Pink Line (Delhi Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Citation bot (talk | contribs) at 03:47, 4 February 2021 (Alter: title. Add: author pars. 1-1. Removed parameters. Some additions/deletions were actually parameter name changes. | You can use this bot yourself. Report bugs here. | Suggested by Abductive | Category:Pages using BSsplit instead of BSsrws | via #UCB_Category 68/464). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Pink Line (Line 7)
Overview
StatusAlmost Fully Operational
OwnerDelhi Metro
LocaleDelhi
Termini
Stations38 , Elevated: 26, Underground: 12
Service
TypeRapid Transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockHyundai-ROTEM
History
Opened14 March 2018 (Majlis Park - Durgabai Deshmukh South Campus)
6 August 2018 (Durgabai Deshmukh South Campus - Lajpat Nagar)
31 October 2018 (Trilokpuri Sanjay Lake - Shiv Vihar)
31 December 2018 (Lajpat Nagar - Mayur Vihar Pocket I)
Technical
Line length58.59 kilometers (36.41 mi), Elevated 39.48 kilometers (24.53 mi); Underground 19.11 kilometers (11.87 mi)
Track length58.59 kilometers (36.41 mi)
CharacterUnderground and Elevated
Track gaugeStandard gauge
Electrification25 kV, 50 Hz AC Overhead catenary
Route map

under construction
Yamuna Vihar
Bhajanpura
Khajuri Khas
Sonia Vihar
Yamuna River
Soorghat
Jagatpur Village
Jharoda Majra
Burari
Outer Ring Road
Mukundpur Depot
Majlis Park
Ring Road
Azadpur
Shalimar Bagh
Netaji Subhash Place
Shakurpur
Rohtak Road
Punjabi Bagh West
ESI - Basaidarapur
Rajouri Garden
Najafgarh Road
Mayapuri
Naraina Vihar
Delhi Cantonment
Dhaula Kuan
Durgabai Deshmukh South Campus
Sir M. Vishweshwaraiah Moti Bagh
Bhikaji Cama Place
Sarojini Nagar
Dilli Haat - INA
South Extension
Lajpat Nagar
Vinobapuri
Ashram
Sarai Kale Khan - Nizamuddin
Hazrat Nizamuddin railway station Sarai Kale Khan Inter-State Bus Terminus
Ring Road
Yamuna River
Mayur Vihar-I
Mayur Vihar Pocket I
Trilokpuri Sanjay Lake
East Vinod Nagar - Mayur Vihar-II
Mandawali - West Vinod Nagar
IP Extension
Anand Vihar
Karkarduma
Karkarduma Court
Krishna Nagar
East Azad Nagar
Welcome
Grand Trunk Road
Jaffrabad
Maujpur - Babarpur
Gokulpuri
Johri Enclave
Shiv Vihar

The Pink Line (Line 7) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India.[1] It is being constructed as part of the Delhi Metro Phase III network development plan. It consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi. In future, the line will be extended to Maujpur-Babarpur,creating one of the world's longest ring lines in the city. The Maujpur-Babarpur to Shiv Vihar route will then act as a branch line.

The Pink Line, with a length of 58.59 kilometres (36.41 mi), is the longest individual line in Delhi Metro, breaking the record set by the operational Blue Line(excluding branch line). It is mostly elevated and covers Delhi in an almost 'U' shaped pattern. The Pink Line is also known as the Ring Road Line, as the entire line passes alongside the busy Ring Road in Delhi, that witnesses massive traffic jams everyday.

The Pink Line has interchanges with most of the operational lines of the network such as the Red Line at Netaji Subhash Place & Welcome, Yellow Line at Azadpur & INA, Green Line at Punjabi Bagh West (via out-of-system transfer), Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar & Karkarduma, Dhaula Kuan of Delhi Airport Metro Express (Orange Line) at Durgabai Deshmukh South Campus, Violet Line at Lajpat Nagar, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways) and the ISBTs at Anand Vihar and Sarai Kale Khan.

The Pink Line has the highest point of Delhi Metro at Dhaula Kuan with a height of 23.6 metres, passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.[2] It also possesses the country's smallest metro station, Ashram, with a size of just 151.6 metres against the usual 265 metres. Also, the platform for a six-coach train is 140 metres but has been reduced to 135 metres in the Ashram station.

The line was opened in four stages from March to December 2018 (except Trilokpuri to Mayur Vihar Pocket I section due to land issue at the former). The first section on the Pink Line become operational from 14 March 2018 between Majlis Park to Durgabai Deshmukh South Campus, thereafter the section between Durgabai Deshmukh South Campus and Lajpat Nagar was opened on 6 August 2018, Shiv Vihar to Trilokpuri was opened on 31 October 2018. The section between Lajpat Nagar to Mayur Vihar Pocket I was opened on 31 December 2018.

Presently trains run between Majlis Park and Mayur Vihar Pocket-1 on the Western part of the line.In the Eastern Part, Trains run in short loops between Trilokpuri-Sanjay Lake and IP Extension(On Single Line) ,IP Extension to Maujpur-Babarpur, and beyond till Shiv Vihar.The Maujpur-Shiv Vihar section will act as a branch line when the line gets extended to Majlis Park

Construction status

The total length of the line is 58.596 km, out of which 39.479 km is elevated and 19.117 km is underground. There are 38 stations in the Pink Line, out of which 26 are elevated and 12 are underground.

The section between Majlis Park to Durgabai Deshmukh South Campus of the Pink Line was opened to public on 14 March 2018 and the section between Durgabai Deshmukh South Campus to Lajpat Nagar was opened on 6 August 2018 and Shiv Vihar to Trilokpuri was opened on 31 October 2018.

Finally, the section between Lajpat Nagar to Mayur Vihar Pkt-1 was opened on 31 December 2018.[3]

Section between Trilokpuri to Mayur Vihar Pkt-1 is expected to be completed by September 2020 as construction of a 1.5 km viaduct began late due to land acquisition issues at Trilokpuri.[4] This has rendered the Pink Line into two independent lines.

Hence, trains from Majlis Park will go until Mayur Vihar Pocket 1, while trains coming from Shiv Vihar will terminate at either IP Extension or Trilokpuri Sanjay Lake. Construction of the missing link is expected to be completed by March 2021.[5][6]

Stations

The stations of the Pink Line are:[7]

Pink Line
# Station Name Phase Opening Interchange Connenction Station Layout Platform Layout Depot Connection Depot Layout
English Hindi
1 Maujpur मौजपुर 4 December 2022   Elevated Side None None
2 Yamuna Vihar यमुना विहार 4 December 2022 None Elevated Side None None
3 Bhajanpura भजनपुरा 4 December 2022 None Elevated Side None None
4 Khajuri Khas खजुरी खास 4 December 2022 None Elevated Side None None
5 Sonia Vihar सोनिया विहार 4 December 2022 None Elevated Side None None
6 Wazirabad Surghat वजीराबाद सुरघाट 4 December 2022 None Elevated Side None None
7 Jagatpur Village जगतपुर गांव 4 December 2022 None Elevated Side None None
8 Jharoda Majra झरोदा माजरा 4 December 2022 None Elevated Side None None
9 Burari बुराड़ी 4 December 2022 None Elevated Side None None
10 Majlis Park मजलिस पार्क 3 14 March 2018  Magenta Line 
(Phase 4 | Under Construction)
Elevated Side Mukundpur Depot At Grade
11 Azadpur आजादपुर 3 14 March 2018  Yellow Line   Magenta Line 
(Phase 4 | Under Construction)
Underground Island None None
12 Shalimar Bagh शालीमार बाग 3 14 March 2018 None Underground Island None None
13 Netaji Subhash Place नेताजी सुभाष प्लेस 3 14 March 2018  Red Line  None None
14 Shakurpur शकूरपुर 3 14 March 2018 None Elevated Island None None
15 Punjabi Bagh West पंजाबी बाग पश्चिम 3 14 March 2018  Green Line 

(Indirect Interchange)

Elevated Side None None
16 ESI Basaidarpur ईएसआई बसईदरपुर 3 14 March 2018 None Elevated Side None None
17 Rajouri Garden राजौरी गार्डन 3 14 March 2018  Blue Line  Elevated Side None None
18 Mayapuri माया पुरी 3 14 March 2018  Metro Lite 
(Phase 4 | Under Construction)
Elevated Side None None
19 Naraina Vihar नारायणा विहार 3 14 March 2018 None Underground Island None None
20 Delhi Cantonment दिल्ली छावनी 3 14 March 2018 None Elevated Side None None
21 Durgabai Deshmukh South Campus दुर्गाबाई देशमुख साउथ कैम्पस 3 14 March 2018  Orange Line  Elevated Side None None
22 Sir Vishweshwaraiah Moti Bagh सर विश्वेश्वरय्या मोती बाग 3 6 August 2018 None Elevated Side None None
23 Bhikaji Cama Place भीकाजी कामा प्लेस 3 6 August 2018 None Underground Island None None
24 Sarojini Nagar सरोजिनी नगर 3 6 August 2018 None Underground Island None None
25 Delhi Haat INA दिल्ली हाट आईएनए 3 6 August 2018  Yellow Line  Underground Island None None
26 South Extension साउथ एक्सटेंशन 3 6 August 2018 None Underground Island None None
27 Lajpat Nagar लाजपत नगर 3 6 August 2018  Violet Line  Underground Island None None
28 Vinobapuri विनोबापुरी 3 31 December 2018 None Underground Island None None
29 Ashram आश्रम 3 31 December 2018 None Underground Island None None
30 Sarai Kale Khan - Nizamuddin सराय काले खान - निजामुद्दीन 3 31 December 2018 None Underground Island None None
31 Mayur Vihar – I मयूर विहार-१ 3 31 December 2018  Blue Line  Elevated Side None None
32 Mayur Vihar Pocket I मयूर विहार पॉकेट 1 3 31 December 2018 None Elevated Side None None
33 Trilokpuri Sanjay Lake त्रिलोकपुरी संजय झील 3 31 October 2018 None Elevated Side None None
34 East Vinod Nagar - Mayur Vihar-II पूर्वी विनोद नगर - मयूर विहार - II 3 31 October 2018 None Elevated Side None None
35 Mandawali - West Vinod Nagar मंडावली- वेस्ट विनोद नगर 3 31 October 2018 None Elevated Side None None
36 IP Extension आईपी एक्सटेंशन 3 31 October 2018 None Elevated Island Vinod Nagar Depot At Grade

Elevated

37 Anand Vihar आनंद विहार 3 31 October 2018  Blue Line  Elevated Side None None
38 Karkarduma कड़कड़डूमा 3 31 October 2018  Blue Line  Elevated Side None None
39 Karkarduma Court कड़कड़डूमा कोर्ट 3 31 October 2018 None Elevated Side None None
40 Krishna Nagar कृष्णा नगर 3 31 October 2018 None Elevated Side None None
41 East Azad Nagar आजाद नगर पूर्व 3 31 October 2018 None Elevated Side None None
42 Welcome वेलकम 3 31 October 2018  Red Line  Elevated Side None None
43 Jaffrabad जाफराबाद 3 31 October 2018 None Elevated Side None None
44 Maujpur-Babarpur मौजपुर - बाबरपुर 3 31 October 2018   Elevated Island None None
45 Gokulpuri गोकुलपुरी 3 31 October 2018 None Elevated Side None None
46 Johri Enclave जौहरी एनक्लेव 3 31 October 2018 None Elevated Side None None
47 Shiv Vihar शिव विहार 3 31 October 2018 None Elevated Side None None
48 Loni लोनी 4 2024 None Elevated Side None None
49 Prem Nagar प्रेम नगर 4 2024 None Elevated Side None None
50 Rameshwar Park रामेश्वर पार्क 4 2024 None Elevated Side None None
51 Tronica City ट्रोनिका सिटी 4 2024 None Elevated Side None None
52 Mandola मंडोला 4 2024 None Elevated Side None None
53 Mandola Vihar मंडोला विहार 4 2024 None Elevated Side None None

Planned Networks:

Mukundpur-Maujpur 12.54 kilometres (7.79 mi).

Type: Elevated

Stations: Burari, Jagatpur Village, Surghat, Khajuri Khas, Bhajanpura, Yamuna Vihar and Maujpur

Train Info

# Pink Line
1 Rakes Hyundai Rotem BEML
2 Train Length 6
3 Train Gauge 4 ft 8 12 in (1,435 mm) standard gauge
4 Electrification 25 kV, 50 Hz AC through overhead catenary

OHE

5 Train's Maximum Speed 100 Km/hr
6 Train Operation Delhi Metro

Towards → Majlis Park

North Bound Towards → Majlis Park
Pink Line
General Class Reserved For Ladies
C6 C5 C4 C3 C2 C1

Towards ← Shiv Vihar

North Bound Towards → Shiv Vihar
Pink Line
General Class Reserved For Ladies
C6 C5 C4 C3 C2 C1

See also

References

  1. ^ "Metro comes to north-east Delhi, but it won't be straight line". Times of India.
  2. ^ "New high for Metro with track at 24m". The Indian Express. 26 September 2014.
  3. ^ Roy, Sidharatha (17 August 2018). "Pink Line section from Shiv Vihar to Trilokpuri may open next month". Times of India. TNN. Retrieved 18 August 2018.
  4. ^ May 4, Sidharatha Roy | TNN | Updated; 2018; Ist, 10:08. "Delhi Metro: Missing link at Mayur Vihar-1 in Metro's longest line finally set to be bridged | Delhi News - Times of India". The Times of India. Retrieved 28 May 2019. {{cite web}}: |last2= has numeric name (help)CS1 maint: numeric names: authors list (link)
  5. ^ Singh, Prashasti (4 October 2020). "Work on Delhi metro's Pink Line's unfinished stretch delayed due to Covid-19". Hindustan Times. New Delhi. Retrieved 8 October 2020.
  6. ^ Roy, Sidharth (21 September 2020). "In times of social distancing, Delhi Metro's set to mend the gap". Times of India. New Delhi. Retrieved 8 October 2020.
  7. ^ "Metro Network Phase I, II, III & NCR" (PDF). Delhi Metro Rail Corporation Ltd (DMRC). February 2015. Retrieved 28 June 2015.

External links