North–South and East–West Corridor

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Thomas.W (talk | contribs) at 13:53, 29 October 2016 (Reverted 1 edit by 182.18.177.110 (talk): Rvv (unsourced and unexplained changes of road numbers; see IP's contributions for more of the same).). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

North–South and East–West Corridor
National highways with the north–south (red) and east–west (green) corridors highlighted
Route information
Length7,300 km (4,500 mi)
North–South
Length4,000 km (2,500 mi)
North endSrinagar
Major intersectionsNH 1A, NH 1, NH 2, NH 3, NH 75, NH 26, NH 7, NH 47
South endKanyakumari
East–west
Length3,300 km (2,100 mi)
East endSilchar
Major intersectionsNH 54, NH 36, NH 37, NH 31, NH 31C, NH 57, NH 28, NH 25, NH 76, NH 14, NH 15, NH 8A, NH 8B
West endPorbandar
Location
CountryIndia
Highway system
NH75: Recently completed 4-lane Gwalior-Jhansi in central India, part of the North-South Corridor highway
NH 7: A section near Kanyakumari, in southern India, of NSEW Corridor highway


The North-South–East-West Corridor (NS-EW) is the largest ongoing highway project in India. It is the second phase of the National Highways Development Project (NHDP), and consists of building 7300 kilometers of four/six lane expressways connecting Srinagar, Kanyakumari, Porbandar and Silchar, at a cost of US$12.317 billion (at 1999 prices). As of 31 March 2015, 6375 of 7142 kilometers project has been completed.[1]

In combination with the Golden Quadrilateral network, and port connectivity highways, the NS-EW Corridor forms a key part of the Indian highway network, connecting many of its important manufacturing, commerce and cultural centers. As of May 2012, India has completed and placed in use some 15,800 kilometers of such 4-lane highways.

The NS–EW project is managed by the National Highways Authority of India under the Ministry of Road Transport and Highways.

Route

Only National Highways are used in the two corridors.

North–South Corridor

This is a 4,000 kilometres (2,500 mi) corridor via NH 1A (SrinagarJalandhar), NH 1 (Jalandhar – Delhi), NH 2 (Delhi–Agra), NH 3 (Agra–Gwalior), NH 75 (Gwalior–Jhansi), NH 26 (Jhansi– Narsinghpur -Lakhnadon), NH 7 (LakhnadonNagpur-Hyderabad-Bengaluru-Madurai-Kanyakumari), NH 544 (SalemCoimbatorePalakkad-Kochi)

East-West Corridor

This is a 3,300 kilometres (2,100 mi) corridor via NH 8B (PorbandarRajkot), NH 8A (Rajkot–Samakhiali), NH 15 (Samakhiali–Radhanpur), NH 14 (Radhanpur–Pindwara), NH 76 (Pindwara – Shivpuri), NH 25 (Shivpuri–Lucknow), NH 28 (Lucknow–Muzaffarpur), NH 57 (Muzaffarpur–Darbhanga- Purnia), NH 31 (Purnia–Galgalia), NH 31C (Galgalia–Bijni), NH 31 (Bijni–Guwahati), NH 37 (Guwahati–Nagaon), NH 36 (Nagaon–Dabaka), NH 54 (Dabaka–Silchar)

Interchange points between the corridors

  • The following is an interchange section
    • Jhansi is the junction of North–South and East–West Corridors.
  • The following stretches are common between the Golden Quadrilateral and the NS-EW Corridors.
  • The following is a Spur Highway of the North–South Corridor

Major cities

North-South Corridor East-West Corridor
(From North to South) (From West to East)

Possible extensions

There is popular demand for the extension of the East West Corridor from Silchar to Moreh via Jiribam and Imphal, and from Nagaon to Stilwell Road via Jorhat, Dibrugarh, Tinsukia and Ledo. These two extensions may increase the cross border trade with South East Asia.

Current status

Segment Total Length Length Completed Under Implementation Length to be Awarded Percent Completed(%) As of (date)
North–South & East–West Corridor 7,142 km (4,438 mi) 6,455 km (4,011 mi) 430 km (270 mi) 257 km (160 mi) 90.38 March 31, 2016 [3]

Gallery

See also

References

External links