Jump to content

Foshan–Dongguan intercity railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 23:34, 11 August 2018 (→‎Stations). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Foshan–Dongguan
intercity railway
Overview
Native name佛莞城际轨道交通
佛莞线
StatusUnder Construction
LocalePeople's Republic of China
Termini
Stations7
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
Technical
Line length36.681 km (23 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50Hz 25,000V
Operating speed200 km/h (124 mph)

Template:BS-map Foshan–Dongguan intercity railway, also called the Foguan intercity railway, is a under construction regional railway within Guangdong province, China, between the cities of Foshan, via Guangzhou, to Dongguan. It forms one leg of the Pearl River Delta Rapid Transit regional network and will provide connections with the Guangzhou–Dongguan–Shenzhen intercity railway, Dongguan–Huizhou intercity railway and local metro systems. It will connect Panyu District, Guangzhou at the major Guangzhou South interchange, tunnelling under the Pearl River through Machong and Hongmei to Wanghong Railway Station providing connections via the Dongguan Rail Transit, the Guangzhou–Dongguan–Shenzhen intercity railway or the Dongguan–Huizhou intercity railway. The length of the railway is 36.681 kilometres. Although this first phase of the project is named Foshan–Dongguan intercity railway, it does not pass through the city of Foshan in any way. The second section of this railway from Guangzhou South to Foshan West Railway Station has been planned, prepared and the line is under construction as the Guangfo intercity railway, the first phase of the Guangzhou–Foshan circular intercity railway.

Overview

It is planned to use domestic CRH6 Intercity EMUs on this railway. Targeting a maximum operational speed of up to 200 km/h. According to the plans, construction was expected to start in 2014, with a construction time of about 5 years. It is expected to open to traffic at some time between 2019 ~ 2025.

Stations

Station Name Chinese Distance
km
PRD MIR (CR C-train)
transfers/connections
Metro
transfers/connections
Location
Template:CR stations (Dongguanxi) 东莞西 0.00 0.00  GH   SGS 
Template:CR stations 麻涌 5.36 5.36
Template:CR stations 莲花 9.02 14.38
Template:CR stations 官桥 5.48 19.86 Guangzhou Metro  4 
Template:CR stations 番禺大道 8.35 28.21
Template:CR stations 长隆 4.21 32.42 Guangzhou Metro  3   7 
Template:CR stations (Guangzhounan) 广州南 6.56 38.98  GZ   GFZ   GFC  Guangzhou Metro  2   7 
Template:CR stations 陈村 3.92  GFZ   GFC 
Template:CR stations 北滘 6.63  GFZ   GFC 
Template:CR stations 佛山新城 5.21  GFZ   GFC 
Template:CR stations 张槎 9.48  GFZ   GFC 
Template:CR stations (Foshanxi) 佛山西 11.18  GFZ   GFC 

References