Arumbakkam metro station
Chennai Metro Station | |||||||||||
General information | |||||||||||
Location | Jawaharlal Nehru Rd,Vinayagapuram, Arumbakkam, Chennai, Tamil Nadu 600106 | ||||||||||
Coordinates | 13°3′44″N 80°12′42″E / 13.06222°N 80.21167°E | ||||||||||
Owned by | Chennai Metro | ||||||||||
Operated by | Chennai Metro Rail Limited (CMRL) | ||||||||||
Line(s) | Green Line | ||||||||||
Platforms | Side platform Platform-1 → St. Thomas Mount Platform-2 → M.G.R Chennai Central | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double Track | ||||||||||
Platform levels | 2 | ||||||||||
Parking | Available | ||||||||||
Bicycle facilities | Free Bicycle Available | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | June 29, 2015 | ||||||||||
Electrified | Single phase 25 kV, 50 Hz AC through overhead catenary | ||||||||||
Services | |||||||||||
| |||||||||||
|
Arumbakkam Metro station is a Metro railway station on the Line 2 of the Chennai Metro, which is currently under operation. The station is among the elevated stations coming up along corridor II of the Chennai Metro, Chennai Central–St. Thomas Mount stretch. The station will serve the neighbourhoods of Vinayagapuram, Choolaimedu and MMDA Colony.
Construction history
The station was constructed by Consolidated Constructed Consortium (CCCL). The station attained structural completion in September 2013. The consolidated cost of the station along with the stations of Koyambedu, CMBT, Vadapalani and Ashok Nagar was ₹ 1,395.4 million.[1]
The station
The station is being constructed as an elevated station on the arterial Inner Ring Road. The station will have ground, concourse and platform levels. The station will have four entry and exit points, four lifts and eight escalators; there will also be a ramp to facilitate the movement of disabled people from the ground level to the concourse level.[1] Elevation of the platforms will be about 15 m from the ground level and the total length of the platforms will be 140 m.[2]
Layout
Arumbakkam track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street Level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Southbound |
Towards → St. Thomas Mount next station is Vadapalani | |
Platform 2 Northbound |
Towards ← Chennai Central next station is Puratchi Thalaivi Dr. J.Jayalalithaa CMBT | |
Side platform | Doors will open on the left | ||
L2 |
Facilities
- Elevator
- Ticket booking Machines
- Refreshmentaries
- Atm
Commercial hub
Arumbakkam station is one of the five stations in the first phase of the Chennai Metro project identified to be converted into commercial hubs, the others being CMBT, Alandur, Ekkattuthangal, and Ashok Nagar. Two nine-floor buildings, measuring 51,379 sq ft and 32,721 sq ft, are proposed to be built at the Arumbakkam station.[3]
Entry/Exit
This section is empty. You can help by adding to it. (October 2017) |
See also
References
- ^ a b "Arumbakkam metro station almost complete". The Hindu. Chennai. 10 September 2013. Retrieved 2 February 2015.
- ^ Hemalatha, Karthikeyan; V Ayyappan (17 January 2013). "All roads to lead to metro stations". The Times of India. Chennai: The Times Group. Archived from the original on 1 February 2015. Retrieved 18 January 2013.
- ^ TNN (23 September 2014). "In less than a year, you can park, shop and ride at metro rail stations". The Times of India. Chennai: The Times Group. Retrieved 3 February 2015.
External links
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
- "Arumbakkam metro station" (Map). Google Maps.