Jump to content

List of commercial nuclear reactors

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ita140188 (talk | contribs) at 07:22, 14 August 2020 (restored template headings for rest of article; kept addition of Satsop). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of April 2020, there are 440 operable power reactors in the world, with a combined electrical capacity of 390 GW. Additionally, there are 55 reactors under construction and 109 reactors planned, with a combined capacity of 63 GW and 118 GW, respectively.[1] 329 more reactors are proposed.[1] For non-power reactors, see List of nuclear research reactors. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).[2]

Argentina

Nuclear power stations in Argentina (view)
 Active plants
 Under construction
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Atucha[3] 1 PHWR Siemens-KWU Operational 335 362 1 June 1968 24 June 1974
2 PHWR Siemens-KWU Operational 692 745 14 July 1981 (halted in 1994, restarted in 2007) 27 June 2014
3 PHWR CANDU-6 Planned[4] 800 (2025)
5th Plant[5] 1 PWR Hualong-1 Planned 1000 (2020) (2026)
Embalse[6] 1 PHWR CANDU-6 Operational 600 648 1 April 1974 20 January 1984 (2049)[7]
CAREM 1 PWR CAREM25 Under construction 25 29 8 February 2014

Armenia

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Metsamor 1 PWR VVER-440 V-270 Shut down 376 408 1 July 1969 6 October 1977 25 February 1989
2 PWR VVER-440 V-270 Operational 375 408 1 July 1975 3 May 1980
3 PWR VVER-1200 V-392 Planned 1060 1200 (2023)

Austria

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Zwentendorf 1 BWR BWR-69 (KWU) Finished; never entered service 692 April 1972 5 November 1978

Bangladesh

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Ruppur 1 PWR VVER-1200/523 Under construction 1080 1200 30 November 2017[8] (2023)
2 PWR VVER-1200/523 Under construction 1080 1200 14 July 2018 (2024)

Belarus

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Ostrovets 1 PWR VVER-1200 V-491 Under construction 1109 1194 6 November 2013 (2019)
2 PWR VVER-1200 V-491 Under construction 1109 1194 24 April 2014 (2020)
Minsk 1 PWR VVER-1000 Unfinished 1000 1983 1987
2 PWR VVER-1000 Unfinished 1000 1983 1987

Belgium

Belgium nuclear power plants (view)
 Active plants
 Closed plants
Name Unit
No.
Reactor Status[9] Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Mol 1 PWR Westinghouse (WH) BR-3 Decommissioned 10 12 1 November 1957 10 October 1962 30 June 1987
Doel 1 PWR WH, 2 loops Operational 433 454 1 July 1969 15 February 1975 (2025)
2 PWR WH, 2 loops Operational 433 454 1 September 1971 1 December 1975 (2025)
3 PWR Framatome, 3-loops Operational 1006 1056 1 January 1975 1 October 1982 (2022)
4 PWR Belgian firms plus WH, 3 loops Operational 1039 1090 1 December 1978 1 July 1985 (2025)
Tihange 1 PWR Framatome, 3 loops Operational 962 1009 1 June 1970 1 October 1975 (2025)
2 PWR Framatome, 3-loops Operational 1008 1055 1 April 1976 1 June 1983 (2023)
3 PWR Belgian firms plus WH, 3 loops Operational 1046 1089 1 November 1978 1 September 1985 (2025)

Brazil

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Angra 1 PWR Westinghouse (WH) 2 loops Operational 609 640 1 May 1971 1 January 1985
2 PWR PRE KONVOI (Vor-Konvoi) Operational 1275 1350 1 January 1976 1 February 2001
3 PWR PRE KONVOI Under construction 1245 1350 1984 (halted in 1986, restarted on 1 June 2010)

Bulgaria

Nuclear power plants in Bulgaria (view)
 Active plants
 Unfinished/future plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Kozloduy 1 PWR VVER-440/V-230 Shut down 408 440 1 April 1970 28 October 1974 31 December 2002
2 PWR VVER-440/V-230 Shut down 408 440 1 April 1970 10 November 1975 31 December 2002
3 PWR VVER-440/V-230 Shut down 408 440 1 October 1973 20 January 1981 31 December 2006
4 PWR VVER-440/V-230 Shut down 408 440 1 October 1973 20 June 1982 31 December 2006
5 PWR VVER-1000/V-320 Operational 963 1000 9 July 1980 23 December 1988
6 PWR VVER-1000/V-320 Operational 963 1000 1 April 1982 30 December 1993
Belene 1 PWR VVER-1000/V-320
VVER-1000/V-446B
Unfinished 1000
2 PWR VVER-1000/V-320
VVER-1000/V-446B
Unfinished 1000

Canada

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Pickering 1 PHWR CANDU Operational 515 542 June 1966 29 July 1971 (2022)
2 PHWR CANDU Shut down 515 542 September 1966 30 December 1971 1997
3 PHWR CANDU Shut down 515 542 December 1967 1 June 1972 1997
4 PHWR CANDU Operational 515 542 May 1968 17 June 1973 (2022)
5 PHWR CANDU Operational 516 540 November 1974 10 May 1983 (2024)
6 PHWR CANDU Operational 516 540 October 1975 1 February 1984 (2024)
7 PHWR CANDU Operational 516 540 March 1976 1 January 1985 (2024)
8 PHWR CANDU Operational 516 540 September 1976 28 February 1986 (2024)
Darlington 1 PHWR CANDU Operational 878 934 April 1982 14 November 1992 (2052)
2 PHWR CANDU Operational 878 934 September 1981 9 October 1990 (2050)
3 PHWR CANDU Operational 878 934 September 1984 14 February 1993 (2053)
4 PHWR CANDU Operational 878 934 July 1985 14 June 1993 (2053)
Bruce 1 PHWR CANDU Operational 750 805 June 1971 1 September 1977 (2042)
2 PHWR CANDU Operational 750 805 December 1970 1 September 1977 (2043)
3 PHWR CANDU Operational 750 805 July 1972 1 February 1978 (2053)
4 PHWR CANDU Operational 750 805 September 1972 18 January 1979 (2054)
5 PHWR CANDU Operational 795 845 June 1978 1 March 1985 (2052)
6 PHWR CANDU Operational 822 872 January 1978 15 September 1984 (2052)
7 PHWR CANDU Operational 822 872 May 1979 10 April 1986 (2052)
8 PHWR CANDU Operational 795 845 August 1979 22 May 1987 (2052)
NPD 1 PHWR CANDU Shut down 19.5 22 January 1958 4 June 1962 1987
Douglas Point 1 PHWR CANDU-6 Shut down 200 220 February 1960 26 September 1968 1984
Gentilly 1 BWR CANDU Shut down 250 266 September 1966 1 May 1972 1977
2 PHWR CANDU-6 Shut down 635 675 April 1974 1 October 1983 2012
Point Lepreau 1 PHWR CANDU Operational 635 660 May 1975 1 February 1983 (2041)

China

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Bailong 1 PWR CAP-1000 Planned 1100 1250
2 PWR CAP-1000 Planned 1100 1250
3 PWR CAP-1000 Planned 1100 1250
4 PWR CAP-1000 Planned 1100 1250
5 PWR CAP-1000 Planned 1100 1250
6 PWR CAP-1000 Planned 1100 1250
Changjiang I-1 PWR CNP-600 Operational 610 650 25 April 2010 25 December 2015
I-2 PWR CNP-600 Operational 610 650 21 November 2010 20 June 2016
I-3[10] PWR Hualong-1 Planned 1200
I-4[10] PWR Hualong-1 Planned 1200
II-1 PWR ACP-100 Planned 100 100
II-2 PWR ACP-100 Planned 100 100
Daya Bay (Guangdong) 1 PWR M-310 Operational 944 984 7 August 1987 1 February 1994
2 PWR M-310 Operational 944 984 7 April 1988 6 May 1994
Fangchenggang 1 PWR CPR-1000 Operational 1000 1080 30 July 2010 25 October 2015
2 PWR CPR-1000 Operational 1000 1080 23 December 2010 15 July 2016
3 PWR Hualong-1 Under construction 1080 1150 24 December 2015 (2022)
4 PWR Hualong-1 Under construction 1080 1150 23 December 2016
5 PWR Hualong-1 Planned 1117 1250
6 PWR Hualong-1 Planned 1117 1250
Fangjiashan 1 PWR CPR-1000 Operational 1000 1080 26 December 2008 15 December 2014
2 PWR CPR-1000 Operational 1000 1080 17 July 2009 12 February 2015
Fuqing 1 PWR CPR-1000 Operational 1000 1080 21 November 2008 19 November 2014
2 PWR CPR-1000 Operational 1000 1080 17 June 2009 15 October 2015
3 PWR CPR-1000 Operational 1000 1080 31 December 2010 7 September 2016
4 PWR CPR-1000 Operational 1000 1080 17 November 2012 31 July 2017
5 PWR Hualong-1 Under construction 1080 1150 15 April 2015 (2019)
6 PWR Hualong-1 Under construction 1080 1150 22 December 2015 (2020)
Haiyang 1 PWR AP-1000 Operational 1100 1250 24 September 2009 23 October 2018[11]
2 PWR AP-1000 Operational 1100 1250 20 June 2010 9 January 2019[12]
3 PWR CAP-1000 Planned 1100 1250
4 PWR CAP-1000 Planned 1100 1250
5 PWR CAP-1000 Planned 1100 1250
6 PWR CAP-1000 Planned 1100 1250
7 PWR CAP-1000 Planned 1100 1250
8 PWR CAP-1000 Planned 1100 1250
Haixing[13] 1 PWR CAP-1000 Planned 1100 1250
2 PWR CAP-1000 Planned 1100 1250
Hongyanhe I 1 PWR CPR-1000 Operational 1061 1119 18 August 2007 6 June 2013
2 PWR CPR-1000 Operational 1061 1119 28 March 2008 13 May 2014
3 PWR CPR-1000 Operational 1000 1080 7 March 2009 23 March 2015
4 PWR CPR-1000 Operational 1000 1080 15 August 2009 1 April 2016
5 PWR Hualong-1 Under construction 1080 1150 29 March 2015 (2019)
6 PWR Hualong-1 Under construction 1080 1150 24 July 2015 (2020)
Lianjiang[14] 1 PWR CAP-1000 Planned 1100 1250
2 PWR CAP-1000 Planned 1100 1250
3 PWR CAP-1000 Planned 1100 1250
4 PWR CAP-1000 Planned 1100 1250
5 PWR CAP-1000 Planned 1100 1250
6 PWR CAP-1000 Planned 1100 1250
Ling Ao I 1 PWR M-310 Operational 950 990 15 May 1997 28 May 2002
2 PWR M-310 Operational 950 990 28 November 1997 8 January 2003
3 PWR CPR-1000 Operational 1007 1086 15 December 2005 15 September 2010
4 PWR CPR-1000 Operational 1007 1086 15 June 2006 7 August 2011
Lufeng 1 PWR CAP-1000 Planned 1100 1250
2 PWR CAP-1000 Planned 1100 1250
3 PWR CAP-1000 Planned 1100 1250
4 PWR CAP-1000 Planned 1100 1250
5 PWR CAP-1000 Planned 1100 1250
6 PWR CAP-1000 Planned 1100 1250
Ningde I 1 PWR CPR-1000 Operational 1018 1087 18 February 2008 15 April 2013
2 PWR CPR-1000 Operational 1018 1080 12 November 2008 4 May 2014
3 PWR CPR-1000 Operational 1018 1080 8 January 2010 10 June 2015
4 PWR CPR-1000 Operational 1018 1080 29 September 2010 29 March 2016
5 PWR Hualong-1 Planned 1080 1150
6 PWR Hualong-1 Planned 1080 1150
Pengze 1 PWR CAP-1000 Planned 1100 1250
2 PWR CAP-1000 Planned 1100 1250
3 PWR CAP-1000 Planned 1100 1250
4 PWR CAP-1000 Planned 1100 1250
Qinshan I-1 PWR CNP-300 Operational 298 310 20 March 1985 1 April 1994
II-1 PWR CNP-600 Operational 610 650 2 June 1996 15 April 2002
II-2 PWR CNP-600 Operational 610 650 1 April 1997 3 May 2004
II-3 PWR CNP-600 Operational 610 650 28 April 2006 5 October 2010
II-4 PWR CNP-600 Operational 610 650 28 January 2007 30 December 2011
III-1 PHWR CANDU-6 Operational 650 728 8 June 1998 31 December 2002
III-2 PHWR CANDU-6 Operational 650 728 25 September 1998 24 July 2003
Sanmen 1 PWR AP-1000 Operational 1000 1250 19 April 2009 21 September 2018[15]
2 PWR AP-1000 Operational 1000 1250 15 December 2009 5 November 2018[16]
3 PWR CAP-1000 Planned 1100 1250
4 PWR CAP-1000 Planned 1100 1250
5 PWR CAP-1000 Planned 1100 1250
6 PWR CAP-1000 Planned 1100 1250
Shidaowan I-1 HTGR HTR-PM Under construction 200 210 December 2012 (2019)[17]
II-1 PWR CAP-1400 Under construction 1500 1550 2019[18][19]
II-2 PWR CAP-1400 Under construction 1500 1550 2019[19]
II-3 PWR CAP-1000 Planned 1100 1250
II-4 PWR CAP-1000 Planned 1100 1250
II-5 PWR CAP-1000 Planned 1100 1250
II-6 PWR CAP-1000 Planned 1100 1250
Taipingling (Huizhou) 1 PWR Hualong-1 Under construction 1000 1150 26 December 2019
2 PWR Hualong-1 Under construction 1000 1150 2019[19]
3 PWR Hualong-1 Planned 1000 1050
4 PWR Hualong-1 Planned 1000 1150
5 PWR Hualong-1 Planned 1000 1150
6 PWR Hualong-1 Planned 1000 1150
Taishan 1 PWR EPR Operational 1660 1750 18 November 2009 14 December 2018[20]
2 PWR EPR Operational 1660 1750 15 April 2010 7 September 2019[21]
3 PWR EPR Planned 1660 1750
4 PWR EPR Planned 1660 1750
Taohuajiang 1 PWR CAP-1000 Planned 1100 1250
2 PWR CAP-1000 Planned 1100 1250
3 PWR CAP-1000 Planned 1100 1250
4 PWR CAP-1000 Planned 1100 1250
Tianwan 1 PWR VVER-1000 Operational 990 1060 20 October 1999 17 May 2007
2 PWR VVER-1000 Operational 990 1060 20 September 2000 16 August 2007
3 PWR VVER-1000 Operational 1060 1126 27 December 2012 14 February 2018
4 PWR VVER-1000 Operational 990 1060 27 September 2013 22 December 2018[22]
5 PWR ACPR-1000 Under construction 1000 1080 27 December 2015
6 PWR ACPR-1000 Under construction 1000 1080 7 September 2016
7 PWR VVER-1200 Planned 1150 1200
8 PWR VVER-1200 Planned 1150 1200
Xianning 1 PWR CAP-1000 Planned 1100 1250
2 PWR CAP-1000 Planned 1100 1250
3 PWR CAP-1000 Planned 1100 1250
4 PWR CAP-1000 Planned 1100 1250
5 PWR CAP-1000 Planned 1100 1250
6 PWR CAP-1000 Planned 1100 1250
Xiapu[23] I-1 SFR CFR-600 Under construction 600 2017
I-2 SFR CFR-600 Planned 600
II-1 PWR CAP-1000 Planned 1100 1250
II-2 PWR CAP-1000 Planned 1100 1250
II-3 PWR CAP-1000 Planned 1100 1250
II-4 PWR CAP-1000 Planned 1100 1250
II-5 PWR CAP-1000 Planned 1100 1250
II-6 PWR CAP-1000 Planned 1100 1250
Xudabao 1 PWR CAP-1000 Planned 1100 1250
2 PWR CAP-1000 Planned 1100 1250
3 PWR VVER V-491[14] Planned 1150 1200
4 PWR VVER V-491[14] Planned 1150 1200
5 PWR CAP-1000 Planned 1100 1250
6 PWR CAP-1000 Planned 1100 1250
Yangjiang 1 PWR CPR-1000 Operational 1000 1086 16 December 2008 25 March 2014
2 PWR CPR-1000 Operational 1000 1086 4 June 2009 8 June 2015
3 PWR CPR-1000+ Operational 1000 1086 15 November 2010 1 January 2016
4 PWR CPR-1000+ Operational 1000 1086 17 November 2012 15 March 2017
5 PWR ACPR-1000 Operational 1000 1086 18 September 2013 12 July 2018[24]
6 PWR ACPR-1000 Operational 1000 1086 23 December 2013 24 July 2019[25]
Zhangzhou 1 PWR Hualong-1 Under construction 1080 1150 16 October 2019[26]
2 PWR Hualong-1 Under construction 1080 1150 2019[19]
3 PWR Hualong-1 Planned 1080 1150
4 PWR Hualong-1 Planned 1080 1150
5 PWR Hualong-1 Planned 1080 1150
6 PWR Hualong-1 Planned 1080 1150

Cuba

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Juragua 1 PWR VVER-440 V-318 Unfinished 440 1983 5 September 1992
2 PWR VVER-440 V-318 Unfinished 440 1985 5 September 1992

Czech Republic

Nuclear power stations in the Czech Republic (view)
 Active plants
 Planned plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Dukovany 1 PWR VVER-440 V-213 Operational 468 500 1 January 1979 3 May 1985
2 PWR VVER-440 V-213 Operational 471 500 1 January 1979 21 March 1986
3 PWR VVER-440 V-213 Operational 468 500 1 March 1979 20 December 1986
4 PWR VVER-440 V-213 Operational 471 500 1 March 1979 19 July 1987
5 PWR ? Planned
Temelín 1 PWR VVER-1000 Operational 1003 1056 1 February 1987 10 June 2002
2 PWR VVER-1000 Operational 1003 1056 1 February 1987 18 April 2003
3 PWR VVER or AP1000 Planned
4 PWR VVER or AP1000 Planned

Egypt

Name Unit
No.
Reactor Status Capacity in MW Construction
start date
Commercial
operation date
Closure
Type Model Net Gross
El Dabaa 1 PWR VVER-1200 Planned 1200 (2020)[27] (2026)
2 PWR VVER-1200 Planned 1200
3 PWR VVER-1200 Planned 1200
4 PWR VVER-1200 Planned 1200

Finland

Nuclear power plants in Finland (view)
 Active plants
 Unfinished plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Hanhikivi 1 PWR VVER-1200/V-491 Planned 1200 (2019)
Loviisa 1 PWR VVER-440/V-213 Operational 496 520 1 May 1971 9 May 1977
2 PWR VVER-440/V-213 Operational 496 520 1 August 1972 5 January 1981
Olkiluoto 1 BWR ASEA-III, BWR-2500 Operational 880 910 1 February 1974 10 October 1979
2 BWR ASEA-III, BWR-2500 Operational 880 910 1 November 1975 10 July 1982
3 PWR EPR Under construction 1600 1720 12 August 2005 (March 2021[28])

France

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Belleville 1 PWR P4 REP 1300 Operational 1310 1363 1 May 1980 1 June 1988
2 PWR P4 REP 1300 Operational 1310 1363 1 August 1980 1 January 1989
Blayais 1 PWR CP1 Operational 910 951 1 January 1977 1 December 1981
2 PWR CP1 Operational 910 951 1 January 1977 1 February 1983
3 PWR CP1 Operational 910 951 1 April 1978 14 November 1983
4 PWR CP1 Operational 910 951 1 April 1978 1 October 1983
Brennilis 1 HWGCR Shut down/in decommissioning 70 75 1 July 1962 1 June 1968 31 July 1985
Bugey 1 GCR UNGG Shut down 540 555 1 December 1965 1 July 1972 27 May 1994
2 PWR CP0 Operational 910 945 1 November 1972 1 March 1979
3 PWR CP0 Operational 910 945 1 September 1973 1 March 1979
4 PWR CP0 Operational 880 917 1 June 1974 1 July 1979
5 PWR CP0 Operational 880 917 1 July 1974 3 January 1980
Cattenom 1 PWR P4 REP 1300 Operational 1300 1362 29 October 1979 1 April 1987
2 PWR P4 REP 1300 Operational 1300 1362 28 July 1980 1 February 1988
3 PWR P4 REP 1300 Operational 1300 1362 15 June 1982 1 February 1991
4 PWR P4 REP 1300 Operational 1300 1362 28 September 1983 1 January 1992
Chinon A-1 GCR UNGG Shut down 70 80 1 February 1957 1 February 1964 16 April 1973
A-2 GCR UNGG Shut down 180 230 1 August 1959 24 February 1965 14 June 1985
A-3 GCR UNGG Shut down 360 480 1 March 1961 4 August 1966 15 June 1990
B-1 PWR CP2 Operational 905 954 1 March 1977 1 February 1984
B-2 PWR CP2 Operational 905 954 1 March 1977 1 August 1984
B-3 PWR CP2 Operational 905 954 1 October 1980 4 March 1987
B-4 PWR CP2 Operational 905 954 1 February 1981 1 April 1988
Chooz A-1 PWR CHOOZ-A Shut down/dismantled 305 320 1 January 1962 15 April 1967 30 October 1991
B-1 PWR N4 REP 1450 Operational 1500 1560 1 January 1984 15 May 2000
B-2 PWR N4 REP 1450 Operational 1500 1560 1 January 1984 15 May 2000
Civaux 1 PWR N4 REP 1450 Operational 1495 1561 15 October 1988 29 January 2002
2 PWR N4 REP 1450 Operational 1495 1561 1 April 1991 23 April 2002
Cruas 1 PWR CP2 Operational 915 956 1 August 1978 2 April 1984
2 PWR CP2 Operational 915 956 15 November 1978 1 April 1985
3 PWR CP2 Operational 915 956 15 April 1979 10 September 1984
4 PWR CP2 Operational 915 956 1 October 1979 11 February 1985
Dampierre 1 PWR CP1 Operational 890 937 1 February 1975 10 September 1980
2 PWR CP1 Operational 890 937 1 April 1975 16 February 1981
3 PWR CP1 Operational 890 937 1 September 1975 27 May 1981
4 PWR CP1 Operational 890 937 1 December 1975 20 November 1981
Fessenheim 1 PWR CP0 Shut down 880 920 1 September 1971 1 January 1978 22 February 2020
2 PWR CP0 Shut down 880 920 1 February 1972 1 April 1978 30 June 2020
Flamanville 1 PWR P4 REP 1300 Operational 1330 1382 1 December 1979 1 December 1986
2 PWR P4 REP 1300 Operational 1330 1382 1 May 1980 9 March 1987
3 PWR EPR Under construction 1600 1650 3 December 2007
Golfech 1 PWR P4 REP 1300 Operational 1310 1363 17 November 1982 1 February 1991
2 PWR P4 REP 1300 Operational 1310 1363 1 October 1984 4 March 1994
Gravelines 1 PWR CP1 Operational 910 951 1 February 1975 25 November 1980
2 PWR CP1 Operational 910 951 1 March 1975 1 December 1980
3 PWR CP1 Operational 910 951 1 December 1975 1 June 1981
4 PWR CP1 Operational 910 951 1 April 1976 1 October 1981
5 PWR CP1 Operational 910 951 1 October 1979 15 January 1985
6 PWR CP1 Operational 910 951 1 October 1979 25 October 1985
Phénix 1 FBR PH-250 Shut down 130 142 1 November 1968 14 July 1974 1 February 2010
Nogent 1 PWR P4 REP 1300 Operational 1310 1363 26 May 1981 24 February 1988
2 PWR P4 REP 1300 Operational 1310 1363 1 January 1982 1 May 1989
Paluel 1 PWR P4 REP 1300 Operational 1330 1382 15 August 1977 1 December 1985
2 PWR P4 REP 1300 Operational 1330 1382 1 January 1978 1 December 1985
3 PWR P4 REP 1300 Operational 1330 1382 1 February 1979 1 February 1986
4 PWR P4 REP 1300 Operational 1330 1382 1 February 1980 1 June 1986
Penly 1 PWR P4 REP 1300 Operational 1330 1382 1 September 1982 1 December 1990
2 PWR P4 REP 1300 Operational 1330 1382 1 August 1984 1 November 1992
Saint-Alban 1 PWR P4 REP 1300 Operational 1335 1381 29 January 1979 1 May 1986
2 PWR P4 REP 1300 Operational 1335 1381 31 July 1979 1 March 1987
Saint-Laurent A-1 GCR UNGG Shut down 390 500 1 October 1963 1 June 1969 18 April 1990
A-2 GCR UNGG Shut down 465 530 1 January 1966 1 November 1971 27 May 1992
B-1 PWR CP2 Operational 915 956 1 May 1976 1 August 1983
B-2 PWR CP2 Operational 915 956 1 July 1976 1 August 1983
Superphénix 1 FBR Na-1200 Shut down/in decommissioning 1200 1242 13 December 1976 1 December 1986 31 December 1998
Tricastin 1 PWR CP1 Operational 915 955 1 November 1974 1 December 1980
2 PWR CP1 Operational 915 955 1 December 1974 1 December 1980
3 PWR CP1 Operational 915 955 1 April 1975 11 May 1981
4 PWR CP1 Operational 915 955 1 May 1975 1 November 1981

Germany

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
AVR 1 HTGR Pebble bed reactor prototype Shut down 13 15 1 August 1961 19 May 1969 31 December 1988
Biblis 1 PWR Type Siemens-KWU Shut downa/in decommissioning 1167 1225 1 January 1970 26 February 1975 6 August 2011
2 PWR KWU Shut downa/in decommissioning 1240 1300 1 February 1972 31 January 1977 6 August 2011
Brokdorf 1 PWR KWU Operational 1410 1480 1 January 1976 22 December 1986 (31 December 2021)
Brunsbüttel 1 BWR BWR-69 Shut downa 771 806 15 April 1970 9 February 1977 6 August 2011
Emsland 1 PWR Konvoi (KWU) Operational 1329 1400 10 August 1982 20 June 1988 (31 December 2022)
Grafenrheinfeld 1 PWR KWU Shut down 1275 1375 1 January 1975 17 June 1982 27 June 2015
Greifswald 1 PWR VVER-440 V-230 Shut down/in decommissioning 408 440 1 March 1970 12 July 1974 14 February 1990
2 PWR VVER V-230 Shut down/in decommissioning 408 440 1 March 1970 16 April 1975 14 February 1990
3 PWR VVER V-230 Shut down/in decommissioning 408 440 1 April 1972 1 May 1978 28 February 1990
4 PWR VVER V-230 Shut down/in decommissioning 408 440 1 April 1972 1 November 1979 22 July 1990
5 PWR VVER V-213 Shut down/in decommissioning 408 440 1 December 1976 1 November 1989 24 November 1989
6 PWR VVER V-213 Finished; never entered service 408 440
Grohnde 1 PWR KWU Operational 1360 1430 1 June 1976 1 February 1985 (31 December 2021)
Grosswelzheim 1 BWR Superheated steam reactor Shut down/dismanteled 25 27 1 January 1965 2 August 1970 20 April 1971
Gundremmingen A BWR GE, BWR-1 Shut down/in decommissioning 237 250 12 December 1962 12 April 1967 13 January 1977
B BWR BWR-72 (KWU) Shut down[29] 1284 1225 20 July 1976 19 July 1984 31 December 2017
3 BWR BWR-72 (KWU) Operational 1288 1344 20 July 1976 18 January 1985 (31 December 2021)
Isar 1 BWR BWR-69 Shut downa 878 912 1 May 1972 21 March 1979 6 August 2011
2 PWR Konvoi (KWU) Operational 1410 1485 15 September 1982 9 April 1988 (31 December 2022)
Kahl 1 BWR BWR Shut down/dismanteled 15 16 1 July 1958 1 February 1962 25 November 1985
SNR-300 1 FBR Finished; never entered service 327 1972 1985
KNK II 1 FBR Shut down 17 21 1 September 1974 3 March 1979 23 August 1991
Krümmel 1 BWR BWR-69 (KWU) Shut downa 1346 1402 5 April 1974 28 March 1984 6 August 2011
Lingen 1 BWR BWR with fossil fuel-fired superheater Shut down 183 268 1 October 1964 1 October 1968 5 January 1977
Mülheim-Kärlich 1 PWR B & W Shut down/in decommissioning 1219 1302 15 January 1975 8 August 1987 9 September 1988
MZFR 1 PHWR Heavy water-cooled pressure vessel reactor Shut down 52 57 1 December 1961 19 December 1966 3 May 1984
Neckarwestheim 1 PWR KWU Shut downa 785 840 1 February 1972 1 December 1976 6 August 2011
2 PWR Konvoi (KWU) Operational 1310 1400 9 November 1982 15 April 1989 (31 December 2022)
Niederaichbach 1 HWGCR Pressure tube reactor Shut down/decommissioned 100 106 1 June 1966 1 January 1973 31 July 1974
Obrigheim 1 PWR Siemens Shut down/in decommissioning 340 357 15 March 1965 31 March 1969 11 May 2005
Philippsburg 1 BWR BWR-69 Shut downa 890 926 1 October 1970 26 March 1980 6 August 2011
2 PWR KWU Shut down[30] 1402 1468 7 July 1977 18 April 1985 31 December 2019
Rheinsberg 1 PWR VVER-70 Shut down/in decommissioning 62 70 1 January 1960 11 October 1966 1 June 1990
Stade 1 PWR Siemens Shut down/in decommissioning 640 672 1 December 1967 19 May 1972 4 November 2003
Stendal 1 PWR VVER-1000/320 Unfinished 1000 1983 1990
2 PWR VVER-1000/320 Unfinished 1000 1983 1990
3 PWR VVER-1000/320 Never built 1000
4 PWR VVER-1000/320 Never built 1000
THTR-300 1 HTGR Pebble bed reactor Shut down 296 308 3 May 1971 1 June 1987 29 September 1988
Unterweser 1 PWR KWU Shut downa/in decommissioning 1345 1410 1 July 1972 6 September 1979 6 August 2011
Würgassen 1 BWR BWR-69 (AEG) Shut down/in decommissioning 640 670 26 January 1968 11 November 1975 26 August 1994
Notes:
^a Post-Fukushima shutdown of eight reactors. On 15 March 2011, the German Government decided to close seven nuclear power plants built before 1980 along with the Krümmel nuclear power plant for a duration of three months.[31] The temporary shutdown was changed into permanent shutdown by the German parliament on 30 June 2012. The remaining nine plants that stayed operational were given new decommissioning dates.[32]

Hungary

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Paks 1 PWR VVER-440 V-213 Operational 470 500 1 August 1974 10 August 1983
2 PWR VVER V-213 Operational 473 500 1 August 1974 14 November 1984
3 PWR VVER V-213 Operational 473 500 1 October 1979 1 December 1986
4 PWR VVER V-213 Operational 471 500 1 October 1979 1 November 1987
5 PWR VVER-1200 Planned 1114 1200 (2023)[citation needed]
6 PWR VVER-1200 Planned 1114 1200 (2025)

The modernization of the four reactors was finally ended at 2009, so the plant's total power generation reached 2000 MWe.

India

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Bhimpur[33] 1 PHWR IPHWR-700 Planned 630 700
2 PHWR IPHWR-700 Planned 630 700
3 PHWR IPHWR-700 Planned 630 700
4 PHWR IPHWR-700 Planned 630 700
Chutka[34] 1 PHWR IPHWR-700 Planned 630 700
2 PHWR IPHWR-700 Planned 630 700
Gorakhpur 1 PHWR IPHWR-700 Under construction 630 700 (2019)[35]
2 PHWR IPHWR-700 Under construction 630 700
3 PHWR IPHWR-700 Planned 630 700
4 PHWR IPHWR-700 Planned 630 700
Jaitapur 1 PWR EPR Planned 1600 1650
2 PWR EPR Planned 1600 1650
3 PWR EPR Planned 1600 1650
4 PWR EPR Planned 1600 1650
5 PWR EPR Planned 1600 1650
6 PWR EPR Planned 1600 1650
Kaiga 1 PHWR IPHWR-220[36] Operational 202 220 1 September 1989 16 November 2000
2 PHWR IPHWR-220[36] Operational 202 220 1 December 1989 16 March 2000
3 PHWR IPHWR-220[36] Operational 202 220 30 March 2002 6 May 2007
4 PHWR IPHWR-220[36] Operational 202 220 10 May 2002 20 January 2011
5 PHWR IPHWR-700 Planned 630 700
6 PHWR IPHWR-700 Planned 630 700
Kakrapar 1 PHWR IPHWR-220[36] Operational 202 220 1 December 1984 6 May 1993
2 PHWR IPHWR-220[36] Operational 202 220 1 April 1985 1 September 1995
3 PHWR IPHWR-700[37] Under construction 630 700 22 November 2010
4 PHWR IPHWR-700[37] Under construction 630 700 22 November 2010
Kovvada 1 PWR AP-1000[38] Planned 1100 1250
2 PWR AP-1000 Planned 1100 1250
3 PWR AP-1000 Planned 1100 1250
4 PWR AP-1000 Planned 1100 1250
5 PWR AP-1000 Planned 1100 1250
6 PWR AP-1000 Planned 1100 1250
Kavali[39] 1 PWR VVER-1000 Planned 917 1000
2 PWR VVER-1000 Planned 917 1000
3 PWR VVER-1000 Planned 917 1000
4 PWR VVER-1000 Planned 917 1000
5 PWR VVER-1000 Planned 917 1000
6 PWR VVER-1000 Planned 917 1000
Kudankulam 1 PWR VVER-1000 Operational 932 1000 31 March 2002 31 December 2014
2 PWR VVER-1000 Operational 932 1000 4 July 2002 31 March 2017
3 PWR VVER-1000 Under construction 917 1000 30 June 2017
4 PWR VVER-1000 Under construction 917 1000 23 October 2017
5 PWR VVER-1000 Planned 917 1000
6 PWR VVER-1000 Planned 917 1000
Madras 1 PHWR IPHWR-220[36] Operational 205 220 1 January 1971 27 January 1984
2 PHWR IPHWR-220[36] Operational 205 220 1 October 1972 21 March 1986
Mahi Banswara 1 PHWR IPHWR-700 Planned 630 700
2 PHWR IPHWR-700 Planned 630 700
3 PHWR IPHWR-700 Planned 630 700
4 PHWR IPHWR-700 Planned 630 700
Narora 1 PHWR IPHWR-220[36] Operational 202 220 1 December 1976 1 January 1991
2 PHWR IPHWR-220[36] Operational 202 220 1 November 1977 1 July 1992
PFBR 1 FBR Prototype Under construction 470 500 23 October 2004
Rajasthan 1 PHWR CANDU/IPHWR-220[36] Shut down 90 100 1 August 1965 16 December 1973 December 2013 [40][41]
2 PHWR CANDU/IPHWR-220[36] Operational 187 200 1 April 1968 1 April 1981
3 PHWR IPHWR-220[36] Operational 202 220 1 February 1990 1 June 2000
4 PHWR IPHWR-220[36] Operational 202 220 1 October 1990 23 December 2000
5 PHWR IPHWR-220[36] Operational 202 220 18 September 2002 4 February 2010
6 PHWR IPHWR-220[36] Operational 202 220 20 January 2003 31 March 2010
7 PHWR IPHWR-700[37] Under construction 630 700 18 July 2011
8 PHWR IPHWR-700[37] Under construction 630 700 30 September 2011
Tarapur 1 BWR BWR-1, Mark 1 Operational 150 160 1 October 1964 28 October 1969
2 BWR BWR-1, Mark 1 Operational 150 160 1 October 1964 28 October 1969
3 PHWR IPHWR-540 Operational 490 540 12 May 2000 18 August 2006
4 PHWR IPHWR-540 Operational 490 540 8 March 2000 12 September 2005

Indonesia

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Muria 1 PWR VVER-1200 Planned 1150 1200 (2022)
2 PWR VVER-1200 Planned 1150 1200 (2022)
3 PWR VVER-1200 Planned 1150 1200 (2022)
4 PWR VVER-1200 Planned 1150 1200 (2022)
Bangka Belitung 1 PWR VVER-1200 Planned 1150 1000 (2030)
2 PWR VVER-1200 Planned 1150 1000 (2030)

Iran

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Bushehr 1 PWR VVER-1000 Operational 915 1000 1 May 1975 23 September 2013
2 PWR VVER-1000 Under construction 915 1057 27 September 2019
3 PWR VVER-1000 Planned 915 1057
4 PWR VVER-1000 Planned 915 1057
5 PWR VVER-1000 Planned 915 1057
Darkhovin 1 PWR Unfinished; restart planned 280 300

Italy

Nuclear power stations in Italy (view)
 Closed plants
 Canceled plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Caorso 1 BWR BWR-4 Mark2 Shut down 860 882 1 January 1970 1 December 1981 1 July 1990
Enrico Fermi 1 PWR WH 4-loop Shut down/in decommissioning 260 270 1 July 1961 1 January 1965 1 July 1990
Garigliano 1 BWR BWR-1 Shut down/in decommissioning 150 160 1 November 1959 1 June 1964 1 March 1982
Latina 1 GCR MAGNOX Shut down/in decommissioning 153 160 1 November 1958 1 January 1964 1 December 1987
Alto Lazio 1 BWR Unfinished 982 1009 1 July 1982 1 January 1988
2 BWR Unfinished 982 1009 1 July 1982 1 July 1988

Japan

Nuclear power plants in Japan (view)
 Active plants
 Inactive plants
 Cancelled plants
 Decommissioned plants
 Planned plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Fugen 1 HWLWR ATR Shut down 148 165 10 May 1972 20 March 1979 29 March 2003
Fukushima Daiichi 1 BWR BWR-3 Inoperable 439 460 25 July 1967 26 March 1971 19 May 2011
2 BWR BWR-4 Inoperable 760 784 9 June 1969 18 July 1974 19 May 2011
3 BWR BWR-4 Inoperable 760 784 28 December 1970 27 March 1976 19 May 2011
4 BWR BWR-4 Shut down/Inoperable 760 784 12 February 1973 12 October 1978 19 May 2011
5 BWR BWR-4 Shut down 760 784 22 May 1972 18 April 1978 17 December 2013
6 BWR BWR-5 Shut down 1067 1100 26 October 1973 24 October 1979 17 December 2013
Fukushima Daini 1 BWR BWR-5 Shut down 1100 16 March 1976 20 April 1982 30 September 2019
2 BWR BWR-5 Shut down 1067 1100 25 May 1979 3 February 1984 30 September 2019
3 BWR BWR-5 Shut down 1067 1100 23 March 1981 21 June 1985 30 September 2019
4 BWR BWR-5 Shut down 1067 1100 28 May 1981 25 August 1987 30 September 2019
Genkai 1 PWR Mitsubishi (2-loop) Shut down 529 559 15 September 1971 15 October 1975 27 April 2015
2 PWR Mitsubishi (2-loop) Shut down 529 559 1 February 1977 30 March 1981 9 April 2019
3 PWR Mitsubishi (4-loop) Operational 1127 1180 1 June 1988 18 March 1994
4 PWR Mitsubishi (4-loop) Operational[42] 1127 1180 15 July 1992 25 July 1997
Hamaoka 1 BWR BWR-4 Shut down 515 540 10 June 1971 17 March 1976 30 January 2009
2 BWR BWR-4 Shut down 806 840 14 June 1974 29 November 1978 30 January 2009
3 BWR BWR-5 Operation suspended
(under review)[43]
1056 1100 18 April 1983 28 August 1987
4 BWR BWR-5 Operation suspended
(under review)[43]
1092 1137 13 October 1989 3 September 1993
5 BWR ABWR Operation suspended 1325 1380 12 July 2000 18 January 2005
Higashidōri 1 BWR BWR-5 Operation suspended
(under review)[43]
1067 1100 7 November 2000 8 December 2005
2 Planned
3 Planned
4 Planned
Ikata 1 PWR Mitsubishi (2-loop) Shut down 538 566 1 September 1973 30 September 1977 25 March 2016
2 PWR Mitsubishi (2-loop) Shut down 538 566 1 August 1978 19 March 1982 27 March 2018
3 PWR Mitsubishi (3-loop) Operational 846 890 1 October 1990 15 December 1994
Kashiwazaki-Kariwa 1 BWR BWR-5 Operation suspended 1067 1100 5 June 1980 18 September 1985
2 BWR BWR-5 Operation suspended 1067 1100 18 November 1985 28 September 1990
3 BWR BWR-5 Operation suspended 1067 1100 7 March 1989 11 August 1993
4 BWR BWR-5 Operation suspended 1067 1100 5 March 1990 11 August 1994
5 BWR BWR-5 Operation suspended 1067 1100 20 June 1985 10 April 1990
6 BWR ABWR Operation suspended
(restart approved)[44]
1315 1356 3 November 1992 7 November 1996
7 BWR ABWR Operation suspended
(restart approved)[44]
1315 1356 1 July 1993 2 July 1997
Mihama 1 PWR Mitsubishi (2-loop) Shut down 320 340 1 February 1967 28 November 1970 March 2015
2 PWR Misubishi (2-loop) Shut down 470 500 29 May 1968 25 July 1972 March 2015
3 PWR Mitsubishi (3-loop) Operation suspended
(restart approved)[44]
780 826 7 August 1972 1 December 1976
Monju 1 FBR - Shut down 246 280 10 May 1986 29 August 1995 8 December 1995
5 December 2017
Ōi 1 PWR W (4-loop) Shut down 1120 1175 26 October 1972 27 March 1979 December 2017
2 PWR Westinghouse (4-loop) Shut down 1120 1175 8 December 1972 5 December 1979 December 2017
3 PWR Mitsubishi (4-loop) Operational 1127 1180 3 October 1987 18 December 1991
4 PWR Mitsubishi (4-loop) Operational[45] 1127 1180 13 June 1988 2 February 1993
Ōma 1 BWR ABWR Under construction 1325 1383 7 May 2010
Onagawa 1 BWR BWR-4 Shut down 498 524 8 July 1980 1 June 1984 21 December 2018
2 BWR BWR-5 Operation suspended
(restart approved)[46]
796 825 12 April 1991 28 July 1995
3 BWR BWR-5 Operation suspended 796 825 23 January 1998 30 January 2002
Sendai 1 PWR M (3-loop) Operational 846 890 15 December 1979 4 July 1984
2 PWR Mitsubishi (3-loop) Operational 846 890 12 October 1981 28 November 1985
Shika 1 BWR BWR-5 Operation suspended 505 530 1 July 1989 30 July 1993
2 BWR ABWR Operation suspended
(under review)[43]
1108 1150 20 August 2001 15 March 2006
Shimane 1 BWR BWR-3 Shut down 439 460 2 July 1970 29 March 1974 March 2015
2 BWR BWR-5 Operation suspended
(under review)[43]
789 820 2 February 1985 10 February 1989
3 BWR ABWR Under construction 1325 1373 12 October 2007
Takahama 1 PWR Mitsubishi (3-loop) Operation suspended
(restart approved)[44]
780 826 25 April 1970 14 November 1974
2 PWR Mitsubishi (3-loop) Operation suspended
(restart approved)[44]
780 826 9 March 1971 14 November 1975
3 PWR Mitsubishi (3-loop) Operational 830 870 12 December 1980 17 January 1985
4 PWR Mitsubishi (3-loop) Operational 830 870 19 March 1981 5 June 1985
Tōkai 1 GCR MAGNOX Shut down 137 166 1 March 1961 25 July 1966 31 March 1998
2 BWR BWR-5 Operation suspended
(restart approved)[47]
1060 1100 3 October 1973 28 November 1978
Tomari 1 PWR Mitsubishi (2-loop) Operation suspended
(under review)[43]
550 579 18 April 1985 22 June 1989
2 PWR Mitsubishi (2-loop) Operation suspended
(under review)[43]
550 579 13 June 1985 12 April 1991
3 PWR Mitsubishi (3-loop) Operation suspended
(under review)[43]
866 912 18 November 2004 22 December 2009
Tsuruga 1 BWR BWR-2 Shut down 340 357 24 November 1966 14 March 1970 March 2015
2 PWR Mitsubishi (4-loop) Operation suspended
(under review)[43]
1108 1160 6 November 1982 17 February 1987

Kazakhstan

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Aktau 1 SFR BN-350 Shut down 135 1964 1973 1999
Kurchatov 1 FBR VBER-300 Planned
2 FBR VBER-300 Planned

Lithuania

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Ignalina 1 LWGR RBMK-1500 Shut down/in decommissioning 1185 1300 1 May 1977 1 May 1985 31 December 2004
2 LWGR RBMK-1500 Shut down/in decommissioning 1185 1300 1 January 1978 1 December 1987 31 December 2009
3 LWGR RBMK-1500 Unfinished 1185 1300
4 LWGR RBMK-1500 Never built 1185 1300
Visaginas 1 BWR ABWR Canceled
2 BWR ABWR Canceled

Mexico

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Laguna Verde 1 BWR BWR-5 Operational 665 700 1 October 1976 29 July 1990
2 BWR BWR-5 Operational 665 700 1 June 1977 10 April 1995

Netherlands

Nuclear power plants in the Netherlands(view)
 Active plants
 Closed plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Borssele 1 PWR KWU - PWR Operational 482 515 1 July 1969 26 October 1973 (26 October 2033)
Dodewaard 1 BWR BWR-2 Shut down 55 60 1 May 1965 26 March 1969 26 March 1997

North Korea

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Yongbyon 1 GCR Magnox (Pu-production) Shut down[citation needed] 5[citation needed] 1994
2 LWR[48] Under construction[48] 30
Taechon 1 Unfinished 200 1994
Kumho 1 PWR Unfinished 1,000 2003
2 PWR Unfinished 1,000 2003

Pakistan

Template:Pakistan nuke plant map

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Chashma 1 PWR CNP-300 Operational 300 325 1 August 1993 15 September 2000
2 PWR CNP-300 Operational 300 325 28 December 2005 18 May 2011
3 PWR CNP-300 Operational 315 340 28 May 2011 15 October 2016
4 PWR CNP-300 Operational 315 340 18 December 2011 1 July 2017
5 PWR Hualong-1 Planned 1080 1150
Karachi 1 PHWR CANDU-137 MW Operational 90 100 1 August 1966 7 December 1972
2 PWR Hualong-1 Under construction 1080 1150 23 May 2013 (2020)
3 PWR Hualong-1 Under construction 1080 1150 21 August 2015 (2021)

Philippines

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Bataan 1 PWR Westinghouse Finished; never entered service 621 1976 1986

Poland

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Żarnowiec 1 PWR VVER-440 Unfinished 440 31 March 1982 4 September 1990
2 PWR VVER-440 Unfinished 440 31 March 1982 4 September 1990
3 PWR VVER-440 Never built 440 4 September 1990
4 PWR VVER-440 Never built 440 4 September 1990
Choczewo 1 ? ? Planned 1500
2 ? ? Planned 1500
Site in the east 1 ? ? Planned 1500
2 ? ? Planned 1500

Romania

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Cernavodă 1 PHWR CANDU-6 Operational 650 706 1 July 1982 2 December 1996
2 PHWR CANDU-6 Operational 650 705 1 July 1983 31 October 2007
3 PHWR CANDU-6 Unfinished; restart planned 650 705
4 PHWR CANDU-6 Unfinished; restart planned 650 705
5 PHWR CANDU-6 Unfinished 650 705

Russia

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Akademik Lomonosov 1 PWR KLT-40S Operational 32 35 15 April 2007 19 December 2019 [49]
2 PWR KLT-40S Operational 32 35 15 April 2007 19 December 2019
Balakovo 1 PWR VVER-1000 Operational 950 1000 1 December 1980 23 May 1986
2 PWR VVER-1000 Operational 950 1000 1 August 1981 18 January 1988
3 PWR VVER-1000 Operational 950 1000 1 November 1982 8 April 1989
4 PWR VVER-1000 Operational 950 1000 1 April 1984 22 December 1993
5 PWR VVER V-320 Unfinished 950 1000 28 December 1992
6 PWR VVER V-320 Unfinished 950 1000 28 December 1992
Bashkir 1 PWR VVER-1000 Unfinished 1000 1980 1991
2 PWR VVER-1000 Unfinished 1000 1980 1991
3 PWR VVER-1000 Unfinished 1000 1980 1991
4 PWR VVER-1000 Unfinished 1000 1980 1991
Beloyarsk 1 LWGR AMB-100 Shut down 102 108 1 June 1958 26 April 1964 1 January 1983
2 LWGR AMB-200 Shut down 146 160 1 January 1962 1 December 1969 1 January 1990
3 SFR BN-600 Operational 560 600 1 January 1969 1 November 1981
4 SFR BN-800 Operational 789 864 18 July 2006 10 December 2015
5 SFR BN-1200 Planned 1100 1220
6 SFR BN-1600 Planned 1500 1600
Bilibino 1 LWGR EGP-6 Shut down 11 12 1 January 1970 1 April 1974 14 January 2019
2 LWGR EGP-6 Operational 11 12 1 January 1970 1 February 1975
3 LWGR EGP-6 Operational 11 12 1 January 1970 1 February 1976
4 LWGR EGP-6 Operational 11 12 1 January 1970 1 January 1977
Dimitrovgrad 1 FBR SVBR-100 Planned 90 100
Gorky 1 PWR AST-500 Unfinished 500 1982 1993
2 PWR AST-500 Unfinished 500 1982 1993
Kalinin 1 PWR VVER-1000 Operational 950 1000 1 February 1977 12 June 1985
2 PWR VVER-1000 Operational 950 1000 1 February 1982 3 March 1987
3 PWR VVER-1000 Operational 950 1000 1 October 1985 8 November 2005
4 PWR VVER-1000 Operational 950 1000 1 August 1986 25 December 2012
Kaliningrad 1 PWR VVER-1200 Under construction
(suspended)[50]
1109 1194 22 February 2012
2 PWR VVER-1200 Planned 1109 1194
Kola 1 PWR VVER-440 V-230 Operational 441 440 1 May 1970 28 December 1973
2 PWR VVER-440 V-230 Operational 441 440 1 May 1970 21 February 1975
3 PWR VVER-440 V-213 Operational 441 440 1 April 1977 3 December 1982
4 PWR VVER-440 V-213 Operational 441 440 1 August 1976 6 December 1984
Kola II[50] 1 PWR AES-2006 Planned 1300 1350
2 PWR AES-2006 Planned 1300 1350
Kostroma[50] 1 PWR AES-2006 Unfinished; restart planned 1300 1350 1979 1990
2 PWR AES-2006 Unfinished; restart planned 1300 1350 1979 1990
3 PWR AES-2006 Unfinished; restart planned 1300 1350 1979 1990
4 PWR AES-2006 Unfinished; restart planned 1300 1350 1979 1990
Kursk 1 LWGR RBMK-1000 Operational 925 1000 1 June 1972 12 October 1977
2 LWGR RBMK-1000 Operational 925 1000 1 January 1973 17 August 1979
3 LWGR RBMK-1000 Operational 925 1000 1 April 1978 30 March 1984
4 LWGR RBMK-1000 Operational 925 1000 1 May 1981 5 February 1986
5 LWGR MKER (1000 MW) Unfinished 925 1000 1 December 1985 2012
6 LWGR RBMK-1000 Unfinished 925 1000 1 August 1986
Kursk II 1 PWR VVER-TOI Under construction 1115 1255 29 April 2018
2 PWR VVER-TOI Under construction 1115 1255 15 April 2019[51]
3 PWR VVER-TOI Planned 1115 1255
4 PWR VVER-TOI Planned 1115 1255
Leningrad 1 LWGR RBMK-1000 Shut down 925 1000 1 March 1970 1 November 1974 21 December 2018[52]
2 LWGR RBMK-1000 Operational 925 1000 1 June 1970 11 February 1976
3 LWGR RBMK-1000 Operational 925 1000 1 December 1973 29 June 1980
4 LWGR RBMK-1000 Operational 925 1000 1 February 1975 29 August 1981
Leningrad II 1 PWR VVER-1200 Operational 1085 1187 25 October 2008 29 October 2018[53]
2 PWR VVER-1200 Under construction 1085 1199 15 April 2010 (2021)
3 PWR VVER-1200 [54] Planned 1085 1170
4 PWR VVER-1200 [54] Planned 1085 1170
Nizhny Novgorod 1 PWR AES-2006 Planned 1300 1350
2 PWR AES-2006 Planned 1300 1350
3 PWR AES-2006 Planned 1300 1350
4 PWR AES-2006 Planned 1300 1350
Novovoronezh 1 PWR VVER-440 V-120 Shut down 197 210 1 July 1957 31 December 1964 16 February 1988
2 PWR VVER-440 V-120 Shut down 336 365 1 June 1964 14 April 1970 29 August 1990
3 PWR VVER-440 V-179 Shut down 385 417 1 July 1967 29 June 1972 25 December 2016
4 PWR VVER 440 V-179 Operational 385 417 1 July 1967 24 March 1973
5 PWR VVER-1000 Operational 950 1000 1 March 1974 20 February 1981
Novovoronezh II 1 PWR VVER-1200 Operational 1114 1180 24 June 2008 27 February 2017
2 PWR VVER-1200 Operational 1114 1195 12 July 2009 6 November 2019
3 PWR VVER-1200 Planned 1175 1255
4 PWR VVER-1200 Planned 1175 1255
Obninsk 1 LWGR AM-1 Shut down 5 6 1 January 1951 1 December 1954 29 April 2002
Rostov 1 PWR VVER-1000 Operational 950 1000 1 September 1981 25 December 2001
2 PWR VVER-1000 Operational 950 1000 1 May 1983 10 December 2010
3 PWR VVER-1000 Operational 950 1000 15 September 2009 27 December 2014
4 PWR VVER-1000 Operational 1011 1030 16 June 2010 28 September 2018
Sakha 1 PWR RITM-200M Planned 45 50
2 PWR RITM-200M Planned 45 50
Seversk 1 FBR BREST-300 Planned 280 300
South Urals 1 FBR BN-1200 Unfinished; restart planned 1100 1220 1982 1993
2 FBR BN-1200 Unfinished; restart planned 1100 1220 1982 1993
3 FBR BN-1200 Unfinished; restart planned 1100 1220 1982 1993
Smolensk 1 LWGR RBMK-1000 Operational 925 1000 1 October 1975 30 September 1983
2 LWGR RBMK-1000 Operational 925 1000 1 June 1976 2 July 1985
3 LWGR RBMK-1000 Operational 925 1000 1 May 1984 12 October 1990
4 LWGR RBMK-1000 Unfinished 925 1000
5 LWGR RBMK-1000 Unfinished 925 1000
6 LWGR RBMK-1000 Unfinished 925 1000
Smolensk II 1 PWR VVER-TOI[54] Planned 1300 1350
2 PWR VVER-TOI Planned 1300 1350
3 PWR VVER-TOI Planned 1300 1350
4 PWR VVER-TOI Planned 1300 1350
Tatar 1 PWR AES-2006 Unfinished; restart planned 1300 1350 1980 1990
2 PWR AES-2006 Unfinished; restart planned 1300 1350 1980 1990
3 PWR Unfinished 1980 1990
4 PWR Unfinished 1980 1990
Voronezh 1 PWR AST-500 Unfinished 500 9 January 1983 5 July 1990
2 PWR AST-500 Unfinished 500 9 January 1983 5 July 1990

Slovakia

Nuclear power stations in Slovakia (view)
 Active plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Bohunice A-1[55] HWGCR KS 150 Shut down/decommissioned 93 143 1 August 1958 25 December 1972 22 February 1977
1[56] PWR VVER-440 V-230 Shut down 408 440 24 April 1972 1 April 1980 31 December 2006
2 PWR VVER-440 V-230 Shut down 408 440 24 April 1972 1 January 1981 31 December 2008
3 PWR VVER-440 V-213 Operational 472 505 1 December 1976 14 February 1985 2045
4 PWR VVER-440 V-213 Operational 471 505 1 December 1976 18 December 1985 2045
Kecerovce 1 ? ? Planned 1200
Mochovce 1 PWR VVER-440 V-213 Operational 436 470 13 October 1983 29 October 1998 2058
2 PWR VVER-440 V-213 Operational 436 470 13 October 1983 11 April 2000 2060
3 PWR VVER-440 V-213+ Under construction 440 471 27 January 1987, restarted in 2009
4 PWR VVER-440 V-213+ Under construction 440 471 27 January 1987, restarted in 2009

Slovenia

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Krško 1 PWR Westinghouse (WH) 212 Operational 688 727 30 March 1975 1 January 1983 2043
2 PWR WH AP-1000, APR-1400 or EPR Planned 1400 2027[57]

South Africa

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Koeberg 1 PWR CP-1 (France) Operational 930 970 1 July 1976 21 July 1984
2 PWR CP-1 (France) Operational 930 970 1 July 1976 9 November 1985
Thyspunt
or
Duynefontein
1 PWR AES 2006 or CAP1400 Planned 1300 1350
2 PWR AES 2006 or CAP1400 Planned 1300 1350
3 PWR AES 2006 or CAP1400 Planned 1300 1350
4 PWR AES 2006 or CAP1400 Planned 1300 1350
5 PWR AES 2006 or CAP1400 Planned 1300 1350
6 PWR AES 2006 or CAP1400 Planned 1300 1350
7 PWR AES 2006 or CAP1400 Planned 1300 1350
8 PWR AES 2006 or CAP1400 Planned 1300 1350

South Korea

Nuclear plants in South Korea (view)
  •  Active plants
  •  Plants under construction
  •  Cancelled plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Hanbit 1 PWR Westinghouse F Operational 960 996 4 June 1981 25 August 1986
2 PWR WH F Operational 958 993 10 December 1981 10 June 1987
3 PWR OPR-1000 Operational 997 1050 23 December 1989 31 March 1995
4 PWR OPR-1000 Operational 997 1049 26 May 1990 1 January 1996
5 PWR OPR-1000 Operational 997 1053 29 June 1997 21 May 2002
6 PWR OPR-1000 Operational 995 1052 20 November 1997 24 December 2002
Hanul 1 PWR France CPI Operational 960 1003 26 January 1983 10 September 1988
2 PWR France CPI Operational 962 1008 5 July 1983 30 September 1989
3 PWR OPR-1000 Operational 994 1050 21 July 1993 11 August 1998
4 PWR OPR-1000 Operational 998 1053 1 November 1993 31 December 1999
5 PWR OPR-1000 Operational 996 1051 1 October 1999 29 July 2004
6 PWR OPR-1000 Operational 996 1051 29 September 2000 22 April 2005
Shin-Hanul 1 PWR APR-1400 Under construction 1340 1400 10 July 2012
2 PWR APR-1400 Under construction 1340 1400 19 July 2012
Kori 1 PWR WH 60 Shut down 576 608 27 April 1972 29 April 1978 18 June 2017
2 PWR WH F Operational 640 681 4 December 1977 25 July 1983
3 PWR WH F Operational 1011 1044 1 October 1979 30 September 1985
4 PWR WH F Operational 1012 1044 1 April 1980 29 April 1986
Shin-Kori 1 PWR OPR-1000 Operational 996 1046 16 June 2006 28 February 2011
2 PWR OPR-1000 Operational 996 1047 5 June 2007 20 July 2012
3 PWR APR-1400 Operational 1416 1486 16 October 2008 15 January 2016
4 PWR APR-1400 Operational 1418 1455 19 August 2009 29 August 2019 [58]
5 PWR APR-1400 Under construction 1340 1400 1 April 2017
6 PWR APR-1400 Under construction 1340 1400 20 September 2018
Wolsong 1 PHWR CANDU-6 Shut down 657 687 30 October 1977 22 April 1983 24 December 2019
2 PHWR CANDU-6 Operational 655 678 22 June 1992 1 July 1997
3 PHWR CANDU-6 Operational 684 698 17 March 1994 1 July 1998
4 PHWR CANDU-6 Operational 688 703 22 July 1994 1 October 1999
Shin-Wolsong 1 PWR OPR-1000 Operational 991 1043 20 November 2007 31 July 2012
2 PWR OPR-1000 Operational 960 1000 23 September 2008 26 February 2015

Spain

Nuclear power plants in Spain (view)
 Active plants
 Closed plants
 Unfinished plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Almaraz 1 PWR Westinghouse 3 loops Operational 1011 1049 3 July 1973 1 September 1983
2 PWR WH 3 loops Operational 1006 1044 3 July 1973 1 July 1984
Ascó 1 PWR WH 3 loops Operational 995 1033 16 May 1974 10 December 1984
2 PWR WH-3 loops Operational 997 1035 7 March 1975 31 March 1986
Cofrentes 1 BWR BWR-6 Operational 1064 1102 9 September 1975 11 March 1985
José Cabrera 1 PWR WH 1 loop Shut down/in decommissioning 141 150 24 June 1964 13 August 1969 30 April 2006
Lemoniz 1 PWR Unfinished 1000 1972 1984
2 PWR Unfinished 1000 1972 1984
Santa María de Garoña 1 BWR BWR-3 Shut down/in decommissioning 446 466 11 May 1971 15 February 1975 6 July 2013
Trillo 1 PWR KWU 3 loops Operational 1003 1066 17 August 1979 6 August 1988
Valdecaballeros 1 BWR Unfinished 975 1975 1984
2 BWR Unfinished 975 1975 1984
Vandellòs 1 GCR Shut down/in decommissioning 480 500 1967 2 August 1972 31 July 1990
2 PWR WH 3 loops Operational 1045 1087 29 December 1980 8 March 1988

Sweden

Nuclear power plants in Sweden (view)
 Active plants
 Closed plants
 Unfinished plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Ågesta 1 PHWR R3 Shut down/dismanteled 10 12 1 December 1957 1 May 1964 2 June 1974
Barsebäck 1 BWR ASEA-II Shut down/in decommissioning 600 615 1 February 1971 1 July 1975 30 November 1999
2 BWR ASEA-II Shut down/in decommissioning 600 615 1 January 1973 1 July 1977 31 May 2005
Forsmark 1 BWR ASEA-III, BWR-2500 Operational 986 1022 1 June 1973 10 December 1980
2 BWR ASEA-III, BWR-2500 Operational 1116 1156 1 January 1975 7 July 1981
3 BWR ASEA-IV, BWR-3000 Operational 1167 1203 1 January 1979 18 August 1985
Oskarshamn 1 BWR ASEA-I Shut down/in decommissioning 473 492 1 August 1966 6 February 1972 19 June 2017
2 BWR ASEA-II Shut down/in decommissioning 638 661 1 September 1969 1 January 1975 22 December 2016
3 BWR ASEA-III, BWR-3000 Operational 1400 1450 1 May 1980 15 August 1985
R4 1 Unfinished 130
Ringhals 1 BWR ASEA-I Operational 881 910 1 February 1969 1 January 1976 (2020)
2 PWR WH 3-loops Shut down 904 963 1 October 1970 1 May 1975 30 December 2019
3 PWR WH 3-loops Operational 1062 1117 1 September 1972 9 September 1981
4 PWR WH 3-loops Operational 1104 1171 1 November 1973 21 November 1983

Switzerland

Switzerland nuclear power plants (view)
 Active plants
 Closed plants
Name Unit
No.
Reactor Status Capacity in MW Construction
Start Date
Commercial
Operation Date
Closure[59]
Type Model Net Gross
Beznau 1 PWR WH 2-loops Operational 365 380 1 September 1965 1 September 1969 2029
2 PWR WH 2-loops Operational 365 380 1 January 1968 1 December 1971 2031
Gösgen 1 PWR KWU 3-loops Operational 1010 1060 1 December 1973 1 November 1979 not defined
Leibstadt 1 BWR BWR-6 Operational 1220 1275 1 January 1974 15 December 1984 not defined
Lucens 1 HWGCR HWGCR Shut down/dismantled 6 7 1 April 1962 29 December 1966 21 January 1969
Mühleberg 1 BWR BWR-4 Shut down/in decommissioning 373 390 1 March 1967 6 November 1972 20 December 2019

Taiwan

Nuclear power plants in Taiwan (view)
 Active plants
 Closed plants
 Unfinished plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Jinshan 1 BWR BWR-4 Shut down 604 636 2 June 1972 10 December 1978 3 October 2018
2 BWR BWR-4 Shut down 604 636 7 December 1973 15 July 1979 3 October 2018
Kuosheng 1 BWR BWR-6 Operational 985 1,020 19 November 1975 28 December 1981
2 BWR BWR-6 Operational 985 1,020 15 March 1976 16 March 1983
Lungmen 1 BWR ABWR Unfinished[60] 1,300 1,350 31 March 1999
2 BWR ABWR Unfinished 1,300 1,350 30 August 1999
Maanshan 1 PWR WH 312 3-loop Operational 926 951 21 August 1978 27 July 1984
2 PWR WH 312 3-loop Operational 928 951 21 February 1979 18 May 1985

Turkey

Nuclear power stations in Turkey (view)
 Under construction
 Proposed
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Akkuyu 1 PWR VVER-1200 V-509 Under construction 1114 1200 3 April 2018 (2023)
2 PWR VVER-1200 V-513 Under construction 1114 1200 26 June 2020 (2024)
3 PWR VVER-1200 V-513 Planned 1114 1200 2020 (2025)
4 PWR VVER-1200 V-513 Planned 1114 1200 2021 (2026)
Sinop 1 PWR Atmea-1 Planned 1100 1150 (2020) (2025)
2 PWR Atmea-1 Planned 1100 1150 (2021) (2026)
3 PWR Atmea-1 Planned 1100 1150 (2022) (2027)
4 PWR Atmea-1 Planned 1100 1150 (2023) (2028)
İğneada 1 PWR AP1000 Planned 1000 1050
2 PWR AP1000 Planned 1000 1050
3 PWR CAP1400 Planned 1400 1500
4 PWR CAP1400 Planned 1400 1500

Ukraine

Nuclear power plants in Ukraine (view)

 Active plants
 Unfinished plants
 Destroyed plants
 Cancelled plants

 Future plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Chernobyl 1 LWGR RBMK Shut down/in decommissioning 740 636 1 March 1970 27 May 1978 30 November 1996
2 LWGR RBMK Shut down/in decommissioning 925 1000 1 February 1973 28 May 1979 11 October 1991
3 LWGR RBMK Shut down/in decommissioning 925 1000 1 March 1976 8 June 1982 15 December 2000
4 LWGR RBMK Destroyed 925 1000 1 April 1979 26 March 1984 26 April 1986
5 LWGR RBMK Unfinished 925 1000
6 LWGR RBMK Unfinished 925 1000
Chyhyryn 1 PWR VVER-1000 Unfinished 1000 1977 19 May 1989
2 PWR VVER-1000 Unfinished 1000 1977 19 May 1989
3 PWR VVER-1000 Unfinished 1000 1977 19 May 1989
4 PWR VVER-1000 Unfinished 1000 1977 19 May 1989
Crimean 1 PWR VVER-1000 Unfinished 1000 26 January 1984 1987
2 PWR VVER-1000 Unfinished 1000 26 January 1984 1987
3 PWR VVER-1000 Never built 1000
4 PWR VVER-1000 Never built 1000
Kharkiv 1 PWR VVER-1000 Unfinished 900 940 1988 1990
2 PWR VVER-1000 Unfinished 900 940 1988 1990
3 PWR VVER-1000 Never built 900 940
4 PWR VVER-1000 Never built 900 940
Khmelnytskyi 1 PWR VVER-1000 Operational 950 1000 1 November 1981 13 August 1988
2 PWR VVER-1000 Operational 950 1000 1 February 1985 15 December 2005
3 PWR VVER-1000 Under construction 950 1000 1 March 1986 (2018)
4 PWR VVER-1000 Under construction 950 1000 1 February 1987 (2020)
5 PWR VVER V-320 Never built 1000
6 PWR VVER V-320 Never built 1000
Odessa 1 PWR VVER-1000 Unfinished 900 940 1989
2 PWR VVER-1000 Unfinished 900 940 1989
Rivne 1 PWR VVER-440 V-213 Operational 381 420 1 August 1973 22 September 1981
2 PWR VVER-440 V-213 Operational 376 415 1 October 1973 29 July 1982
3 PWR VVER-1000 Operational 950 1000 1 February 1980 16 May 1987
4 PWR VVER-1000 Operational 950 1000 1 August 1986 6 April 2006
5 PWR VVER-1000 Never built 1000
6 PWR VVER-1000 Never built 1000
South Ukraine 1 PWR VVER-1000 Operational 950 1000 1 August 1976 2 December 1983
2 PWR VVER-1000 Operational 950 1000 1 July 1981 6 April 1985
3 PWR VVER-1000 Operational 950 1000 1 November 1984 29 December 1989
4 PWR VVER-1000 Unfinished 950 1000
Zaporizhia 1 PWR VVER-1000 Operational 950 1000 1 April 1980 25 December 1985
2 PWR VVER-1000 Operational 950 1000 1 January 1981 15 February 1986
3 PWR VVER-1000 Operational 950 1000 1 April 1982 5 March 1987
4 PWR VVER-1000 Operational 950 1000 1 April 1983 14 April 1988
5 PWR VVER-1000 Operational 950 1000 1 November 1985 27 October 1989
6 PWR VVER-1000 Operational 950 1000 1 June 1986 17 September 1996

United Arab Emirates

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Barakah 1 PWR APR-1400 Under construction 1345 1400 19 July 2012 (2020)
2 PWR APR-1400 Under construction 1345 1400 16 April 2013 (2020)
3 PWR APR-1400 Under construction 1345 1400 24 September 2014 (2020)
4 PWR APR-1400 Under construction 1345 1400 30 July 2015 (2021)

United Kingdom

Nuclear power plants in United Kingdom (view)
 Active plants
 Cancelled plants
 Closed plants
 Under construction
 Planned plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Berkeley 1 GCR Magnox Shut down 138 166 1 January 1957 12 June 1962 31 March 1989
2 GCR Magnox Shut down 138 166 1 January 1957 20 October 1962 26 October 1988
Bradwell 1 GCR Magnox Shut down 123 146 1 January 1957 1 July 1962 31 March 2002
2 GCR Magnox Shut down 123 146 1 January 1957 12 November 1962 30 March 2002
Bradwell B 1 PWR Hualong-1 Planned 1117 1250
2 PWR Hualong-1 Planned 1117 1250
Calder Hall 1 GCR Magnox Shut down 49 60 1 August 1953 1 October 1956 31 March 2003
2 GCR Magnox Shut down 49 60 1 August 1953 1 February 1957 31 March 2003
3 GCR Magnox Shut down 49 60 1 August 1955 1 May 1958 31 March 2003
4 GCR Magnox Shut down 49 60 1 August 1955 1 April 1959 31 March 2003
Chapelcross 1 GCR Magnox Shut down 48 60 1 October 1955 1 March 1959 29 June 2004
2 GCR Magnox Shut down 48 60 1 October 1955 1 August 1959 29 June 2004
3 GCR Magnox Shut down 48 60 1 October 1955 1 December 1999 29 June 2004
4 GCR Magnox Shut down 48 60 1 October 1955 1 March 1960 29 June 2004
Dounreay[61] 1 SFR DFR Shut down 11 15 1 March 1955 1 October 1962 1 March 1977
2 SFR PFR Shut down 234 250 1 January 1966 1 July 1976 31 March 1994
Dungeness A-1 GCR Magnox Shut down 225 230 1 July 1960 28 October 1965 31 December 2006
A-2 GCR Magnox Shut down 225 230 1 July 1960 30 December 1965 31 December 2006
B-1 GCR AGR Operational 520 615 1 October 1965 1 April 1985 (2028)
B-2 GCR AGR Operational 520 615 1 October 1965 1 April 1989 (2028)
Hartlepool 1 GCR AGR Operational 595 655 1 October 1968 1 April 1989 (2024)
2 GCR AGR Operational 585 655 1 October 1968 1 April 1989 (2024)
Heysham A-1 GCR AGR Operational 585 625 1 December 1970 1 April 1989 (2024)
A-2 GCR AGR Operational 575 625 1 December 1970 1 April 1989 (2024)
B-1 GCR AGR Operational 610 680 1 August 1980 1 April 1989 (2030)
B-2 GCR AGR Operational 610 680 1 August 1980 1 April 1989 (2030)
Hinkley Point A 1 GCR Magnox Shut down 235 267 1 November 1957 30 March 1965 23 May 2000
2 GCR Magnox Shut down 235 267 1 November 1957 5 May 1965 23 May 2000
Hinkley Point B 1 GCR AGR Operational 435 655 1 September 1967 2 October 1978 (2023)
2 GCR AGR Operational 435 655 1 September 1967 27 September 1976 (2023)
Hinkley Point C 1 PWR EPR Under construction 1600 1630 11 December 2018
2 PWR EPR Under construction 1600 1630 12 December 2019
Hunterston A 1 GCR Magnox Shut down 150 173 1 October 1957 5 February 1964 30 March 1990
2 GCR Magnox Shut down 150 173 1 October 1957 1 July 1964 31 December 1989
Hunterston B 1 GCR AGR Operational 460 644 1 November 1967 6 February 1976 (2023)
2 GCR AGR Operational 460 644 1 November 1967 31 March 1977 (2023)
Moorside[62] 1 PWR AP1000 Cancelled 1000 1135
2 PWR AP1000 Cancelled 1000 1135
3 PWR AP1000 Cancelled 1000 1135
Moorside 1 PWR EPR Planned 1600 1630
2 PWR EPR Planned 1600 1630
Oldbury 1 GCR Magnox Shut down 217 230 1 May 1962 31 December 1967 29 February 2012
2 GCR Magnox Shut down 217 230 1 May 1962 30 September 1968 30 June 2011
Oldbury B 1 BWR ABWR Planned 1300 1380
2 BWR ABWR Planned 1300 1380
Sizewell A 1 GCR Magnox Shut down 210 245 1 April 1961 25 March 1966 31 December 2006
2 GCR Magnox Shut down 210 245 1 April 1961 15 September 1966 31 December 2006
Sizewell B 1 PWR WH SNUPPS Operational 1191 1250 18 July 1988 22 September 1995 (2035)
Sizewell C 1 PWR EPR Planned 1600 1630
2 PWR EPR Planned 1600 1630
Torness 1 GCR AGR Operational 595 682 1 August 1980 25 May 1988 (2030)
2 GCR AGR Operational 595 682 1 August 1980 3 February 1989 (2030)
Trawsfynydd 1 GCR Magnox Shut down 195 235 1 July 1959 24 March 1965 6 February 1991
2 GCR Magnox Shut down 195 235 1 July 1959 24 March 1965 4 February 1991
Winfrith[63] 1 SGHWR SGHWR Shut down 92 100 1 May 1963 1 January 1968 11 September 1990
Wylfa 1 GCR Magnox Shut down 490 530 1 September 1963 1 November 1971 30 December 2015
2 GCR Magnox Shut down 490 540 1 September 1963 3 January 1972 25 April 2012
Wylfa Newydd 1 BWR ABWR Planned 1300 1380
2 BWR ABWR Planned 1300 1380

United States

Name Unit Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
Arkansas Nuclear One 1 PWR B & W (DRY-Cont.) Operational 846 1 October 1968 21 May 1974
2 PWR CE (DRY) Operational 930 6 December 1968 1 September 1978
Beaver Valley 1 PWR WH 3-loop (DRY) Operational 970 26 June 1970 2 July 1976
2 PWR WH 3-loop (DRY) Operational 920 3 May 1974 14 August 1987
Bellefonte 1 Unfinished 1,100 1975
2 Unfinished 1,100 1975
Big Rock Point[64] 1 BWR BWR-1 Shut down/dismantled 67 1 May 1960 29 March 1963 29 August 1997
Blue Castle Project[65] 1 Planned 1,500 (2023) (2028)
2 Planned 1,500 (2023) (2028)
Braidwood 1[66] PWR WH 4-loop (DRY) Operational 1,194 1,270 1 August 1975 29 July 1988
2[67] PWR WH 4-loop (DRY) Operational 1,121 17 October 1988
Browns Ferry 1 BWR BWR-4 (WET) Operational 1,310 20 December 1973
2 BWR BWR-4 (WET) Operational 1,310 2 August 1974
3 BWR BWR-4 (WET) Operational 1,310 18 August 1976
Brunswick 1 BWR BWR-4 (WET) Operational 938 18 March 1977[68]
2 BWR BWR-4 (WET) Operational 920 3 November 1975[69]
Byron 1 PWR WH 4-loop (DRY) Operational 1,168 16 September 1985
2 PWR WH 4-loop (DRY) Operational 1,168 2 August 1987
Callaway 1 PWR WH 4-loop (DRY) Operational 1,300 19 December 1984
Calvert Cliffs 1 PWR CE 2-loop (DRY) Operational 873 1975
2 PWR CE 2-loop (DRY) Operational 863 1977
Catawba 1 PWR WH 4-loop (ICECOND.) Operational 1,129 29 June 1985
2 PWR WH 4-loop (ICECOND.) Operational 1,129 19 August 1986
Clinton 1 BWR BWR-6 (WET) Operational 1,043 24 April 1987
Columbia 1 BWR BWR-5 (WET) Operational 1,170 13 December 1984
Comanche Peak 1 PWR WH 4-loop (DRY) Operational 1,084 17 April 1990
2 PWR WH 4-loop (DRY) Operational 1,124 6 April 1993
Connecticut Yankee 1 PWR WH DRY Shut down/dismantled 582 1968 2004
Cooper 1 BWR BWR-4 (WET) Operational 770 1 July 1974
Crystal River 3 1 B & W (DRY) Shut down 860 13 March 1977 5 February 2013
Davis-Besse 1 PWR B & W (DRY) Operational 965 31 July 1978
Diablo Canyon 1 PWR WH DRY Operational 1,122 7 May 1985
2 WH PWR DRY Operational 1,118 13 March 1986
Donald C. Cook 1 PWR WH (ICECOND.) Operational 1,020 27 August 1975
2 PWR WH (ICECOND.) Operational 1,090 1 July 1978
Dresden 1 BWR BWR-1 Shut down 210 1960 1978
2 BWR BWR-3 (WET) Operational 867 9 June 1970
3 BWR BWR-3 (WET) Operational 867 16 November 1971
Duane Arnold 1 BWR BWR-4 (WET) Operational 581 20 February 1975
Edwin I. Hatch 1 BWR BWR-4 (WET) Operational 924 31 December 1975
2 BWR BWR-4 (WET) Operational 924 5 September 1979
Elk River 1 BWR Shut down/dismantled 22 1 July 1964 1 February 1968
Fermi 1 FBR Prototype Shut down 69 1957 22 September 1972
2 BWR BWR-4 (WET) Operational 1,098 23 January 1988
Fort Calhoun 1 PWR CE 2-loop (WET) Shut down 476 9 August 1973 24 October 2016
Fort St. Vrain 1 Shut down 330 1 July 1979 29 August 1989
Ginna 1 PWR WH 2-loop (DRY) Operational 610 1 June 1970
Grand Gulf 1 BWR BWR-6 (WET) Operational 1,500 1 July 1985
H. B. Robinson 1 PWR WH 3-loop (DRY) Operational 735 7 March 1971
Hallam 1 Shut down/dismantled 75 1963 1969
Hartsville A1 BWR Unfinished 1,233 1,269 1975 29 August 1984
A2 BWR Unfinished 1,233 1,269 1975 29 August 1984
B1 BWR Unfinished 1,233 1,269 1975 22 March 1983
B2 BWR Unfinished 1,233 1,269 1975 22 March 1983
Hope Creek 1 BWR BWR-4 (WET) Operational 1,059 20 December 1986
Humboldt Bay 1 BWR BWR-1 Shut down/dismantled 63 August 1963 July 1976
Indian Point 1 PWR Shut down 275 1 May 1956 1 October 1962 31 October 1974
2 PWR WH 4-loop (DRY) Shut down 1,032 14 October 1966 1 August 1974 (30 April 2020)[70]
3 PWR WH 4-loop (DRY) Operational 1,051 1 November 1968 30 August 1976 (2021)[70]
James A. FitzPatrick 1 BWR BWR-4 (WET) Operational 838 July 1975
Joseph M. Farley 1 PWR WH (DRY) Operational 900 1 December 1977
2 PWR WH (DRY) Operational 920 30 July 1981
Kewaunee 1 PWR WH 2-loop (DRY) Shut down 556 16 June 1974 7 May 2013
La Crosse 1 BWR BWR-1 Shut down/dismantled 50 7 November 1969 30 April 1987
LaSalle County 1 BWR BWR-5 (WET) Operational 1,200 1 January 1984
2 BWR BWR-5 (WET) Operational 1,200 19 October 1984
Limerick 1 BWR BWR-5 (WET) Operational 1,134 1 February 1986
2 BWR BWR-5 (WET) Operational 1,134 8 January 1990
Maine Yankee 1 PWR WH (DRY) Shut down/dismantled 860 1 October 1968 28 December 1972[71] 1 August 1997[71]
Marble Hill 1 Unfinished 1977 1984
McGuire 1 PWR WH (ICECOND.) Operational 1,100 1 December 1981
2 PWR WH (ICECOND.) Operational 1,100 1 March 1984
Millstone 1 BWR BWR-3 (WET) Shut down 28 December 1970 21 July 1998
2 PWR CE 2-loop (DRY) Operational 882 26 December 1975
3 PWR WH (DRY) Operational 1,155 23 April 1986
Monticello 1 BWR BWR-3 (WET) Operational 647 30 June 1971
N-Reactor 1 Shut down 1964 December 1986
Nine Mile Point 1 BWR BWR-2 (WET) Operational 621 1 December 1969
2 BWR BWR-5 (WET) Operational 1,140 11 March 1988
North Anna 1 PWR WH (DRY) Operational 903 6 June 1978
2 PWR WH (DRY) Operational 972 14 December 1980
North Anna 3 ESBWR WET Planned 1,500
Oconee 1 PWR B & W (DRY) Operational 846 15 July 1973
2 PWR B & W (DRY) Operational 846 9 September 1974
3 PWR B & W (DRY) Operational 846 16 December 1974
Oyster Creek 1 BWR BWR-2 (WET) Shut down 636 15 December 1964 23 December 1969 17 September 2018
Palisades 1 PWR CE 2-loop (DRY) Operational 800 14 March 1967 31 December 1971 (2022)[72]
Palo Verde 1 PWR CE80 2-loop (DRY) Operational 1,447 1986
2 PWR CE80 2-loop (DRY) Operational 1,447 1986
3 PWR CE80 2-loop (DRY) Operational 1,447 1988
Parr 1 PHWR CVTR Shut down/dismantled 17 18 December 1963 10 January 1967
Pathfinder 1 BWR BWR-1 Shut down/dismantled 59 July 1966 October 1967
Peach Bottom 1 GCR Prototype Shut down 1966 1974
2 BWR BWR-4 (WET) Operational 1,382 5 July 1974
3 BWR BWR-4 (WET) Operational 1,382 23 December 1974
Perry 1 BWR BWR-6 (WET) Operational 1,231 18 November 1987
Pilgrim 1 BWR BWR-3 (WET) Shut down 677 711 26 August 1968 9 December 1972 31 May 2019
Piqua 1 Shut down/decommissioned 12.5 1963 1966
Point Beach 1 PWR WH 2-loop (DRY) Operational 510 21 December 1970
2 PWR WH 2-loop (DRY) Operational 516 1 October 1972
Prairie Island 1 PWR WH 2-loop (DRY) Operational 548 16 December 1973
2 PWR WH 2-loop (DRY) Operational 548 21 December 1974
Quad Cities 1 BWR BWR-4 (WET) Operational 912 18 February 1973
2 BWR BWR-4 (WET) Operational 912 10 March 1973
Rancho Seco 1 PWR WH (DRY) Shut down/dismantled 913 17 April 1975 23 October 2009
River Bend 1 BWR BWR-6 (WET) Operational 978 16 June 1986
Salem 1 PWR WH 3-loop (DRY) Operational 1,174 30 June 1977
2 PWR WH 3-loop (DRY) Operational 1,130 31 October 1981
San Onofre 1 PWR WH (DRY) Shut down/dismantled 436 456 1964 1 January 1968 30 November 1992
2 PWR CE (DRY) Shut down 1,172 8 August 1983 7 June 2013
3 PWR CE (DRY) Shut down 1,178 1 April 1984 7 June 2013
Satsop 1 PWR CE (DRY) Unfinished 1,240 1 May 1977
2 PWR CE (DRY) Unfinished 1,240 1 May 1977
Saxton 1 PWR Shut down/dismantled November 1961 May 1972
Seabrook Station 1 PWR WH (DRY) Operational 1,194 15 March 1990
Sequoyah 1 PWR WH 4-Loop (ICECOND.) Operational 1,148 1 July 1981
2 PWR WH 4-Loop (ICECOND.) Operational 1,126 1 June 1982
Shearon Harris A-1 PWR WH 3-Loop (DRY) Operational 900 960 28 January 1978 2 May 1987
A-2 PWR WH 3-Loop Unfinished 900 960
A-3 PWR WH 3-Loop Unfinished 900 960
A-4 PWR WH 3-Loop Unfinished 900 960
B-2 PWR AP1000 Never Built 1117
B-3 PWR AP1000 Never Built 1117
Shippingport 1 PWR WH Shut down/dismantled 60 26 May 1958 December 1989
Shoreham 1 Shut down 820 1 August 1986 1 May 1989
Sodium Reactor Experiment 1 FBR Shut down/dismantled 6.5 12 July 1957 15 February 1964
South Texas 1 PWR WH 4-loop (DRY) Operational 1,250 25 August 1988
2 PWR WH 4-loop (DRY) Operational 1,250 19 June 1989
St. Lucie 1 PWR CE (DRY) Operational 1,002 1 March 1976
2 PWR CE (DRY) Operational 1,002 10 June 1983
Surry 1 PWR WH 3-loop (DRY) Operational 799 22 December 1972
2 PWR WH 3-loop (DRY) Operational 799 1 May 1973
Susquehanna 1 BWR BWR-5 (WET) Operational 1,350 12 November 1982
2 BWR BWR-5 (WET) Operational 1,350 27 June 1984
Three Mile Island 1 PWR B & W (DRY) Shut down 852 18 May 1968 2 September 1974 20 September 2019
2 PWR B & W (DRY) Shut down/Core melt 906 1 November 1969 30 December 1978 1979
Trojan 1 PWR WH (DRY) Shut down/dismantled 1,130 20 May 1976 1992
Turkey Point 1 PWR WH 3-loop (DRY) Operational 900 14 December 1972
2 PWR WH 3-loop (DRY) Operational 900 7 September 1973
3 PWR AP1000 Planned 1000 1135
4 PWR AP1000 Planned 1000 1135
UAMPS (SMR) 1 PWR NuScale Planned 45 50
2 PWR NuScale Planned 45 50
3 PWR NuScale Planned 45 50
4 PWR NuScale Planned 45 50
5 PWR NuScale Planned 45 50
6 PWR NuScale Planned 45 50
7 PWR NuScale Planned 45 50
8 PWR NuScale Planned 45 50
9 PWR NuScale Planned 45 50
10 PWR NuScale Planned 45 50
11 PWR NuScale Planned 45 50
12 PWR NuScale Planned 45 50
Vallecitos 1 BWR BWR-1 Shut down 25 October 1957 December 1963
Vermont Yankee 1 BWR BWR-4 (WET) Shut down 514[73] 30 November 1972 29 December 2014[74]
Virgil C. Summer 1 PWR WH 3-Loop (DRY) Operational 1,000 1 January 1984
2 PWR AP1000 Unfinished 1,117 1,250 9 March 2013 31 July 2017
3 PWR AP1000 Unfinished 1,117 1,250 4 November 2013 31 July 2017
Vogtle 1 PWR WH (DRY) Operational 1,215 1 June 1987
2 PWR WH (DRY) Operational 1,215 20 May 1989
3 PWR AP1000 (DRY) Under construction 1,250 12 March 2013 (2021)[75]
4 PWR AP1000 (DRY) Under construction 1,250 19 November 2013 (2022)[75]
Waterford 1 PWR CE 2-loop (DRY) Operational 1,218 24 September 1985
Watts Bar 1 PWR WH (ICECOND.) Operational 1,121 27 May 1996
2 PWR WH (ICECOND.) Operational 1,165 4 June 2016
Wolf Creek 1 PWR WH (DRY) Operational 1,250 3 September 1985
Yankee Rowe 1 PWR WH (DRY) Shut down/dismantled 185 1956 1960 26 February 1992
Zion 1 PWR WH (DRY) Shut down/decommissioned 1,040 June 1973 13 February 1998
2 PWR WH (DRY) Shut down/decommissioned 1,040 December 1973 13 February 1998

See also

Notes and references

  1. ^ a b "World Nuclear Power Reactors & Uranium Requirements". www.world-nuclear.org. World Nuclear Association. Retrieved 5 May 2020.
  2. ^ "PRIS - Home". pris.iaea.org.
  3. ^ "Nuclear Power in Argentina | Argentinian Nuclear Energy - World Nuclear Association". www.world-nuclear.org. Retrieved 4 August 2019.
  4. ^ "Atucha 3 contract signed". Retrieved 20 August 2015.
  5. ^ "Macri acordó en China que la construcción de Atucha III comenzará en enero". Télam. Retrieved 30 May 2017.
  6. ^ Yulia Kosarenko. "NASA fact sheet". Archived from the original on 8 July 2007. Retrieved 20 August 2015.
  7. ^ https://www.bnamericas.com/en/news/electricpower/the-embalse-nuclear-power-plant-returns-to-service-for-a-new-cycle-of-30-years
  8. ^ "Nuclear Power in Bangladesh - World Nuclear Association". world-nuclear.org. Retrieved 17 July 2018.
  9. ^ "RTBF Info of 21 December 2018". RTBF Info. Retrieved 28 December 2018.
  10. ^ a b "China / Construction Begins Of Two Hualong One Reactors At Changjiang". The Independent Global Nuclear News Agency. Retrieved 28 November 2019.
  11. ^ "Second AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  12. ^ "Fourth Chinese AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 13 January 2019.
  13. ^ "China Nuclear Power | Chinese Nuclear Energy - World Nuclear Association". www.world-nuclear.org. Retrieved 16 July 2018.
  14. ^ a b c "China Nuclear Power | Chinese Nuclear Energy - World Nuclear Association". www.world-nuclear.org. Retrieved 15 June 2018.
  15. ^ "First AP1000 reactor enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  16. ^ "Sanmen 2 AP1000 enters commercial operation - World Nuclear News". www.world-nuclear-news.org. Retrieved 7 November 2018.
  17. ^ "HTR-PM: Making dreams come true - Nuclear Engineering International". www.neimagazine.com. Retrieved 7 May 2019.
  18. ^ "UPDATE 1-China starts construction at 3 nuclear projects". Reuters. Retrieved 26 July 2019.
  19. ^ a b c d "China approves first new nuclear reactors in 3-plus years". Nikkei Asian Review. Retrieved 2 August 2019.
  20. ^ "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale". Capital.fr (in French). 14 December 2018. Retrieved 14 December 2018.
  21. ^ "World's second EPR starts operations". Retrieved 10 September 2019.
  22. ^ "Fourth Tianwan unit enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  23. ^ "Fast nuclear reactor to start construction in Fujian in 2017". 16 August 2015. Archived from the original on 17 August 2015. Retrieved 16 August 2015.
  24. ^ "Yangjiang 5 enters commercial operation". www.world-nuclear-news.org. Retrieved 16 July 2018.
  25. ^ "PRIS - Reactor Details - YANGJIANG-6". pris.iaea.org. Retrieved 7 August 2019.
  26. ^ "Construction starts on first Zhangzhou unit - World Nuclear News". www.world-nuclear-news.org. Retrieved 18 October 2019.
  27. ^ "Egypt says to start building nuclear plant in next two years". 1 July 2018. Retrieved 8 July 2018.
  28. ^ "Olkiluoto 3 nuke delayed yet again, now 12 years behind schedule". Yle Uutiset. 20 December 2019. Retrieved 9 June 2020.
  29. ^ "German reactor permanently shut down". www.world-nuclear-news.org. Retrieved 10 May 2018.
  30. ^ "Germany shuts down Philippsburg 2". www.energycentral.com. Retrieved 8 January 2020.
  31. ^ "Bundesregierung | Kernkraftwerke kommen auf den Prüfstand" (in German). Bundesregierung.de. Archived from the original on 4 May 2011. Retrieved 8 August 2012.
  32. ^ 13. Gesetz zur Änderung des Atomgesetzes
  33. ^ {{|url=http://www.newindianexpress.com/nation/2015/apr/30/Government-Approves-10-Sites-for-New-Nuclear-Power-Projects-749056.html}}
  34. ^ Indian Nuclear Power Program Archived 1 July 2012 at the Wayback Machine
  35. ^ "Annual Report 2018-19 DAE" (PDF). Department of Atomic Energy. Retrieved 13 February 2020.
  36. ^ a b c d e f g h i j k l m n o p https://aris.iaea.org/PDF/IPHWR-220.pdf. {{cite web}}: Missing or empty |title= (help)
  37. ^ a b c d https://aris.iaea.org/PDF/IPHWR-700.pdf. {{cite web}}: Missing or empty |title= (help)
  38. ^ {{|url=http://world-nuclear-news.org/Articles/India-USA-document-their-commitment-to-new-build}}
  39. ^ {{|url=https://www.deccanchronicle.com/nation/current-affairs/220918/andhra-pradesh-to-get-another-nuclear-plant.html%7Ctitle=Andhra Pradesh to get another nuclear plant|date=2018-09-22|work=Deccan Chronicle|access-date=2018-10-01|language=en}}
  40. ^ "Establishment of New Nuclear Power Plants in the Country". PIB. Retrieved 9 December 2013.
  41. ^ "RAPS". NPCIL. Retrieved 14 February 2020.
  42. ^ "Genkai unit 4 supplying power again". www.world-nuclear-news.org. Retrieved 22 June 2018.
  43. ^ a b c d e f g h i "Licensing status for the Japanese nuclear facilities - Japan Nuclear Safety Institute". www.genanshin.jp. Retrieved 15 January 2020.
  44. ^ a b c d e "Nuclear Power Plants in Japan - The Federation of Electric Power Companies of Japan(FEPC)". www.fepc.or.jp. Retrieved 8 May 2018.
  45. ^ "Ohi No.4 reactor restarted- News - NHK WORLD - English". NHK WORLD. Archived from the original on 10 May 2018. Retrieved 10 May 2018.
  46. ^ "Japan clears restart at nuclear reactor closest to epicenter of 2011 quake - Reuters". www.reuters.com. Retrieved 27 November 2019.
  47. ^ "Japan approves extension for reactor similar to Fukushima units that melted down - Reuters". www.reuters.com. Retrieved 29 December 2019.
  48. ^ a b "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North. U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 January 2016. Archived from the original on 9 April 2016. Retrieved 4 April 2016.
  49. ^ "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". rosatom.ru. Retrieved 1 January 2020.
  50. ^ a b c "Nuclear Power in Russia | Russian Nuclear Energy - World Nuclear Association". www.world-nuclear.org. Retrieved 14 May 2018.
  51. ^ "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". www.rosenergoatom.ru. Retrieved 16 April 2019.
  52. ^ "Russia retires Leningrad unit 1". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  53. ^ "PRIS - Reactor Details". pris.iaea.org. Retrieved 8 December 2018.
  54. ^ a b c "Four new npp units will be built in russia". rosatom-europe.com. Retrieved 26 June 2020.
  55. ^ Shut down after a 1977 refuelling incident; decommission in progress since 1979
  56. ^ Tlačová agentúra Slovenskej republiky Archived 20 January 2009 at the Wayback Machine
  57. ^ https://world-nuclear-news.org/Articles/Slovenia-decision-on-second-unit-by-2027-minister
  58. ^ "Second APR-1400 unit starts commercial operation". www.world-nuclear-news.org. Retrieved 3 September 2019.
  59. ^ admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 June 2013 at the Wayback Machine, 25 May 2011
  60. ^ http://voiceofrussia.com/news/2014_04_27/Construction-halted-at-Taiwan-nuclear-plant-after-protests-6641/
  61. ^ "PRIS - Reactor Details". pris.iaea.org. Retrieved 26 January 2019.
  62. ^ "Nuclear Power in the United Kingdom |UK Nuclear Energy - World Nuclear Association". www.world-nuclear.org. Retrieved 14 May 2018.
  63. ^ "PRIS - Reactor Details". pris.iaea.org. Retrieved 24 January 2019.
  64. ^ "PRIS - Reactor Details". www.iaea.org. Retrieved 11 May 2018.
  65. ^ Kern, Penelope (30 October 2007). "Nuclear Plant in Works for Utah; Coal Developer Joins Effort". Energy Prospects West.
  66. ^ "PRIS - Reactor Details". www.iaea.org. Retrieved 11 May 2018.
  67. ^ "PRIS - Reactor Details". www.iaea.org. Retrieved 11 May 2018.
  68. ^ "BRUNSWICK-1". IAEA. Retrieved 14 April 2013.
  69. ^ "BRUNSWICK-2". IAEA. Retrieved 14 April 2013.
  70. ^ a b "Entergy's Indian Point Unit 2 to Shut Down Permanently". Indian Point Energy Center. 29 April 2020. Retrieved 30 April 2020.
  71. ^ a b "MAINE YANKEE". IAEA. Retrieved 14 April 2013.
  72. ^ AP, John Madill/The Herald-Palladium via; File. "Palisades nuclear plant in Michigan to shut down in 2022". Energy News Network. Retrieved 7 December 2019.
  73. ^ "VERMONT YANKEE". IAEA. 13 April 2013. Retrieved 14 April 2013.
  74. ^ StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 December 2014 at the Wayback Machine, 29 December 2014
  75. ^ a b Walton, Rod (9 August 2018). "Vogtle Cost Upgrade Causes Rethinking of $25B Nuclear Plant's Future". Power Engineering.
Reactor lists