miyapur Ameerpet 11.3 km (7.0 mi) Line I 29 November 2017
Stage 2 Ameerpet LB Nagar 16.8 km (10.4 mi) 24 September 2018
2 Stage 4/1 Green JBS MGBS 11 km (6.8 mi) Line II 7 February 2020
Stage 4/2 MGBS Falaknuma 5.2 km (3.2 mi) Yet to start construction
3 Stage 1 Blue Nagole Ameerpet 16.8 km (10.4 mi) Line III 29 November 2017
Stage 3/1 Ameerpet Hitech City 8.5 km (5.3 mi) 20 March 2019
Stage 3/2 Hitech City Raidurg 1.5 km (0.93 mi) 29 November 2019
Phase 2 Network
No. Stage Line Name Terminals Distance Line Opening Date
1 TBA Raidurg RGI Airport 32 km (20 mi) Line IV Construction from 9 December 2022

Phase I

Phase I of the project includes 3 lines covering a distance of around 72 kilometres (45 mi). The metro rail line between Nagole and Secunderabad was originally scheduled open by December 2015; it was partly opened on 29 November 2017 and the entire 67 km phase 1 completed in 2020 .[68] Earlier in 2010, All India Majlis-e-Ittehadul Muslimeen suggested an alternate route for metro in the old city through Purana pul, Muslimjung, Bahadurpura, Zoo Park, Tadbun junction, Kalapathar, Misrigunj and Shamsheergunj to Falaknuma.[69][70][71] However, this 7.4 kilometres (4.6 mi) route was not accepted. The eastern parts of the old city have access to the metro via the Malakpet metro station.[72] A 5.5 kilometres (3.4 mi)-long green line in the old city will pass through Dar-ul-Shifa, Salar Jung Museum, Charminar, Shah-Ali-Banda , Shamsheer Gunj , Jungametta and ends at Falaknuma.[73][74] In June 2022, Hyderabad Metro Rail started a fresh survey of the Old City route from MGBS for underground utilities.[75] The survey is through the Lidar, Global Positioning System and Inertial measurement unit and the plan is to build the elevated line alongside Musi river and centre of the road.

  • Line 1 - Red Line - Miyapur–LB Nagar - 29 km (18 mi) 27 stations
  • Line 2 - Green Line - JBS–Falaknuma 15 km (9.3 mi) 15 stations
  • Line 3 - Blue Line - Nagole–Raidurg - 28 km (17 mi) 24 stations

Note: Stage 4/2 MGBS–Falaknuma section (5.36 km) is also part of the initial phase I, but has been rumored that the state government might take up this section instead of L&T, but will be completed along with the phase I work. The Stage 3/2 HITEC City–Raidurg section (1.3 km) of Corridor III was not initial part of phase I, it was later on added by the newly elected state government. This section is opened on 29 November 2019.

Phase II

The Government is planning second phase of metro rail extending further.[76] The construction of Phase II will be taken up solely by the state government, instead of public–private partnership (PPP) mode in Phase I.[77] Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II.[78][79] Metro Rail Phase II expansion plan is for about 63 km,[6][80] which includes providing link to Shamshabad RGI Airport.[81] In February 2020, Hyderabad Metro MD NVS Reddy said that three corridors are considered for phase 2. The DPR has been submitted to state government.[82][83]

In November 2022, Telangana government asked the Central Government to sanction the metro rail Phase-II, to be jointly owned by Telangana and the Centre (on the lines of MMTS) with external financial assistance.[84] Telangana government proposed metro rail connectivity for about 26 km from BHEL to Lakdikapul with 23 stations and extension of other stretch from Nagole to LB Nagar covering a distance of about 5 kms with 4 stations.[85] BHEL-Lakdikapul metro rail corridor is expected to pass through Miyapur, Raidurg, Khajaguda Junction, Mehdipatnam, Tolichowki and Masab tank areas. Telanagana Government has asked Central Government to sanction 8,453 crore (US$1.0 billion) for metro works in the upcoming union budget for 2023-24.[86] For implementing the project, detailed project reports (DPRs) have already been prepared by the state government with the help of Delhi Metro Rail Corporation (DMRC). The reports have been sent to the Centre. Also the Hyderabad airport metro limited and HMDA will build an elevated Hyderabad Bus Rapid Transit System between Kokapet neopolis and KPHB Colony metro station covering 20kms [87]

Propose Routes in Phase-II Distance (in km) Line Line colour Status
NagoleLB Nagar 5 km (3.1 mi) Line III extension Blue DPR submitted
Lakdi ka pulBHEL 26 km (16 mi) Line V TBA

Hyderabad Airport Metro Express

On 26 March 2018, a special purpose vehicle company, Hyderabad Airport Metro Limited (HAML), was established by Government of Telangana to develop the Hyderabad Airport Metro Express.[88][89] HMRL Managing Director N.V.S. Reddy (Venkatsatyanarayan Reddy Nallamilli) is also Managing Director of HAML, which is jointly promoted by HMRL and HMDA. In August 2019, TRS Working President, Minister for Municipal Administration & Urban Development, Industries and IT&C K. T. Rama Rao said that the work on Hyderabad Metro Airport Express from Raheja Mindspace to Shamshabad RGI Airport will start soon.[90] The alignment to Shamshabad RGI Airport from the Raidurg metro station will be through new Khajaguda Link Road (Beside CARE Hospitals) via Diamond Hills, instead of Gachibowli ORR entrance. The 31 km-long Hyderabad Metro Airport Express link will cost around 5000 crore.[91] In March 2021, Government of Telangana allocated 1,000 crore for Hyderabad Metro Rail Ltd in the 2021-2022 state budget.[92][93] In September 2021, GMR Group, the company operating the Rajiv Gandhi International Airport (RGIA) in Hyderabad said that it will invest 519.52 crore towards metro connectivity at the airport.[94][95]

In March 2022, Government of Telangana allocated 2,377.35 crore to the Hyderabad Metro Rail (HMR) in the 2022-2023 state budget. The Government of Telangana announced funds worth 1,500 crore for the Hyderabad Metro Rail for taking up land acquisition, preparation of detailed project reports and other developmental work, 377.35 crore for Airport Metro connectivity[96] and 500 crore for Metro connectivity to the old city (for initiating Corridor II- Green Line works from MGBS to Falaknuma; 5.5km).[97][98] The 31-km Airport Express Metro Corridor is proposed to have 27-km elevated, 1 km on ground and a 2.5-km underground section to connect to the airport terminal.[99] The airport route will have 9 elevated stations and one underground station.[100] From Raidurg Metro terminal station, it will pass through Khajaguda Junction, touching Outer Ring Road at Nanakramguda junction, traverse along ORR to Shamshabad Airport through the existing dedicated Metro Rail Right-of-Way.[101][102] Chief Minister of Telangana K. Chandrashekar Rao will be laying the foundation stone for Hyderabad Metro Airport Express on 9 December 2022.[103][104] It will be built at an approximate cost of 6,250 crore (US$750 million).[105] Hyderabad Airport Express Metro is a Telangana State Government funded project and will be completed by end of 2025.

Lines

Blue line of Hyderabad metro

Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color.[106] Ameerpet- LB Nagar metro stretch opened on 24 September 2018.[107] HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is opened on 29 November 2019,[108][109] as it involves construction of 49 pillars and the Raidurg terminal station.[110]

Red Line: Miyapur–L.B. Nagar

Route length – 29.21 km (18.15 mi)
Number of stations (All elevated) – 27
Link to other corridors

# Station Name Opened Connections Alignment
1 Miyapur November 29, 2017 None Elevated
2 J.N.T.U College November 29, 2017 None Elevated
3 K.P.H.B. Colony November 29, 2017 None Elevated
4 Kukatpally November 29, 2017 None Elevated
5 Balanagar November 29, 2017 None Elevated
6 Moosapet November 29, 2017 None Elevated
7 Bharat Nagar November 29, 2017 None Elevated
8 Erragadda November 29, 2017 None Elevated
9 ESI Hospital November 29, 2017 None Elevated
10 S.R Nagar November 29, 2017 None Elevated
11 Ameerpet November 29, 2017 Blue Line Elevated
12 Punjagutta September 24, 2018 None Elevated
13 Irrum Manzil September 24, 2018 None Elevated
14 Khairatabad September 24, 2018 None Elevated
15 Lakdi-ka-pul September 24, 2018 None Elevated
16 Assembly September 24, 2018 None Elevated
17 Nampally September 24, 2018 None Elevated
18 Gandhi Bhavan September 24, 2018 None Elevated
19 Osmania Medical College September 24, 2018 None Elevated
20 M.G. Bus Station September 24, 2018 Green Line Elevated
21 Malakpet September 24, 2018 None Elevated
22 New Market September 24, 2018 None Elevated
23 Musarambagh September 24, 2018 None Elevated
24 Dilsukhnagar September 24, 2018 None Elevated
25 Chaitanyapuri September 24, 2018 None Elevated
26 Victoria Memorial September 24, 2018 None Elevated
27 L.B. Nagar September 24, 2018 None Elevated

Green Line: JBS–Falaknuma

Route length – 15 km (9.3 mi)
Number of stations (all elevated) – 16
Link to other corridors

# Station Name Opened Connections Alignment
1 JBS Parade Ground February 7, 2020 None Elevated
2 Parade Ground February 7, 2020 Blue Line Elevated
3 Secunderabad West February 7, 2020 None Elevated
4 Gandhi Hospital February 7, 2020 None Elevated
5 Musheerabad February 7, 2020 None Elevated
6 R.T.C. Cross Roads February 7, 2020 None Elevated
7 Chikkadpally February 7, 2020 None Elevated
8 Narayanguda February 7, 2020 None Elevated
9 Sultan Bazaar February 7, 2020 None Elevated
10 M.G. Bus Station February 7, 2020 Red Line Elevated
11 Salarjung Museum TBA None Elevated
12 Charminar TBA None Elevated
13 Shah-Ali-Banda TBA None Elevated
14 Shamsherganj TBA None Elevated
15 Jungametta TBA None Elevated
16 Falaknuma TBA None Elevated

Blue Line: Raidurg-Nagole

Route length – 27 km (17 mi)
Number of stations (all elevated) – 23
Link to other corridors

# Station Name Opened Connections Alignment
1 Raidurg November 29, 2019 None Elevated
2 HITEC City March 20, 2019 None Elevated
3 Durgam Cheruvu March 20, 2019 None Elevated
4 Madhapur April 13, 2019 None Elevated
5 Peddamma Gudi March 30, 2019 None Elevated
6 Jubilee Hills Check Post May 18, 2019 None Elevated
7 Jubilee Hills Road No. 5 March 20, 2019 None Elevated
8 Yousufguda March 20, 2019 None Elevated
9 Madhura Nagar March 20, 2019 None Elevated
10 Ameerpet November 29, 2017 Red Line Elevated
11 Begumpet November 29, 2017 None Elevated
12 Prakash Nagar November 29, 2017 None Elevated
13 Rasoolpura November 29, 2017 None Elevated
14 Paradise November 29, 2017 None Elevated
15 Parade Ground November 29, 2017 Green Line Elevated
16 Secunderabad East November 29, 2017 None Elevated
17 Mettuguda November 29, 2017 None Elevated
18 Tarnaka November 29, 2017 None Elevated
19 Habsiguda November 29, 2017 None Elevated
20 NGRI November 29, 2017 None Elevated
21 Stadium November 29, 2017 None Elevated
22 Uppal November 29, 2017 None Elevated
23 Nagole November 29, 2017 None Elevated

Finances

The Hyderabad metro is a Public–private partnership project, the total cost of this transport systems is US$ 3.07 billion which is shared by both Larsen & Toubro (90%) Government of Telangana (10%).[111] In July 2022, L&T Metro Rail Hyderabad Limited came up with a unique concept of ‘Office Bubbles’ wherein it will offer remote, co-working spaces as part of its Transit-oriented development (ToD). The L&T Hyderabad Metro organisation is offering 1,750 sq. ft. space with two units each in 49 Metro stations across the three corridors and another 5,000-30,000 sq. ft. in eight other Metro stations.[112] Focusing on IT companies, Office Bubbles concept offers Spoke–hub distribution paradigm.[113]

In Hyderabad Metro, 40 per cent of the retail space was sold even before the metro stations were built to generate non-fare revenue.[114] L&TMRHL built real- estate projects like Next Galleria malls in Panjagutta, Irrum Manzil, Hitech City and Musarambagh with skywalks,[115] for generating non-fare revenues under Transit-oriented development (TOD).[17][116][117] In 2019, Hyderabad Metro started a semi-naming policy of metro stations, awarded through an open e-tendering process, to generate non-fare revenues.[citation needed]

Depots

Hyderabad Metro currently has 2 operational depots.[118] Miyapur and Uppal depot land is 100 acres each.[119][120] The proposed Falaknuma depot will be constructed in 17 acres.

Hyderabad Metro
Depots
Line No. Line Name Number of Depots Location Opening Date
1 Red Line 1 Miyapur Depot, Near Calvary Temple, Nadigada Tanda, Miyapur, Hyderabad, Telangana 28 November 2017
2 Blue Line 1 Uppal Metro Depot, Nagole Rd, Laxmi Narayan Nagar Colony, Uppal, Hyderabad, Telangana 28 November 2017
3 Green Line 1 Falaknuma TBD

Ridership

JBS Parade Ground metro station

The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1.[121] On the first Sunday of operations, the Metro was used by 240,000 people.[122] As of 2020, the daily ridership is about 490,000. Although there was hiccups in the beginning of operations in 2017 with meager ridership of 100,000 per day, opening the new lines to LB Nagar and Hi-Tech city in 2018–19, ridership has surged and reached milestones from 2 to 4 lakhs in very short duration.[123]

Trains are initially being operated at a frequency of 3 minutes in very peak hours and every 5 minutes in peak hours (between Miyapur-LB Nagar) and 4 minutes in peak hours (between Hi-Tec City/ Ameerpet-Nagole),[124] though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.[125]

In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari.[126][127] Hyderabad Metro timings are available on T-Savari app.[128] Ola Cabs and Uber tied up its services with app.[129]

In May 2022, Hyderabad Metro Managing Director N.V.S. Reddy ruled out possibility of attaching one single or double coach to three-coach train sets.[130][131] Each three-coach train can take between 900-1,000 passengers per trip[132] and the project has been envisaged in such a manner that another three-coach set rake can be attached to make them into six-coach trains with the stations/depots too already planned for the increased length of the trains.[133] L&T Metro Rail has been using 53 train sets of three coaches each with four three-coach sets under repair or maintenance undertaken using special software based on Internet of Things. Hyderabad Metro Rail crossed 100 million cumulative ridership milestone in just 671 days.[citation needed]

Last-mile connectivity

In order to enhance first and last mile connectivity of Hyderabad Metro Rail, Svida Mobility Pvt Ltd, an urban mobility services startup signed a Memorandum of Understanding (MoU) with the L&T Metro Rail Hyderabad Limited (L&TMRHL) with plans to scale up their feeder vehicle services.[134] Svida offers services via a robust AI-enabled tech platform, which provides the booking of feeder vehicles. Svida Mobility Pvt Ltd is L&TMRHL authorised feeder service provider since 2019.[135] The first and last mile connectivity routes, across seven metro stations - Raidurg, Parade ground, Mettuguda, LB Nagar, Uppal, KPHB and Miyapur- use e-Autos and Tata wingers. On 21 April 2022, Hyderabad metro launched its electric auto services in collaboration with AI-enabled ride-hailing mobility platform MetroRide.[136][137] The services were launched at two metro stations - Parade Grounds and Raidurg Stations.[138][139]

Cost

The initial official estimated cost of the 72 km long Metro project stood at 14,132 crore (US$1.7 billion). The State Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost.[140][141] The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to 15,957 crore (US$1.9 billion).[142] This has been further revised upwards to 18,800 crore (US$2.3 billion) (as of November 2017).[24]

Infrastructure

Hyderabad Metro Rail Bhavan

The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25 kV AC 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).[143]

CBTC Technology

At the end of 2012, L&T Metro Rail awarded Thales a 7.4 billion ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales Group supplied its SelTrac Communications-based train control (CBTC) technology,[144] and trains initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).[145]

Hyderabad metro ticket online booking through MakeMyTrip and Goibibo.

Rolling stock

On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem.[146][147] The 18 billion (US$220 million) tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage.[148][149] On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad.[150] The trains will be 3.2m wide and 4m high.[151] There will be 4 doors on each side of each coach.[151]

On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014.[152] On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.[153]

Ticketing and recharge

The L&T Hyderabad project has an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues.[154] Hyderabad Metro Rail smart card acts as a virtual wallet that facilitates seamless travel. A smart card can be purchased from a ticketing office at any Hyderabad Metro station or through TSavaari App. A smart card can be recharged for a minimum amount of 50 and maximum amount of 3000. The smart card can be recharged through TSavaari App, HMR Passenger website (www.ltmetro.com), or Paytm App. There is 10% discount on all trips made through smart card.[155] In December 2019, Hyderabad Metro started cashless QR (Quick Response) code payment option for e-tickets through MakeMyTrip and Goibibo.[156][157] In October 2022, Hyderabad Metro became the first Metro rail in the country to launch an end-to-end fully digital payment-enabled Metro ticket booking through the WhatsApp e-ticketing facility.[158]

Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.[154][159] Official ticket prices were announced on 25 November 2017. The base fare is 10 for up to 2 km.[citation needed]

Hyderabad metro nebula smart card
Slab Distance (km) Metro Fare ()
1 0 - 2 10
2 2 - 4 15
3 4 - 6 25
4 6 - 8 30
5 8 - 10 35
6 10 - 14 40
7 14 - 18 45
8 18 - 22 50
9 22 - 26 55
10 > 26 60

Awards and nominations

The HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.[160][161]

L&T Metro Rail Hyderabad Limited (LTMRHL) was conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management'[162] category.

In 2018 the Rasoolpura, Paradise and Prakash Nagar Metro stations were awarded the Indian Green Building Council's (IGBC) Green MRTS Platinum Award.[163]

Hyderabad Metro was adjudged as the Best Urban Mass Transit Project by the Government of India in November 2018.[164]

In October 2022, three metro stations of Hyderabad Metro- Durgam Cheruvu , Punjagutta and LB Nagar were awarded Indian Green Building Council (IGBC) Green MRTS Certification with the highest platinum rating under elevated stations category.[165] With this, Hyderabad Metro Rail has 23 metro stations certified with the IGBC Platinum rating.[166]

Network Map

Map


See also

References

  1. ^ a b "Stations | Hyderabad Metro | L&T India". ltmetro.in.
  2. ^ "Hyderabad metro receives 4L users on Friday". the siasat daily.
  3. ^ "N. V. S. REDDY | Hyderabad Metro | L&T India". ltmetro.in.
  4. ^ "Hyderabad Metro rail flagged off today: See fares, timings, routes and other features". The Indian Express. 28 November 2017. Retrieved 28 November 2017.
  5. ^ "Hyderabad metro rail: Survey commences in old city". The Siasat Daily.
  6. ^ a b "KTR assures to take up Phase-II Metro Rail".
  7. ^ "Project Description". Archived from the original on 11 June 2012. Retrieved 19 June 2012.
  8. ^ Geetanathhyderabad, V. (11 January 2020). "Course corrections put metro rail on track". The Hindu – via www.thehindu.com.
  9. ^ "Jubilee Hills Check Post metro station opening today". The Hindu. 18 May 2019 – via www.thehindu.com.
  10. ^ "Tryst with Metro history as 2nd longest corridor opens | Hyderabad News - Times of India". The Times of India.
  11. ^ "Skywalks to connect Metro with schools & malls: NVS Reddy | Hyderabad News - Times of India". The Times of India.
  12. ^ Sood, Jyotika (26 July 2017). "How metro rail networks are spreading across India". Livemint.
  13. ^ "EPC vs PPP in metro rail". Projectsmonitor.com. 2 December 2007. Archived from the original on 2 December 2007. Retrieved 18 April 2013.
  14. ^ "The Next Station Is... | Outlook India Magazine". outlookindia.com/. 5 February 2022.
  15. ^ Kumar, V. Rishi (20 August 2019). "Eyeing non-fare revenues, L&T Metro Hyderabad takes up transit oriented development". @businessline.
  16. ^ "N.V.S. Reddy to be AP Govt nominee on L&T Metro Rail board". @businessline. 14 February 2012.
  17. ^ a b "Hyderabad metro on tricky track, running on losses | Hyderabad News - Times of India". The Times of India.
  18. ^ "Hyderabad Metro model coach unveiled".
  19. ^ "Hyderabad Metro: PM Modi inaugurates Hyderabad Metro Rail | Hyderabad News - Times of India". The Times of India.
  20. ^ "PM Narendra Modi flags off Hyderabad Metro". Archived from the original on 12 June 2018. Retrieved 31 December 2017.
  21. ^ "Metro: SR Nagar-Mettuguda was missing link in 30-km Metro rail corridor | Hyderabad News - Times of India". The Times of India.
  22. ^ "Metro Rail to get lease of life in November | Hyderabad News - Times of India". The Times of India.
  23. ^ "Metro rail gets closer to 5-lakh ridership mark". The Hindu. 11 February 2020. Retrieved 11 February 2020.
  24. ^ a b "Hyderabad Metro project delay by L&T pushes up cost by over 30 per cent". India Today. 26 November 2017.
  25. ^ ""Ladies only" coach in Hyderabad metro rail". Deccan Chronicle. 6 May 2018. Retrieved 10 June 2018.
  26. ^ "Rolling Stock | Hyderabad Metro | L&T India". www.ltmetro.in. Retrieved 4 October 2020.
  27. ^ Correspondent, Our Special (27 October 2003). "Nod for metro rail project in Hyderabad". The Hindu. ISSN 0971-751X. Retrieved 28 February 2020.
  28. ^ Network, BD News (17 August 2018). "Vajpayee-era a great chapter, recalls Chandrababu Naidu". Bengal Daily. Retrieved 28 February 2020.
  29. ^ "Advani flags off first MMTS train". The Hindu. Hyderabad. 10 August 2003. Archived from the original on 29 March 2004. Retrieved 18 April 2015.
  30. ^ "Advani flags off Hyderabad MMTS". The Times of India. 9 August 2003. Retrieved 29 February 2020.
  31. ^ "Rs 4,500-crore MMTS project report under way". Business Standard. Hyderabad. 15 February 2004. Retrieved 18 May 2015.
  32. ^ Sharma, Swati (20 August 2016). "Hum Tum: Bonding over work". Deccan Chronicle.
  33. ^ "Centre approves Hyderabad Metro Rail Project". The Economic Times. 3 May 2007.
  34. ^ Garari, Kaniza (15 June 2014). "Hyderabad Metro runs into hard rocks". Deccan Chronicle.
  35. ^ "Metro rail deadline may get derailed".
  36. ^ "Union Govt withheld money due to Hyderabad Metro for violation of guidelines".
  37. ^ "Maytas-Nava consortium wins bid for Hyderabad Metro Rail". The Financial Express. 29 July 2008.
  38. ^ "2010 concessionaire agreement between L&T and AP Govt" (PDF).
  39. ^ "Niz is Hyderabad Metro Rail's mascot". The Hindu. 12 September 2014. Retrieved 3 October 2016.
  40. ^ "L&T performs Bhoomi Puja for Hyderabad metro". The Hindu. 26 April 2012.
  41. ^ "L&T metro rail schedule on track". The Hindu. Chennai, India. 7 June 2012.
  42. ^ "Metro Rail works picking up speed". The Deccan Chronicle. 31 August 2011. Archived from the original on 12 October 2012. Retrieved 31 August 2011.
  43. ^ "Old City: Monument law amendment buoys Metro dream in Old City, but political will needed | Hyderabad News - Times of India". The Times of India.
  44. ^ "Hyderabad Metro Rail phase-I to be completed by 2014". NDTV.com. 21 January 2013. Retrieved 18 April 2013.
  45. ^ Our Bureau. "Hyderabad Metro rail stage I to be flagged off by June 2014 - Business Line". Thehindubusinessline.com. Retrieved 18 April 2013.
  46. ^ Kumar, V. Rishi (20 November 2013). "L&T Hyderabad Metro begins laying of rails". Retrieved 29 November 2017.
  47. ^ Kumar, V.Rishi (7 November 2013). "L&T Hyderabad Metro phase I to be ready by March 2015". Retrieved 29 November 2017.
  48. ^ "CMRS completes 1 day inspection for Hyderabad Metro Stage-II, Miyapur to S.R. Nagar". metrorailnews.info. Archived from the original on 15 September 2016.
  49. ^ "Hyderabad Metro ROB placed at Oliphant Bridge". telanganatoday.com.
  50. ^ "Metro steel bridge crosses Oliphenta railway bridge". thehindu.com.
  51. ^ Kumar, V. Rishi (20 November 2017). "L&T Hyderabad Metro Rail gets safety approval". @businessline.
  52. ^ "Hyderabad Metro chugs on Ameerpet-LB Nagar route". The Times of India.
  53. ^ Geetanath, V. (20 August 2019). "Hyderabad Metro to run trains to HiTec City at 3 minute frequency". The Hindu – via www.thehindu.com.
  54. ^ "Metro rail's last pier built after seven years of work". The Hindu. 19 May 2019 – via www.thehindu.com.
  55. ^ "'2599 metro pillars erected in 2599 days': Work on 66-km stretch of Hyd metro finished". 20 May 2019.
  56. ^ "Hyderabad Metro to get service lanes". 22 May 2015. Retrieved 29 November 2017.
  57. ^ "No Language Wars Here, Hyderabad Metro to Use 4 Languages". News18. 12 July 2017.
  58. ^ "Fare structure for Hyderabad metro notified". 14 April 2011. Retrieved 29 November 2017.
  59. ^ "Hyderabad Metro stations to have electric vehicle charging points". The Economic Times. 19 May 2018. Retrieved 20 May 2018.
  60. ^ Ghanate, Naveena (25 October 2018). "Hyderabad Metro stations do not reflect exact locations". Deccan Chronicle.
  61. ^ "Watch videos with free Wi-Fi at Hyderabad metro". Deccan Chronicle. 11 October 2018.
  62. ^ "Hyderabad metro rail celebrates its first anniversary | Hyderabad Traffic".
  63. ^ "Metro connectivity to airport may take three more years, says L&T official | Hyderabad News - Times of India". The Times of India.
  64. ^ "200km of metro rail planned for Hyderabad: KT Rama Rao | Hyderabad News - Times of India". The Times of India.
  65. ^ "All metro corridors to terminate at Shamshabad". The Hindu. 7 April 2019 – via www.thehindu.com.
  66. ^ Kumar, V. Rishi (14 August 2019). "Metro link work on IT Hub to Hyderabad airport will begin soon, says KT Rama Rao". @businessline.
  67. ^ "PROJECT DESCRIPTION - Hyderabad Metro Rail". hmrl.telangana.gov.in.
  68. ^ "Metro rail line to Raidurg another two years away". The Hindu. Retrieved 29 November 2017.
  69. ^ Geetanath, V. (25 December 2014). "No metro stations at Charminar, Shalibanda and Shamsheergunj". The Hindu.
  70. ^ "Hyderabad Metro Rail releases mall plans". 11 June 2015.
  71. ^ "Hyderabad Metro Rail route mired in political controversy". 14 December 2017.
  72. ^ "Lack of funds, poor planning: Residents of Hyderabad's old city cut off from the metro". 30 August 2021.
  73. ^ "Work in Old City to start in '19, will take three years | Hyderabad News". The Times of India.
  74. ^ "After much delay work to begin". 26 August 2018.
  75. ^ Geetanath, V. (2 June 2022). "HMR takes up re-survey of Old City stretch". The Hindu.
  76. ^ "State to seek Japanese help for Phase II works of Metro Rail Project". 9 August 2017. Retrieved 9 August 2017.
  77. ^ "Hyderabad Metro: Metro corridors to crisscross Hyderabad for airport link | Hyderabad News". The Times of India.
  78. ^ "raidurg: SPV formed to extend Metro from Raidurg to Hyderabad airport | Hyderabad News". The Times of India.
  79. ^ The Hindu Business Line, Hyderabad 23 January 2018
  80. ^ Kumar, V. Rishi (10 September 2018). "L&T secures extension of repayment deadline from lenders for Hyderabad metro project". @businessline.
  81. ^ Geetanath, V. (27 January 2018). "Metro line to RGIA under study". The Hindu.
  82. ^ "Hyderabad Metro News: Three new corridors in phase 2 of Hyderabad Metro | Hyderabad News". The Times of India.
  83. ^ "'Hyderabad Metro was not given extra land, fares are bare minimum'". The Hindu. 27 February 2020.
  84. ^ "Sanction metro rail phase II to Hyderabad: KTR urges Centre".
  85. ^ "Telangana seeks Centre's help for metro rail expansion".
  86. ^ "Telangana minister KTR seeks Centre's nod for BHEL-Lakdikapul Metro project".
  87. ^ "eBRTS set to ease travel on busy KPHB-Financial District route". Telangana Today. 7 June 2022.
  88. ^ "Metro Rail to airport may not take off".
  89. ^ "Govt's 'open offer' to private firms for Airport Metro".
  90. ^ "Work on Airport Express metro to begin soon: KTR | Hyderabad News". The Times of India.
  91. ^ "Hyderabad: Airport Metro line to cost Rs 5,000 crore". The New Indian Express.
  92. ^ "Telangana Budget: No allocation for GHMC, HMDA". 18 March 2021.
  93. ^ "Telangana: ₹1000 crore allocated for Hyderabad Metro Rail in ₹2.30 lakh crore budget 2021-22".
  94. ^ "GHIAL to invest Rs 500 crore for metro connectivity at Hyderabad airport". The Times of India.
  95. ^ "GMR to invest over Rs 500 crore in Hyderabad Airport metro link project". The Economic Times.
  96. ^ "Hyderabad: Telangana govt allocates funds for metro connectivity to old city, airport".
  97. ^ Geetanath, V. (7 March 2022). "Plans for metro connectivity to Hyderabad's Old City revived". The Hindu.
  98. ^ "HMRL tops in budgetary allocation for city departments". 8 March 2022.
  99. ^ "Hyderabad: Metro's airport service to have underground stretch | Hyderabad News". The Times of India.
  100. ^ Geetanath, V. (2 September 2019). "Airport Metro to have underground section connecting to passenger terminal". The Hindu – via www.thehindu.com.
  101. ^ "Telangana announces 31-km Metro line from Madhapur to airport".
  102. ^ "Telangana govt announces Airport Metro corridor in Hyderabad at Rs 6,250 crore".
  103. ^ "KCR To Lay Foundation Stone For Airport Express Metro On Dec. 9".
  104. ^ "KCR to lay foundation stone for airport express Metro on Dec. 9".
  105. ^ "Airport Express Metro on track, Telangana CM K Chandrasekhar Rao to lay foundation on December 9".
  106. ^ "Archived copy". Archived from the original on 11 January 2014. Retrieved 18 August 2013.{{cite web}}: CS1 maint: archived copy as title (link)
  107. ^ "Telangana Governor To Flag Off New Metro Line On September 24". NDTV.com.
  108. ^ "Metro extension to Raidurg by July-end | Hyderabad News - Times of India". The Times of India.
  109. ^ Geetanath, V. (21 May 2019). "Metro 'Blue Line' likely by July". The Hindu – via www.thehindu.com.
  110. ^ Geetanath, V. (30 October 2018). "Metro may go the extra mile soon" – via www.thehindu.com.
  111. ^ "Transit-oriented Development Implementation Resources and Tools" (PDF). World Bank. 2021. p. 449. Retrieved 29 May 2022.
  112. ^ "Metro stations to have Office Bubbles". The Hindu. 30 June 2022.
  113. ^ "Metro to turn stations into 'Office Bubbles' in Hyderabad".
  114. ^ "Behind BMRCL's non-fare revenue goals".
  115. ^ "Hyderabad metro news: Swanky malls to help L&T mop up revenue | Hyderabad News - Times of India". The Times of India.
  116. ^ Geetanath, V. (18 September 2018). "L&TMRH to open two more malls" – via www.thehindu.com.
  117. ^ "L&T plans 3 malls-cum-multiplexes along metro rail corridors in Hyderabad | Hyderabad News - Times of India". The Times of India.
  118. ^ "Depots | Hyderabad Metro | L&T India". ltmetro.in.
  119. ^ "Depot lands continue to dog metro rail project". The Hindu. 23 December 2011 – via www.thehindu.com.
  120. ^ "Marsh land transformed into state-of-the-art Uppal depot | Hyderabad News - Times of India". The Times of India.
  121. ^ "Over 2 lakh passengers travel by Hyderabad metro rail on day 1". The Indian Express. 30 October 2017. Retrieved 30 November 2017.
  122. ^ "Record 2.4 lakh commuters travel by Hyderabad Metro on Sunday". Zee Business. 4 December 2017.
  123. ^ "Hyderabad Metro records highest footfall, to run more trains". The new indian express.
  124. ^ "Metro: Mania peaks: 2.1 lakh riders send Metro in tizzy | Hyderabad News - Times of India". The Times of India.
  125. ^ Geetanath, V. (9 September 2017). "Full metro service from launch day". The Hindu – via www.thehindu.com.
  126. ^ Geetanath, V. (25 November 2017). "'TSavaari' app for Hyderabad metro rail passengers". The Hindu – via www.thehindu.com.
  127. ^ "Hyderabad Metro Rail app update includes latest timings". Deccan Chronicle. 29 September 2018.
  128. ^ Ghanate, Naveena (15 January 2018). "Hyderabad Metro timings available on T-Savari app, L&T website". Deccan Chronicle.
  129. ^ "Ola integrates services with Hyderabad Metro Rail's TSavaari app". The Economic Times. 13 December 2017.
  130. ^ "Metro rail ridership is 3 lakh passengers a day". The Hindu.
  131. ^ "Fashionable in India to build metros in small cities — Hyderabad Metro MD".
  132. ^ "Metro prototype unveiled".
  133. ^ "Extra Metro rail trips to deal with rush hours". The Hindu.
  134. ^ "Firm to ramp up feeder services from Metro stations".
  135. ^ "Soon, Hyderabad Metro to roll out e-auto feeder services".
  136. ^ "Now, hire an electric auto from two Hyderabad metro stations".
  137. ^ "In conversation with Kamaan Agarwal, CTO of Metro Ride".
  138. ^ "E-mobility platform MetroRide expands footprint in Hyderabad".
  139. ^ "Electric auto services to improve first, last mile connectivity for Hyderabad Metro".
  140. ^ "Hyderabad Metro Rail Project will be completed by 2017: Andhra Pradesh government". NDTV.com. 8 August 2012. Retrieved 18 April 2013.
  141. ^ "Hyd Metro Rail Project will be completed on schedule: AP govt, IBN Live News". Ibnlive.in.com. 8 August 2012. Archived from the original on 12 August 2012. Retrieved 18 April 2013.
  142. ^ "Metro rail cost overshoots estimates". The Times of India. 8 March 2012. Archived from the original on 14 July 2012.
  143. ^ Ghanate, Naveena (12 October 2018). "Hyderabad: Women safety is key objective for metro". Deccan Chronicle.
  144. ^ Geetanathhyderabad, V. (13 June 2019). "Metro glitches may lead to CBTC tweak" – via www.thehindu.com.
  145. ^ "L&T Hyderabad Metro awards contracts to Thales". thehindubusinessline.com. 16 November 2012. Retrieved 28 November 2017.
  146. ^ "L&T Metro Rail grants Rs 1,800 cr contract to Hyundai Rotem". Zeenews.india.com. Retrieved 18 April 2013.
  147. ^ "City metro rail to run on Korean wheels | Deccan Chronicle". 11 September 2012. Archived from the original on 11 September 2012.
  148. ^ "Hyundai Rotem cars to run on metro tracks". The Times Of India. 12 September 2012. Retrieved 15 September 2012.
  149. ^ "L&T awards rolling stock contract to Hyundai Rotem". Ibnlive.in.com. 14 September 2012. Archived from the original on 15 September 2012. Retrieved 18 April 2013.
  150. ^ "Larsen and Tourbo Hyderabad Metro unveils train car". Retrieved 29 November 2017.
  151. ^ a b ":: Hyderabad Metro Rail Limited ::". Archived from the original on 20 August 2013. Retrieved 23 October 2013.
  152. ^ "First train for Hyderabad Metro rolls out of Korean factory". IANS. news.biharprabha.com. Retrieved 10 April 2014.
  153. ^ "Metro rail goes on first automatic trial run". 31 December 2014. Retrieved 29 November 2017 – via www.thehindu.com.
  154. ^ a b Our Bureau (18 February 2013). "Samsung bags fare collection system contract for Hyderabad Metro | Business Line". Thehindubusinessline.com. Retrieved 28 September 2013.
  155. ^ "10% off on metro rail smart cards". 7 December 2017 – via www.thehindu.com.
  156. ^ Kumar, V. Rishi. "MakeMyTrip, Hyderabad Metro launch QR-code based e-tickets for easy mobility". @businessline.
  157. ^ Gandhi, Forum. "MakeMyTrip deploys AI to make bookings easier". @businessline.
  158. ^ "Now, book your Hyderabad Metro tickets via WhatsApp. Here's how".
  159. ^ Udgirkar, Trushna. "Hyderabad Metro in ticketing deal with Samsung". mydigitalfc.com. Retrieved 28 September 2013.
  160. ^ "TheHindu.com Metro in best 100 global projects". www.thehindubusinessline.com.
  161. ^ "DeccanChronicle.com metro-among-100-global-projects". metro-among-100-global-projects. Archived from the original on 17 December 2012.
  162. ^ "L&T Metro Rail Hyd bags SAP award". The Hindu. 10 December 2015. Retrieved 29 November 2017 – via www.thehindu.com.
  163. ^ "Metro stations get Green Platinum Award". The Hindu. 1 November 2018 – via www.thehindu.com.
  164. ^ "Hyderabad Metro Rail gets 'Best Urban Mass Transit Project' award". United News of India. 5 November 2018. Retrieved 11 January 2019.
  165. ^ "Three more Hyderabad metro rail stations get green certification".
  166. ^ "Hyderabad Metro Rail gets green award".
  167. ^ "Nani- Akkineni Nagarjuna starrer is the first film to be shot in Hyderabad Metro". Hindustan Times. 28 March 2018.
  168. ^ "Nagarjuna-Nani starrer becomes first film to shoot in Hyd metro".
  169. ^ "Watch: Pawan Kalyan's 'Vakeel Saab' teaser shows glimpses of courtroom drama".
  170. ^ "Pawan Kalyan travels in Hyderabad Metro for Vakeel Saab shoot. Trending pics and videos".
  171. ^ "Hyderabad: Amitabh Bachchan spotted at Raidurg metro station".