Kolkata Metro Line 3
This article needs additional citations for verification. (September 2016) |
Kolkata Metro Line 3![]() | |
---|---|
Overview | |
Status | Under construction |
Locale | ![]() |
Termini | |
Stations | 12 |
Website | KMRC |
Service | |
Type | Rapid transit |
System | Kolkata Metro |
Operator(s) | KMRC |
Technical | |
Line length | 16.72 kilometres (10.39 mi) |
Number of tracks | 2 |
Character | Elevated and Underground |
Track gauge | 1,676 mm (5 ft 6 in) Broad gauge |
Electrification | 750 V DC using third rail[1] |
Operating speed | 80 km/h (designed) |
Kolkata Metro Line 3 is a line of the Kolkata Metro, that of 2018 is still under construction.[citation needed] The route spans 16.72 kilometres (10.39 mi) from Joka in the south, to Esplanade in the north.[citation needed] It will connect to Kolkata Metro Line 1 and Kolkata Metro Line 2 at Esplanade in central Kolkata.[citation needed] Line 3 is being built by Rail Vikas Nigam Limited.[citation needed]
Development
It is partially elevated and partially underground: around 8.5 kilometres (5.3 mi) of the project will be elevated and the rest 6.32 kilometres (3.93 mi) of the metro line will be underground.[citation needed] The project is getting delayed due to non availability of land for the construction of train depot at Joka.[citation needed] As on March 2018 the Train Depot construction have not yet started.[citation needed]
Construction was further delayed in September 2018 due to the Majerhat Bridge collapse: the metro was being built right next to the bridge.
List of stations
Line 3 | |||||||||
---|---|---|---|---|---|---|---|---|---|
No. | Station Name | Opening | Connections | Layout | |||||
1 | Joka | Under construction | Elevated | ||||||
2 | Thakurpukur | Under construction | Elevated | ||||||
3 | Behala Sakherbazar | Under construction | Elevated | ||||||
4 | Behala Chowrasta | Under construction | Elevated | ||||||
5 | Behala Bazar | Under construction | Elevated | ||||||
6 | Taratala | Under construction | Elevated | ||||||
7 | Majerhat | Under Construction | ![]() |
Elevated | |||||
8 | Mominpur | Planned | Underground | ||||||
9 | Kidderpore | Planned | Underground | ||||||
10 | Victoria Memorial | Planned | Underground | ||||||
11 | Park Street | 24 October 1984 for Line 1 | Kolkata Metro Line 1 | Underground | |||||
12 | Esplanade | Planned | Kolkata Metro Line 1 Kolkata Metro Line 2 |
Underground |
See also
- List of Kolkata metro stations
- Kolkata Metro Rolling Stock
- 2018 Kolkata bridge collapse
- Kolkata Suburban Railway
References
- ^ "CAF to supply Kolkata metro trains". Railway Gazette. 9 September 2012. Retrieved 6 September 2018.