Jump to content

Salt Lake Sector-V metro station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Colonies Chris (talk | contribs) at 21:39, 1 February 2021 (sp, date & link fixes, replaced: India → India, - → – (4), |Street Level → |Street level (2), '''Kolkata Metro''' '''station''' → Kolkata Metro station). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.


Salt Lake Sector – V
Kolkata Metro station
Sector V, Metro Station
General information
LocationSector – V, Salt Lake Bidhannagar, Kolkata – 700091
Coordinates22°34′53″N 88°25′47″E / 22.581318°N 88.429822°E / 22.581318; 88.429822
Owned byKolkata Metro Rail Corporation
Operated byMetro Railway, Kolkata
Platforms Line 2   Line 6 
Tracks4
Construction
Structure typeElevated (Line 2)
Elevated (Line 6)
Platform levels2
AccessibleYes Disabled access
History
Opened13 February 2020; 4 years ago (13 February 2020)[1]
Electrified750V DC
Services
Preceding station   Kolkata Metro   Following station
TerminusTemplate:Kolkata Metro lines
Template:Kolkata Metro lines
Location
Salt Lake Sector-V is located in Kolkata
Salt Lake Sector-V
Salt Lake Sector-V
Location within Kolkata

Salt Lake Sector – V is a station of the Kolkata Metro close to Nabadiganta Industrial Township, Salt Lake City, Kolkata, India. This metro station will be for Kolkata Metro Line 2 and Kolkata Metro Line 6. The construction of station for the Line 2 is complete and it has been inaugurated in February 2020 while that of Line 6 is in progress.[2] The stations of Line 2 and Line 6 will be connected by over-bridge.[3]

Structure

 Line 2 

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform doors will open on the left Disabled access
Eastbound Terminus
Westbound Towards ←Karunamoyee← ←
Side platform doors will open on the left Disabled access
L2

 Line 6 

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform doors will open on the left Disabled access
Northbound Towards →Nicco Park→ →
Southbound Towards ← Bidhannagar← ←
Side platform doors will open on the left Disabled access
L2

See also

Island Platform
Two tracks and one island platform

References

  1. ^ "অবশেষে চলার পথে, ১৩ ফেব্রুয়ারি থেকে শুরু ইস্ট-ওয়েস্ট মেট্রো" (in Bengali). Kolkata: eisamay.indiatimes.com. 3 February 2020. Retrieved 3 February 2020.
  2. ^ "Trial runs for new East-West Metro rakes to start in May". The Times of India .
  3. ^ "Tech hub to mass-transit interface". The Telegraph.