This is an old revision of this page, as edited by ArnabSaha (talk | contribs) at 07:31, 22 June 2020 (Adding short description: "Transit line in Kolkata, India" (Shortdesc helper)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Kolkata Metro Line 5

Baranagar-Barrackpore Metro
Overview
StatusPlanned but Construction not started
OwnerMetro Railway, Kolkata
LocaleIndia Kolkata and North 24 Parganas
Termini
Connecting lines Blue Line 
Stations11
Websitehttps://mtp.indianrailways.gov.in
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)Noapara Depot
Technical
Line length12.40 kilometres (7.71 mi)[1]
Number of tracks2
CharacterElevated
Track gauge1,676 mm (5 ft 6 in) Broad gauge
Electrification750 V DC[2] using third rail
Operating speed80 km/h (designed)

The Baranagar to Barrackpore, 12.40 km metro corridor (Line 5)[1] in North 24 Parganas, is another line of Kolkata Metro, was sanctioned in 2009, at a cost of Rs.2070 crore[3], to enable a quicker commute from the northern suburbs to Kolkata, via North Kolkata.

Route

Map

Kolkata Metro Line 5

Stations (South to North)

The stations in this line are:[4]

Line 5
No. Station Name Location Phase Opening Connections Layout Platform type Coordinates Notes
English Bengali
1 Baranagar বরানগর Baranagar 1 Under construction  Blue Line  (operational)
Baranagar Road
Elevated Side 22°37′23″N 88°25′38″E / 22.62306°N 88.42722°E / 22.62306; 88.42722 Also known as Dunlop Crossing
2 Kamarhati কামারহাটি Kamarhati Planned
3 Agarpara আগরপাড়া Agarpara
4 Panihati পানিহাটি Panihati
5 Sodepur সোদপুর Sodepur
6 Subhash Nagar সুভাষ নগর Subhash Nagar Also known as Sukchar
7 Khardaha খড়দহ Khardaha
8 Tata Gate টাটা গেট Titagarh Power Plant Also known as Vivek Nagar
9 Titagarh টিটাগড় Titagarh
10 Talpukur তালপুকুর Talpukur
11 Barrackpore ব্যারাকপুর Barrackpore Barrackpore

Proposed realignment

State government proposed for realigning the line via Kalyani Expressway, instead of B.T. Road, due to the presence of arterial water pipelines, that supply water to the city, below BT Road. The construction might create huge traffic jam along the road and also damage the water pipelines, which will cutoff the city's water supply. This will increase the length to 17 km.[3][5]

See also

References

  1. ^ a b "New System Map of Kolkata Metro".
  2. ^ CAF to supply Kolkata metro trains, Railway Gazette, 9 September 2012
  3. ^ a b B, Krishnendu; May 16, yopadhyay | TNN |; 2018; Ist, 06:57. "Metro: Metro iffy about state's Barrackpore route plan | Kolkata News - Times of India". The Times of India. Retrieved 28 February 2020. {{cite web}}: |last3= has numeric name (help)CS1 maint: numeric names: authors list (link)
  4. ^ TNN. "Mamata paves way for Metro's northern journey". Times of India. Retrieved 12 October 2019.
  5. ^ "Barrackpore Metro 'detour' to Kalyani". www.telegraphindia.com. Retrieved 28 February 2020.